  1. Page 48 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 48 of 297 Documentation The following shall be used to document the permission process: • Proposed Tree Work form • Status Record form • Tree Work Modification Form • Letters to customers • Return Receipt cards
  2. Page 49 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 49 of 297 Eversource Vegetation Management Organization Alan Carey Manager Eileen Nye Clerk Eric Barber Arborist Bear LeVangie Arborist Stan Bartkowiak Arborist Kathleen Ferrier Arborist Doug Pistawka Supervisor David Boyle Arborist Jenna Turner Arborist Susan Stotts Arborist Patrick Tracy Arborist
  3. Page 50 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 50 of 297 APPENDIX 4 TABLE OF INSPECTION AND MAINTENANCE FREQUENCIES
  4. Page 51 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 51 of 297 Ref. No. Frequency Now Types of Equipment/Procedure 1. Inspection of DB Facilities 2. Prior Remarks As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Capacitor Bank Pole Top Substation 1Year Monthly No Change 3. Inspect & Maintain Pole-top Voltage Regulating Equipment 1 Year As Required No Change Company experience has proven that a 1-year interval is sufficient for keeping this equipment reliable. Major Maintenance based on inspection results 4. Inspect, Test, and Maintain Reclosers SCADA Controlled Non-SCADA Controlled Substation Major Maintenance Oil Annually Bi-Monthly Monthly No Change No Change No Change Additional equipment checks are performed following storms and line faults. 12 Year No Change Scheduled Major Maintenance for oil filled Reclosers may be deferred if a capital replacement project has been formally established and is being implemented on a 12-year replacement plan 5. Network Transformers Protectors Annually 2 or 4 Years No Change No Change Routine Maintenance Inspection Major Maintenance/Frequency dependant on model # of protector 6. Underground Plant 5 Year No Change 7.. Street Lights in Underground Areas 5 Year No Change Coincident with other underground and direct buried system equipment inspections. 8. Infrared Inspection Annually No Change 3-phase circuit backbone and associated pole mounted reclosers, sectionalizers, 3-phase regulators, capacitors and switches. 9. Distribution Wood Pole Insp. & Treat. 15 Year No Change 10. 3-Phase Group Operated Switches Major Maintenance as required with 1 Year Visual on Backbone No Change Combination IR and visual for GOAB during yearly Overhead Plant inspections. Major maintenance will be performed upon findings.
  5. Page 52 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 52 of 297 Ref. No. Frequency Now Type of Equipment/Procedure Prior Remarks 11. Underground Transformers As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Coincident with other underground equipment maintenance 12. Vaults & Manholes 5 Year No Change Coincident with the Company owned equipment maintenance frequencies or every 5 years, whichever comes first.
  6. Page 53 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 53 of 297 APPENDIX 5 INSPECTION OF DIRECT-BURIED FACILITIES
  7. Page 54 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 54 of 297 5.11 Inspection of Direct Buried (DB) Systems General Description This procedure defines the schedule, inspection, and the reporting requirements for the inspection of Direct Buried facilities. Periodic inspections of Direct Buried and associated equipment at the specified interval allows preventative and corrective actions to be performed prior to situations becoming hazardous to the public or resulting in equipment failure. Inspection and failure recording ensures that corrective actions are taken by appropriate departments. See EMP instruction 6.11 for details on performing the DB Inspection NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. Facilities/Equipment Company-owned direct-buried facilities including: • Pad-Mounted Transformers • Submersible Transformers • Switch Enclosures • Switchgear • Transclosures • Handholes (HH) • Pull Holes • Risers • Fault Indicators ▲ • Primary and secondary cable
  8. Page 55 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 55 of 297 5.11.1 Inspection and Maintenance Activity Schedules 5.11.1.1 Table 1 – Direct-Buried Facilities Maintenance Intervals Interval Direct-Buried Facilities Maintenance Schedule PM Task Condition Monitoring N/A Time-Directed Routine Inspection ▲ Note 1 A/R with 15 Year Max Replace Fault Indicators 15Y Condition-Based Any defects found during Routine Inspection A/R Failure Finding EFRS, UPER, or Failure Reporting System used by your region A/R Failure Investigation A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection is 5Y (or 5 years). The abbreviations used for the intervals are: Y = Year, i.e. 5Y = 5 Years N/A = Not Applicable A/R = As Required 5.11.2 Maintenance Categories TIME-DIRECTED 5.11.2.1 Routine Inspection ▲ Refer to EMP Instruction 6.11 for details. 5.11.2.2 Replace Fault Indicators • Refer to EMP Instruction 6.11 for details.
  9. Page 56 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 56 of 297 Conditioned Based 5.11.2.3 Repair or replace any defective components found during the DB routine inspection if possible, or note repairs that cannot be completed during the routine inspection for future correction. Failure Finding 5.11.3 Perform any necessary repairs or correct any conditions as required and document the repairs or corrections made. Failures of any major DB equipment shall be documented in the equipment failure reporting system used by your region. Minor deficiencies (e.g premature paint peeling on newer equipment, or misaligned doors on pad-mounted equipment) should also be reported to Distribution Standards. Analysis of DB equipment failures should be performed when deemed necessary by Distribution Standards. 5.11.3.1 DB Facilities References • TD 804 “Inspection of Direct Buried Facilities” • Accident Prevention Manual – “Direct Buried Lines” • Work Practice WP-3038, “Stray Voltage Monitoring” • Work Practice WP-3012, “Direct Buried Inspection” • OP4154 Eversource Direct-Buried Inspections Form • Underground Distribution Standards – DTR Sections 42, 43 and 44 • Distribution Standard – DTR 04.225
  10. Page 57 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 57 of 297 5.11.4 Maintenance Basis Documentation Requirement Basis Fault Indicator Replacement 15Y Manufacturer’s recommendation of a 15-20 year battery life. As Required with a max 15Y Inspection Reliability based inspection in additional to post storm patrols A review of data from the Equipment Failure Reporting System (EFRS) indicates a very low failure rate for padmounted transformers. Although EFRS data indicates a higher failure rate for DB cable, few interruptions can be eliminated by routine preventative maintenance practices. The EFRS has shown a very low failure rate for other DB related equipment such as handholes, secondary cables, etc. The EPRI Power Plant Electrical Reference Series, Volume 2 “Power Transformers” states “Every transformer should be inspected at regular intervals. The length of those intervals varies from company to company, depending on prior experience, severity of service, and harshness of the environment. 5.11.5 Condition Monitoring: N/A 6.11 - DIRECT - BURIED INSPECTION emp 6.11 – Rev. 2 WORK REQUEST NO MAP NO. LOCATION ITEM NO. Inspection Item DETAILS 01 DETERIORATION/PROPER GRADING 02 PROPERLY SET 03 CONDITION OF CASE 05 STANDARD SIGNS AND LABELS* Inspect the vault, extensions, concrete slab/pad, and hand-holes for deterioration and proper grading and ensure they are properly set. Check the transformer/enclosure to verify they are properly set on the concrete pad or slab. Inspect the condition of the case. Check it for internal and external rust, dents, etc. Ensure standard signs, cable tags, and labels (internal
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026