Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 50 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 50 of 297 APPENDIX 4 TABLE OF INSPECTION AND MAINTENANCE FREQUENCIESPage 51 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 51 of 297 Ref. No. Frequency Now Types of Equipment/Procedure 1. Inspection of DB Facilities 2. Prior Remarks As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Capacitor Bank Pole Top Substation 1Year Monthly No Change 3. Inspect & Maintain Pole-top Voltage Regulating Equipment 1 Year As Required No Change Company experience has proven that a 1-year interval is sufficient for keeping this equipment reliable. Major Maintenance based on inspection results 4. Inspect, Test, and Maintain Reclosers SCADA Controlled Non-SCADA Controlled Substation Major Maintenance Oil Annually Bi-Monthly Monthly No Change No Change No Change Additional equipment checks are performed following storms and line faults. 12 Year No Change Scheduled Major Maintenance for oil filled Reclosers may be deferred if a capital replacement project has been formally established and is being implemented on a 12-year replacement plan 5. Network Transformers Protectors Annually 2 or 4 Years No Change No Change Routine Maintenance Inspection Major Maintenance/Frequency dependant on model # of protector 6. Underground Plant 5 Year No Change 7.. Street Lights in Underground Areas 5 Year No Change Coincident with other underground and direct buried system equipment inspections. 8. Infrared Inspection Annually No Change 3-phase circuit backbone and associated pole mounted reclosers, sectionalizers, 3-phase regulators, capacitors and switches. 9. Distribution Wood Pole Insp. & Treat. 15 Year No Change 10. 3-Phase Group Operated Switches Major Maintenance as required with 1 Year Visual on Backbone No Change Combination IR and visual for GOAB during yearly Overhead Plant inspections. Major maintenance will be performed upon findings.Page 52 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 52 of 297 Ref. No. Frequency Now Type of Equipment/Procedure Prior Remarks 11. Underground Transformers As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Coincident with other underground equipment maintenance 12. Vaults & Manholes 5 Year No Change Coincident with the Company owned equipment maintenance frequencies or every 5 years, whichever comes first.Page 53 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 53 of 297 APPENDIX 5 INSPECTION OF DIRECT-BURIED FACILITIESPage 54 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 54 of 297 5.11 Inspection of Direct Buried (DB) Systems General Description This procedure defines the schedule, inspection, and the reporting requirements for the inspection of Direct Buried facilities. Periodic inspections of Direct Buried and associated equipment at the specified interval allows preventative and corrective actions to be performed prior to situations becoming hazardous to the public or resulting in equipment failure. Inspection and failure recording ensures that corrective actions are taken by appropriate departments. See EMP instruction 6.11 for details on performing the DB Inspection NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. Facilities/Equipment Company-owned direct-buried facilities including: • Pad-Mounted Transformers • Submersible Transformers • Switch Enclosures • Switchgear • Transclosures • Handholes (HH) • Pull Holes • Risers • Fault Indicators ▲ • Primary and secondary cablePage 55 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 55 of 297 5.11.1 Inspection and Maintenance Activity Schedules 5.11.1.1 Table 1 – Direct-Buried Facilities Maintenance Intervals Interval Direct-Buried Facilities Maintenance Schedule PM Task Condition Monitoring N/A Time-Directed Routine Inspection ▲ Note 1 A/R with 15 Year Max Replace Fault Indicators 15Y Condition-Based Any defects found during Routine Inspection A/R Failure Finding EFRS, UPER, or Failure Reporting System used by your region A/R Failure Investigation A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection is 5Y (or 5 years). The abbreviations used for the intervals are: Y = Year, i.e. 5Y = 5 Years N/A = Not Applicable A/R = As Required 5.11.2 Maintenance Categories TIME-DIRECTED 5.11.2.1 Routine Inspection ▲ Refer to EMP Instruction 6.11 for details. 5.11.2.2 Replace Fault Indicators • Refer to EMP Instruction 6.11 for details.Page 56 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 56 of 297 Conditioned Based 5.11.2.3 Repair or replace any defective components found during the DB routine inspection if possible, or note repairs that cannot be completed during the routine inspection for future correction. Failure Finding 5.11.3 Perform any necessary repairs or correct any conditions as required and document the repairs or corrections made. Failures of any major DB equipment shall be documented in the equipment failure reporting system used by your region. Minor deficiencies (e.g premature paint peeling on newer equipment, or misaligned doors on pad-mounted equipment) should also be reported to Distribution Standards. Analysis of DB equipment failures should be performed when deemed necessary by Distribution Standards. 5.11.3.1 DB Facilities References • TD 804 “Inspection of Direct Buried Facilities” • Accident Prevention Manual – “Direct Buried Lines” • Work Practice WP-3038, “Stray Voltage Monitoring” • Work Practice WP-3012, “Direct Buried Inspection” • OP4154 Eversource Direct-Buried Inspections Form • Underground Distribution Standards – DTR Sections 42, 43 and 44 • Distribution Standard – DTR 04.225Page 57 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 57 of 297 5.11.4 Maintenance Basis Documentation Requirement Basis Fault Indicator Replacement 15Y Manufacturer’s recommendation of a 15-20 year battery life. As Required with a max 15Y Inspection Reliability based inspection in additional to post storm patrols A review of data from the Equipment Failure Reporting System (EFRS) indicates a very low failure rate for padmounted transformers. Although EFRS data indicates a higher failure rate for DB cable, few interruptions can be eliminated by routine preventative maintenance practices. The EFRS has shown a very low failure rate for other DB related equipment such as handholes, secondary cables, etc. The EPRI Power Plant Electrical Reference Series, Volume 2 “Power Transformers” states “Every transformer should be inspected at regular intervals. The length of those intervals varies from company to company, depending on prior experience, severity of service, and harshness of the environment. 5.11.5 Condition Monitoring: N/A 6.11 - DIRECT - BURIED INSPECTION emp 6.11 – Rev. 2 WORK REQUEST NO MAP NO. LOCATION ITEM NO. Inspection Item DETAILS 01 DETERIORATION/PROPER GRADING 02 PROPERLY SET 03 CONDITION OF CASE 05 STANDARD SIGNS AND LABELS* Inspect the vault, extensions, concrete slab/pad, and hand-holes for deterioration and proper grading and ensure they are properly set. Check the transformer/enclosure to verify they are properly set on the concrete pad or slab. Inspect the condition of the case. Check it for internal and external rust, dents, etc. Ensure standard signs, cable tags, and labels (internalPage 58 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 58 of 297 and external) are in place and in good condition as specified in DTR Sections 03 and 42. Use the equipment prints/schematics to verify the actual field conditions, i.e., transformer size, abnormal switching conditions, etc. against prints/schematics obtained from Supervision. Ensure safety and security equipment (such as locks and penta-bolts) are in place and in good working condition as specified in DTR Section 03. Check for signs of vandalism. SEE EMP Section 6.62 Inspect protective bumpers to ensure they are present and in good condition, as required. Replace damaged bumpers. Ensure all covers or grates are securely locked or bolted in position. Inspect equipment for signs of oil leaks. Inspect for vegetation for intrusion into the equipment. Ensure there are no obstructions (i.e., shrubs, fences, buildings, foreign material, objects, etc.) and that the area is accessible as specified in DTR Section 42. Inspect the general condition of the riser and ensure it is secured to a pole. Ensure riser pole stencils are present and that the stenciled fuse size agrees with that on the DB map. 06 PRINTS/SCHEMATICS 07 SECURITY / VANDALISM / SAFETY 08 09 TOUCH POTENTIAL TESTING 10 COVER / GRATE 11 12 13 OIL LEAKS 14 CONDITION OF RISER 15 POLE NO. / FUSE SIZE Note: 16 IF OBSTRUCTIONS/VEGETATION PREVENT ACCOMPLISHMENT OF THE INTERNAL INSPECTION STOP. THE FOLLOWING INTERNAL INSPECTION STEPS NEED NOT BE PERFORMED BARRIERS (ELECTRICAL) 17 GROUNDS 18 PRIMARY/SECONDARY EQUIPMENT 19 INDICATORS 20 PIT/HANDHOLE (CABLE) 21 DEFLECTOR PLATE 22 MOUNTING HARDWARE 23 ELBOW ARRESTERS 24 SWITCH GEAR COVERS 25 DEAD-END CAPS ON UNUSED BUSHINGS 26 INFRARED INSPECTION ON INDUSTRIAL AND COMMERCIAL EQUIPMENT: (See TD 853) PROTECTIVE BUMPERS VEGETATION OBSTRUCTION/ACCESSIBILITY Ensure electrical barriers are in place and in good condition. Ensure that all grounds, neutral, and drain wire connections, such as primary, secondary, transformer, telephone, etc. are in place and in good condition. Ensure that primary/secondary equipment, such as bushings, insulators, arresters, elbows, terminators, connectors, cable taps, dead-end receptacles are in good condition. Check for signs of arcing, tracking, chipping, stress, etc. for all connections. Inspect indicators including – temperature, oil level, faultread, record, and reset as applicable. Test fault indicators per DTR Section 44 and ensure they are in good condition and working. Check fault indicator’s date and replace older style indicators, if found. Ensure proper installation per DTR 44.222 – 223 & verify 2.5” min. spacing to ensure proper operation. Check the cable pit/hand-hole for silt, debris, and corrosion Ensure deflector plates are installed, as required for the specific equipment type. Check the mounting hardware to ensure it is stable and free from corrosion. Inspect elbow arresters are present and in good condition, as required. Ensure switchgear covers are in place and are in good condition. Details for performing switchgear maintenance are provided in a separate chapter. Inspect dead-end caps on unused bushings are present and in good condition, as required. NOTE ANY CONDITIONS THAT REQUIRE FOLLOW-UP REPAIR. ► Obstruction/vegetation which DOES NOT require a tree crew and more than 1 hour to clear need not be reported for follow up repair. In addition, the severity of obstructions must be verified by supervision as a condition for a CWO to be initiated for obstructions and/or vegetation. NOTE: This use of this form is optional and it is intended for use as a Worker’s aid – not for use as a permanent record.Page 59 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 59 of 297 APPENDIX 6 CAPACITOR BANK INSPECTION
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026