Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 218 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 218 of 297 Table 1 Test Values Test a) Minimum Trip b) Minimum Motor Close Voltage c) No Pickup (Motor Relay) d) Min Pickup (Motor Relay) % 7.5% 73% 73% 80% 125/216V 16.2V or Less 158V or Less 158V or Less 160V – 173V 277/480V 36.0V or Less 350V or Less 350V or Less 354V – 384V Mechanical – Electrical Test (continued) MIN TRIP TESTING 1. 2. With the breaker closed, apply 7.5% of system voltage. See Table 1. Press the TRIP button on the test set. • If the protector does not trip at this level, then a sensitivity adjustment is needed on the shunt trip level assembly. The shunt trip assembly and adjustment screw are located on the upper left side of the mechanism. NOTE: To initially set this device, perform the following: a) Manually close the breaker. b) Adjust this screw upward until the breaker opens. c) Turn the screw back down 1 turn after the opening. d) Tighten the lock nut. e) Re-test the min level to determine if this adjustment fits the trip range. TRIP FREE TEST NOTE: During Trip Free operation, verify that the main contacts do not close. Perform the following at full system voltage. 1. 2. With the breaker open, hold the trip latch and hold the “close” button on the protector test set. After two or three operations, release the trip latch. The protector should close on the next close operation. Test 5 – Relay Tests Electro-Mechanical Relay Tests 1. Perform the Master Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions
  2. Page 219 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 219 of 297 2. 3. 4. Perform the Phasing Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform the Reverse Current Limiting Trip test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a BN relay is installed, perform the Timing test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 5 - Relay Tests (continued) Solid State / Microprocessor Relays 1. 2. 3. Perform an Overvoltage test and adjust the relay in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform a Reverse Current Trip test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a Time Delay is used, perform a Time Delay test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 6 – Ground Fault Test (480V units only) The ground fault protection circuit between the protector and the customer main service is owned and maintained by the customer. Testing the lock out may call for all protectors to trip. An up-to-date drawing must be made available and reviewed to determine those steps which must be taken to prevent tripping of all protectors.
  3. Page 220 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 220 of 297 Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) 2) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource Owned. It is important to have an up-to-date print of the scheme prior to performing a test. This test is only to be performed on those units equipped with a ground fault system. GE MG8/9 Re-install Procedure Reminder: Proper PPE must be worn while performing the following steps. CAUTION: A misaligned operating handle can result in the network protector mechanisms remaining in the “Automatic” position with the network protector operating handle in the “Open” position. 1. Check the operating handle alignment before rolling the protector back into its housing. Ensure the base of the handle is aligned with the slot into which it will fit. See Figure 3. Shaft dog flats fit into this slot in the Operating Handle Gear Shaft Dog Flats Figure 3 – Operating Handle Alignment Before the Protector is Reinstalled 2. Roll the unit back into the housing to its installed position. Proper alignment of the shaft dog is assured when the two flat surfaces of the shaft dog are fully engaged in the slot on the enclosure’s geared operating handle. See Figure 4.
  4. Page 221 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 221 of 297 Figure 4 – Operating Handle Properly Aligned 3. 4. With an insulated wrench, tighten the 4 mounting bolts. Using test probes, verify that no shorts exists as follows: • For the “I Frame” style, place one insulated test probe at the breaker fuse mounting position for Phase A and the other probe on the network terminal fuse mounting position for Phase A with the protector breaker in the open position. See Figure 4. • For the “U Frame” style, the transformer bus touches the transformer shunts as the protector is rolled in, thus eliminating the safety probe on the transformer side. Figure 4 – Insulated Test Probe 5. Check the test fuse continuity across the test probes using a light tester, bell tester, or ohmmeter. • If the test fuse has not blown, install the Phase A network fuse using an insulated wrench and wearing the appropriate PPE. • If the test fuse has blown, roll the unit back out and check the protector
  5. Page 222 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 222 of 297 6. 7. 8. 9. 10. 11. 12. • and relays for phase-to-ground fault. Repeat the previous step for testing the additional network phases and for testing the transformer side of the protector at the disconnect link mounting locations. Apply anti-seize grease to the door bolt hardware. Apply gasket preservative to the door gasket. Tighten all door bolts. NOTE: Use of impact tools is not recommended and could lead to moving stop nuts for proper sealing and premature door gasket damage. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI. Place the operating handle in as-found position. Record the as-left counter reading. 6.29D - CM-22 Network Protectors – Major Maintenance CAUTION 1. No modifications to network protectors shall be made, either temporary or permanent, without prior approval of the Distribution Engineering Department. 2. Stop the job, place equipment in a safe condition, and contact Supervision if the process does not proceed as expected, if unusual situations occur during the performance of the process, or any significant problems occur during maintenance activities. Before You Begin Prior to assigning work on network protectors, Supervision shall: 1. 2. The Supervision shall, prior to assigning personnel to perform “Work” on a network protector, ENSURE the person(s) responsible for performing the “Work” is fully qualified in accordance with operating company requirements The Supervision shall, ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing”
  6. Page 223 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 223 of 297 • 3. 4. 5. 6. TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western MA only) • TD 955, “Confined Space Requirements” • NU System Employee Safety & Health Handbook • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (Connecticut ONLY) The Supervision shall, ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required: • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to Connecticut and Western MA)
  7. Page 224 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 224 of 297 • 7. 8. 9. If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be de-energized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit de-energized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be deenergized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program. o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level. o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage/ corrosion in the network protector or other defect that requires immediate repair to return to service. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary deenergized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro- filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis.
  8. Page 225 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 225 of 297 10. 11. 12. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Supervision shall ensure the assigned workers have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center. Prepare the vault for entry. a. Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment b. Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. c. Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Socket size 9/16”, 1/2” drive, 6 pt. 0441651 Wrench, Socket, T Handle, 33” long, 9/16” socket 0441646 Wrench, Socket, T Handle, 33” long, 3/4” socket 0441647 Wrench, Socket, T Handle, 33” long, 7/8” socket 0441648 Test Probe 0441607 ETI Relay Programmer 0400188 MPCV Relay Programmer 0445902 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Rolling Out and Isolating the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors.
  9. Page 226 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 226 of 297 NOTE: The CM-22 Network Protector is a live-front, bolted-in-place device requiring the handling of energized links and/or fuses. Because of this, it is imperative that the CM-22 be out on the rails and isolated from the energized bus work of the enclosure before any work or testing is done. The CM-22 requires the following procedure for its removal from the housing. WARNING: CM-22 Aluminum Bus Issue WARNING Small frame (2000 amp and below), submersible Westinghouse, type CM-22 network protectors, containing an aluminum transformer bus may develop a volatile atmosphere within the enclosure if the aluminum transformer bus is exposed to moisture. Network Protectors with the following Shop Order numbers (S.O. #) are suspected to contain Al transformer bus and require the venting prior to operating the handle. This requirement also includes protectors that are found in the open position. In addition, if the nameplate on the network protector is missing or not legible, the network protector shall be treated as if it contains Al bus unless it has been positively identified as containing copper bus. S.O. #’s Year of Manufacture - 1950-1963 30Y, 31Y, 32Y, 33Y, 35Y, 43Y and 44Y, all followed by four digits (Serial numbers starting with the above but followed by three digits are not affected) 13. Prior to operating the network protector handle, determine if the network protector may contain an aluminum bus, as described in the above WARNING. If the protector serial number is within the range of those protectors with aluminum busses, vent the protector cabinet as follows: a) Loosen the enclosure cover bolts on the side opposite from the operating handle, while allowing the bolts to remain engaged. Allow for a gap of 1/8” to ¼”. b) Wait for a minimum of two minutes to allow the enclosure to vent. c) Retighten all of the enclosure cover bolts.
  10. Page 227 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 227 of 297 14. 15. Operate the network protector handle while standing to the side of the enclosure or as far away as possible from the front of the enclosure. Leave the handle in the “open” position. Verify that the network protector mechanism is in the open position as follows: a) Inspect the network protector position indicator through the network protector enclosure window. b) Use a clamp or rope style circuit tester (CT) around the conductors of each phase, measure and record the current on each phase of the network protector secondary cables. (Zero current indicates that the breaker position is open.) c) Open the enclosure door to inspect the right-hand contacts to verify the contacts are open. CAUTION: If the protector contacts do not open, stop all work and place the network protector in a safe condition and contact your supervisor. 16. Check the protector enclosure and transformer throat area for signs of liquids. 17. Ensure that there are adequate clearances between energized parts and the ground or that adequate barriers exist. • Install temporary boards as necessary to provide adequate clearances. 18. Inspect the CM-22 network protector and correct any of the following conditions. Protectors must be racked out for all repairs, except as noted below: NOTE: The following conditions must be made safe before racking out the protector and repaired after the protector is racked out. • 19. 20. 21. 22. CM-22 Right Hand Extension Rail Assembly, Westinghouse Bulletin Dated June 16, 1987. (Attachment #1). The rail assembly should be changed before racking out. • CM-22 Auxiliary Switch Assembly, Westinghouse Technical Service Bulletin No 920519. Replacement required if black-filled polycarbonate is cracked or damaged. (Attachment #2). • Old Style CM-22 BN Plate replacement. BN Plates manufactured from brown or black phenolic material shall be replaced with BN plates manufactured of Glass Polyester material (Red material). Remove the disconnect links at the bottom of the rollout unit, using an insulated wrench and wearing appropriate PPE. Remove the fuse, using a Company-approved insulated socket wrench in good condition and wearing appropriate PPE. Store all fuses, fuse nuts, and links on the inside door ledge of the Network Protector. Loosen the bolts that fasten the rollout unit to the housing. a) Loosen the left hand relay panel bolt and the center mechanism “red” bolt to access the (2) left side bolts. b) Disconnect the ground bolt last. See Figure 1.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)