Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 236 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 236 of 297 Verify trip from lockout and block the close of the protectors on all units having a ground fault scheme. NOTES: 1) The Ground Fault system is typically Customer-owned, and the Lockout is typically Eversource owned. It is important to have an up-to-date print of the scheme prior to performing a test. 2) This test is only to be performed on those units equipped with a ground fault system. CM-22 Re-install Procedure 1. 2. 3. Roll the unit back into the housing to its installed position. With an insulated wrench, tighten the ground bolt first and then secure other bolts into place. With the protector breaker in tripped position, use test probe (Stock Code 441607) with a 1 amp or 5 amp current limiting fuse (KTK-1 or KTK-5) in accordance with the manufacturer’s instructions to ensure that a short circuit does not exist in the network protector. See Figure 7. Figure 7 – Test Probe Placement 4. 5. 6. 7. 8. Apply anti-seize grease to the door bolt hardware. Check the door gasket to ensure it is still in good condition. Apply gasket preservative to the door gasket. Tighten all door bolts (The tank is secure once the 2 jam (stop) nuts touch tank.) NOTE: Use of impact tools is not recommended and could lead to moving stop nuts for proper sealing and premature door gasket damage.) Check condition of external tank. Check cooling fins to ensure that they are not clogged, missing, or in need of replacement.Page 237 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 237 of 297 9. 10. 11. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 30 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI. Place the operating handle in as-found position. Read and record the as-left counter reading.Page 238 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 238 of 297 APPENDIX 14 APPENDIX NO LONGER USEDPage 239 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 239 of 297 APPENDIX 15 UNDERGROUND SYSTEM – TRANSFORMERSPage 240 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 240 of 297 5.55 Underground Transformers General Description Loads fed from the underground system that are not tied to the network grid are supplied from either single phase transformers, banks of single phase transformers, or three-phase transformer units. These pad-mounted transformers are usually of an underground or submersible type. Transformers that were installed years ago had various types of cable entrances to accommodate the various types of insulated cables that were installed. They could be fed from underground cables or from a riser. The transformers were generally protected on the high voltage side with either external fuses or internal fuses. The system voltages were generally 5kV and below. Many of these transformers have been replaced over the years as 5kV and below systems have been converted to systems ranging from 15kV to 35kV. Single phase transformers installed in these conversion areas and in new underground areas are the standard manhole or vault type transformer. These submersible transformers have internal fuses on the high voltage side and secondary breakers on the low voltage side. Industry standard rubber molded products are used to connect the transformers to insulated primary cables made of newer materials. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. 5.55.1 Inspection and Maintenance Activity Schedules 5.55.1.1 Table 1 – Underground Transformer Maintenance Intervals UNDERGROUND TRANSFORMER All Models Maintenance Schedule PM Task Condition Monitoring Time-Directed Routine Inspection – Energized ▲ N/A A/R or max 15Y Condition-Based Infrared Inspection (Note 1) A/R Correct any defects found during Routine Inspection. A/R Inspect suspect equipment or conditions previously reported 1YR (Note 2) Failure Finding Equipment Failure Reporting System (EFRS) A/R Failure Investigation A/R Scheduling Requirements Perform together with underground system (radial) cablePage 241 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 241 of 297 In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection for all models of Underground Transformers is maximum 15Y (or Fifteen years). The abbreviations used for the intervals are: Y = Year, i.e. 1Y = 1 year A/R = As Required NOTE 1 = Infrared surveys are performed on Underground Transformers in accordance with EMP Chapter 5.22 – Infrared Inspections. Refer To EMP Chapter 5.22 – Infrared Inspections for inspection requirements and the interval at which inspections are to be performed. NOTE 2 = Equipment or conditions may exist that require monitoring on a basis more frequent than maximum 15Y Routine Inspection. 5.55.2 Underground Transformer Maintenance Categories TIME-DIRECTED 5.55.2.1 Routine Inspection – Energized ▲ 1. See EMP Instructions 6.55 for detail steps CONDITION-BASED 5.55.2.2 Infrared Inspection – Refer to EMP Chapter 5.22 for inspection requirements and intervals. 5.55.3 Failure Finding - Failures of Underground Transformers shall be documented in the equipment failure reporting system used by your region. A failure report shall be completed for any underground transformer failure and placed in “To Eng” status for review by Distribution Standards. Analysis of underground transformer failures should be performed when deemed necessary by Distribution Standards. 5.55.4 Underground Transformer References: • Electric Utility Line Maintenance Plan • EMP (the Eversource Maintenance Program)Page 242 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 242 of 297 5.55.5 Underground Transformer Maintenance Basis Documentation The maintenance activities and their schedules are based on company past practices, and the subject matter expert who is a Senior Engineer for Distribution Engineering and Design. Requirement Basis Routine Inspection – Energized A/R or Max 15Y interval. Move to a condition/reliability-based inspection. Frequency will depend on previous fault history and/or known environmental conditions. The maximum inspection period will align with other DB inspections and fault indicator replacement. Infrared Inspection Infrared inspection is a proven technique for locating “hot spots” on equipment and connections in order to identify conditions that can be corrected before they become serious problems. 6.55 Underground Transformers Instructions Before You Begin Prior to assigning work in Underground Vaults & Manholes, Supervision shall: 1. 2. 3. 4. Ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western MA only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual Ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR(flame resistant) clothing, as specified in TD 211 Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger,Page 243 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 243 of 297 Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Prepare the vault for entry. a) Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment. b) Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. c) Remove any standing water or debris from the vault in accordance withENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. 5. Equipment Covered by This Section • • Underground Transformers – Dead Front Underground Transformers – Live Front Routine Inspection – Preparation Supervisor, Planner, or Working Foremen (as appropriate) 1. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. Ensure Copies are provided to the crew performing the inspection. 2. Provide equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc. can be verified by the crew performing the inspection. Routine Inspection – Performance Inspection Crew CAUTION Special precautions need to be taken when performing inspections on Live Front transformers. Review the Eversource Employee Safety Manual for specific safety requirements and operating company specific procedures. 1. Check for stray voltage in accordance with EMP 6.62 - Touch Potential. 2. Verify the actual field conditions, i.e., transformer size, etc. using the equipment prints /schematics / circuit maps. 3. Ensure equipment nomenclature, standard signs, cable tags, labels, and status indicators are present and in good condition. Clean as required and replace missing cable ID tags with brass tags. Plastic tags may be used in addition to the brass tags. CAUTION: Before replacing missing tags, BE SURE you have the correct information to put on the tag. Use appropriate procedures and circuit maps / prints for identification.Page 244 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 244 of 297 4. Check the nameplate for presence of PCBs within the equipment. This will be indicated by a blue or green label. Note the presence of PCBs or the absence of a sticker indicating this information. 5. Observe the exterior of the transformer for any other significant defect or abnormal condition that may affect the safe operation of the unit, such as excessive damage /corrosion to the unit or other defect that requires immediate repair. NOTE: Entry into the transformer must be prevented. Any hole from corrosion or other damage must be blocked to prevent intrusion and possible harm to the public. 6. Ensure safety and security equipment (such as brass locks and penta-bolts) are in place and in good working condition. Check for signs of vandalism. NOTE: Any transformer that cannot be locked due to rusted or broken locking hardware must be secured to prevent public entry. If the transformer cannot be secured, replace it immediately. 7. Ensure the transformer includes spare fuses (if practiced by your operating company). 8. For Live front Transformer units, ensure electrical barriers (i.e. baker board) are in place. NOTE: Removal of barriers (i.e. baker board) for the purpose of performing an inspection in the primary compartment shall be done using appropriate PPE in accordance with Safety rules / requirements and operating company specific procedures. 9. Ensure that all grounds, neutral, and drain (or bleed) wire connections, such as primary, secondary, etc. are in place and in good condition. Refer to Underground Standards sections 56 and 58 for grounding requirements. 10. Ensure that primary / secondary equipment such as bushings, insulators, arresters, elbows, elbow arresters, terminators, connectors, cable taps, deadend receptacles are present and in in good condition. Check for signs of arcing, tracking, chipping, stress, etc. for all connections. NOTE: Treat load break elbows (if present) with missing test caps as “live front” until the elbow test caps are replaced according to manufacturer’s recommendations. Tag the transformer as needing repair until the elbow test caps are replaced. New Hampshire personnel should refer to New Hampshire Procedure CO-1004 Load-Break Elbow Procedure. 11. Ensure all fault indicators (as applicable) are in good condition and working. Replace them every fifteen years or as necessary. 12. Ensure all gauges are in good condition and working, if present. These may include those for temperature, oil level, etc.Page 245 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 245 of 297 13. Inspect equipment for signs of oil leaks. 14. Visually check the oil level, if practical. 15. Ensure deflector plates are installed, as required for the specific equipment type (varies by operating company). Deflector plates are shields installed over some submersible transformers. 16. Check for the presence of anodes and the condition of their connections, as applicable for three phase transformers or network protector installation in below grade vaults. See Underground Standards sections 013 and 015-016 for anode requirements.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026