Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 231 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 231 of 297 18. 19. 20. Check the cross bar insulation and ensure that there is no build up on the backboard between phases. The backboard integrity and cross bar require an Insulation Resistance test, which is described in the Insulation Test section. Check for melted paraffin in bottom of the enclosure which indicates possible deterioration of the backer board. Remaining verification testing will be done with MECHANICAL TESTING and RELAY TESTING. Please see appropriate sections for testing descriptions and the steps required for proper execution. Test Sequence: The following sections are a series of tests defined to ensure proper operation at normal condition and at fault duty. It is important to perform the following tests in this order: Test 1 – Manual Breaker Operation Test Test 2 – Insulation Resistance Test (Megger) Test 3 – Micro-Ohm Test (Ductor) Test 4 – Mechanical Electrical Test (Voltage Only Testing Test 5 – Relay Tests Test 6 – Ground Fault Test (For 480V Units Only) Test 1 – Manual Breaker Operation Test 1. Operate the breaker manually while it is on rails using an external closing prop on the handle. Close and trip the breaker 5 times to verify proper mechanical operation. At least one of these tests should be performed with the protector in its enclosure with the fuses and links removed. Test 2 – Insulation Resistance Test (Megger) The CM-22 breaker is constructed upon a common insulated back board and requires periodic insulation integrity checks to ensure proper isolation. In addition, the breaker construction relies upon an insulated cross bar that ties all 3 phases together and must be periodically checked to ensure compliance. 1. Remove all potential leads from the breaker bus. • The top is the Network side. • The bottom is the Transformer side.Page 232 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 232 of 297 2. Using at least a 1,000 VDC Megger, complete the 9-point test outlined in the chart below: An acceptable value is 10 Meg Ohms or greater for a 1 minute time duration. Backboard Insulation Breaker Position OPEN Reading Location N1 to T1 N2 to T2 N3 to T3 Inspection Value Reading Location Inspection Value Reading Location Inspection Value Crossbar Insulation Breaker Position CLOSED N1 to GND N2 to GND N3 to GND Crossbar Insulation Breaker Position CLOSED N1 to N2 N2 to N3 N3 to N1 Test 3 – Micro-Ohm Testing (Ductor) Perform an as-found and then after cleaning, a final ductor test. The maximum acceptable value for ductor testing is 25 micro-ohms or less, using a 100 Amp ductor. 1. 2. With the breaker closed, connect the micro-ohm test leads to the network protector. Test and record the value. • If the micro-ohm reading is greater than 25 micro-ohms: Open the breaker and clean the contact surface with Scotch Brite. Re-test and record the “as-left” value. Test 4 – Mechanical – Electrical (Voltage Only) Testing This is a test of minimum acceptable values using 2 phases of the control circuitry. Mechanical testing is defined as a “voltage only test” without the use of any network relays (electro-mechanical, solid state or digital). This testing is defined in the IEEE standard for Network Protectors C57.12.44. The basis for this type of testing is the minimum trip and close criteria required. 1. Remove all Network Relays. • The phasing relay position type (CNJ) must be jumpered out with the relay removed. (Points 4 & 5 on the relay terminal block) • The use of a CNJ jumper plate may be required.Page 233 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 233 of 297 CAUTION! - Failure to connect the leads in the correct sequence will cause damage to the Network Protector Test Set. Reminder: Proper PPE must be worn while attaching leads to an energized bus. 2. Connect the Test Set according to manufacturer’s instruction manual and local system operating conditions (phasing). MIN CLOSE TESTING 1. 2. 3. 4. Apply full system voltage with the test set to ensure closure when the CLOSE button is pressed on the TEST SET. Trip the breaker with the trip lever (Repeat steps (1) and (2) 5 times at full voltage.) Apply 73% of the L-L system voltage. See Table 1. The breaker should NOT close at this level. If the breaker closes, the motor control relay will need adjustment. • Older NPs contain a “SG” type open contact motor control relay. There is a center screw on the relay for mechanical contact separation and adjustment. Increase the contact gap for more resistance and stop pickup at 73% level • Newer CM-22 designs have an encapsulated motor control relay and use an adjustable resistor on the relay for the same purpose. Apply 80% of the L-L system voltage. The breaker should close. Table 1 Test Values Test a) Minimum Trip b) Minimum Motor Close Voltage c) No Pickup (Motor Relay) % 7.5% 73% 73% 125/216V 16.2V or Less 158V or Less 158V or Less 277/480V 36.0V or Less 350V or Less 350V or Less d) Min Pickup (Motor Relay) 80% 160V – 173V 354V – 384V MIN TRIP TESTING 1. With the breaker closed, apply 7.5% of system voltage (16 Volt (216), 36 Volts (480). 2. Depress the TRIP button on the test set. • If the CM-22 does not trip at this level, then a sensitivity adjustment is needed on the shunt trip level assembly. The adjustment screw is located behind the swing relay panel. See Figure 6. Access to the screw is given by a hole in the bottom red insulation barrier on the swinging door panel. It is best to remove the motor to view the screw. Any adjustment vertically will make the mechanism more sensitive to trip.Page 234 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 234 of 297 NOTE: To initially set this device, perform the following: a. Manually close the breaker. b. Adjust this screw upward until the breaker opens. c. Turn the screw back down 1 turn after the opening. d. Lock down the top lock nut. e. Re-test the min level to determine if this adjustment fits the trip range. Top Lock Nut Sensitivity Adjustment Screw Figure 6 – Trip Screw Adjustment Test 5 – Relay Tests Electro-mechanical Relay Tests 1. Perform the Master Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector InstructionsPage 235 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 235 of 297 2. 3. 4. Perform the Phasing Relay Overvoltage test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform the Reverse Current LimitingTrip test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a BN relay is installed, perform the Timing test and adjust the relay as necessary in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions • Test 5 – Relay Tests (continued) Solid State / Microprocessor Relays 1. 2. 3. Perform an Overvoltage test and adjust the relay in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Perform a Reverse Current Trip test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions If a Time Delay is used, perform a Time Delay test in accordance with the following documents. Record the As-Found and As-Left values. • Network Protector Test Set Instructions • Relay Instructions • Network Protector Instructions Test 6 – Ground Fault Test (480V units only) CAUTION: The ground fault protection circuit between the protector and the customer main service is owned and maintained by the customer. Testing the lock out may call for all protectors to trip. An up-to-date drawing must be made available and reviewed to determine those steps which must be taken to prevent tripping of all protectors.Page 236 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 236 of 297 Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource owned. It is important to have an up-to-date print of the scheme prior to performing a test. 2) This test is only to be performed on those units equipped with a ground fault system. CM-22 Re-install Procedure 1. 2. 3. Roll the unit back into the housing to its installed position. With an insulated wrench, tighten the ground bolt first and then secure other bolts into place. With the protector breaker in tripped position, use test probe (Stock Code 441607) with a 1 amp or 5 amp current limiting fuse (KTK-1 or KTK-5) in accordance with the manufacturer’s instructions to ensure that a short circuit does not exist in the network protector. See Figure 7. Figure 7 – Test Probe Placement 4. 5. 6. 7. 8. Apply anti-seize grease to the door bolt hardware. Check the door gasket to ensure it is still in good condition. Apply gasket preservative to the door gasket. Tighten all door bolts (The tank is secure once the 2 jam (stop) nuts touch tank.) NOTE: Use of impact tools is not recommended and could lead to moving stop nuts for proper sealing and premature door gasket damage.) Check condition of external tank. Check cooling fins to ensure that they are not clogged, missing, or in need of replacement.Page 237 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 237 of 297 9. 10. 11. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI. Place the operating handle in as-found position. Read and record the as-left counter reading.Page 238 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 238 of 297 APPENDIX 14 APPENDIX NO LONGER USEDPage 239 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 239 of 297 APPENDIX 15 UNDERGROUND SYSTEM – TRANSFORMERSPage 240 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 240 of 297 5.55 Underground Transformers General Description Loads fed from the underground system that are not tied to the network grid are supplied from either single phase transformers, banks of single phase transformers, or three-phase transformer units. These pad-mounted transformers are usually of an underground or submersible type. Transformers that were installed years ago had various types of cable entrances to accommodate the various types of insulated cables that were installed. They could be fed from underground cables or from a riser. The transformers were generally protected on the high voltage side with either external fuses or internal fuses. The system voltages were generally 5kV and below. Many of these transformers have been replaced over the years as 5kV and below systems have been converted to systems ranging from 15kV to 35kV. Single phase transformers installed in these conversion areas and in new underground areas are the standard manhole or vault type transformer. These submersible transformers have internal fuses on the high voltage side and secondary breakers on the low voltage side. Industry standard rubber molded products are used to connect the transformers to insulated primary cables made of newer materials. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. 5.55.1 Inspection and Maintenance Activity Schedules 5.55.1.1 Table 1 – Underground Transformer Maintenance Intervals UNDERGROUND TRANSFORMER All Models Maintenance Schedule PM Task Condition Monitoring Time-Directed Routine Inspection – Energized ▲ N/A A/R or max 15Y Condition-Based Infrared Inspection (Note 1) A/R Correct any defects found during Routine Inspection. A/R Inspect suspect equipment or conditions previously reported 1YR (Note 2) Failure Finding Equipment Failure Reporting System (EFRS) A/R Failure Investigation A/R Scheduling Requirements Perform together with underground system (radial) cable
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026