Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 216 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 216 of 297 Test 5 Relay Tests Test 6 Ground Fault Test (480V Unit Only) Test 1 – Manual Breaker Test 1. Operate the breaker manually while it is on rails using an external closing prop on the handle. Close and trip the breaker 5 times to verify proper mechanical operation. At least one of these operations should be performed with the protector in the enclosure with the fuses removed. Test 2 – Insulation Resistance Test (Megger) The GE MG8/9 breaker is constructed upon a common insulated back board and requires periodic insulation integrity checks to ensure proper isolation. In addition, the breaker construction relies upon an insulated cross bar on the breaker. This ties all 3 phases together and must be periodically checked to ensure compliance. 1. 2. 3. Remove all potential leads from the breaker bus. Remove A, B, and C Links to isolate the resistance circuit. Using at least a 1,000 VDC Megger, complete the 9-point test outlined in the chart below: An acceptable value is 10 Meg Ohms or greater for a 1 minute time duration. Reading Location Inspection Value Reading Location Inspection Value Reading Location Inspection Value Backboard Insulation Breaker Position OPEN N1 to T1 N2 to T2 N3 to T3 Crossbar Insulation Breaker Position CLOSED N1 to GND N2 to GND N3 to GND Crossbar Insulation Breaker Position CLOSED N1 to N2 N2 to N3 N3 to N1 Test 3 – Micro-Ohm Test (Ductor) Perform an as-found and then after cleaning, a final ductor test. The maximum acceptable value for ductor testing is 25 micro-ohms or less, using a 100 Amp ductor.Page 217 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 217 of 297 1. 2. With the breaker closed, connect the micro-ohm test leads to the network protector. Test and record the value. • If the contact resistance (micro-ohm reading) is greater than 25 microohms: Open the breaker and clean the contact surface with Scotch Brite. Re-test and record the “as-left” value. Test 4 – Mechanical – Electrical Test (Voltage Only Testing) Mechanical testing is defined as a “voltage only test” without the use of any network relays (electro-mechanical, solid state or digital). This testing is defined in the IEEE standard for Network Protectors C57.12.44. The basis for this type of testing is the minimum trip and close criteria required. 1. 2. Remove all Network Relays. • The phasing relay Terminal Points 1 & 2 (wires No. 6-6A) must be jumped. Connect the Test Set according to the manufacturer’s instruction manual and local system operating conditions (phasing). CAUTION! - Failure to connect the leads in the correct sequence will cause damage to the Network Protector Test Set. Reminder: Proper PPE must be worn while attaching leads to an energized bus. MIN CLOSE TESTING 1. Apply full system voltage to ensure closing operation when the CLOSE button is pressed on the TEST SET. 2. Trip the breaker with the trip lever. 3. Apply 73% of the L-L system voltage. See Table 1. The breaker should NOT close at this level. If the breaker closes, the motor control relay will need adjustment. The Motor Control Relay is located below the mechanism. To make adjustments: a) Remove the steel guard. b) Use 3/8” wrenches to hold the bottom fixed nut and adjust the upper nut. o Compress the spring for a higher value. o Lengthen the spring for a lower value. 4. Apply 80% of the L-L system voltage. See Table 1. The breaker should close.Page 218 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 218 of 297 Table 1 Test Values Test a) Minimum Trip b) Minimum Motor Close Voltage c) No Pickup (Motor Relay) d) Min Pickup (Motor Relay) % 7.5% 73% 73% 80% 125/216V 16.2V or Less 158V or Less 158V or Less 160V – 173V 277/480V 36.0V or Less 350V or Less 350V or Less 354V – 384V Mechanical – Electrical Test (continued) MIN TRIP TESTING 1. 2. With the breaker closed, apply 7.5% of system voltage. See Table 1. Press the TRIP button on the test set. • If the protector does not trip at this level, then a sensitivity adjustment is needed on the shunt trip level assembly. The shunt trip assembly and adjustment screw are located on the upper left side of the mechanism. NOTE: To initially set this device, perform the following: a) Manually close the breaker. b) Adjust this screw upward until the breaker opens. c) Turn the screw back down 1 turn after the opening. d) Tighten the lock nut. e) Re-test the min level to determine if this adjustment fits the trip range. TRIP FREE TEST NOTE: During Trip Free operation, verify that the main contacts do not close. Perform the following at full system voltage. 1. 2. With the breaker open, hold the trip latch and hold the “close” button on the protector test set. After two or three operations, release the trip latch. The protector should close on the next close operation. Test 5 – Relay Tests Electro-Mechanical Relay Tests 1. Perform the Master Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector InstructionsPage 219 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 219 of 297 2. 3. 4. Perform the Phasing Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform the Reverse Current Limiting Trip test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a BN relay is installed, perform the Timing test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 5 - Relay Tests (continued) Solid State / Microprocessor Relays 1. 2. 3. Perform an Overvoltage test and adjust the relay in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform a Reverse Current Trip test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a Time Delay is used, perform a Time Delay test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 6 – Ground Fault Test (480V units only) The ground fault protection circuit between the protector and the customer main service is owned and maintained by the customer. Testing the lock out may call for all protectors to trip. An up-to-date drawing must be made available and reviewed to determine those steps which must be taken to prevent tripping of all protectors.Page 220 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 220 of 297 Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) 2) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource Owned. It is important to have an up-to-date print of the scheme prior to performing a test. This test is only to be performed on those units equipped with a ground fault system. GE MG8/9 Re-install Procedure Reminder: Proper PPE must be worn while performing the following steps. CAUTION: A misaligned operating handle can result in the network protector mechanisms remaining in the “Automatic” position with the network protector operating handle in the “Open” position. 1. Check the operating handle alignment before rolling the protector back into its housing. Ensure the base of the handle is aligned with the slot into which it will fit. See Figure 3. Shaft dog flats fit into this slot in the Operating Handle Gear Shaft Dog Flats Figure 3 – Operating Handle Alignment Before the Protector is Reinstalled 2. Roll the unit back into the housing to its installed position. Proper alignment of the shaft dog is assured when the two flat surfaces of the shaft dog are fully engaged in the slot on the enclosure’s geared operating handle. See Figure 4.Page 221 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 221 of 297 Figure 4 – Operating Handle Properly Aligned 3. 4. With an insulated wrench, tighten the 4 mounting bolts. Using test probes, verify that no shorts exists as follows: • For the “I Frame” style, place one insulated test probe at the breaker fuse mounting position for Phase A and the other probe on the network terminal fuse mounting position for Phase A with the protector breaker in the open position. See Figure 4. • For the “U Frame” style, the transformer bus touches the transformer shunts as the protector is rolled in, thus eliminating the safety probe on the transformer side. Figure 4 – Insulated Test Probe 5. Check the test fuse continuity across the test probes using a light tester, bell tester, or ohmmeter. • If the test fuse has not blown, install the Phase A network fuse using an insulated wrench and wearing the appropriate PPE. • If the test fuse has blown, roll the unit back out and check the protectorPage 222 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 222 of 297 6. 7. 8. 9. 10. 11. 12. • and relays for phase-to-ground fault. Repeat the previous step for testing the additional network phases and for testing the transformer side of the protector at the disconnect link mounting locations. Apply anti-seize grease to the door bolt hardware. Apply gasket preservative to the door gasket. Tighten all door bolts. NOTE: Use of impact tools is not recommended and could lead to moving stop nuts for proper sealing and premature door gasket damage. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI. Place the operating handle in as-found position. Record the as-left counter reading. 6.29D - CM-22 Network Protectors – Major Maintenance CAUTION 1. No modifications to network protectors shall be made, either temporary or permanent, without prior approval of the Distribution Engineering Department. 2. Stop the job, place equipment in a safe condition, and contact Supervision if the process does not proceed as expected, if unusual situations occur during the performance of the process, or any significant problems occur during maintenance activities. Before You Begin Prior to assigning work on network protectors, Supervision shall: 1. 2. The Supervision shall, prior to assigning personnel to perform “Work” on a network protector, ENSURE the person(s) responsible for performing the “Work” is fully qualified in accordance with operating company requirements The Supervision shall, ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing”Page 223 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 223 of 297 • 3. 4. 5. 6. TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western MA only) • TD 955, “Confined Space Requirements” • NU System Employee Safety & Health Handbook • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (Connecticut ONLY) The Supervision shall, ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required: • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to Connecticut and Western MA)Page 224 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 224 of 297 • 7. 8. 9. If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be de-energized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit de-energized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be deenergized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program. o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level. o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage/ corrosion in the network protector or other defect that requires immediate repair to return to service. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary deenergized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro- filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis.Page 225 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 225 of 297 10. 11. 12. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Supervision shall ensure the assigned workers have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center. Prepare the vault for entry. a. Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment b. Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. c. Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Socket size 9/16”, 1/2” drive, 6 pt. 0441651 Wrench, Socket, T Handle, 33” long, 9/16” socket 0441646 Wrench, Socket, T Handle, 33” long, 3/4” socket 0441647 Wrench, Socket, T Handle, 33” long, 7/8” socket 0441648 Test Probe 0441607 ETI Relay Programmer 0400188 MPCV Relay Programmer 0445902 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Rolling Out and Isolating the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026