Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 261 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 261 of 297 4. Check for objects blocking ventilation. • 5. 6. 7. 8. There must be at least 3 sq. inches of clear opening / kVA as a minimum. (N.E.C. requirement, section 450.45, Paragraph C). If it appears that less than the required amount of ventilation is present, note this condition so the issue can be resolved. Ensure that all access to the vault is properly secured to prevent unauthorized entry. • Check for signs of vandalism. • Ensure safety and security equipment (such as brass locks and pentabolts) are in place and in good working condition. • Replace broken or missing locks and related hardware as necessary. Perform touch potential testing as required and described on section 5.62 of the Eversource Maintenance Program. Check ladders to ensure they are in good condition, if installed. a) Inspect the fixed ladder for damage b) Inspect attachment points c) Inspect hardware for corrosion and adequate securement d) Ensure the ladder is corrosion resistant (NESC) e) Ensure pull-up bars are in good condition and properly secured to the vault/ladder if present Perform a physical inspection of the vault as follows: a) Check pulling eyes for corrosion and condition of hardware b) Inspect the walls and ceiling for any signs of: • Cracking or flaking concrete • Exposed or corroded reinforcing steel • Severely rusted I-Beams • Severely pitted or rusty structural components, etc. • Signs of bowing out c) Check horizontal and vertical concrete beams for corrosion and spalling. d) Check bottom steel beam flanges for fatigue. e) Inspect Beam Pockets to ensure: • Sufficient bearing surface • Beams lay flat in the pocket, with no torsion • Shims, concrete, and bearing surfaces are in good condition • Beams have proper embedment into the pocket f) Inspect the vault for excessive mid-span deflection of walls, floors, lids, and supports. G) Report any serious defects found or suspected in the vault structure to initiate a Civil Engineering inspection.
  2. Page 262 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 262 of 297 9. Use the equipment prints / schematics / circuit maps to verify the actual field conditions, i.e. transformer size, etc. Verify that the structure is correctly located on the U.G. map. CAUTION Use caution when replacing or installing missing tags, especially when identifying cable by duct position and cable size. 10. 11. Ensure standard signs, cable tags, and labels are in place and in good condition. Replace missing or plastic cable ID tags with brass tags. Check Structure Location to street, alley, etc. If the map is incorrect, markup any required changes using a vault diagram as shown in Attachment 2. a. Check Structure concrete features to the Structure drawing on the map. If the map is incorrect, then mark-up the changes. b. Check Primary and Secondary Tags at each structure duct to the duct on map. If the map is incorrect, then mark-up the changes. c. Check all Primary Cutouts, Switches, Transformers, Elbows, Splices, and other primary equipment to the map. If the map is incorrect, mark- up the changes. d. Return the marked-up map to GIS/Mapping, NU EAST, 2nd Floor. NOTE Perform the Infrared (IR) Inspection using an Infrared camera. If an infrared camera is not available, a temperature reading tool, such as the Fluke 63 (SC0435572) may be used to take spot temperature readings of the equipment in place of the IR inspection 12. Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Primary cables and connecting devices include: • PILC Splices • Pre-Molded Splice • Heat Shrink Splices • Cold Shrink Splices • 200 AMP Load Break Elbows • 600 AMP Load Break Elbows Secondary cables and devices to check include: • Mains •Services • Bus Bars •Bus Limiters • Line Limiter • Molded Crabs (both limited and non-limited) • Network Transformer Secondary Connection • Secondary and Service Splices
  3. Page 263 of 297

    13. 14. 15. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 263 of 297 Verify limiters are installed in accordance with standards DTR 84.601, 84.602, or DTR 84.301. Verify the integrity of the secondary (network) grid. Amp each conductor on the secondary mains (preferred) or verify the limiters are not blown. Report secondaries with zero (0) amps. Ensure all fault indicators (as applicable) are in good condition and working. Replace them every ten years or as necessary. Refer to DTR 44.221 – DTR 44.223 16. Ensure status indicators are present and in good condition. Clean or replace as required. 17. Check cable racks to ensure that: •Arms or supports are not corroded •Mounting hardware is in good condition •Cables are properly fastened with insulators 18. Inspect supports (cable, equipment, etc.) for damage and/or tripping hazards. a) Check all mounting hardware to ensure that it is stable and free of corrosion b) Ensure all installed equipment is set properly on its concrete slab/pad. c) Ensure all cables are properly supported and resting on insulators. Report any cables that have shifted from load cycling, traffic vibration, etc. 19. Inspect primary cables splices and terminations for the following abnormal conditions: •Oil leaks, soft spots and insulation swelling •Cracked or corroded lead sheaths •Damaged fireproofing •Poor connections, signs of arcing/tracking •Collapsed or bulged cables •Bulged splices •Physical damage, sharp bends and excessive tension •250S Splices (Note splices for future replacement.) •Ensure that cable neutral, concentric neutral and/or lead sheaths are properly grounded in accordance with standards DTR 78.151, 78.153, & 78.113.
  4. Page 264 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 264 of 297 20. Check duct banks for: •Cracked concrete •Collapsed conduit •Abandoned cable cut •Collapsed header Inspect secondary and service cables for the following: a) Ensure connections are clean and tight b) Check the insulation to ensure it is in good condition c) Ensure neutral connections are made with permanent connection (compression or shear bolt). Neutral connections to the ground bus may be made with bolted connections. d) Verify secondary ring bus or alternate crab design is built in accordance with the standards DTR Section 84. e) Verify secondary neutrals are in good condition and constructed in accordance with the appropriate standard – DTR 843181,84.191,84.195,84.281,84.285,84.291 & 84.381. 22. Ensure that all grounds, neutral, and drain (or bleed) wire connections, such as primary, secondary, etc. are in place and in good condition. Refer to Undergrounds Standards sections 56 and 58 for grounding requirements. 21. a) Ensure the ground bus and connections are in good condition. b) Ensure the ground bus is constructed in accordance with standards DTR 76.451, DTR 76.453, or DTR 76.571, as appropriate. 23. Perform secondary sheath voltage testing as follows (Refer to M4-WP3059): a) Insert 3,000 Ohm Fluke SV225 Stray Voltage Eliminator (or other manufacturer equivalent) into the voltmeter probe ports. b) Insert the test leads in the stray voltage eliminator. c) Attach one meter lead to ground on the vault ground system. d) Attach second lead to the secondary sheath surfaces and test for any leakage (secondary mains, services, bus bars, and molded crabs (both limited and non-limited). e) Verify that voltage values between Vault system ground and sheath/equipment sample points is less than 40 volts. 24. Ensure that primary/secondary equipment, such as bushings, insulators, arresters, elbows, elbow arresters, terminators, connectors, cable taps, dead-end receptacles are in good condition. Check for signs of arcing, tracking, chipping, stress, etc. for all connections. Note the absence of elbow arrestors for possible installation at a later date. Perform inspections of installed underground equipment including transformers, network protectors, network transformers, underground switches and sector cabinets as required in accordance with the appropriate chapter of the Eversource Maintenance Program.
  5. Page 265 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 265 of 297 NOTE: Treat load break elbows (if present) with missing test caps as “live front” until the elbow test caps are replaced in accordance with manufacturer’s recommendations. Tag the transformer as needing repair until the elbow test caps are replaced. 25. Inspect the supports and mounting hardware. Check all mounting hardware to ensure that it is stable and free of corrosion. Ensure that all installed equipment is set properly on its concrete pad/slab. 26. Inspect sumps and drains as follows: a) Check for signs of excessive water entering the facility. b) Check the drains for blockage. c) Check for proper operation of installed oil-water separators, if one is present. d) Clean gravity sumps and check the pumps, if present. 27. Check for the presence of anodes and the condition of their connections (if anodes are installed). Refer to DTR 88.013 and DTRs 88-015 – 88.016. 28. Notify supervision of any safety concerns that require correction. • 29. If Customer-owned facilities supporting Company-owned facilities need repair, notify the appropriate AE (Account Executive) Manager in writing. If the repair requires immediate attention, notify the AE Manager, Operations Manager, or designee verbally within 24 hours. Note any other deficiencies found that requires a correction. • Complete Attachment 1 and forward to Asset Management. NOTE A lack of adequate clear working space shall be reported by the responsible Supervisor to Asset Management for tracking and correction. 30. Ensure adequate clear working space is present. • Vertical dimension shall not be less than 6 feet except in manholes where the manhole opening is within 1 foot, horizontally of the adjacent interior side wall of the manhole. (NESC) • Horizontal dimensions shall not be less than 3 feet, horizontally between cable racks on opposite walls. (Horizontal dimension may be decreased to 30 inches if cables are installed only on one wall.) (NESC) 31. Report any serious defects found or suspected in the vault structure to initiate a Civil Engineering inspection. 32. Inspect the duct shield and install or replace as necessary. 33. Ensure protective bumpers are in place and in good condition, if applicable
  6. Page 266 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 266 of 297 CONDITION-BASED NOTE Civil inspections are performed as required. Major defects found during a routine inspection may be cause to require a civil inspection and to require it to receive more frequent inspections until repairs can be made. Civil Engineering Inspection Civil or Structural Engineer 1. Review the results from the last routine inspection prior to performing Civil Engineering Inspection. 2. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. 3. Obtain equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc. can be verified. 4. Inspect Beam Pockets to ensure that: •There is sufficient bearing surface •Beams lay flat in the pocket, with no torsion •Shims, concrete, and bearing surfaces are in good condition •Beams have proper embedment into the pocket 5. Ensure grate frames and removable slabs are in uniform contact with the top of the support beams. 6. Check pulling eyes for corrosion and the condition of related hardware. 7. Check horizontal and vertical concrete beams for corrosion and spalling. 8. Check bottom steel beam flanges for fatigue. 9. Check duct banks for: •Cracked concrete •Collapsed conduit •Abandoned cable cut •Collapsed header 10. Check walls and ceiling (lids) for: •Cracks •Exposed or corroded rebar 11. •Signs of bowing out Check racks to ensure that: •Arms or supports are not corroded •Mounting hardware is in good condition
  7. Page 267 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 267 of 297 •Cables are properly fastened with insulators 12. Replace sump grates with fiberglass grates, if applicable. 13. Check gravity sumps and the pumps. 14. Check for presence of anodes and the condition of their connections (if anodes are installed). 15. Check the zinc coating on metal surfaces for signs of degradation. 16. Check for signs of excessive water entering the facility. 17. Check ladders to ensure they are in good condition, if installed. Cleaning – As Required Cleaning underground vaults shall be performed at the frequency required to ensure the safety of those workers who enter the facilities and the protection of the equipment within them. 1. Ensure the vault is free from: •Water or other liquids •Salt •Dirt or other debris that could affect equipment operation or maintenance. Failure Finding •A failure report shall be completed and placed in the appropriate failure tracking system (EFRS, UPER, Cascade, etc.) for review. References: •Eversource Maintenance Program, Section U6, “Inspection and Maintenance , Subway System-Customer Vaults and Manholes” •Eversource Maintenance Program, Section U4, “Inspection and Maintenance of Subway System Switches” •Eversource Maintenance Program, Section U2, “Inspection and Maintenance , Subway System-Cable” •M4-WP-3059 Sheath Voltage Testing in Vaults and Manholes •TD 853 Infrared Thermographic Inspections •TD 900. Electric System Nomenclature •TD 921 UG/DB System: Guidelines for Replacement of Suspect Molded Rubber Components •TD952 Confined Space Requirements •DTR 44.221 – 44.223 Fault Indicator Guide, Solid Dielectric Cables •DTR 70-891. Identification of UG Cables •DTR 07-201. Fault Indicators •DTR 76.451 Conduit System – Grounding, Below Grade Manholes and Vaults •DTR 76.453 Grounding Details, Installation in Customer Service Vaults
  8. Page 268 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 268 of 297 •DTR 76.571 Customer Service Vault – 1000 KVA Maximum, Notes for NU Personnel •DTR 78.151 4 CT Cable Splices – Conduit System Grounding •DTR 78.153 3/C Cable Splices – Conduit System Grounding •DTR 78.113 Splicing Instructions – General - Paper & Lead Cables – 5KV thru 30 KV •DTR 84.301 Secondary Network Bus – Phase Connections Customer Vault – 500 KVA Transformer •DTR 84.601 and 84.602 Limiter Guide – Secondary Network Conduit System – 216Y / 125 Volt •DTR 88.013 Corrosion Protection Three-Phase Network/Underground Transformers •DTR 88.015, 016 Corrosion Protection Anode Installation/General Requirements •PR-132. Product Review for Elbow Pullers •PR-133, Product Review – Elbow Pulling Tool. Alternate tool to loosen and remove “stuck” elbows •PR-163, Product Review Alert – Failed Elbow Pulling Hot Stick •M4-SO-3103. Direct Buried Switching. CL&P Unified Switching Practice •Safety Alert 02-2003. Elbow Flashovers •Safety Alert 06-2003. DB Elbow Flash •Distribution Work Practice "Testing of UG Getaways / Cables in Urban Areas". VAULT INSPECTION Workers Aid Guideline EMP 6.59A-1 ITEM # INSPECT INSPECTION ATTRIBUTES 1 Foreign Materials Ensure all foreign materials are cleared from the vault entrance and from the vault, including dirt, salt, etc. 2 Door Sill and Bumpers Ensure the door sill is properly maintained to contain Oil spills, (Customer Vaults ONLY). Ensure protective bumpers are in place and in good condition. Inspect frames for signs of excessive elevation differences, either above or below grade: •Their corners are either welded or bolted together or •They are seated properly in a polymer mortar base that is fastened firmly on top of the wall. 3 Vault frame & Grating Inspect for damages: •Broken hinges; •Damaged or missing locks on grates as required or other hardware defects or •Broken or cracked welds, excessive wear to bearing bars (lids and grates) and broken rivets. 4 Ventilation Ensure openings are not blocked and that there are at least 3 sq. Inches of clear opening / kVA. Remove obstructions from vault as required. 5 Safety & Security Ensure that all access to the vault is properly secured to prevent unauthorized entry. Ensure all safety & security equipment are in place and in good working condition. These include brass locks, penta-bolts, etc. Replace broken or missing hardware as necessary. 6 Touch Potential If stray voltage is detected, perform corrective action or make safe until repairs can be made. Refer to NUMM 5.62 –Touch Potential for additional guidance.
  9. Page 269 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 269 of 297 7 Fixed Ladders •Inspect the fixed ladder for damage. •Inspect attachment points. •Inspect hardware for corrosion and adequate securement. •Ladder shall be corrosion resistant. (NESC) •Ensure pull-up bars are in good condition and properly secured to the vault/ladder if present. 8 Walls And Ceiling Inspect for signs of excessive cracking or flaking concrete, exposed reinforcing steel, rusty I-beams, etc. 9 Verify Maps, Prints, Schematics Verify actual field conditions (i.e. transformer size) against equipment prints, schematics, circuit maps and secondary maps. Is structure correctly located on U.G. map? 10 Signs, Cable Tags, Labels Replace missing or incorrect signs, tags, labels, as required. (NESC) Use caution when replacing or installing missing tags, especially when identifying cable by duct position and cable size NOTE: Brass tags shall be permanently stamped with appropriate information and applied to the cable with #14 awg copper wire, plastic cable ties are not acceptable. Check for heat anomalies on primary and secondary connections and accessories. 11 Infrared Inspection • Primary cables and connecting devices include: • PILC splices, pre-molded splices, heat shrink splices, cold shrink splices, 200 amp load break elbows, 600 amp load break elbows. • Secondary cables and connecting devices include: Mains, services, bus bars, bus limiters, line limiter, molded crabs (limited and non-limited), network transformer secondary connection, secondary and service splices. Refer to EMP 5.22 –Infrared Inspection for additional guidance. 12 Blown / Open Limiters • VERIFY limiters are installed in accordance with standards DTR 84.601, 84.602,& DTR 84.301 as applicable • Inspect, where applicable. Use clamp-on ammeter to verify current in each phase of each conductor. 13 Fault Indicators Ensure they are working and in good condition. Replace every 10 years or as required. Refer to DTR 44.221 – DTR 44.223 14 Equipment Status Indicators Ensure all are present. Clean or replace as required. (Ex. meters, gauges and cathodic protection) 15 Rack Supports • • ITEM # INSPECT 16 Cable Supports/Protection Inspect rack supports (cable, equipment, etc.) for damage or tripping hazards. Inspect racks for damaged or severely corroded hardware. INSPECTION ATTRIBUTES • • • • Ensure primary and secondary cables are installed a minimum of 3 inches above the floor. (NESC) Ensure primary cables are properly supported and resting on insulators. Ensure cable protectors are installed at duct mouth or bell and conduit fittings are installed. (NESC) Ensure cable supports are not damaged and cables are properly supported. Inspect primary cable splices and terminations for the following abnormal conditions: provide details, including circuit number, in the comments section. Refer to DTR 84 • Oil leaks, soft spots and insulation swelling. 18 Duct Banks Check duct banks for: - Cracked concrete - Collapsed conduit - Abandoned cable cut - Collapsed header - Duct shield – ensure it is in place and in good condition.
  10. Page 270 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 270 of 297 19 20 Inspect secondary and service cables to ensure connections are clean and tight and that the insulation is in good condition. Ensure neutral connections are made with permanent connection (compression or Secondary, Neutral, And shear bolt). Neutral connections to the ground bus may be made with bolted Service Cables connections. Verify secondary ring bus or alternate crab design is built in accordance with standards DTR Section 84 Verify secondary neutrals are in good condition and constructed in accordance with the appropriate standard DTR 84.181, 84.191, 84.195, 84.281, 84.285, 84.291, & 84.381. Verify secondary neutrals are properly grounded in each manhole in accordance with standards. DTR 84.181, 84 191 84 195 84 281 84 285 84 291 & 84 381 Ensure that all grounds, neutral, and drain (or bleed) wire connections, such as Grounds, Neutrals, Drain primary, secondary, etc. are in place and in good condition. Wire Connections 21 Ground Bus 22 Secondary Sheath Voltage Testing 23 Primary/Secondary Equipment 24 Supports & Mounting Hardware 25 Sumps &Drains 26 Cathodic Protection 27 Safety Concerns ITEM # INSPECT 28 Deficiencies (Other) Ensure ground bus is constructed in accordance with standards DTR 76.451, DTR 76.453, DTR 76.571 or DTR 76.451 as appropriate Ensure ground bus and connections are in good condition. Verify that voltage values between vault system ground and sheath/equipment sample points is less than 40 volts. Refer to M4-WP-3059 • Ensure that primary/secondary equipment, are in good condition. Check for signs of arcing, tracking, chipping, stress, etc. for all connections. • Note the absence of elbow arrestors that should be installed. • • Check all mounting hardware to ensure that it is stable and free of corrosion. Ensure all installed equipment is set properly on its concrete slab/pad. • Ensure drains, if present, are cleared of any blockages. • Ensure drains, if present, have functional traps. (NESC) • Check proper operation of installed oil-water separators, if one is present. • Ensure sump pump, if present, is working and installed in accordance with standards DTR 76.111 through Check anodes if installed Refer to DTR 88.013 – 88.016 Notify supervision of safety concerns that require correction INSPECTION ATTRIBUTES Note any other deficiencies found that require correction Corrective work orders NOT required 29 Clearing Work Space • • Horizontal dimensions shall not be less than 3 feet horizontally between cable racks on opposite walls. (Horizontal dimension may be decreased to 30 inches if cables are installed on only one wall.) (NESC) Vertical dimension shall not be less than 6 feet except in manholes where the manhole opening is within 1 foot , horizontally of the adjacent interior side wall of the manhole (NESC)
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)