  1. Page 251 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 251 of 297 interval required for that type of maintenance is listed in the right column. For example, the interval for a Routine Inspection 6Y (or 6 years). The abbreviations used for the intervals are: N/A = Not Applicable Y = Year, i.e. 2Y = 2 Years 5.52.2 Maintenance Categories and Descriptions See EMP Instruction 6.52 for details on performing the following maintenance activities. Condition Monitoring N/A TIME-DIRECTED 5.52.2.1 Routine Inspections • Pole Inspection • Concrete Base and Anchor Bolt Inspection 5.52.3 Failure Finding Report any findings of failed or degraded materials on the appropriate form. 5.52.4 Metal Streetlight Pole – Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from service technicians, and the subject matter expert, who is an engineer for Distribution Engineering and Design. Requirement Routine Inspection at 6Y Basis The interval has been increased from the previous 5Y interval to a 6Y interval to better coincide the inspection with that of other Underground and Direct Buried system equipment. Manufacturers (Hapco, P&K, Union Metal) do not suggest time intervals, but NU research has found that other utilities are performing inspections on this equipment on a 3Y to 6Y interval.
  2. Page 252 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 252 of 297 APPENDIX 17 UNDERGROUND VAULTS AND MANHOLES
  3. Page 253 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 253 of 297 5.59 Underground Vaults & Manholes General Description This chapter provides the requirements for inspecting and maintaining company-owned underground vaults and manholes that contain company owned equipment in order to ensure they provide a safe working environment for those who enter the facilities, protect the equipment from water or debris that may enter the vault/manhole, and to assure public safety. The underground equipment includes transformers, cables, and switchgear that will be maintained in accordance with the appropriate chapter of the Distribution Maintenance Program. Facilities/Equipment Underground Vaults or Manholes 5.59.1 Inspection and Maintenance Activity Schedules Table 1 – Underground Vaults & Manholes Maintenance Intervals Underground Vaults Maintenance Schedule PM Task Condition Monitoring Time Directed Interval N/A Major Maintenance 10 Years Major Maintenance CL&P Only 5 Years Transmission Level Inspection 5 Years Condition-Based C1 Vaults/Manholes – Major Maintenance (Note 1) 1st Priority C2 Vaults/Manholes – Major Maintenance (Note 1) 2nd Priority C3 Vaults/Manholes – Major Maintenance (Note 1) 3rd Priority C4 Vaults/Manholes – Major Maintenance (Note 1) 4th Priority Routine Inspection (Note 2) A/R Cleaning (Note 3) A/R Correct any defects found during Routine Inspection, if possible. A/R Change Condition Rating of work site. A/R Failure Finding Report defect conditions for underground vaults and manholes. A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for cleaning the vault/manhole is A/R (As Required). The abbreviations used for the intervals are: Y = Year, i.e. 5Y = 5 Years N/A = Not Applicable
  4. Page 254 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 254 of 297 A/R = As Required Note 1: The condition of the vaults will determine their next maintenance interval as follows: • Major defects found during a planned entry inspection may be cause to classify the structure as described below and require it to receive more frequent inspections until repairs can be made. A planned entry is any entry being made to a vault or manhole for the purpose of performing scheduled maintenance on any piece of equipment located within the vault or manhole. Conditions C1 – C4 represent underground vaults and manholes as follows: oC1 –. A Structural Engineer will recommend repair/replacement/reinspection as soon as possible, not to exceed one year. Manhole requires repairs within one year’s time. oC2 – Deterioration Noted. This manhole exhibits structural degradation that is not likely to cause failure within the next year. Review within one year by Structural Engineer to determine recommended repair/replacement/re-inspection schedule. oC3 – Manhole exhibits structural degradation but failure is not likely within the next five years. This structure should be reviewed by a Structural Engineer to recommend re-inspection/repair/replacement schedule. oC4 – Re-inspect at the next planned entry. Note 2: All manholes and vaults will receive an inspection during each planned maintenance entry. Any vaults (both network and non-network) may be inspected more frequently based on their history or maintenance requirements. In no case shall the period between inspections exceed ten years within the Transmission system, Massachusetts or New Hampshire nor exceed 5 Years within the Connecticut Distribution System. Note 3: Manholes and vaults will be cleaned as required based on inspection results. Any manholes or vaults may be cleaned more frequently based on their history or maintenance requirements. 5.59.2 Maintenance Categories NOTE: Use a fiberglass ladder whenever possible to enter or exit the underground facility. TIME-DIRECTED 5.59.2.1 Major Maintenance 1. See EMP Instructions 6.59C for detail steps for Vaults and EMP Instructions 6.59D for detail steps for Manholes. 5.59.2.2 Major Maintenance – Connecticut Distribution ONLY 1. See EMP Instructions 6.59A for detail steps for Vaults and EMP Instructions 6.59B for detail steps for Manholes.
  5. Page 255 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 255 of 297 5.59.2.3 Transmission Level Inspections 1. See EMP Instructions 6.59E for detail steps for Transmission level Vaults and Manholes. CONDITION-BASED Cleaning underground vaults and manholes shall be performed at the frequency required to ensure the safety of those workers who enter the facilities and the protection of the equipment within them. Routine Inspections of vaults and manholes are visual inspections of the structure itself. The structures shall be inspected coincident with the inspection of installed equipment in the vault or manhole. 5.59.2.4 Routine Inspection – As Required 1. See EMP Instructions 6.59C for detail steps for Vaults and EMP 6.59D for detail steps for Manholes. 2. For Connecticut Distribution only, see EMP Instructions 6.59 A for detail steps for Vaults and EMP 6.59B for detail steps for Manholes. 5.59.2.5 Cleaning – As Required 1. See EMP Instructions 6.59 for detail steps. 2. For Connecticut Distribution only, see EMP Instructions 6.59 A for detail steps for Vaults and EMP 6.59B for detail steps for Manholes. 5.59.3 Failure Finding A failure report shall be completed and placed in the appropriate failure tracking system (EFRS, UPER, Cascade, etc.) for review. 5.59.4 References: • Eversource Maintenance Program, Section U6, “Inspection and Maintenance , Subway System-Customer Vaults and Manholes” • Eversource Maintenance Program, Section U4, “Inspection and Maintenance of Subway System Switches” • Eversource Maintenance Program, Section U2, “Inspection and Maintenance , Subway System-Cable” • TD 952 Confined Space Requirements • Eversource Maintenance Program Procedure 5.63 – “Sump Pumps” • Eversource Maintenance Program Procedure 5.54 – “Underground Corrosion” • CO-1004, PSNH Procedure that establishes guidelines for the safe operation of loadbreak elbows during load break, load make switching and phasing of the underground systems at PSNH • TD 921, UG/DB System: Guidelines for Replacement of Suspect Molded Rubber Components • Stancor Operators Manual • Stancor Oil-Minder Maintenance Procedures, Eversource, Transformer Vault Oil Minder System • Eversource Letter to CT-DOT dated December 16, 2006 agreeing to perform structural integrity inspections of specific vaults located within CT-DOT paved roadways. • CT-DOT’s “Traffic Control Patterns for Highway Maintenance Operations” • CT-DOT’s “Manual for Uniform Traffic Control Devices”
  6. Page 256 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 256 of 297 5.59.5 Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from the service technicians and the subject matter expert, who in this case, is a Senior Engineer with Distribution Substation Engineering and Design. Requirement Major Maintenance Major Maintenance CONNECTICUT DISTRIBUTION SYSTEM ONLY Transmission Level Inspection Routine Inspection – As Required Inspection/maintenance of customer owned vaults will be coincident with inspections or maintenance of equipment in the vault or on a 10 year cycle Inspect/maintain the Anodes coincident with other inspections or maintenance of equipment being protected by the anode. Cleaning – As Required Basis To maximize the productivity of our existing inspections and to ensure the vaults and manholes are maintained to support the requirements of the installed equipment, vaults and manholes shall be inspected coincident with equipment maintenance frequencies or every 10 years, whichever occurs first. Due to regulatory issues associated with past performance, Eversource Connecticut Distribution System continues to inspect at a frequency of every 5 years to maximize the productivity of our existing inspections and to ensure the vaults and manholes are maintained to support the requirements of the installed equipment. This inspection will also be performed coincident with equipment maintenance frequencies. The inspection frequency to perform civil structural vault and cable system inspections is 5 years in accordance with the requirements agreed to by Eversource and the CT-DOT and the TMPM. The inspection schedules will be placed and maintained in the computerized maintenance management system (CASCADE), to ensure Transmission Civil Structural and Cable System Vault Inspections are performed. The process supports the requirements identified by the CTDOT, Docket Nos. 217, 272 and 292 Design & Inspection Requirements for Splice Vaults Underground Transmission Line Inspection is performed to determine the condition of the structure and classify it as to severity of required repairs (C1 – C4). To maximize the productivity of our existing inspections and to ensure the customer vaults are maintained to support the requirements of the installed equipment, customer-owned vaults and manholes shall be inspected coincident with the company owned equipment maintenance frequencies or every 10 years, whichever comes first. To maximize the productivity of our existing inspections and ensure the equipment is properly protected from corrosion, inspection of the anodes is planned to be coincident to existing equipment inspections Underground facilities must be kept clean in order to provide a safe working environment for maintenance technicians and to provide a nondestructive and secure environment for the equipment within it. It is known that vaults in
  7. Page 257 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 257 of 297 different locations will vary widely in their needs for cleaning and that a time-based approach cannot be applied as this will cause unneeded maintenance for those locations that do not accumulate debris and allow debris to accumulate in those facilities that are more prone to do so. For these reasons, vaults will be cleaned on a conditional basis. Those vaults that are prone to rapid debris accumulation will be cleaned more frequently than those that are not. To make this work, records must be maintained for all vaults so that a variable cleaning schedule can be developed. Condition Monitoring Not Applicable. 6.59A Underground Vaults Instructions NOTE For Connecticut, this instruction supersedes guidance contained in the following instructions: • EMP 6.49 Under Ground Cables • EMP 6.54 Underground Corrosion • EMP 6.53 Underground Customer Vaults • EMP 6.59 Underground Vaults and Manholes • EMP 6.63 Sump Pumps VAULTS Instructions Before You Begin 1. Prior to assigning work in Vaults, Supervision shall ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed “Spaces” • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual 2. Prior to assigning work in vaults, Supervision shall ensure those performing the work are aware of the following PPE requirements whenever working in vaults: • • • 3. Safety Glasses with side shields EH (Electrical Hazard) rated boots High Voltage gloves FR (flame resistant) clothing, as specified in TD 211 Whenever “Work”, as defined in paragraph 4 of this procedure, is performed in a vault containing a network unit the following PPE is required : • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent
  8. Page 258 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 258 of 297 • • 4. Safety glasses with side shields Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) In vaults that contain Network Units, all persons performing “Work”, as defined below, and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • • • • • • • 5. Installing or removing transformer links and network fuses Rolling or racking out the protector Phasing the unit Connecting test leads to an energized bus Obtaining transformer and network voltages Using a test probe prior to installing links and network fuses Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing vaults containing a single network unit to in order to perform work, or to conduct investigations or inspections, the maintenance records for that network unit will be reviewed to determine the condition of that unit. • If the records indicate that a major maintenance was completed within the maintenance cycle in accordance with the Eversource Employee Safety Manual and the unit has no major deficiencies, work may commence in the vault with the unit energized following all applicable company procedures and protocols. • If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle in accordance with the Eversource Employee Safety Manual or if existing major deficiencies have not been addressed, then the primary feed to the unit will be de- energized prior to commencement of maintenance work. The maintenance work in the vault will then take place with the unit de- energized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de- energized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program
  9. Page 259 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 259 of 297 6. 7. 8. 9. o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service. For cases in which multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working in the vault, in which multiple network transformers exist, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle in accordance with the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies exist or if major maintenance was not completed as required by the Eversource Maintenance program, management will jointly work with employees to determine the appropriate steps to follow. Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check vaults prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, and visible oil. If any contaminates are found, provide samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Prepare the vault for entry. a. Check for dangerous atmospheric conditions before entering the manhole using company-approved atmospheric sampling equipment. b. Ventilate the manhole, if required, in accordance with the Eversource Employee Safety Manual. c. Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf.
  10. Page 260 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 260 of 297 d. Any enclosed space that is found to have a potential hazard will be identified with a yellow streamer barrier across the entrance. The identified enclosed space will be inaccessible to personnel for routine work until repairs are made or the hazard made safe so other work can be performed safely in the enclosed space. NOTE: For Connecticut, this instruction supersedes guidance contained in the following instructions: • EMP 6.59 Under Ground Cables • EMP 6.54 Underground Corrosion • EMP 6.53 Underground Customer Vaults • EMP 6.59 Underground Vaults and Manholes • EMP 6.63 Sump Pumps Routine Inspection – Preparation Supervisor, Planner, or Working Foremen (as appropriate) 1. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. Ensure Copies are provided to the crew performing the inspection. 2. Provide equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc can be verified by the crew performing the inspection. Routine Inspection – Performance Crew performing the inspection NOTE It is the company’s expectation that whenever possible, repairs shall be made during the course of the routine inspection. 1. Clear foreign materials from the vault entrance and the vault, as required. 2. Ensure the door sill is properly maintained to contain oil spills, if appropriate. 3. Inspect frames and grating: Check vault frames for signs of snow plow impacts, excessive elevation difference, either above or below grade. Ensure that: • Their corners are either welded or bolted together • They are seated properly in a polymer mortar base that is fastened firmly on top of the wall Check grating for: • Broken hinges or other hardware defects • Broken or cracked welds • Excessive wear to bearing bars (lids and grates) • Broken rivets
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)