    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 196 of 297 • 5. 6. Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • installing or removing transformer links and network fuses • rolling or racking out the protector • phasing the unit • connecting test leads to an energized bus • obtaining transformer and network voltages • test probe usage prior to installing links and network fuses • or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to CL&P and WMECO) • If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service.
  2. Page 197 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 197 of 297 7. 8. 9. 10. 11. 12. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Employee maintenance manual prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary deenergized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retrofilling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Supervision shall ensure the assigned workers have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center. Prepare the vault for entry. a. Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment b. Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. c. Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf.
  3. Page 198 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 198 of 297 Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Socket size 9/16”, 1/2” drive, 6 pt. 0441651 Wrench, Socket, T Handle, 33” long, 9/16” socket 0441646 Wrench, Socket, T Handle, 33” long, 3/4” socket 0441647 Wrench, Socket, T Handle, 33” long, 7/8” socket 0441648 Test Probe 0441607 ETI Relay Programmer 0400188 MPCV Relay Programmer 0445902 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Rolling Out the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors. NOTE: The CMD Network Protector is a dead-front, racked-in device that does not require the handling of energized links and/or fuses. The CMD requires the following procedure for its removal from the housing. 1. 2. 3. Prior to operating the network protector handle, vent the protector cabinet as follows: a) Loosen the enclosure cover bolts on the side opposite from the operating handle in order to vent the protector. Operate the network protector handle while standing to the side of the enclosure or as far away as possible from the front of the enclosure. Leave the handle in the “OPEN” position. Verify that the network protector mechanism is in the open position as follows: a) Inspect the network protector position indicator through the network protector enclosure window. Verify the status flag reads OPEN. CAUTION: If the protector contacts do not open, stop all work and place the network protector in a safe condition and contact your supervisor.
  4. Page 199 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 199 of 297 4. 5. 6. b) Use a clamp or rope style current transformer (CT) around the conductors of each phase, verify that the current on each phase is zero. (Zero current may indicate that the breaker position is open or the network protector fuses or cable limiters are blown.) c) Record the secondary voltages. Lift the extension rails into place. Press the trip lever on the breaker and lift the shutter by hand. (The trip lever must remain pressed in to allow the shutter to be raised.) Inspect the CMD network protector and correct any of the following conditions. Protectors must be racked out for all repairs, except as noted below: NOTE: The following conditions must be made safe before racking out the protector and repaired after the protector is racked out. • • CMD Ratchet Wheel Assembly, Westinghouse Technical Service Bulletin No.930614, Dated June 14, 1993 for units produced after November 1992.(Attachment #1). CMD Auxiliary Switch Stop Retrofit Kit, Westinghouse Technical Service Bulletin No 890105 for units produce from January 1987 to August 1987. (Attachment #2). Figure 1 – The Levering Crank 7. 8. Insert the levering crank (Figure 1) into the Lev-in device and rack the breaker out of the enclosure. Pull the breaker to the edge of the rails (using the handles on the shield) to ensure the anti-tilt pins are under the extension rail keepers. See Figure 2. (This will ensure the breaker does not tilt during maintenance.)
  5. Page 200 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 200 of 297 Anti-Tilt Extension Rail Figure 2 – Breaker on the Edge of the Rails CAUTION: If a capacitor is present, always press the red button down when performing maintenance in order to prevent electric shock. 9. Press the red button if a capacitor is present. This step does not apply to older models that do not utilize the capacitor. NOTE: Convert all DTA actuators to CTD at this time. See Section 1 of the Network Protectors Maintenance Manual for details. 10. Turn the three thumbscrews located toward the top of the shield counterclockwise and lift up so that the shield can be removed. Breaker Mechanical Inspection: 1. 2. 3. 4. 5. 6. 7. 8. Record the counter reading. Check for broken or damaged barriers on breaker and housing. Check for any signs of liquid entry into enclosure, transformer throat, etc. Check for indication of overheating. Check for loose hardware. Check the arc chutes. Look through them to ensure the vents are free and clear. Manually close the breaker with the charge handle. Install a blocking bar over the trip bar to ensure the breaker is not accidentally tripped. See Figure 3.
  6. Page 201 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 201 of 297 Blocking Bar Trip Bar Figure 3 – The Blocking Bar 9. Check the contact pressure using the CMD contact pressure gauge. NOTE: The procedure varies with the size of the network protector. Use the procedure in the following section that applies to the protector on which you are working. Checking Contact Pressure on Large Frame (2500 – 3000A) CMD Protectors 1. Ensure that: • The Breaker is racked out onto rails. • The Capacitor is discharged using the pushbutton. • The Front Shield and Arc Chutes removed. • The Breaker is in the closed position. CAUTION: The Contact Pressure Gauge is NON-INSULATED. 2. Use the bottom edge of the contact pressure gauge as shown below. The gauge is 0.13 thick and 0.19 wide at the bottom. Use the 0.19 side for checking contact adjustment. See Figure 4. • Use the top of the gauge for 1875 Amp protectors. Use the handle for 3000 Amp protectors.
  7. Page 202 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 202 of 297 Figure 4 – The Contact Pressure Gauge 3. Place the contact gauge between the moving head and the side of the cage assembly. See Figure 5. The Contact Gage The Moving Head contact Contact must be parallel to the Edge of the Gauge The Cage Figure 5 – Checking the Contact Adjustment
  8. Page 203 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 203 of 297 4. 5. 6. Use the bottom edge of the gauge to determine if there is a lot of movement between the cage and the moving contact head. Slide the handle side of the gauge to ensure the minimum gap exists. It should fit into the gap without a lot of additional clearance. See Figure 6. • If the gap is too small for the handle side of the gauge, adjust the contacts until the gauge will slide into the gap with interference. Adjust the contacts as necessary NOTE: It is essential that the CMD contact pressure is check and adjusted as necessary to ensure the proper functionality of the protector. 7. 8. 9. Once correct pressure is set, lock down top elastic stop nut using 20 ft/lbs for the large adjusting screw and 15 ft/lbs for the small adjusting screw. Remove the blocking bar. Trip the protector and close it manually to ensure correct pressure is set. Slight adjustment many be needed after closing.) Checking Contact Pressure on Small Frame (1875A) CMD Protectors 1. 2. 3. Ensure that: • The Breaker is racked out onto rails. • The Capacitor is discharged using the pushbutton. • The Front Shield and Arc Chutes removed. • The Breaker is in the closed position. Use the top of the contact gauge and a small mirror to view the contact pressure. • Gauge Part # 3670A81H03 • Contact Mirror # PROTO2373 Locate the gap created by the cage and the main contacts when the breaker is in the open position. See Figure 6. Gap created when breaker is closed The Cage Use a mirror to ensure you are not measuring this gap Contact Gauge tool in correct Figure 6 – Checking Small Frame Protector Contact Pressure
  9. Page 204 of 297

    4. 5. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 204 of 297 Slide the Go side of the gauge to ensure the minimum gap exists. It should fit into the gap without a lot of additional clearance. See Figure 7. • If the gap is too small for the Go gauge, adjust the contacts until the gauge will slide into the gap with interference. Use the No Go side of the gauge to ensure the gap is not too large. See Figure 7. • If the No Go side of the gauge fits into the gap, adjust the contacts to reduce the gap to the point where the No Go gauge no longer fits, but the gap is still large enough for the Go side of the gauge The Go side of the Gauge The No Go side of the Gauge Figure 7 – The Go / No Go Gauge NOTE: It is essential that the CMD contact pressure is check and adjusted as necessary to ensure the proper functionality of the protector. 6. Once correct pressure is set, lock down top elastic stop nut using 20 ft/lbs for the large adjusting screw and 15 ft/lbs for the small adjusting screw. 7. Remove the blocking bar. 8. Trip the protector and close it manually to ensure correct pressure is set. (Slight adjustment many be needed after closing Test Sequence: The following sections are a series of tests defined to ensure proper operation at normal condition and at fault duty. It is important to perform the following tests in this order: 1. Manual Operation Test 2. Mechanical Electrical Testing (Voltage Only Testing) 3. Relay Tests 4. Ground Fault Test (480V Unit Only) Test 1 – Manual Operation Test 1. Exercise the unit at least 5 times – mechanically closing and mechanically tripping the CMD breaker
  10. Page 205 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 205 of 297 Test 2 – Mechanical – Electrical Testing (Voltage Only Testing) Mechanical testing is defined as a “voltage only test” without the use of any network relays (electro-mechanical, solid state or digital). This testing is defined in the IEEE standard for Network Protectors C57.12.44. The basis for this type of testing is the minimum trip and close criteria required. 1. Remove all Network Relays. • The phasing relay position type (CNJ) must be jumpered out with the relay removed. (Points 4 &5 on the relay terminal block). • A CNJ jumper plate may be required to complete the circuit CAUTION: Failure to connect the leads in the correct sequence will cause damage to the Network Protector Test Set. Reminder: Proper PPE must be worn while attaching leads to an energized bus. 2. 3. Connect the Test Set according to the manufacturer’s technical manual and local operating system conditions (phasing). Place a magnet over the Auto button on the JA – JA bracket. See Figure 8 Figure 8 – Magnet Placed Over AUTO Button
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)