Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 36 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 36 of 297 The contractor shall make every effort to minimize the amount of wood and wood chip disposal that requires hauling away from the site. This can be accomplished by; making agreements with property owners to leave logs and larger limbs at the site for use as firewood, blowing chips onto the ground in rural and unimproved natural locations with approval, and offering chips to property owners for use as mulch. All debris shall be disposed in accordance with all local laws and regulations. The tree contractor shall not sell any unwanted logs or chips. The contractor shall not leave wood debris that can be chipped overnight except on off-road sections. 6.1. Chips Smaller limbs, branches, or cut-off brush shall be chipped, normally by chipping into a truck mounted dumping chip box. However, at unimproved natural locations, chips may be blown upon the ground provided that the depth of fresh chips shall be no greater than 3 inches. Limited brush piling may be done along the edges of off-the-road pole lines, either method being subject to the land owner's approval. 6.2. Logs Logs from the tree trunks and larger limbs shall be cut into mutually agreed or convenient handling lengths. No logs shall be split. 6.3. Debris disposal The tree owner shall be given first preference to utilize logs and/or chips. This agreement shall be made at the time the work is scheduled. 6.3.1. Chips Where chips cannot be left on site, they shall be delivered to the nearest appropriate disposal space. 6.3.2. Logs Logs shall be left at the work site in a safe location, not to pose a hazard to anyone, for a maximum of 7 days, during which time they will be available for pick up. Any logs remaining after 7 days shall be delivered to the appropriate disposal site. 7. Substation Perimeter Clearing
  2. Page 37 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 37 of 297 This section describes how tree and brush work shall be performed around substations. Prior to beginning any work around a substation, Eversource personnel will provide site specific guidelines to the contractor. At no time shall contractor personnel enter the fenced area of the substation without an Eversource approved escort. 7.1. Brush removal 7.1.1. Non-visually sensitive or non-landscaped substations Cut and remove all brush within 10 feet of the substation fence. If the land adjacent to the substation fence slopes toward the fence, the cleared area shall be 20 feet. 7.1.2. Visually sensitive or landscaped substations Clear as far away from the fence as practical as directed by the Eversource representative. 7.2. Pruning Trim back all branches to a minimum of 10 feet from the fence. 7.3. Ornamental Screens Ornamental trees and shrubs (arborvitae, hemlock, white pine, yew, etc.) that have been planted to provide a visual screen of the substation shall not be removed. If necessary, shearing shall be performed as directed by the Eversource representative. 7.4. Stump treatment All stumps from trees and brush that have been removed and are capable of re-sprouting shall be herbicide treated with an appropriate herbicide as directed by the Eversource representative (CT only). 7.5. Cleanup Remove and dispose of all trimmings and removal debris away from the job site unless directed otherwise by Eversource. The site shall be left in at least as neat and orderly condition as it was found.
  3. Page 38 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 38 of 297 8. Definitions ANSI A300 (Part 1)-2008 Pruning – American National Standard for Tree Care Operations – Tree Shrub, and Other Woody Plant Maintenance – Standard Practices (Pruning) ANSI Z133.1-2012 – American National Standard for Arboricultural Operations – Safety Requirements. Backbone – a section of line starting at a substation and extending to the first fused device or single/double phase reclosing device. Brush - Tree species with a DBH of less than 6 inches (less than 1.5 inches DBH in MA in town lay out), that can grow tall enough to reach conductors. Occasionally, shrub species are considered as brush, if they have to be removed for line clearance or access. Clearance - the distance between vegetation and conductor. Contractor - the business or employees of that business, that has contracted with Eversource to perform line clearing. DBH - Diameter Breast Height - Diameter of a tree measured at a point 4 1/2 feet above ground. Fall Zone - The area including the roadside clearance zone and extending from the conductors out a distance to where an uprooted tree could strike the conductor and cause an outage. Hazard tree – Any tree or part of a tree that is (A) dead, (B) extensively decayed, or (C) structurally weak, which, if it falls, would endanger utility infrastructure, facilities or equipment. Lateral – a section of primary voltage line extending from the end of backbone to a secondary or service wire. Line Clearing - Controlling vegetation to maintain proper clearance from conductors which includes tree trimming, removal, and brush and vine removal. Modification – when the property owner requests modification to required clearances. OSHA – Occupational Safety and Health Administration.
  4. Page 39 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 39 of 297 Overhead hazards – dead, dying, diseased, insect infected and structurally weak branches including those which could break at weak points and strike conductors. Refusal – When a property owner does not allow any tree work to be performed. Risk Tree – The combination of; the likelihood of a tree-wire conflict or tree failure occurring, and the severity of the potential consequences including but not limited to injury, utility infrastructure damage or electric service disruption Shrub - A woody plant normally maturing less than 20 feet in height and presenting a generally bushy appearance because of its several erect, spreading or prostrate stems. Stump Treatment - Herbicide applications made to sproutable cut-off stumps (all hardwoods and Pitch Pine) in order to prevent the stump from sprouting. Substation - An electrical facility that receives electricity at high voltages and reduces the voltage so that it can be passed on to customers at a lower voltage. Tree - A woody plant normally maturing at 20 feet or more in height, usually with a single trunk, unbranched for several feet above ground, with a definite crown. T&M – Tree work performed at Time and Material billing rates. Work is recorded on the Weekly Distribution Tree or Brush Control Report using labor and equipment codes approved by Eversource’s Procurement Department or via electronic submission Wires/Lines/Conductors - the overhead wires which carry the electric current at required voltages. Also to be considered for tree clearance and safety are other pole mounted equipment such as transformers, fuses, circuit breakers, etc. Wire types – Primary - A wire running from pole to pole operating at a voltage level exceeding 600 volts (2400 to 34500 volts on the Eversource overhead System), and normally located at the top of a pole. Secondary - A wire running from pole to pole operating at a voltage level of 600 volts or less (normally 120 to 240 volts on the Eversource overhead System), and generally located approximately 4 feet below the primary.
  5. Page 40 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 40 of 297 Triplex - Two insulated wires in a twisted configuration around a bare neutral wire. Open Wire Secondary - Three parallel wires normally in a vertical configuration separated from each other by a few inches. Service Drop - The secondary wires connecting the point of attachment on the premises being served to the nearest pole of the distribution system.
  6. Page 41 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 41 of 297 Eversource Vegetation Management Work Planning Guide Work Planning General Description This guide describes the process for Eversource and its Contractor to plan scheduled work, including providing notification and obtaining consent per Section 16-234 of the Connecticut General Statutes as amended by Public Act No. 14-151 and as ordered in the final decision issued by the Public Utilities Regulatory Authority (“PURA”) on June 25, 2014 in Docket No. 12-01-10. In addition, the guide identifies the responsibilities and expectations for the Work Planner. Contractor Representative of Eversource The Work Planner is performing as a contractor representative of Eversource and shall at all time: • Maintain a neat, clean and professional appearance. • Be trained in and exhibit strong interpersonal and customer-focused communications skills. • Be knowledgeable about all aspects of utility arboriculture including: o Eversource’s tree work specifications; and o Federal, state and local laws and regulations. Planner Expectations The contractor shall ensure that property owners or abutting property owners understand the extent of the proposed tree work to be performed and shall make every effort to obtain full consent to prune and remove trees and brush and cut vines in compliance with state statutes, regulatory requirements, Eversource’s specifications and local or state permits. Objections, refusals, modified specifications and failure to contact customers shall be considered exceptions to normal practice and will be properly documented. However, the Work Planner shall not attempt to obtain permission in a manner that is threatening, intimidating or may appear to be threatening or intimidating to a tree owner.
  7. Page 42 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 42 of 297 Planning Municipal Communication Prior to work planning beginning, Eversource or its representative will communicate with the Town and Tree Warden the scheduled work including location of work, work type, and specifications. Eversource and the town will discuss opportunities to coordinate efforts for shared work, parking locations and debris disposal. All local ordinances will be evaluated and applicability determined. Eversource will request the necessary permit from the town for pruning trees in the public right of way. Property Owner Identification Property owner information shall be obtained from municipal tax assessor’s lists. Information will be used to identify parcel information, property owners, and mailing address. Starting and Ending Points Typically, a starting point would be the beginning of a road or the source of the circuit (i.e. substation) and the ending point would be the end of the road or circuit. It may be appropriate to change the starting point to meet requirements of municipal officials or for reliability improvements. Survey and Evaluation Planned Work Survey The contractor shall survey the entire circuit as part of the bid preparation. Based on the planned work type, each tree shall be evaluated to determine properties needing work and the specific tree work to be performed at least 10 days prior to notification and consent. The work to be proposed is as required per the specifications outlined in Eversource’s Specification for Local Distribution Line Clearance Tree Work and Brush Control 2014-A Revision and Section II – Special Conditions and Amendments of the contract. Compatible trees and shrubs listed in the State Vegetation Management Task Force Report under the Right Tree, Right Place section or that may be added by DEEP in the future, shall remain unless special circumstances exist that warrant pruning or removal.
  8. Page 43 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 43 of 297 Property and Tree Evaluation At locations the contractor has determined work is required, the Work Planner will evaluate all vegetation that could affect the electrical facilities now and in the future based on the planned work type. The Work Planner shall take into consideration individually each tree’s species, condition (vigor, disease, defects, and structure), growth rate, failure characteristics and location (proximity, soil type, and slope) in determining scope of work to be performed. Additionally, per the National Electric Safety Code (NESC), movement of vegetation during typical weather conditions plus sag of conductors due to elevated temperatures or icing must be considered when determining the extent of tree work to be performed. The Work Planner most consider when proposing pruning the final structure, look and risk of the tree. The specific pruning required and final form of the tree must be relayed to the property owner and consideration of removal of the tree as an option must be made if any aspect of the tree may be compromised or unfavorable. Public Right-of-Way and Private Property The Work Planner determines whether the tree or part of the tree that requires work is on or overhanging the Public Right-of-Way or on Private Property Tree work that is on or overhanging the Public Right-of-Way will require notification to the abutting property owner. Tree work that is on private property will require consent of the property owner. Property Owner Identification Based on the information available from tax assessor’s records, the Work Planner must determine if the property owner resides at the property where the work is to be performed or not. If the property owner resides at the property where the work is to be performed, the Work Planner will follow the steps for in- person contact. If the property owner does not reside at the property where the work is to be performed, the Work Planner will follow the steps to contact by certified mail. Notification and Consent Procedure Property owner resides at property of tree work: In Person Contact The Work Planner shall: • Identify themselves as a contractor working as a representative of Eversource.
  9. Page 44 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 44 of 297 • Provide the property owner with informational brochure. • Explain their purpose for being there and summarize the goals of Eversource’s line clearance program (i.e. visual and physical access to electric facilities; prevention of equipment damage; provide reliable electric service). • Explain the tree work specification (SMT, ETT, or Hazard Tree Removal) and specifically the proposed tree work for that location. • Explain that the owner’s signature of consent for work on private property and initials for verification of notification is required before any tree work can be performed and ask that they sign the completely filledout Eversource Proposed Tree Work form. • Record the tree owner’s name and address on the Eversource Status Record form and indicate explicitly the planned work and the level of consent received or notification verified from the property owner. Property Owner is Not Present The Work Planner Specialist shall: • Leave the Eversource Tree Work door hanger with the informational brochure describing the work, the contractor’s contact name and phone number, and the filled out Eversource Proposed Tree Work form. • Return to the location the next day or as soon as possible to determine if the door hanger has been acknowledged and returned to the door with Proposed Tree Work form signed for consent and initialed for notification. • Answer any questions received from the property owner from the contact phone number provided. • Record the status and date of the owner’s consent and notification on the Eversource Status Record form, if door hanger has been returned. Door Hanger Not Returned The Work Planner shall: • Leave a second door hanger and repeat steps defined above. • Obtain the telephone number from customer service, municipal or internet records and attempt to contact owner by phone at different times of the day to obtain consent and document notification. • If the tree owner cannot be contacted, compete the Tree Work Modification form and update the Status Record form as a “No Contact”.
  10. Page 45 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 45 of 297 • Follow steps for sending a certified letter stated below. Property owner does not reside at property of tree work Certified Letter The Work Planner shall: • Provide Eversource with information on o Property requiring tree work o Property Owner’s Name and Address o Proposed Tree Work Form filled out for property • Eversource will send the property owner via certified mail with return receipt: o A cover letter explaining purpose of mailing with instructions o Informational brochure o Proposed Tree Work Form o Self-addressed stamped envelope to return the signed consent form if needed. • Eversource will notify contractor of return receipts for notification and returned, completed Proposed Tree Work forms Modifications of Specifications All modification to the specifications of proposed work must be documented and reported to PURA. Modifications can include: • Trimming less then proposed (Modification) • Denied consent of work on private property (Denial) • Objection to proposed work in the Public Right-of-Way (Objection) • Response to attempts to obtain consent unanswered (No Contact) • Failure to notify (No Notification) Private property tree work Where the Work Planner cannot obtain full consent for pruning or removing trees and brush on private property, they shall provide Eversource with a copy of the Tree Work Modification form. Eversource will evaluate the tree conditions, their impact on the electric system and determine the next course of action.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)