Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 200 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 200 of 297 Anti-Tilt Extension Rail Figure 2 – Breaker on the Edge of the Rails CAUTION: If a capacitor is present, always press the red button down when performing maintenance in order to prevent electric shock. 9. Press the red button if a capacitor is present. This step does not apply to older models that do not utilize the capacitor. NOTE: Convert all DTA actuators to CTD at this time. See Section 1 of the Network Protectors Maintenance Manual for details. 10. Turn the three thumbscrews located toward the top of the shield counterclockwise and lift up so that the shield can be removed. Breaker Mechanical Inspection: 1. 2. 3. 4. 5. 6. 7. 8. Record the counter reading. Check for broken or damaged barriers on breaker and housing. Check for any signs of liquid entry into enclosure, transformer throat, etc. Check for indication of overheating. Check for loose hardware. Check the arc chutes. Look through them to ensure the vents are free and clear. Manually close the breaker with the charge handle. Install a blocking bar over the trip bar to ensure the breaker is not accidentally tripped. See Figure 3.Page 201 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 201 of 297 Blocking Bar Trip Bar Figure 3 – The Blocking Bar 9. Check the contact pressure using the CMD contact pressure gauge. NOTE: The procedure varies with the size of the network protector. Use the procedure in the following section that applies to the protector on which you are working. Checking Contact Pressure on Large Frame (2500 – 3000A) CMD Protectors 1. Ensure that: • The Breaker is racked out onto rails. • The Capacitor is discharged using the pushbutton. • The Front Shield and Arc Chutes removed. • The Breaker is in the closed position. CAUTION: The Contact Pressure Gauge is NON-INSULATED. 2. Use the bottom edge of the contact pressure gauge as shown below. The gauge is 0.13 thick and 0.19 wide at the bottom. Use the 0.19 side for checking contact adjustment. See Figure 4. • Use the top of the gauge for 1875 Amp protectors. Use the handle for 3000 Amp protectors.Page 202 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 202 of 297 Figure 4 – The Contact Pressure Gauge 3. Place the contact gauge between the moving head and the side of the cage assembly. See Figure 5. The Contact Gage The Moving Head contact Contact must be parallel to the Edge of the Gauge The Cage Figure 5 – Checking the Contact AdjustmentPage 203 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 203 of 297 4. 5. 6. Use the bottom edge of the gauge to determine if there is a lot of movement between the cage and the moving contact head. Slide the handle side of the gauge to ensure the minimum gap exists. It should fit into the gap without a lot of additional clearance. See Figure 6. • If the gap is too small for the handle side of the gauge, adjust the contacts until the gauge will slide into the gap with interference. Adjust the contacts as necessary NOTE: It is essential that the CMD contact pressure is check and adjusted as necessary to ensure the proper functionality of the protector. 7. 8. 9. Once correct pressure is set, lock down top elastic stop nut using 20 ft/lbs for the large adjusting screw and 15 ft/lbs for the small adjusting screw. Remove the blocking bar. Trip the protector and close it manually to ensure correct pressure is set. Slight adjustment many be needed after closing.) Checking Contact Pressure on Small Frame (1875A) CMD Protectors 1. 2. 3. Ensure that: • The Breaker is racked out onto rails. • The Capacitor is discharged using the pushbutton. • The Front Shield and Arc Chutes removed. • The Breaker is in the closed position. Use the top of the contact gauge and a small mirror to view the contact pressure. • Gauge Part # 3670A81H03 • Contact Mirror # PROTO2373 Locate the gap created by the cage and the main contacts when the breaker is in the open position. See Figure 6. Gap created when breaker is closed The Cage Use a mirror to ensure you are not measuring this gap Contact Gauge tool in correct Figure 6 – Checking Small Frame Protector Contact PressurePage 204 of 297
4. 5. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 204 of 297 Slide the Go side of the gauge to ensure the minimum gap exists. It should fit into the gap without a lot of additional clearance. See Figure 7. • If the gap is too small for the Go gauge, adjust the contacts until the gauge will slide into the gap with interference. Use the No Go side of the gauge to ensure the gap is not too large. See Figure 7. • If the No Go side of the gauge fits into the gap, adjust the contacts to reduce the gap to the point where the No Go gauge no longer fits, but the gap is still large enough for the Go side of the gauge The Go side of the Gauge The No Go side of the Gauge Figure 7 – The Go / No Go Gauge NOTE: It is essential that the CMD contact pressure is check and adjusted as necessary to ensure the proper functionality of the protector. 6. Once correct pressure is set, lock down top elastic stop nut using 20 ft/lbs for the large adjusting screw and 15 ft/lbs for the small adjusting screw. 7. Remove the blocking bar. 8. Trip the protector and close it manually to ensure correct pressure is set. (Slight adjustment many be needed after closing Test Sequence: The following sections are a series of tests defined to ensure proper operation at normal condition and at fault duty. It is important to perform the following tests in this order: 1. Manual Operation Test 2. Mechanical Electrical Testing (Voltage Only Testing) 3. Relay Tests 4. Ground Fault Test (480V Unit Only) Test 1 – Manual Operation Test 1. Exercise the unit at least 5 times – mechanically closing and mechanically tripping the CMD breakerPage 205 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 205 of 297 Test 2 – Mechanical – Electrical Testing (Voltage Only Testing) Mechanical testing is defined as a “voltage only test” without the use of any network relays (electro-mechanical, solid state or digital). This testing is defined in the IEEE standard for Network Protectors C57.12.44. The basis for this type of testing is the minimum trip and close criteria required. 1. Remove all Network Relays. • The phasing relay position type (CNJ) must be jumpered out with the relay removed. (Points 4 &5 on the relay terminal block). • A CNJ jumper plate may be required to complete the circuit CAUTION: Failure to connect the leads in the correct sequence will cause damage to the Network Protector Test Set. Reminder: Proper PPE must be worn while attaching leads to an energized bus. 2. 3. Connect the Test Set according to the manufacturer’s technical manual and local operating system conditions (phasing). Place a magnet over the Auto button on the JA – JA bracket. See Figure 8 Figure 8 – Magnet Placed Over AUTO ButtonPage 206 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 206 of 297 NOTE: The schematic will be needed to ensure the proper wires are completed in the closing circuit. 4. Place the Close jumper accordingly on the secondary disconnects or the fuse block to complete the close circuit. 5. Operate the protector at full voltage to ensure everything is operational. MIN CLOSE TESTING NOTE: The following procedure takes place after the breaker has been operated at full voltage. 1. Apply 73% of the L-L system voltage. See Table 1. The breaker should NOT close at this level. If the breaker closes, the motor control relay will need adjustment via the adjustable resistor. 2. Apply 80% of the L-L system voltage. See Table 1. The breaker should close. MIN TRIP TESTING NOTE: The CMD Protector has two possible testing procedures. Replace all DTA actuators with Capacitive Trip Devices. Table 1 Test Values Test a) Minimum Trip b) Minimum Motor Close Voltage c) No Pickup (Motor Relay) d) Min Pickup (Motor Relay) % 7.5% 73% 73% 80% 125/216V 16.2V or Less 158V or Less 158V or Less 160V – 173V 277/480V 36.0V or Less 350V or Less 350V or Less 354V – 384V Mechanical – Electrical Testing - continued Capacitor Testing 1. Close the protector using full voltage. 2. Turn the test set off. (The set will not be turned back on until this test is completed.) 3. Press the trip button on the test set. 4. Manually charge the protector via the handle. 5. Continue to trip the protector via the push button or jumper a minimum of 3 times. (If the capacitor cannot trip the breaker 3 times, it must be replaced.) Anti-Close Relay Testing The CMD is equipped with a BF2 relay that ensures the breaker opens the close circuit and engages the trip circuit. NOTE: The breaker must be open for this test. 1. 2. 3. Connect the Common & Close leads to the relay terminal block. Connect the Jumper to Common & Trip points on the relay terminal block. Apply rated voltage to the protector. (NOTE: BF2 should pick up.)Page 207 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 207 of 297 4. 5. Press the Close button on the test set. The motor should not operate. Manually start to close the mechanism using the handle until the “W” switch changes states. (NOTE: The Anti-Close coil must pick up) • The Anti-Close assembly should rotate the trip bar on the protector such that the breaker cannot be manually closed. Test 3 – Relay Tests Electro-mechanical Relay 1. 2. 3. 4. Perform the Master Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform the Phasing Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform the Reverse Current Limiting Trip test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a BN relay is installed, perform the Timing test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions • Relay Tests (continued) Solid State / Microprocessor Relays 1. 2. Perform an Overvoltage test and adjust the relay in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform a Reverse Current Trip test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay InstructionsPage 208 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 208 of 297 3. • Network Protector Instructions If a Time Delay is used, perform a Time Delay test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 4 – Ground Fault Test (480V units only) CAUTION: The ground fault protection circuit between the protector and the customer main service is owned and maintained by the customer. Testing the lock out may call for all protectors to trip. An up-to-date drawing must be made available and reviewed to determine those steps which must be taken to prevent tripping of all protectors. Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource owned. It is important to have an up-to-date print of the scheme prior to performing a test. 2) This test is only to be performed on those units equipped with a ground fault system. CMD Re-install Procedure 1. 2. 3. 4. 5. 6. 7. Re-install the arc chutes, front and front shield. Check to ensure the unit opens. Roll the unit back into housing to its installed position. With a CMD wrench, rack the protector back into the enclosure. Apply anti-seize grease to door bolt hardware. Apply gasket preservative to door gasket. Tighten all door bolts. The tank is secure once the 2 jam (stop) nuts touch the tank. Note: Do not use impact tools as this could lead to moving the stop nuts in place for proper sealing and cause premature door gasket damage. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI.Page 209 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 209 of 297 8. 9. Place operating handle in as-found condition. Record the “as-left” counter reading 6.29C - MG8/9 Network Protectors – Major Maintenance CAUTION 1. 2. No modifications to network protectors shall be made, either temporary or permanent, without prior approval of the Distribution Engineering Department. Stop the job, place equipment in a safe condition, and contact Supervision if the process does not proceed as expected, if unusual situations occur during the performance of the process, or any significant problems occur during maintenance activities. Before You Begin Prior to assigning work on network protectors, Supervision shall: 1. The Supervision shall, prior to assigning personnel to perform “Work” on a network protector, ENSURE the person(s) responsible for performing the “Work” is fully qualified in accordance with operating company requirements 2. The Supervision shall, ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western MA only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (Connecticut ONLY) 3. The Supervision shall, ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 4. Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required: • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred)
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026