  1. Page 248 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 248 of 297 5.48 Streetlights and Floodlights General Description Streetlight and Floodlight maintenance includes the Time-Directed (preventive) group re-lamping program and Condition-Based maintenance which includes the troubleshooting and repair of lights that have failed. This document provides the intervals for time-directed maintenance for both large and small municipalities. • • The term “Lamp” refers to the bulb that actually illuminates. The term “fixture” refers to streetlights and floodlights. It includes the assembly into which the lamp and photoelectric cell are installed. Facilities/Equipment Streetlights and Floodlights 5.48.1 Inspection and Maintenance Activity Schedules 5.48.1.1 Table 1 – Streetlight Maintenance Intervals Streetlight / Floodlight Maintenance Schedule Interval PM Task Time-Directed Replace lamps (Note 1) 6Y or 5Y Replace lamps – Small Town Note 2 Condition-Based Perform Troubleshooting Based on Malfunction A/R Replace Lamps A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval to perform Troubleshooting is A/R (or As Required). The abbreviations used for the intervals are: NOTE 1: Municipalities with greater than 1000 street lights will be group relamped on a 5 or 6 year cycle (depending on specific operating company requirements. NOTE 2: Municipalities with less than 1000 fixtures will be managed through the repair process unless they reach the peak repair rate described below: • Municipalities with 750 – 1000 street lights will be group relamped when the repair rate reaches 10% (an average of 8.3 repairs per month).
  2. Page 249 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 249 of 297 • Municipalities with 500 – 700 street lights will be group re-lamped when the rate reaches 12% (an average of 7.5 repairs a month). • Municipalities with 250 – 500 street lights will be group re-lamped when the repair rate reaches 14% (an average of 6 repairs a month). • Municipalities with 1 – 250 street lights will be group re-lamped when the repair rate reaches 19% (an average of 4 repairs a month). 5.48.2 Maintenance Categories Time – Directed For Eversource a 5 year cycle is a parameter of the Group Relamping program in accordance with TD 080. Lamps are replaced on a scheduled basis before they fail in order to provide continuous service and eliminate the cost of emergency repairs. Conditioned – Based See TD 863 for details on troubleshooting streetlight problems and the handling of waste materials related to re-lamping. 5.48.3 Failure Finding 1. Report each fixture that has been disconnected at the end of the work day to your Supervisor (district line groups) or to the Street Light Planner (Street Light Mechanics and Re- lampers). 2. Keep a defective fixture at the area work center if it is less than 5 years old; otherwise, discard the fixture in a designated recycling container. Inside of the fixture there is a label with the date code on it. 3. Any failures found during group re-lamping should be recorded on the re-lamping spreadsheet and provided to the Supervisor – Street Light Maintenance or the Street Light Account Executive for follow-up. Refer to TD 080 The responsibility for cost of repair of lighting fixtures varies with each operating company. Documentation specific to each company should be referenced where appropriate. 4. 5.48.4 Reference Documentation • TD 080 – Group Relamping • TD 863 – Pole-top Repair of High Pressure Sodium Luminaires and Flood Lights • DTR 21.061 and 21.433
  3. Page 250 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 250 of 297 5.48.5 Basis Documentation Requirement 5Y or 6Y Relamping Basis A 5Y interval is recommended by the manufacturer (GE) and IESNA (Illuminating Engineering Society of North America), but company experience has shown a 6Y interval provides adequate reliability at a lower cost. A shorter interval is still optional at the discretion of each operating company. Small municipalities (less than 1000 fixtures) relamping guidelines. CT DPUC # 09-12-05, Q-LF-009-HS01 5.48.6 Condition Monitoring N/A 5.52 Metal Streetlight Poles General Description This Inspection and Maintenance procedure pertains to metal streetlight poles owned by Eversource and is intended to insure structural integrity and enhance public safety. In urban areas where electric distribution is underground (direct buried or conduit), a tapered aluminum alloy pole is the current Northeast Utilities standard. Decorative streetlight poles (also aluminum), steel streetlight poles, and concrete bases (poured or precast) and are covered by this procedure. This procedure does not cover the inspection and maintenance of the luminaire or its components (bulbs, photo cells, etc.), as these are covered on TD 863. 5.52.1 Inspection and Maintenance Activity Schedules Table 1 – Maintenance Task and Interval Metal Streetlight Pole Interval Maintenance Schedule Condition Monitoring N/A Time-Directed Routine Inspection 6Y Condition-Based Correct any defects found during Routine Inspection such as loose or missing hardware, rust, exposed wiring, etc. A/R In Table 1, the type of maintenance is listed in the left column and the
  4. Page 251 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 251 of 297 interval required for that type of maintenance is listed in the right column. For example, the interval for a Routine Inspection 6Y (or 6 years). The abbreviations used for the intervals are: N/A = Not Applicable Y = Year, i.e. 2Y = 2 Years 5.52.2 Maintenance Categories and Descriptions See EMP Instruction 6.52 for details on performing the following maintenance activities. Condition Monitoring N/A TIME-DIRECTED 5.52.2.1 Routine Inspections • Pole Inspection • Concrete Base and Anchor Bolt Inspection 5.52.3 Failure Finding Report any findings of failed or degraded materials on the appropriate form. 5.52.4 Metal Streetlight Pole – Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from service technicians, and the subject matter expert, who is an engineer for Distribution Engineering and Design. Requirement Routine Inspection at 6Y Basis The interval has been increased from the previous 5Y interval to a 6Y interval to better coincide the inspection with that of other Underground and Direct Buried system equipment. Manufacturers (Hapco, P&K, Union Metal) do not suggest time intervals, but NU research has found that other utilities are performing inspections on this equipment on a 3Y to 6Y interval.
  5. Page 252 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 252 of 297 APPENDIX 17 UNDERGROUND VAULTS AND MANHOLES
  6. Page 253 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 253 of 297 5.59 Underground Vaults & Manholes General Description This chapter provides the requirements for inspecting and maintaining company-owned underground vaults and manholes that contain company owned equipment in order to ensure they provide a safe working environment for those who enter the facilities, protect the equipment from water or debris that may enter the vault/manhole, and to assure public safety. The underground equipment includes transformers, cables, and switchgear that will be maintained in accordance with the appropriate chapter of the Distribution Maintenance Program. Facilities/Equipment Underground Vaults or Manholes 5.59.1 Inspection and Maintenance Activity Schedules Table 1 – Underground Vaults & Manholes Maintenance Intervals Underground Vaults Maintenance Schedule PM Task Condition Monitoring Time Directed Interval N/A Major Maintenance 10 Years Major Maintenance CL&P Only 5 Years Transmission Level Inspection 5 Years Condition-Based C1 Vaults/Manholes – Major Maintenance (Note 1) 1st Priority C2 Vaults/Manholes – Major Maintenance (Note 1) 2nd Priority C3 Vaults/Manholes – Major Maintenance (Note 1) 3rd Priority C4 Vaults/Manholes – Major Maintenance (Note 1) 4th Priority Routine Inspection (Note 2) A/R Cleaning (Note 3) A/R Correct any defects found during Routine Inspection, if possible. A/R Change Condition Rating of work site. A/R Failure Finding Report defect conditions for underground vaults and manholes. A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for cleaning the vault/manhole is A/R (As Required). The abbreviations used for the intervals are: Y = Year, i.e. 5Y = 5 Years N/A = Not Applicable
  7. Page 254 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 254 of 297 A/R = As Required Note 1: The condition of the vaults will determine their next maintenance interval as follows: • Major defects found during a planned entry inspection may be cause to classify the structure as described below and require it to receive more frequent inspections until repairs can be made. A planned entry is any entry being made to a vault or manhole for the purpose of performing scheduled maintenance on any piece of equipment located within the vault or manhole. Conditions C1 – C4 represent underground vaults and manholes as follows: oC1 –. A Structural Engineer will recommend repair/replacement/reinspection as soon as possible, not to exceed one year. Manhole requires repairs within one year’s time. oC2 – Deterioration Noted. This manhole exhibits structural degradation that is not likely to cause failure within the next year. Review within one year by Structural Engineer to determine recommended repair/replacement/re-inspection schedule. oC3 – Manhole exhibits structural degradation but failure is not likely within the next five years. This structure should be reviewed by a Structural Engineer to recommend re-inspection/repair/replacement schedule. oC4 – Re-inspect at the next planned entry. Note 2: All manholes and vaults will receive an inspection during each planned maintenance entry. Any vaults (both network and non-network) may be inspected more frequently based on their history or maintenance requirements. In no case shall the period between inspections exceed ten years within the Transmission system, Massachusetts or New Hampshire nor exceed 5 Years within the Connecticut Distribution System. Note 3: Manholes and vaults will be cleaned as required based on inspection results. Any manholes or vaults may be cleaned more frequently based on their history or maintenance requirements. 5.59.2 Maintenance Categories NOTE: Use a fiberglass ladder whenever possible to enter or exit the underground facility. TIME-DIRECTED 5.59.2.1 Major Maintenance 1. See EMP Instructions 6.59C for detail steps for Vaults and EMP Instructions 6.59D for detail steps for Manholes. 5.59.2.2 Major Maintenance – Connecticut Distribution ONLY 1. See EMP Instructions 6.59A for detail steps for Vaults and EMP Instructions 6.59B for detail steps for Manholes.
  8. Page 255 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 255 of 297 5.59.2.3 Transmission Level Inspections 1. See EMP Instructions 6.59E for detail steps for Transmission level Vaults and Manholes. CONDITION-BASED Cleaning underground vaults and manholes shall be performed at the frequency required to ensure the safety of those workers who enter the facilities and the protection of the equipment within them. Routine Inspections of vaults and manholes are visual inspections of the structure itself. The structures shall be inspected coincident with the inspection of installed equipment in the vault or manhole. 5.59.2.4 Routine Inspection – As Required 1. See EMP Instructions 6.59C for detail steps for Vaults and EMP 6.59D for detail steps for Manholes. 2. For Connecticut Distribution only, see EMP Instructions 6.59 A for detail steps for Vaults and EMP 6.59B for detail steps for Manholes. 5.59.2.5 Cleaning – As Required 1. See EMP Instructions 6.59 for detail steps. 2. For Connecticut Distribution only, see EMP Instructions 6.59 A for detail steps for Vaults and EMP 6.59B for detail steps for Manholes. 5.59.3 Failure Finding A failure report shall be completed and placed in the appropriate failure tracking system (EFRS, UPER, Cascade, etc.) for review. 5.59.4 References: • Eversource Maintenance Program, Section U6, “Inspection and Maintenance , Subway System-Customer Vaults and Manholes” • Eversource Maintenance Program, Section U4, “Inspection and Maintenance of Subway System Switches” • Eversource Maintenance Program, Section U2, “Inspection and Maintenance , Subway System-Cable” • TD 952 Confined Space Requirements • Eversource Maintenance Program Procedure 5.63 – “Sump Pumps” • Eversource Maintenance Program Procedure 5.54 – “Underground Corrosion” • CO-1004, PSNH Procedure that establishes guidelines for the safe operation of loadbreak elbows during load break, load make switching and phasing of the underground systems at PSNH • TD 921, UG/DB System: Guidelines for Replacement of Suspect Molded Rubber Components • Stancor Operators Manual • Stancor Oil-Minder Maintenance Procedures, Eversource, Transformer Vault Oil Minder System • Eversource Letter to CT-DOT dated December 16, 2006 agreeing to perform structural integrity inspections of specific vaults located within CT-DOT paved roadways. • CT-DOT’s “Traffic Control Patterns for Highway Maintenance Operations” • CT-DOT’s “Manual for Uniform Traffic Control Devices”
  9. Page 256 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 256 of 297 5.59.5 Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from the service technicians and the subject matter expert, who in this case, is a Senior Engineer with Distribution Substation Engineering and Design. Requirement Major Maintenance Major Maintenance CONNECTICUT DISTRIBUTION SYSTEM ONLY Transmission Level Inspection Routine Inspection – As Required Inspection/maintenance of customer owned vaults will be coincident with inspections or maintenance of equipment in the vault or on a 10 year cycle Inspect/maintain the Anodes coincident with other inspections or maintenance of equipment being protected by the anode. Cleaning – As Required Basis To maximize the productivity of our existing inspections and to ensure the vaults and manholes are maintained to support the requirements of the installed equipment, vaults and manholes shall be inspected coincident with equipment maintenance frequencies or every 10 years, whichever occurs first. Due to regulatory issues associated with past performance, Eversource Connecticut Distribution System continues to inspect at a frequency of every 5 years to maximize the productivity of our existing inspections and to ensure the vaults and manholes are maintained to support the requirements of the installed equipment. This inspection will also be performed coincident with equipment maintenance frequencies. The inspection frequency to perform civil structural vault and cable system inspections is 5 years in accordance with the requirements agreed to by Eversource and the CT-DOT and the TMPM. The inspection schedules will be placed and maintained in the computerized maintenance management system (CASCADE), to ensure Transmission Civil Structural and Cable System Vault Inspections are performed. The process supports the requirements identified by the CTDOT, Docket Nos. 217, 272 and 292 Design & Inspection Requirements for Splice Vaults Underground Transmission Line Inspection is performed to determine the condition of the structure and classify it as to severity of required repairs (C1 – C4). To maximize the productivity of our existing inspections and to ensure the customer vaults are maintained to support the requirements of the installed equipment, customer-owned vaults and manholes shall be inspected coincident with the company owned equipment maintenance frequencies or every 10 years, whichever comes first. To maximize the productivity of our existing inspections and ensure the equipment is properly protected from corrosion, inspection of the anodes is planned to be coincident to existing equipment inspections Underground facilities must be kept clean in order to provide a safe working environment for maintenance technicians and to provide a nondestructive and secure environment for the equipment within it. It is known that vaults in
  10. Page 257 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 257 of 297 different locations will vary widely in their needs for cleaning and that a time-based approach cannot be applied as this will cause unneeded maintenance for those locations that do not accumulate debris and allow debris to accumulate in those facilities that are more prone to do so. For these reasons, vaults will be cleaned on a conditional basis. Those vaults that are prone to rapid debris accumulation will be cleaned more frequently than those that are not. To make this work, records must be maintained for all vaults so that a variable cleaning schedule can be developed. Condition Monitoring Not Applicable. 6.59A Underground Vaults Instructions NOTE For Connecticut, this instruction supersedes guidance contained in the following instructions: • EMP 6.49 Under Ground Cables • EMP 6.54 Underground Corrosion • EMP 6.53 Underground Customer Vaults • EMP 6.59 Underground Vaults and Manholes • EMP 6.63 Sump Pumps VAULTS Instructions Before You Begin 1. Prior to assigning work in Vaults, Supervision shall ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed “Spaces” • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual 2. Prior to assigning work in vaults, Supervision shall ensure those performing the work are aware of the following PPE requirements whenever working in vaults: • • • 3. Safety Glasses with side shields EH (Electrical Hazard) rated boots High Voltage gloves FR (flame resistant) clothing, as specified in TD 211 Whenever “Work”, as defined in paragraph 4 of this procedure, is performed in a vault containing a network unit the following PPE is required : • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)