    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 208 of 297 3. • Network Protector Instructions If a Time Delay is used, perform a Time Delay test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 4 – Ground Fault Test (480V units only) CAUTION: The ground fault protection circuit between the protector and the customer main service is owned and maintained by the customer. Testing the lock out may call for all protectors to trip. An up-to-date drawing must be made available and reviewed to determine those steps which must be taken to prevent tripping of all protectors. Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource owned. It is important to have an up-to-date print of the scheme prior to performing a test. 2) This test is only to be performed on those units equipped with a ground fault system. CMD Re-install Procedure 1. 2. 3. 4. 5. 6. 7. Re-install the arc chutes, front and front shield. Check to ensure the unit opens. Roll the unit back into housing to its installed position. With a CMD wrench, rack the protector back into the enclosure. Apply anti-seize grease to door bolt hardware. Apply gasket preservative to door gasket. Tighten all door bolts. The tank is secure once the 2 jam (stop) nuts touch the tank. Note: Do not use impact tools as this could lead to moving the stop nuts in place for proper sealing and cause premature door gasket damage. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI.
  2. Page 209 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 209 of 297 8. 9. Place operating handle in as-found condition. Record the “as-left” counter reading 6.29C - MG8/9 Network Protectors – Major Maintenance CAUTION 1. 2. No modifications to network protectors shall be made, either temporary or permanent, without prior approval of the Distribution Engineering Department. Stop the job, place equipment in a safe condition, and contact Supervision if the process does not proceed as expected, if unusual situations occur during the performance of the process, or any significant problems occur during maintenance activities. Before You Begin Prior to assigning work on network protectors, Supervision shall: 1. The Supervision shall, prior to assigning personnel to perform “Work” on a network protector, ENSURE the person(s) responsible for performing the “Work” is fully qualified in accordance with operating company requirements 2. The Supervision shall, ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western MA only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (Connecticut ONLY) 3. The Supervision shall, ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 4. Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required: • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred)
  3. Page 210 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 210 of 297 • 5. 6. Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to Connecticut and Western MA). • If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be de-energized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit de-energized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be deenergized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service.
  4. Page 211 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 211 of 297 7. 8. 9. 10. 11. 12. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary deenergized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retrofilling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Supervision shall ensure the assigned workers have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center. Prepare the vault for entry. a. Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment b. Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. c. Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf.
  5. Page 212 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 212 of 297 Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Socket size 9/16”, 1/2” drive, 6 pt. 0441651 Wrench, Socket, T Handle, 33” long, 9/16” socket 0441646 Wrench, Socket, T Handle, 33” long, 3/4” socket 0441647 Wrench, Socket, T Handle, 33” long, 7/8” socket 0441648 Test Probe 0441607 ETI Relay Programmer 0400188 MPCV Relay Programmer 0445902 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Rolling Out and Isolating the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors. NOTE: The MG8/9 Network Protectors are live-front, bolted-in-place devices requiring the handling of energized links and/or fuses. Because of this, it is imperative that they be out on the rails and isolated from the energized bus work of the enclosure before any work or testing is done. The MG8/9 requires the following procedure for its removal from the housing. 1. 2. 3. Prior to operating the network protector handle, vent the protector cabinet as follows: a) Loosen the enclosure cover bolts on the side opposite from the operating handle in order to vent the protector. Operate the network protector handle while standing to the side of the enclosure or as far away as possible from the front of the enclosure. Leave the handle in the “open” position. Verify that the network protector mechanism is in the open position as follows:
  6. Page 213 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 213 of 297 a) Inspect the network protector position indicator through the network protector enclosure window to ensure the Positive indicator reads OPEN. b) Use a clamp or rope style current transformer (CT) around the conductors of each phase, verify that the current on each phase is zero. (Zero current may indicate that the breaker position is open or the network protector fuses or cable limiters are blown.) c) Record the secondary voltages. CAUTION: If the protector contacts do not open, stop all work and place the network protector in a safe condition and contact your supervisor. 4. Ensure that there are adequate clearances between energized parts and the ground and that the top housing and bottom barriers are in place. • Install temporary boards as necessary to provide adequate Clearances. CAUTION: The following steps require the use of a Company-approved insulated wrench and that you use wear the appropriate PPE. 5. For top-connected protectors: • Remove the fuses without disturbing the fuse connecting blocks. See Figure 1. • Remove the fuse connecting blocks and the screws securing the protector unit to the low voltage transformer bushing. See Figure 1. Fuse connecting block Fuse Figure 1 – Fuse Connecting Block and Fuse
  7. Page 214 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 214 of 297 For protectors above 1875 amperes: • Remove the fuses at the top of the protector. • Remove the disconnect links at the bottom of the protector unit. CAUTION: On Network Protectors with the transformer bus on the bottom, remove the transformer links first to allow the removal of the fuse nuts. 6. 7. 8. Store all fuses, fuse nuts, and links on the inside door ledge of the Network Protector. Loosen the 4 bolts that fasten the rollout unit to the housing. Install the rail extensions, ensuring they are locked in place, and move the rollout unit from the housing. Breaker Mechanical Inspection: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Record the counter reading. Check for broken or damaged barriers on breaker and housing. Check for any signs of liquid entry into enclosure, transformer throat, etc. Check for indication of overheating, including discoloration of the bus or barrier boards or greenish brown paraffin like substance in the bottom of the enclosure and area as this may indicate degradation of insulation backboards. Use a drop of oil on all mechanism pins. Inspect and clean the motor housing race. a) Inspect the motor and brushes for wear. b) Check the torque brake for absence of grease or oil and for wear on the drum and shoe surfaces. c) Check the gear reducer oil level. Inspect for loose wiring at control components: • Motor control relay • Resistors • Terminals • Auxiliary switches Check for frayed, cracked, or damaged control wire. Asbestos coated wiring or older wire harness may require an additional dielectric test to determine if it has reached its useful life. See Dielectric Testing. Check for loose hardware. Check the door gasket to ensure it is in good condition. Fuse Inspection: (See Figure 2.) a) For the Y and Z fuses: o Examine the fuse element to ensure that no visible cracks are present in the element and there are no signs of slow melt. b) For the alloy fuses: o Examine the fuse element to ensure that no visible cracks are present in the element and there are no signs of slow melt. o Place the fuse flat on the top surface of the housing door.
  8. Page 215 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 215 of 297 o Ensure that the fuses rock. Discard any alloy fuses that are annealed flat, thus eliminating the required spring action. NOTE: 480Y/277 Voltage units alloy fuses (shown on left) require the extended arc horn and addition barrier to properly clear the phase. Fuses are embossed with the style number that correlates to ampere and curve characteristics. Extended Arc Horns Figure 2 – Fuses 12. 13. 14. Remove and inspect the arc chutes and contacts. CAUTION: Some arc chutes are made from asbestos. Use hazardous material handling procedures for these and do not clean them. Replace them instead. • Arc chutes must be free and clear of any carbon buildup. Clean as necessary. • Inspect contacts for excessive pitting and dress the contacts as necessary. Check the cross bar insulation and ensure that no buildup is on the backboard between the phases. Check for melted paraffin in the bottom of the enclosure which indicates possible deterioration of the backer board. Testing Sequence: The next section is a series of tests defined to ensure proper operation at normal condition and at fault duty. It is important to perform the following tests in this order: Test 1 Manual Breaker Operation Test Test 2 Insulation Resistance Testing (Megger) Test 3 Micro-Ohm Test (Ductor) Test 4 Mechanical Electrical Test (Voltage Only Testing)
  9. Page 216 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 216 of 297 Test 5 Relay Tests Test 6 Ground Fault Test (480V Unit Only) Test 1 – Manual Breaker Test 1. Operate the breaker manually while it is on rails using an external closing prop on the handle. Close and trip the breaker 5 times to verify proper mechanical operation. At least one of these operations should be performed with the protector in the enclosure with the fuses removed. Test 2 – Insulation Resistance Test (Megger) The GE MG8/9 breaker is constructed upon a common insulated back board and requires periodic insulation integrity checks to ensure proper isolation. In addition, the breaker construction relies upon an insulated cross bar on the breaker. This ties all 3 phases together and must be periodically checked to ensure compliance. 1. 2. 3. Remove all potential leads from the breaker bus. Remove A, B, and C Links to isolate the resistance circuit. Using at least a 1,000 VDC Megger, complete the 9-point test outlined in the chart below: An acceptable value is 10 Meg Ohms or greater for a 1 minute time duration. Reading Location Inspection Value Reading Location Inspection Value Reading Location Inspection Value Backboard Insulation Breaker Position OPEN N1 to T1 N2 to T2 N3 to T3 Crossbar Insulation Breaker Position CLOSED N1 to GND N2 to GND N3 to GND Crossbar Insulation Breaker Position CLOSED N1 to N2 N2 to N3 N3 to N1 Test 3 – Micro-Ohm Test (Ductor) Perform an as-found and then after cleaning, a final ductor test. The maximum acceptable value for ductor testing is 25 micro-ohms or less, using a 100 Amp ductor.
  10. Page 217 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 217 of 297 1. 2. With the breaker closed, connect the micro-ohm test leads to the network protector. Test and record the value. • If the contact resistance (micro-ohm reading) is greater than 25 microohms: Open the breaker and clean the contact surface with Scotch Brite. Re-test and record the “as-left” value. Test 4 – Mechanical – Electrical Test (Voltage Only Testing) Mechanical testing is defined as a “voltage only test” without the use of any network relays (electro-mechanical, solid state or digital). This testing is defined in the IEEE standard for Network Protectors C57.12.44. The basis for this type of testing is the minimum trip and close criteria required. 1. 2. Remove all Network Relays. • The phasing relay Terminal Points 1 & 2 (wires No. 6-6A) must be jumped. Connect the Test Set according to the manufacturer’s instruction manual and local system operating conditions (phasing). CAUTION! - Failure to connect the leads in the correct sequence will cause damage to the Network Protector Test Set. Reminder: Proper PPE must be worn while attaching leads to an energized bus. MIN CLOSE TESTING 1. Apply full system voltage to ensure closing operation when the CLOSE button is pressed on the TEST SET. 2. Trip the breaker with the trip lever. 3. Apply 73% of the L-L system voltage. See Table 1. The breaker should NOT close at this level. If the breaker closes, the motor control relay will need adjustment. The Motor Control Relay is located below the mechanism. To make adjustments: a) Remove the steel guard. b) Use 3/8” wrenches to hold the bottom fixed nut and adjust the upper nut. o Compress the spring for a higher value. o Lengthen the spring for a lower value. 4. Apply 80% of the L-L system voltage. See Table 1. The breaker should close.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)