  1. Page 46 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 46 of 297 Eversource may: • Contact the tree owner in person, by phone or letter to discuss options • File the refusal for future reference. Public Right-of-Way tree work Where the Work Planner receives an objection to pruning or removing trees and brushes on or overhanging the Public Right-of-Way, they shall provide Eversource with a copy of the Tree Work Modification form. Eversource will evaluate the tree conditions, their impact on the electric system and determine the next course of action. Eversource may: • Contact the tree owner in person, by phone or letter to discuss options • Refer the objection to the municipal or state authority that has jurisdiction over trees in the public way. The Town Tree Warden or State Commissioner of the DOT then must make a decision within 10 business days. • Based on the decision, Eversource or the abutting property owner may appeal the decision to PURA within ten business days. o PURA will schedule a mediation session within thirty calendar days o If property owner refuses mediation, PURA will hold a hearing within sixty days of the appeal o If mediation session is held and no resolution is reached, PURA will hold a hearing within thirty calendar days of the mediation session. Objection, Mediation, or Hearing decision Final decisions after appropriate time periods will be relayed to the contractor to proceed with work as determined in such final decisions. Status Record forms will be updated to indicate approved work. Records Processing Eversource Status Record
  2. Page 47 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 47 of 297 Specific information of proposed tree work at each property, status of consent and notification and all pertinent information shall be recorded on the Status Record form. The detail includes exactly how and what is to be trimmed and removed and if necessary, any modification to the specifications. The date of consent and notification will also be recorded for record. Transfer of Information When all the consent and notification for the circuit has been completed: • Review the Eversource Status Record for completeness and ensure information will be clear to the tree crew. • Provide one copy of the Eversource Status Record to EVERSOURCE and the Contractor General Foreman or the assigned tree crew. • Provide verbal, on-site instructions to the assigned tree crew for unusual or complicated requests. Record Keeping Eversource and the contractor will retain copies of all completed Proposed Tree Work forms, Status Record forms and Tree Work Modification forms for twenty four months from received date. Eversource will keep a log of all the properties and property owner notification or consent that was attempted, the initial status received from the customer, any objections referred to the Tree Warden or DOT, their decisions, any appeals to PURA of those decisions, outcome of mediation or hearings. Town and DOT Permits Eversource or the contractor is required to obtain permits for planned work on town roads or state roadways. A permit from the Town Tree Warden is required to prune trees on or overhanging the town road Public Right-of-Way. A written permit is required from the Town Tree Warden to remove a tree in the town road Public Right-of-Way Proceeding with Work The contractor may begin work as planned with consent for private trees, after fifteen business days of documented notification of trees on or over the Public Right-of-Way, and when all permits have been obtained.
  3. Page 48 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 48 of 297 Documentation The following shall be used to document the permission process: • Proposed Tree Work form • Status Record form • Tree Work Modification Form • Letters to customers • Return Receipt cards
  4. Page 49 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 49 of 297 Eversource Vegetation Management Organization Alan Carey Manager Eileen Nye Clerk Eric Barber Arborist Bear LeVangie Arborist Stan Bartkowiak Arborist Kathleen Ferrier Arborist Doug Pistawka Supervisor David Boyle Arborist Jenna Turner Arborist Susan Stotts Arborist Patrick Tracy Arborist
  5. Page 50 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 50 of 297 APPENDIX 4 TABLE OF INSPECTION AND MAINTENANCE FREQUENCIES
  6. Page 51 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 51 of 297 Ref. No. Frequency Now Types of Equipment/Procedure 1. Inspection of DB Facilities 2. Prior Remarks As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Capacitor Bank Pole Top Substation 1Year Monthly No Change 3. Inspect & Maintain Pole-top Voltage Regulating Equipment 1 Year As Required No Change Company experience has proven that a 1-year interval is sufficient for keeping this equipment reliable. Major Maintenance based on inspection results 4. Inspect, Test, and Maintain Reclosers SCADA Controlled Non-SCADA Controlled Substation Major Maintenance Oil Annually Bi-Monthly Monthly No Change No Change No Change Additional equipment checks are performed following storms and line faults. 12 Year No Change Scheduled Major Maintenance for oil filled Reclosers may be deferred if a capital replacement project has been formally established and is being implemented on a 12-year replacement plan 5. Network Transformers Protectors Annually 2 or 4 Years No Change No Change Routine Maintenance Inspection Major Maintenance/Frequency dependant on model # of protector 6. Underground Plant 5 Year No Change 7.. Street Lights in Underground Areas 5 Year No Change Coincident with other underground and direct buried system equipment inspections. 8. Infrared Inspection Annually No Change 3-phase circuit backbone and associated pole mounted reclosers, sectionalizers, 3-phase regulators, capacitors and switches. 9. Distribution Wood Pole Insp. & Treat. 15 Year No Change 10. 3-Phase Group Operated Switches Major Maintenance as required with 1 Year Visual on Backbone No Change Combination IR and visual for GOAB during yearly Overhead Plant inspections. Major maintenance will be performed upon findings.
  7. Page 52 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 52 of 297 Ref. No. Frequency Now Type of Equipment/Procedure Prior Remarks 11. Underground Transformers As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Coincident with other underground equipment maintenance 12. Vaults & Manholes 5 Year No Change Coincident with the Company owned equipment maintenance frequencies or every 5 years, whichever comes first.
  8. Page 53 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 53 of 297 APPENDIX 5 INSPECTION OF DIRECT-BURIED FACILITIES
  9. Page 54 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 54 of 297 5.11 Inspection of Direct Buried (DB) Systems General Description This procedure defines the schedule, inspection, and the reporting requirements for the inspection of Direct Buried facilities. Periodic inspections of Direct Buried and associated equipment at the specified interval allows preventative and corrective actions to be performed prior to situations becoming hazardous to the public or resulting in equipment failure. Inspection and failure recording ensures that corrective actions are taken by appropriate departments. See EMP instruction 6.11 for details on performing the DB Inspection NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. Facilities/Equipment Company-owned direct-buried facilities including: • Pad-Mounted Transformers • Submersible Transformers • Switch Enclosures • Switchgear • Transclosures • Handholes (HH) • Pull Holes • Risers • Fault Indicators ▲ • Primary and secondary cable
  10. Page 55 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 55 of 297 5.11.1 Inspection and Maintenance Activity Schedules 5.11.1.1 Table 1 – Direct-Buried Facilities Maintenance Intervals Interval Direct-Buried Facilities Maintenance Schedule PM Task Condition Monitoring N/A Time-Directed Routine Inspection ▲ Note 1 A/R with 15 Year Max Replace Fault Indicators 15Y Condition-Based Any defects found during Routine Inspection A/R Failure Finding EFRS, UPER, or Failure Reporting System used by your region A/R Failure Investigation A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection is 5Y (or 5 years). The abbreviations used for the intervals are: Y = Year, i.e. 5Y = 5 Years N/A = Not Applicable A/R = As Required 5.11.2 Maintenance Categories TIME-DIRECTED 5.11.2.1 Routine Inspection ▲ Refer to EMP Instruction 6.11 for details. 5.11.2.2 Replace Fault Indicators • Refer to EMP Instruction 6.11 for details.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)