Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 276 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 276 of 297 or transformer, such as: free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service 6. For cases in which multiple network transformers exist in a manhole, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working in the manhole in which multiple network transformers exist, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle in accordance with the Eversource Maintenance Program prior to working in the manhole. • If records indicate that major maintenance for all transformers within the manhole is up-to-date, and that there are no major deficiencies, then work may proceed. If existing major deficiencies were not corrected or if major maintenance was not completed within the required schedule, management will jointly work with employees to determine the appropriate steps to follow. • 7. Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, and visible oil. If any contaminates are found, provide samples for lab analysis. 8. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. 9. Prepare the manhole for entry. a) Check for dangerous atmospheric conditions before entering the manhole using company-approved atmospheric sampling equipment. b) Ventilate the manhole, if required, in accordance with the Eversource Employee Safety Manual. c) Remove any standing water or debris from the manhole in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Any enclosed space that is found to have a potential hazard will be identified with a yellow streamer barrier across the entrance. The identified enclosed space will be inaccessible to personnel for routine work until repairs are made or the hazard made safe so other work can be performed safely in the enclosed space. d)Page 277 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 277 of 297 FOR CONNECTICUT - this instruction supersedes guidance contained in the following instructions: EMP 6.59 Under Ground Cables EMP 6.54 Underground Corrosion EMP 6.53 Underground Customer Vaults EMP 6.59 Underground Vaults and Manholes EMP 6.63 Sump Pumps Routine Inspection – Preparation Supervisor, Planner, or Working Foremen (as appropriate) 1. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. Ensure Copies are provided to the crew performing the inspection. 2. Provide equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc can be verified by the crew performing the inspection. 3. Supervision shall ensure the assigned workers have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the unit prior to departing the work center. Routine Inspection – Performance Inspection Crew. NOTE It is the company’s expectation that whenever possible, repairs shall be made during the course of the routine inspection. 1. Clear foreign materials from the manhole entrance and the manhole, as required. 2. Inspect frames for signs of snow plow impacts, excessive elevation difference, either above or below grade. 3. Perform touch potential testing as required and described on section 5.62 of the Eversource Maintenance Program. CAUTION Use caution when replacing or installing missing tags, especially when identifying the cable by duct position and cable size. 4. Ensure standard signs, cable tags, and labels and other equipment nomenclature are in place and in good condition. Clean as needed. Replace missing or plastic cable ID tags with brass tags, as appropriate. 5. Perform manhole physical inspection as follows:Page 278 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 278 of 297 a) Inspect the walls and ceiling for any signs of: • Excessive cracking or flaking concrete • Exposed or corroded reinforcing steel • Severely rusted I-beams • Severely pitted or rusty structural components, etc. • Signs of bowing out • Corrosion and spalling on horizontal and vertical concrete beams • Fatigue on the bottom steel beam flanges b) Inspect Beam Pockets to ensure: 6. • Sufficient bearing surface • Beams lay flat in the pocket, with no torsion • Shims, concrete, and bearing surfaces are in good condition • Beams have proper embedment into the pocket c) Inspect the manhole for excessive mid-span deflection of: • Walls • Floors • Lids • Supports. d) Check pulling eyes for: • Corrosion • Condition of hardware Ensure the duct shield is present and in good condition and install or replace it as necessary. a) Check duct banks for: • Cracked concrete • Collapsed conduit • Abandoned cable cut • Collapsed header b) Verify actual field conditions (i.e. transformer size) using: • Equipment prints • Schematics • Circuit maps c) Check Structure Location to street, alley, etc. If the map is incorrect then mark-up the changes using Attachment 2 I. Check Structure concrete features to Structure drawing on map. If the map is incorrect, mark-up the changes. II. Check the Primary and Secondary Tags at each structure duct to the duct on map. If the map is incorrect, mark-up the changes. III. Check all Primary Cutouts, Switches, Transformers, Elbows, Splices, and other primary equipment to the map. If the map is incorrect, markup the changes.Page 279 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 279 of 297 7. Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Refer to NOTE: Perform the Infrared (IR) inspection using an infrared camera. If an infrared camera is not available, a temperature reading tool, such as the Fluke 63 (SC 0435572) may be used to take spot temperature readings of the equipment in place of the IR inspection. EMP 5.22 for additional guidance. Primary cables and connecting devices include: • PILC Splices • Premolded Splices • Heat Shrink Splices • Cold Shrink Splices • 200 AMP Load Break Elbows • 600 AMP Load Break Elbows Secondary cables and devices to check include: • • • • • • Mains • Services Bus Bars • Bus Limiters Line Limiter Molded Crabs (both limited and non-limited Network Transformer Secondary Connection Secondary and Service Splices 8. Verify that limiters are installed in accordance with standards DTR 84.601 & 84.602 and that they are not blown or open. 9. Verify the integrity of the secondary (network) grid. Amp each conductor on the secondary mains (preferred) or verify the limiters are not blown. Report secondaries with zero (0.0) amps. 10. Ensure all fault indicators (as applicable) are in good condition and working. Replace them every ten years or as necessary. 11. Clean or replace equipment status indicators. 12. Inspect primary cables splices and terminations for the following abnormal conditions: • • • • • • • Oil leaks, soft spots and insulation swelling Cracked or corroded lead sheaths Damaged fireproofing Poor connections, signs of arcing/tracking Collapsed or bulged cables Bulged splices Physical damage, sharp bends and excessive tensionPage 280 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 280 of 297 • • 13. 250S Splices (Note splices for future replacement.) 1 Proper grounding for the cable neutral, concentric neutral and/or lead sheaths and compliance with standards DTR 78.151, 78.153, & 78.113 Inspect secondary and service cables for the following: a. Ensure connections are clean and tight. b. Inspect the insulation to ensure it is in good condition. c. Ensure that neutral connections are made with a permanent connection (compression or shear bolt). Neutral connections to the ground bus may be made with bolted connections. d. Verify the secondary ring bus or alternate crab design is built in accordance with standards DTR Section 84. e. Verify that limiters are installed in accordance with standards DTR 84.601 & 84.602. f. Verify that secondary neutrals are in good condition and are constructed in accordance with the appropriate standards – DTR 84.181, 84.191, 84.195, 84.281, 84.285, 84.291, & 84.381. g. Verify that secondary neutrals are properly grounded in each manhole in accordance with the appropriate standards – DTR 84.181, 84.191, 84.195, 84.281, 84.285, 84.291, & 84.381. 14. Inspect rack supports (cable, equipment, etc.) for damage and/or tripping hazards. Check the mounting hardware to ensure that it is stable and free of corrosion. 15. Check racks to ensure that: • • • • Arms or supports are not corroded Mounting hardware is in good condition Cables are properly fastened with insulators All cables are properly supported and resting on insulators. Report any cables that have shifted from load cycling, traffic vibration, etc. 16. Ensure that all grounds, neutral, and drain (or bleed) wire connections, such as primary, secondary, etc. are in place and in good condition. 17. Ensure ground bus is constructed in accordance with standards DTR 76.451, DTR 76.453, and DTR 76.571 and that the ground bus and connections are in good condition. 18. Perform secondary sheath voltage testing as follows: a. Insert a 3,000 Ohm (Fluke SV225 Stray Voltage Eliminator or other manufacturer equivalent) into the voltmeter probe ports. b. Insert the test leads into the stray voltage eliminator.Page 281 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 281 of 297 c. Attach one meter lead to ground on the manhole ground system. d. Attach the second lead to the secondary sheath surfaces and test for any leakage (secondary mains, services, bus bars, and molded crabs - both limited and non-limited). e. Verify that voltage values between the manhole system ground and sheath/equipment sample points are less than 40 volts. 19. Check sumps and drains to ensure: • • • • • • Signs of excessive water entering the facility are noted and that the presence of any water sheen, unusual odor, water discoloration, or any significant sludge build-up is noted Drains are not blocked Drains have a functional trap Gravity sumps are clean Sump pumps, if present, are working and installed in accordance with standards DTR 76.111 through 76.113 Proper operation of installed the oil-water separator, if one is present 20. Check for the presence of anodes and the condition of their connections (if anodes are installed). 21. Notify supervision of any safety concerns that require correction. 22. Note any other deficiencies found that requires correction. 23. Complete Attachment 1 and forward to Connecticut Asset Management. 24. Verify that the manhole access opening meets the following criteria: • • • • • 25. Round access openings shall not be less than 28” in diameter Rectangular openings shall not be less than 26” x 22”. Access openings shall not be located directly over cables or equipment covers. The manhole shall be permanently marked indicating ownership or type of utility (NESC). Air sample hole is present to allow sampling without removal of the cover Ensure that adequate clear working space is present. • Vertical dimension shall not be less than 6 feet except in manholes where the manhole opening is within 1 foot, horizontally of the adjacent interior side wall of the manhole. (NESC). • Horizontal dimensions shall not be less than 3 feet, horizontally between cable racks on opposite walls. (Horizontal dimension may be decreased to 30 inches if cables are installed only on one wall) (NESC).Page 282 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 282 of 297 NOTE The lack of adequate clear working space or inadequate manhole access openings shall be reported by the responsible Supervisor to Connecticut Asset Management for tracking and correction. CONDITION-BASED NOTE Civil Inspections are performed as required. Major defects found during a routine inspection may be cause to require a Civil Inspection and to require it to Civil Engineering Inspection Civil or Structural Engineer 1. Review last routine inspection results prior to performing Civil Engineering Inspection. 2. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. 3. Obtain equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc can be verified. 4. Inspect Beam Pockets to ensure: • • • • Sufficient bearing surface Beams lay flat in the pocket, with no torsion Shims, concrete, and bearing surfaces are in good condition Beams have proper embedment into the pocket 5. Check pulling eyes for corrosion and condition of hardware. 6. Check horizontal and vertical concrete beams for corrosion and spalling. 7. Check bottom steel beam flanges for fatigue. 8. Check duct banks for: • • • • 9. Cracked concrete Collapsed conduit Abandoned cable cut Collapsed header Check walls and ceiling (lids) for: • • Cracks Exposed or corroded rebarPage 283 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 283 of 297 • 10. Signs of bowing out Check racks to ensure that: • • • Arms or supports are not corroded Mounting hardware is in good condition Cables are properly fastened with insulators 11. Check for signs of excessive water entering the facility. 12. Replace sump grates with fiberglass grates if applicable. 13. Check gravity sumps and the pumps. 14. Check for presence of anodes and the condition of their connections (if anodes are installed). 15. Check the zinc coating on metal surfaces for signs of degradation. Cleaning – As Required Cleaning underground manholes shall be performed at the frequency required to ensure the safety of those workers who enter the facilities and the protection of the equipment within them. 1. Ensure the manhole is free from: • Water or other liquids • Salt • Dirt or other debris that could affect equipment operation or maintenance. Failure Finding A failure report shall be completed and placed in the appropriate failure tracking system (EFRS, UPER, Cascade, etc.) for review. MANHOLE INSPECTION Workers Aid Guideline EMP 6.59B-1 ITEM NO. INSPECT INSPECTION ATTRIBUTES 1 Foreign Materials Ensure all foreign materials are cleared from the manhole entrance and from the manhole, including dirt, salt, etc. 2 Frames Inspect for signs of snow plow impacts and excessive elevation difference. 3 Touch Potential If stray voltage is detected, perform corrective action or make safe until repairs can be made. Refer to EMP 5.62 –Touch Potential for additional guidance. Signs, Cable Tags, Labels Replace missing or incorrect signs, tags, and labels, as required. (NESC) NOTE: Brass tags shall be permanently stamped with appropriate information and applied to the cable with #14 awg copper wire; plastic cable ties are not acceptable. 4Page 284 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 284 of 297 ITEM NO. INSPECT INSPECTION ATTRIBUTES 5 Walls And Ceiling Inspect for signs of excessive cracking or flaking concrete, exposed reinforcing steel, rusty I-beams, etc. 6 Verify Maps, Prints, Schematics Verify actual field conditions (i.e. transformer size) against equipment prints, schematics, circuit maps and secondary maps and verify that the structure is correctly located on the U.G. map. Check for heat anomalies on primary and secondary connections and accessories. 7 Infrared Inspection • Primary cables and connecting devices include: • PILC splices, pre-molded splices, heat shrink splices, cold shrink splices, 200 amp load break elbows, 600 amp load break elbows. • Secondary cables and connecting devices include: • Mains, services, bus bars, bus limiters, line limiter, molded crabs (limited and non-limited), network transformer secondary connection, secondary and service splices. Refer to EMP 5.22 –Infrared Inspection for additional guidance. • Verify limiters are installed in accordance with standards DTR 84.601 & 84.602. • Inspect, where applicable. Use clamp-on ammeter to verify current in each phase of each conductor. 8 Blown / Open Limiters 9 Fault Indicators Ensure they are working and in good condition. Replace every 10 years or as required. Refer to DTR 44.221 through DTR 44.223. 10 Equipment Status Indicators Ensure all are present. Clean or replace as required. These include meters, gauges, and cathodic protection. Inspect primary cable splices and terminations for the following abnormal conditions: provide details, including circuit number, in the comments section. 11 Primary Cable Splices And Terminations • Oil leaks, soft spots and insulation swelling • Cracked or corroded lead sheaths • Damaged fireproofing • Poor connections, signs of arcing / tracking • Collapsed or bulged cables • Bulged splices • Physical damage, sharp bends and excessive tension • 250s splices (note these for future replacement.) • Cable neutral, concentric neutral and/or lead sheaths are properly grounded in accordance with standards DTR 78.151, 78.153, & 78.113 Inspect secondary and service cables to ensure connections are clean and tight and that the insulation is in good condition. 12 Secondary, Neutral, And Service Cables Ensure neutral connections are made with permanent connection (compression or shear bolt). Neutral connections to the ground bus may be made with bolted connections. Verify secondary ring bus or alternate crab design is built in accordance with all standards within DTR Section 84. Verify secondary neutrals are properly grounded, in good condition, and constructed in accordance with standards DTR 84.181, 84.191, 84.195, 84.281, 84.285, 84.291, & 84.381.Page 285 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 285 of 297 ITEM NO. INSPECT INSPECTION ATTRIBUTES Inspect rack supports (cable, equipment, etc.) For damage or tripping hazards. 13 Rack Supports Inspect racks for damaged or severely corroded hardware. • 14 Cable Supports/Protection 15 Grounds, Neutrals, Drain Wire Connections 16 Ground Bus Ensure primary and secondary cables are installed a minimum of 3 inches above the floor. (NESC) • Ensure primary cables are properly supported and resting on insulators. • Ensure cable protectors are installed at duct mouth or bell and conduit fittings are installed. (NESC) • Ensure cable supports are not damaged and cables are properly supported. Ensure that all grounds, neutral, and drain (or bleed) wire connections, such as primary, secondary, etc. are in place and in good condition. Ensure ground bus is constructed in accordance with standards DTR 76.451, DTR 76.453, and DTR 76.571. Ensure ground bus and connections are in good condition. Secondary Sheath Voltage Testing 17 18 Sumps &Drains Verify that voltage values between vault system ground and sheath/equipment sample points are less than 40 volts. Refer to Work Practice M4-WP-3059. • Ensure drains, if present, are cleared of any blockages. • Ensure drains, if present, have functional traps. (NESC) • Check proper operation of installed oil-water separators, if one is present. • Ensure sump pump, if present, is working and installed in accordance with standards DTR 84.111 through 84.113. • Note the presence of any oil sheen, or any unusual odor or water discoloration as well as any significant sludge build-up. 19 Cathodic Protection Check anodes if installed. 20 Safety Concerns Notify supervision of safety concerns that require correction. 21 Deficiencies (Other) Note any other deficiencies found that require correction. Corrective work orders NOT required 22 • Round access openings shall not be less than 28” in diameter. • Rectangular openings shall not be less than 26” x 22”. • Access openings shall not be located directly over cables or equipment covers. • Manhole covers shall be permanently marked indicating ownership or type of utility. (NESC) • Air sample hole present. Manhole Access Covers
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026