    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 51 of 297 Ref. No. Frequency Now Types of Equipment/Procedure 1. Inspection of DB Facilities 2. Prior Remarks As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Capacitor Bank Pole Top Substation 1Year Monthly No Change 3. Inspect & Maintain Pole-top Voltage Regulating Equipment 1 Year As Required No Change Company experience has proven that a 1-year interval is sufficient for keeping this equipment reliable. Major Maintenance based on inspection results 4. Inspect, Test, and Maintain Reclosers SCADA Controlled Non-SCADA Controlled Substation Major Maintenance Oil Annually Bi-Monthly Monthly No Change No Change No Change Additional equipment checks are performed following storms and line faults. 12 Year No Change Scheduled Major Maintenance for oil filled Reclosers may be deferred if a capital replacement project has been formally established and is being implemented on a 12-year replacement plan 5. Network Transformers Protectors Annually 2 or 4 Years No Change No Change Routine Maintenance Inspection Major Maintenance/Frequency dependant on model # of protector 6. Underground Plant 5 Year No Change 7.. Street Lights in Underground Areas 5 Year No Change Coincident with other underground and direct buried system equipment inspections. 8. Infrared Inspection Annually No Change 3-phase circuit backbone and associated pole mounted reclosers, sectionalizers, 3-phase regulators, capacitors and switches. 9. Distribution Wood Pole Insp. & Treat. 15 Year No Change 10. 3-Phase Group Operated Switches Major Maintenance as required with 1 Year Visual on Backbone No Change Combination IR and visual for GOAB during yearly Overhead Plant inspections. Major maintenance will be performed upon findings.
  2. Page 52 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 52 of 297 Ref. No. Frequency Now Type of Equipment/Procedure Prior Remarks 11. Underground Transformers As required with a max of 15 years No Change Move to condition/reliability-based inspection. Max inspection period to correspond with fault indicator replacement. Coincident with other underground equipment maintenance 12. Vaults & Manholes 5 Year No Change Coincident with the Company owned equipment maintenance frequencies or every 5 years, whichever comes first.
  3. Page 53 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 53 of 297 APPENDIX 5 INSPECTION OF DIRECT-BURIED FACILITIES
  4. Page 54 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 54 of 297 5.11 Inspection of Direct Buried (DB) Systems General Description This procedure defines the schedule, inspection, and the reporting requirements for the inspection of Direct Buried facilities. Periodic inspections of Direct Buried and associated equipment at the specified interval allows preventative and corrective actions to be performed prior to situations becoming hazardous to the public or resulting in equipment failure. Inspection and failure recording ensures that corrective actions are taken by appropriate departments. See EMP instruction 6.11 for details on performing the DB Inspection NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. Facilities/Equipment Company-owned direct-buried facilities including: • Pad-Mounted Transformers • Submersible Transformers • Switch Enclosures • Switchgear • Transclosures • Handholes (HH) • Pull Holes • Risers • Fault Indicators ▲ • Primary and secondary cable
  5. Page 55 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 55 of 297 5.11.1 Inspection and Maintenance Activity Schedules 5.11.1.1 Table 1 – Direct-Buried Facilities Maintenance Intervals Interval Direct-Buried Facilities Maintenance Schedule PM Task Condition Monitoring N/A Time-Directed Routine Inspection ▲ Note 1 A/R with 15 Year Max Replace Fault Indicators 15Y Condition-Based Any defects found during Routine Inspection A/R Failure Finding EFRS, UPER, or Failure Reporting System used by your region A/R Failure Investigation A/R In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection is 5Y (or 5 years). The abbreviations used for the intervals are: Y = Year, i.e. 5Y = 5 Years N/A = Not Applicable A/R = As Required 5.11.2 Maintenance Categories TIME-DIRECTED 5.11.2.1 Routine Inspection ▲ Refer to EMP Instruction 6.11 for details. 5.11.2.2 Replace Fault Indicators • Refer to EMP Instruction 6.11 for details.
  6. Page 56 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 56 of 297 Conditioned Based 5.11.2.3 Repair or replace any defective components found during the DB routine inspection if possible, or note repairs that cannot be completed during the routine inspection for future correction. Failure Finding 5.11.3 Perform any necessary repairs or correct any conditions as required and document the repairs or corrections made. Failures of any major DB equipment shall be documented in the equipment failure reporting system used by your region. Minor deficiencies (e.g premature paint peeling on newer equipment, or misaligned doors on pad-mounted equipment) should also be reported to Distribution Standards. Analysis of DB equipment failures should be performed when deemed necessary by Distribution Standards. 5.11.3.1 DB Facilities References • TD 804 “Inspection of Direct Buried Facilities” • Accident Prevention Manual – “Direct Buried Lines” • Work Practice WP-3038, “Stray Voltage Monitoring” • Work Practice WP-3012, “Direct Buried Inspection” • OP4154 Eversource Direct-Buried Inspections Form • Underground Distribution Standards – DTR Sections 42, 43 and 44 • Distribution Standard – DTR 04.225
  7. Page 57 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 57 of 297 5.11.4 Maintenance Basis Documentation Requirement Basis Fault Indicator Replacement 15Y Manufacturer’s recommendation of a 15-20 year battery life. As Required with a max 15Y Inspection Reliability based inspection in additional to post storm patrols A review of data from the Equipment Failure Reporting System (EFRS) indicates a very low failure rate for padmounted transformers. Although EFRS data indicates a higher failure rate for DB cable, few interruptions can be eliminated by routine preventative maintenance practices. The EFRS has shown a very low failure rate for other DB related equipment such as handholes, secondary cables, etc. The EPRI Power Plant Electrical Reference Series, Volume 2 “Power Transformers” states “Every transformer should be inspected at regular intervals. The length of those intervals varies from company to company, depending on prior experience, severity of service, and harshness of the environment. 5.11.5 Condition Monitoring: N/A 6.11 - DIRECT - BURIED INSPECTION emp 6.11 – Rev. 2 WORK REQUEST NO MAP NO. LOCATION ITEM NO. Inspection Item DETAILS 01 DETERIORATION/PROPER GRADING 02 PROPERLY SET 03 CONDITION OF CASE 05 STANDARD SIGNS AND LABELS* Inspect the vault, extensions, concrete slab/pad, and hand-holes for deterioration and proper grading and ensure they are properly set. Check the transformer/enclosure to verify they are properly set on the concrete pad or slab. Inspect the condition of the case. Check it for internal and external rust, dents, etc. Ensure standard signs, cable tags, and labels (internal
  8. Page 58 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 58 of 297 and external) are in place and in good condition as specified in DTR Sections 03 and 42. Use the equipment prints/schematics to verify the actual field conditions, i.e., transformer size, abnormal switching conditions, etc. against prints/schematics obtained from Supervision. Ensure safety and security equipment (such as locks and penta-bolts) are in place and in good working condition as specified in DTR Section 03. Check for signs of vandalism. SEE EMP Section 6.62 Inspect protective bumpers to ensure they are present and in good condition, as required. Replace damaged bumpers. Ensure all covers or grates are securely locked or bolted in position. Inspect equipment for signs of oil leaks. Inspect for vegetation for intrusion into the equipment. Ensure there are no obstructions (i.e., shrubs, fences, buildings, foreign material, objects, etc.) and that the area is accessible as specified in DTR Section 42. Inspect the general condition of the riser and ensure it is secured to a pole. Ensure riser pole stencils are present and that the stenciled fuse size agrees with that on the DB map. 06 PRINTS/SCHEMATICS 07 SECURITY / VANDALISM / SAFETY 08 09 TOUCH POTENTIAL TESTING 10 COVER / GRATE 11 12 13 OIL LEAKS 14 CONDITION OF RISER 15 POLE NO. / FUSE SIZE Note: 16 IF OBSTRUCTIONS/VEGETATION PREVENT ACCOMPLISHMENT OF THE INTERNAL INSPECTION STOP. THE FOLLOWING INTERNAL INSPECTION STEPS NEED NOT BE PERFORMED BARRIERS (ELECTRICAL) 17 GROUNDS 18 PRIMARY/SECONDARY EQUIPMENT 19 INDICATORS 20 PIT/HANDHOLE (CABLE) 21 DEFLECTOR PLATE 22 MOUNTING HARDWARE 23 ELBOW ARRESTERS 24 SWITCH GEAR COVERS 25 DEAD-END CAPS ON UNUSED BUSHINGS 26 INFRARED INSPECTION ON INDUSTRIAL AND COMMERCIAL EQUIPMENT: (See TD 853) PROTECTIVE BUMPERS VEGETATION OBSTRUCTION/ACCESSIBILITY Ensure electrical barriers are in place and in good condition. Ensure that all grounds, neutral, and drain wire connections, such as primary, secondary, transformer, telephone, etc. are in place and in good condition. Ensure that primary/secondary equipment, such as bushings, insulators, arresters, elbows, terminators, connectors, cable taps, dead-end receptacles are in good condition. Check for signs of arcing, tracking, chipping, stress, etc. for all connections. Inspect indicators including – temperature, oil level, faultread, record, and reset as applicable. Test fault indicators per DTR Section 44 and ensure they are in good condition and working. Check fault indicator’s date and replace older style indicators, if found. Ensure proper installation per DTR 44.222 – 223 & verify 2.5” min. spacing to ensure proper operation. Check the cable pit/hand-hole for silt, debris, and corrosion Ensure deflector plates are installed, as required for the specific equipment type. Check the mounting hardware to ensure it is stable and free from corrosion. Inspect elbow arresters are present and in good condition, as required. Ensure switchgear covers are in place and are in good condition. Details for performing switchgear maintenance are provided in a separate chapter. Inspect dead-end caps on unused bushings are present and in good condition, as required. NOTE ANY CONDITIONS THAT REQUIRE FOLLOW-UP REPAIR. ► Obstruction/vegetation which DOES NOT require a tree crew and more than 1 hour to clear need not be reported for follow up repair. In addition, the severity of obstructions must be verified by supervision as a condition for a CWO to be initiated for obstructions and/or vegetation. NOTE: This use of this form is optional and it is intended for use as a Worker’s aid – not for use as a permanent record.
  9. Page 59 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 59 of 297 APPENDIX 6 CAPACITOR BANK INSPECTION
  10. Page 60 of 297Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 60 of 297 5.05 Capacitor Banks General Description Banks of capacitors are used to improve the power factor on the system. Other benefits include reducing system losses and improved voltage control. Capacitors are voltage sensitive, and will not tolerate an extended over voltage condition of more than 110 percent of the nameplate rating without deterioration and eventual failure. Because of their electrical characteristics, they are susceptible to large inrush currents, discharge currents, and transient voltage peaks, each of which can reduce the expected life of the individual capacitor or increase the equipment servicing requirement of the bank. Capacitors store energy in the form of electrical charge. They are designed with internal resistors that are intended to discharge to 50 volts within 5 minutes after disconnection from the voltage source. It is important to allow this period to expire before applying grounds to a de- energized capacitor bank, in order to prevent damage and/or hazards resulting from high discharge currents. Note that newer capacitors have discharge resistors, but older ones may not. Check the Capacitor breaker with an approved audible tester. Capacitor banks are applied within substations and on poles on the distribution system. Substation capacitor banks are made up of one or more series groups of capacitor cans often connected in parallel. Individual capacitors are normally provided with fuses. A blown fuse may be a sign of a failed capacitor. Since this could result in poor operation of the bank and/or damage to other capacitors within the bank, any capacitor with a blown fuse should be tested. Any capacitor suspected to be damaged (i.e., bulged tank, partial shorting per test results, etc.) should be replaced prior to re-energizing the bank. Failed capacitors must be handled carefully, due to the possible presence of gasses under pressure. Capacitor Banks can be switched or not switched. Capacitor switches are devices that require periodic maintenance. For information on servicing capacitor switches, see the chapters on Circuit Switchers and Oil & Vacuum Switches. Pole-Top capacitor banks are generally protected by fused cutouts. As with substation banks, a blown fuse may indicate a failed capacitor unit. Pole-Top capacitors require little maintenance. Scheduled inspections should be made before the heavy load season (typically from November to March) to ensure the equipment is operating properly. The components to inspect include capacitor cans, cutouts, oil switches, vacuum switches, arresters, control settings, control and radio batteries, and grounding.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)