  1. Page 228 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 228 of 297 23. Once all panel mounting bolts are disengaged, swing the relay panel closed and retighten the mechanism red bolt and the relay panel left-hand hold down bolts. The Grounding Bolt is located in the lower right hand side of the CM-22. Figure 1 – The Grounding Bolt 24. Install the rail extensions, ensuring they are locked in place, and move the rollout unit from the housing. Breaker Mechanical Inspection: 1. 2. 3. 4. Record the counter reading. Check for broken or damaged barriers on breaker and housing. Check for any signs of liquid entry into enclosure, transformer throat, etc. Check for indication of overheating, including discoloration of low barrier boards, or a greenish brown paraffin-like substance at the bottom of the
  2. Page 229 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 229 of 297 enclosure. This may indicate degradation of the insulation back board. Record any findings. 5. Mechanism Roller Test - Ensure that the roller on the mechanism turns freely to ensure proper closure of contacts. Use a light oil to ensure proper lubrication. 6. Use a drop of oil on all mechanism pins. 7. Verify that the mechanism insulation caps are in place. 8. Inspect and clean the motor housing race of the mechanical 2 lead motors only. a) Inspect the motor and brushes for wear. Clean and lubricate these parts as necessary. 9. Inspect for loose wiring at control components: • Motor control relay • Resistors • Terminals • Auxiliary switches 10. Check for frayed, cracked, or damaged control wire. Asbestos coated wiring or older wire harness may require an additional dielectric test to determine if it has reached its useful life. See Dielectric Testing. 11. Check for loose hardware. 12. Inspect the bumper on the back of the movable relay mechanism assembly to ensure it is in place and in good condition. 13. Inspect the air dashpot, if so equipped, and clean and lubricate as necessary. 14. Inspect the auxiliary switches (behind the cover) and motor contacts for excessive contact wear. 15. Fuse Inspection: (See Figure 2.) a) For the Y and Z fuses: o Examine the fuse element to ensure that no visible cracks are present in the element or signs of slow melt. b) For the alloy fuses: o Examine the fuse element to ensure that no visible cracks are present in the element or signs of slow melt. o Place the fuse flat on the top surface of the housing door. o Ensure that the fuses rock. Discard any alloy fuses that are annealed flat, thus eliminating the required spring action. Note: 480Y/277 Voltage units alloy fuses (shown on left) require the extended arc horn and addition barrier to properly clear the phase. Fuses are embossed with the style number that correlates to ampere and curve characteristics.
  3. Page 230 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 230 of 297 Extended Arc Horns Figure 2 – Fuses CAUTION: Some arc chutes are made from asbestos. Use hazardous handling procedures for these. 16. material Remove the arc chutes and inspect the contacts. CAUTION: Do Not clean those arc chutes made from asbestos. Replace them instead. • Arc chutes must be free and clear of any carbon buildup. Clean as necessary. • Suspect contacts require an additional Micro-Ohm test to verify the resistance level. See Micro-Ohm section. 17. Arc Contact Timing Test. See Figures 3 and 4. This test is critical to determine if the linkages are set properly and to ensure the auxiliary trip “a” contact picks up prior to the arcing contact touching. Test leads Figures 3 and 4 – The Arc Contact Timing Test
  4. Page 231 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 231 of 297 18. 19. 20. Check the cross bar insulation and ensure that there is no build up on the backboard between phases. The backboard integrity and cross bar require an Insulation Resistance test, which is described in the Insulation Test section. Check for melted paraffin in bottom of the enclosure which indicates possible deterioration of the backer board. Remaining verification testing will be done with MECHANICAL TESTING and RELAY TESTING. Please see appropriate sections for testing descriptions and the steps required for proper execution. Test Sequence: The following sections are a series of tests defined to ensure proper operation at normal condition and at fault duty. It is important to perform the following tests in this order: Test 1 – Manual Breaker Operation Test Test 2 – Insulation Resistance Test (Megger) Test 3 – Micro-Ohm Test (Ductor) Test 4 – Mechanical Electrical Test (Voltage Only Testing Test 5 – Relay Tests Test 6 – Ground Fault Test (For 480V Units Only) Test 1 – Manual Breaker Operation Test 1. Operate the breaker manually while it is on rails using an external closing prop on the handle. Close and trip the breaker 5 times to verify proper mechanical operation. At least one of these tests should be performed with the protector in its enclosure with the fuses and links removed. Test 2 – Insulation Resistance Test (Megger) The CM-22 breaker is constructed upon a common insulated back board and requires periodic insulation integrity checks to ensure proper isolation. In addition, the breaker construction relies upon an insulated cross bar that ties all 3 phases together and must be periodically checked to ensure compliance. 1. Remove all potential leads from the breaker bus. • The top is the Network side. • The bottom is the Transformer side.
  5. Page 232 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 232 of 297 2. Using at least a 1,000 VDC Megger, complete the 9-point test outlined in the chart below: An acceptable value is 10 Meg Ohms or greater for a 1 minute time duration. Backboard Insulation Breaker Position OPEN Reading Location N1 to T1 N2 to T2 N3 to T3 Inspection Value Reading Location Inspection Value Reading Location Inspection Value Crossbar Insulation Breaker Position CLOSED N1 to GND N2 to GND N3 to GND Crossbar Insulation Breaker Position CLOSED N1 to N2 N2 to N3 N3 to N1 Test 3 – Micro-Ohm Testing (Ductor) Perform an as-found and then after cleaning, a final ductor test. The maximum acceptable value for ductor testing is 25 micro-ohms or less, using a 100 Amp ductor. 1. 2. With the breaker closed, connect the micro-ohm test leads to the network protector. Test and record the value. • If the micro-ohm reading is greater than 25 micro-ohms: Open the breaker and clean the contact surface with Scotch Brite. Re-test and record the “as-left” value. Test 4 – Mechanical – Electrical (Voltage Only) Testing This is a test of minimum acceptable values using 2 phases of the control circuitry. Mechanical testing is defined as a “voltage only test” without the use of any network relays (electro-mechanical, solid state or digital). This testing is defined in the IEEE standard for Network Protectors C57.12.44. The basis for this type of testing is the minimum trip and close criteria required. 1. Remove all Network Relays. • The phasing relay position type (CNJ) must be jumpered out with the relay removed. (Points 4 & 5 on the relay terminal block) • The use of a CNJ jumper plate may be required.
  6. Page 233 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 233 of 297 CAUTION! - Failure to connect the leads in the correct sequence will cause damage to the Network Protector Test Set. Reminder: Proper PPE must be worn while attaching leads to an energized bus. 2. Connect the Test Set according to manufacturer’s instruction manual and local system operating conditions (phasing). MIN CLOSE TESTING 1. 2. 3. 4. Apply full system voltage with the test set to ensure closure when the CLOSE button is pressed on the TEST SET. Trip the breaker with the trip lever (Repeat steps (1) and (2) 5 times at full voltage.) Apply 73% of the L-L system voltage. See Table 1. The breaker should NOT close at this level. If the breaker closes, the motor control relay will need adjustment. • Older NPs contain a “SG” type open contact motor control relay. There is a center screw on the relay for mechanical contact separation and adjustment. Increase the contact gap for more resistance and stop pickup at 73% level • Newer CM-22 designs have an encapsulated motor control relay and use an adjustable resistor on the relay for the same purpose. Apply 80% of the L-L system voltage. The breaker should close. Table 1 Test Values Test a) Minimum Trip b) Minimum Motor Close Voltage c) No Pickup (Motor Relay) % 7.5% 73% 73% 125/216V 16.2V or Less 158V or Less 158V or Less 277/480V 36.0V or Less 350V or Less 350V or Less d) Min Pickup (Motor Relay) 80% 160V – 173V 354V – 384V MIN TRIP TESTING 1. With the breaker closed, apply 7.5% of system voltage (16 Volt (216), 36 Volts (480). 2. Depress the TRIP button on the test set. • If the CM-22 does not trip at this level, then a sensitivity adjustment is needed on the shunt trip level assembly. The adjustment screw is located behind the swing relay panel. See Figure 6. Access to the screw is given by a hole in the bottom red insulation barrier on the swinging door panel. It is best to remove the motor to view the screw. Any adjustment vertically will make the mechanism more sensitive to trip.
  7. Page 234 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 234 of 297 NOTE: To initially set this device, perform the following: a. Manually close the breaker. b. Adjust this screw upward until the breaker opens. c. Turn the screw back down 1 turn after the opening. d. Lock down the top lock nut. e. Re-test the min level to determine if this adjustment fits the trip range. Top Lock Nut Sensitivity Adjustment Screw Figure 6 – Trip Screw Adjustment Test 5 – Relay Tests Electro-mechanical Relay Tests 1. Perform the Master Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions
  8. Page 235 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 235 of 297 2. 3. 4. Perform the Phasing Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform the Reverse Current LimitingTrip test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a BN relay is installed, perform the Timing test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions • Test 5 – Relay Tests (continued) Solid State / Microprocessor Relays 1. 2. 3. Perform an Overvoltage test and adjust the relay in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform a Reverse Current Trip test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a Time Delay is used, perform a Time Delay test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 6 – Ground Fault Test (480V units only) CAUTION: The ground fault protection circuit between the protector and the customer main service is owned and maintained by the customer. Testing the lock out may call for all protectors to trip. An up-to-date drawing must be made available and reviewed to determine those steps which must be taken to prevent tripping of all protectors.
  9. Page 236 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 236 of 297 Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource owned. It is important to have an up-to-date print of the scheme prior to performing a test. 2) This test is only to be performed on those units equipped with a ground fault system. CM-22 Re-install Procedure 1. 2. 3. Roll the unit back into the housing to its installed position. With an insulated wrench, tighten the ground bolt first and then secure other bolts into place. With the protector breaker in tripped position, use test probe (Stock Code 441607) with a 1 amp or 5 amp current limiting fuse (KTK-1 or KTK-5) in accordance with the manufacturer’s instructions to ensure that a short circuit does not exist in the network protector. See Figure 7. Figure 7 – Test Probe Placement 4. 5. 6. 7. 8. Apply anti-seize grease to the door bolt hardware. Check the door gasket to ensure it is still in good condition. Apply gasket preservative to the door gasket. Tighten all door bolts (The tank is secure once the 2 jam (stop) nuts touch tank.) NOTE: Use of impact tools is not recommended and could lead to moving stop nuts for proper sealing and premature door gasket damage.) Check condition of external tank. Check cooling fins to ensure that they are not clogged, missing, or in need of replacement.
  10. Page 237 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 237 of 297 9. 10. 11. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI. Place the operating handle in as-found position. Read and record the as-left counter reading.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)