Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 58 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 58 of 297 and external) are in place and in good condition as specified in DTR Sections 03 and 42. Use the equipment prints/schematics to verify the actual field conditions, i.e., transformer size, abnormal switching conditions, etc. against prints/schematics obtained from Supervision. Ensure safety and security equipment (such as locks and penta-bolts) are in place and in good working condition as specified in DTR Section 03. Check for signs of vandalism. SEE EMP Section 6.62 Inspect protective bumpers to ensure they are present and in good condition, as required. Replace damaged bumpers. Ensure all covers or grates are securely locked or bolted in position. Inspect equipment for signs of oil leaks. Inspect for vegetation for intrusion into the equipment. Ensure there are no obstructions (i.e., shrubs, fences, buildings, foreign material, objects, etc.) and that the area is accessible as specified in DTR Section 42. Inspect the general condition of the riser and ensure it is secured to a pole. Ensure riser pole stencils are present and that the stenciled fuse size agrees with that on the DB map. 06 PRINTS/SCHEMATICS 07 SECURITY / VANDALISM / SAFETY 08 09 TOUCH POTENTIAL TESTING 10 COVER / GRATE 11 12 13 OIL LEAKS 14 CONDITION OF RISER 15 POLE NO. / FUSE SIZE Note: 16 IF OBSTRUCTIONS/VEGETATION PREVENT ACCOMPLISHMENT OF THE INTERNAL INSPECTION STOP. THE FOLLOWING INTERNAL INSPECTION STEPS NEED NOT BE PERFORMED BARRIERS (ELECTRICAL) 17 GROUNDS 18 PRIMARY/SECONDARY EQUIPMENT 19 INDICATORS 20 PIT/HANDHOLE (CABLE) 21 DEFLECTOR PLATE 22 MOUNTING HARDWARE 23 ELBOW ARRESTERS 24 SWITCH GEAR COVERS 25 DEAD-END CAPS ON UNUSED BUSHINGS 26 INFRARED INSPECTION ON INDUSTRIAL AND COMMERCIAL EQUIPMENT: (See TD 853) PROTECTIVE BUMPERS VEGETATION OBSTRUCTION/ACCESSIBILITY Ensure electrical barriers are in place and in good condition. Ensure that all grounds, neutral, and drain wire connections, such as primary, secondary, transformer, telephone, etc. are in place and in good condition. Ensure that primary/secondary equipment, such as bushings, insulators, arresters, elbows, terminators, connectors, cable taps, dead-end receptacles are in good condition. Check for signs of arcing, tracking, chipping, stress, etc. for all connections. Inspect indicators including – temperature, oil level, faultread, record, and reset as applicable. Test fault indicators per DTR Section 44 and ensure they are in good condition and working. Check fault indicator’s date and replace older style indicators, if found. Ensure proper installation per DTR 44.222 – 223 & verify 2.5” min. spacing to ensure proper operation. Check the cable pit/hand-hole for silt, debris, and corrosion Ensure deflector plates are installed, as required for the specific equipment type. Check the mounting hardware to ensure it is stable and free from corrosion. Inspect elbow arresters are present and in good condition, as required. Ensure switchgear covers are in place and are in good condition. Details for performing switchgear maintenance are provided in a separate chapter. Inspect dead-end caps on unused bushings are present and in good condition, as required. NOTE ANY CONDITIONS THAT REQUIRE FOLLOW-UP REPAIR. ► Obstruction/vegetation which DOES NOT require a tree crew and more than 1 hour to clear need not be reported for follow up repair. In addition, the severity of obstructions must be verified by supervision as a condition for a CWO to be initiated for obstructions and/or vegetation. NOTE: This use of this form is optional and it is intended for use as a Worker’s aid – not for use as a permanent record.Page 59 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 59 of 297 APPENDIX 6 CAPACITOR BANK INSPECTIONPage 60 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 60 of 297 5.05 Capacitor Banks General Description Banks of capacitors are used to improve the power factor on the system. Other benefits include reducing system losses and improved voltage control. Capacitors are voltage sensitive, and will not tolerate an extended over voltage condition of more than 110 percent of the nameplate rating without deterioration and eventual failure. Because of their electrical characteristics, they are susceptible to large inrush currents, discharge currents, and transient voltage peaks, each of which can reduce the expected life of the individual capacitor or increase the equipment servicing requirement of the bank. Capacitors store energy in the form of electrical charge. They are designed with internal resistors that are intended to discharge to 50 volts within 5 minutes after disconnection from the voltage source. It is important to allow this period to expire before applying grounds to a de- energized capacitor bank, in order to prevent damage and/or hazards resulting from high discharge currents. Note that newer capacitors have discharge resistors, but older ones may not. Check the Capacitor breaker with an approved audible tester. Capacitor banks are applied within substations and on poles on the distribution system. Substation capacitor banks are made up of one or more series groups of capacitor cans often connected in parallel. Individual capacitors are normally provided with fuses. A blown fuse may be a sign of a failed capacitor. Since this could result in poor operation of the bank and/or damage to other capacitors within the bank, any capacitor with a blown fuse should be tested. Any capacitor suspected to be damaged (i.e., bulged tank, partial shorting per test results, etc.) should be replaced prior to re-energizing the bank. Failed capacitors must be handled carefully, due to the possible presence of gasses under pressure. Capacitor Banks can be switched or not switched. Capacitor switches are devices that require periodic maintenance. For information on servicing capacitor switches, see the chapters on Circuit Switchers and Oil & Vacuum Switches. Pole-Top capacitor banks are generally protected by fused cutouts. As with substation banks, a blown fuse may indicate a failed capacitor unit. Pole-Top capacitors require little maintenance. Scheduled inspections should be made before the heavy load season (typically from November to March) to ensure the equipment is operating properly. The components to inspect include capacitor cans, cutouts, oil switches, vacuum switches, arresters, control settings, control and radio batteries, and grounding.Page 61 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 61 of 297 Capacitor fuse(s) often blow with no visible damage, or indication of failure, of the capacitor. Failure of the newer all-film capacitors are particularly hard to discern since they generate considerably less gas than paper-film capacitors. Field inspection of capacitors, at best, only indicates some probability that a capacitor has not failed. Field inspections provide no assurance as to the functional condition and expected life of a capacitor. Facilities/Equipment • Substation Capacitors – Rack-Mounted or Metal-Enclosed • Pole-Top Capacitor Banks 5.05.1 Inspection and Maintenance Activity Schedules WARNING: Wait at least FIVE MINUTES after de-energizing the capacitors before beginning servicing them. 5.05.1.1 Table 1 – Capacitor Maintenance Intervals Substation Capacitor Bank Maintenance Schedule Interval Time-Directed Maintenance Routine Check – Energized (Rack Mounted and Enclosed) 1M Major Inspection – De-Energized (Enclosed only) 1Y Condition-Based Maintenance (CBM) – S/S only Fuse replacement (replace if failed) A/R Major Test - De-Energized A/R Major Maintenance – De-Energized A/R Unit replacement (physical damage or failed test) A/R Block openings (if signs of animal or debris entry) A/R Clean the unit (if contaminated) A/R Repair all defects as they are found during Inspection and Test. A/R Pole-Top Capacitor Bank Maintenance Schedule Interval Time-Directed Maintenance Inspection 1Y Infrared - Backbone only, while energized 1Y Condition-Based Maintenance (CBM)Page 62 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 62 of 297 Perform Test A/R Scheduling Requirements Perform Capacitor Inspection at same time as controller inspection A/R Maintain attached Potential Transformer at time of Capacitor Inspection, if possible. A/R Capacitor Bank - 69kV and above Maintenance Schedule Interval Time-Directed Maintenance Routine Check – Energized Infrared Inspection Major Inspection – De-Energized (Note 1) 1M 6M 1Y Condition-Based Maintenance (CBM) Fuse replacement (replace if failed) Major Test - De-Energized Major Maintenance – De-Energized Unit replacement (physical damage or failed test) Block openings (if signs of animal or debris entry) Clean the unit (if contaminated) Diagnostic Testing Repair all defects as they are found during Inspection and Test. A/R A/R A/R A/R A/R A/R A/R A/R Continuous Monitoring Overvoltage condition Imbalanced condition. C C Scheduling Requirements Perform Capacitor Inspection at same time as controller inspection A/R Maintain attached Potential Transformer at time of Capacitor Inspection, if possible. A/R In Table 1, the type of maintenance is listed in the left column and the interval required for that type of maintenance is listed in the right column. For example, the interval for a Major Inspection of a Substation Capacitor is 1Y (or 1 Year). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years M = Month, i.e. 1M = 1 Month A/R = As Required Note 1 = The Major Inspection for enclosed units is to replace one of the monthly Routine Checks, so that the unit is only maintained 12 times per year. 5.05.2 Substation (S/S) Capacitor Maintenance Categories See EMP Instruction 6.05 for details on performing the following maintenance activities. Condition-Based Repair all defects as they are found.Page 63 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 63 of 297 Time-Directed • 5.05.2.1 S/S Routine Check - Energized Rack-Mounted Units Metal-Enclosed U • 5.05.2.2 S/S Major Inspection – De-Energized Metal-Enclosed Units • 5.05.2.3 S/S Major Test – De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.2.4 S/S Major Maintenance - De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.2.5 Infrared Testing – Rack Mounted Only 5.05.3 Pole-Top Capacitor Maintenance See EMP Instruction 6.05 for details on performing the following maintenance activities. Time-Directed 5.05.3.1 Pole-Top Capacitor Inspection 5.05.4 Capacitor – 69KV and Above Maintenance See EMP Instruction 6.05 for details on performing the following maintenance activities. Time-Directed • 5.05.4.1 Routine Check - Energized Rack-Mounted Units and Metal-Enclosed Units • 5.05.4.2 Major Inspection – De-Energized Metal-Enclosed Units Only • 5.05.4.3 Major Test – De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.4.4 Major Maintenance - De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.4.5 Infrared Testing 5.05.5 FAILURE FINDING Failures of capacitors shall be documented in the equipment failure reporting system used by your region (EFRS, UPER, or Cascade, as appropriate) and placed in “To Eng” status for review by Distribution Standards. 5.05.6 References Supporting References include: • TD 832, “Capacitor Bank Inspection” • Accident Prevention Manual – “Capacitors” • NoMAX 1000 & 2000 series capacitor control Instruction Manual • Fisher Pierce POWERFLEX Instruction Manual • Supervisors’ Briefing Sheet No. SBS-05-017. Issued 12-08-2005Page 64 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 64 of 297 5.05.7 Capacitor Maintenance Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from service technicians, and the subject matter experts. Requirement Basis Substation Capacitors Routine Check – Energized @ 1M interval Monthly inspections performed energized have historically been the accepted frequency cycle for this equipment. No information, either internal or external to NU, has been found to suggest a change to this frequency cycle is warranted. Major Inspection (Metal-Enclosed only) – Deenergized @ 1Y Manufacturer’s literature recommends periodic de-energized maintenance, but does not provide a recommended frequency. Because components of a metal enclosed bank cannot be inspected during the monthly inspection, a de-energized inspection on an annual basis is necessary. Infrared Inspection Infrared inspection is a proven technique for locating “hot spots” on equipment and connections in order to identify conditions that can be corrected before they become serious problems. Pole Top Capacitors Inspection 1Y (Minimum) A yearly inspection (at a minimum) has historically been the accepted frequency cycle for this equipment, as recommended by the MFR. No information, either internal or external to NU, has been found to suggest a change to this frequency cycle is warranted. This is supported by TD832 that indicates “One capacitor inspection is required annually in the spring. An optional inspection may be performed in the fall.” Capacitors – 69KV and above Infrared Inspection 6M(Minimum) Thermography should be performed every 6 months with capacitors in service. 6.05 Capacitor Maintenance Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource Employee Safety & Health Handbook • TD 832, “Capacitor Bank Inspection” • TD 800, “Distribution System Protective Work Clearances”Page 65 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 65 of 297 • • • • (Connecticut & Western MA) DTR 19.133 – “Capacitor Fusing Guide” PSNH Procedure CO-1155, “Isolation of Capacitor Banks on Distribution Circuits” TD 703 – Temporary Protective Grounds for Personnel in Substations TD 855 – Grounding for Personal Protection on Overhead Lines Capacitor Maintenance Instructions Routine Check – Energized – Substation Rack-Mounted Units 1. Check the fence enclosure, warning and caution signs, and locks for proper installation and condition (if applicable). 2. Visually check all fuses. 3. Check for oil leaks. 4. Visually check the condition of each capacitor. 5. Visually check for objects or animals/birds’ nests on the capacitors and on the rack. 6. Visually check any associated primary connected equipment (i.e., switches, lightning arresters, reactors) for abnormalities. 7. Visually check the breaker or interrupter counter(s) for normal operation without cycling the equipment. 8. Visually check the controls (i.e., voltage, current, time clock, radio and lights) for proper operation without cycling the equipment. 9. Listen for unusual noises. 10. Check the condition of the control cable, if possible. 11. Record the operations counter reading and other conditions pertinent to the unit (i.e., targets, fuses). 12. Notify Supervisor & create MxO Alert or Work Order if unusual conditions found. Metal – Enclosed Units 1. 2. 3. 4. 5. 6. 7. 8. Visually check the enclosure for damage and security (i.e., proper locking, unrestricted ventilation, signs of animal entry). If the breaker, switch, or interrupter is safely accessible, visually check the condition and counter for normal operation without cycling the equipment. If applicable, Check the condition of the control cable, if possible. Visually check the controls (i.e., voltage, current, time clock, radio and lights) for proper operation without cycling the equipment. Record the operations counter reading and other conditions pertinent to the unit (i.e., targets, fuses). Check for oil leaks, if possible. Listen for unusual noises. Notify Supervisor & Create MxO Work Order if unusual conditions found.Page 66 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 66 of 297 Major Inspection – De-Energized – Substation NOTE: Prior to beginning maintenance, ensure that all switching and notifications are performed in accordance with Company requirements. Metal-Enclosed Units Only Isolate and ground the capacitor bank using appropriate operating and safety procedures (allow 5 minutes before grounding bank after isolation). 1. Isolate and ground the capacitor bank from service in accordance with Company requirements. 2. Remove the capacitor bank from service in accordance with Company requirements. 3. Visually inspect the bank for the following: • Bulging cans • Oil leaks • Cracked housings 3. Check the ground switch and interlocking mechanism for damage or abnormalities. 5. I f a p p lic a b le , Open all compartment doors and check for water leaks, oil leaks, moisture, and contamination. 6. Check for foreign material or signs of animal entry. If an opening exists that may allow entry, repair or safely block the opening before returning the bank to service. 7. If applicable, Check the condition of ventilators and filters. 8. If applicable, Check the fans and thermostats, if applicable, for proper operation. 9. If applicable, Check all fuses. 10.If applicable, Check all capacitor tanks and connections for abnormalities. 11. If applicable, Clean the unit before re-energizing if it is dirty. 12. If applicable, Remove Worker’s grounds and short circuits from the bushings, if installed. 13. If applicable, Disconnect the phase jumpers between the capacitor cans, if installed. 14. Calibrate and functionally checked monitoring equipment (relays, etc) used to alarm or trip the bank under abnormal conditions. 15. Test any capacitors found to have blown fuses as follows: a). Review the capacitance meter manufacturer’s instructions. b). Calibrate the capacitance meter. c). Connect test leads to capacitor-can bushings. d). Ensure good test lead connection. e). Measure the capacitance of each capacitor can. See Appendix 1 for acceptable test values. Fail any can that tests outside of these values. NOTES:Page 67 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 67 of 297 • • Acceptable capacitance readings and a satisfactory visual inspection are indications of a good capacitor can. The capacitance meter test may not always be correct. A failed capacitor may read within the range which that indicates that the capacitor is good. Because this is not a conclusive test, every precaution shall be taken when energizing a capacitor. 16. Refer to Appendix 1, Capacitor Test Benchmarks and the following to determine if the capacitor can(s) are acceptable: 17. Compare test results to the indicated values for the size and voltage of the can. 18. Refer to Appendix 1 and verify the meter reading is within the acceptable range specified by upper and lower limits. 19. If the capacitance meter reading is outside of the acceptable range specified by the upper and lower limits, identify the cans as failed. 20. Replace failed capacitor can(s) if visual inspection and/or capacitance test results indicate capacitor can failure(s). Refer to TD 832, “Capacitor Bank Inspection”. 21. Restore the capacitor bank to service in accordance with Company requirements. 22. Check the operation of the oil switches when initiating a close (to re-energize the bank) Major Test – De-Energized – Substation Rack-Mounted and Metal-Enclosed Units 1. Test the voltage, current, time and/or radio operating controls for proper operation; check and verify their settings NOTE: Prior to performing the remainder of this maintenance, ensure that all switching and notifications are performed in accordance with Company requirements. 2. Isolate and ground the capacitor bank using appropriate operating and safety procedures. Allow 5 minutes before grounding the bank after isolating it. 3. Remove the capacitor from service in accordance with Company requirements. 4. Visually inspect the bank for the following: • Bulging cans • Oil leaks • Cracked housings 5. Open all compartment doors and check for water leaks, oil leaks, moisture, and contamination. 6. Check for foreign material or signs of animal entry. If an opening exists that may allow entry, repair or safely block the opening before returning the bank to service. 7. Check the condition of ventilators and filters. 8. Check the fans and thermostats, if applicable, for proper operation. 9. Operationally check all associated switches and interlocking
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026