Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 6 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 6 of 297 corrective action in the upcoming year. All transmission lines are inspected at least once annually. All lines that are subject to FAC-003 requirements are inspected at least twice annually. Cyclical Vegetation Control – This consists of the control of undesirable vegetation (tallgrowing species) within the cleared and maintained areas of the ROW and is performed on a 4-year cycle. The Company employs Integrated Vegetation Management (“IVM”) methods, including manual, mechanical and the targeted application of herbicides to control the tall-growing tree species and state-listed invasive woody shrub species within the ROW. Proper notification of abutters for herbicide application is performed in accordance with C.G.S Chapter 441, section 22a-64k. Side Trimming – This consists of the trimming and removal of tree branches that encroach into the ROW from the outside edges of the cleared ROW for the purpose of ensuring adequate clearance between energized conductors and vegetation located outside the maintained corridors. The Company will be completing side trimming to coincide with the four-year maintenance program. Hazard Tree Removals – Trees along the transmission corridor, both outside and within the easement limits of the ROW are visually inspected to identify those trees that pose a higher risk of falling and making contact with the transmission facilities. Those trees are scheduled for corrective action (topping, trimming, removal), with appropriate notification and/or consent of property owners as required. The inspections are performed in conjunction with the scheduled side trimming. Storm Hardening and System Resiliency Special Program Following the recommendations within the FERC “Report on Transmission Facility Outages during the Northeast Snowstorm of October 29-30, 2011,” the Company has initiated a special program to remove all non-compatible trees within the easemented or fee-owned Rights-Of-Way. In 2016, the Company began its first ROW clearing projects, expanding cleared boundaries by approximately 500 acres. This initiative is expected to continue through 2035 to complete the system in CT. In 2020, the Company is planning to clear approximately 650 acres, subject to permitting requirements. C) Maintenance Practices In accordance with the Authority’s requirements, this section of the Plan includes a detailed description of the Company's inspection, testing, and maintenance practices for transmission and distribution lines and equipment, and any significant changes thereto over the past two years.Page 7 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 7 of 297 • Description of Distribution Maintenance Organization and Work Force Electric System Operations The Electric System Operations organization has the mission to operate the Electric Transmission and Distribution system. This includes overseeing the scheduling and switching required to both restore power when outages occur, and to safely remove assets from service for maintenance and other construction activities. Electric Systems Operations encompasses first response for outages and trouble events, systemrestoration activities and control-room management, and electric system configuration control with the objective of limiting the frequency and duration of customer outages. Electric Field Operations The Electric Field Operations organization is responsible for the construction, maintenance and Operations of the CL&P overhead and underground distribution system. The Electric Field Operations organization at CL&P is composed of a System Projects group and three Division Operations groups, each with responsibility for a specific geographic area. A limited amount of some system maintenance is performed within the Electric Field Operations organization. Engineering The Engineering organization works as a centralized team with responsibility for all design, engineering and technology functions necessary to perform distribution operations. The Engineering organization includes substation engineering, protection and controls engineering, telecommunications engineering, distribution standards and system resiliency. This alignment of engineering functions is designed to promote a stream-lined decision-making focus and standard distribution-system design. Station Operations The Station Operations organization is responsible for a major portion of distribution maintenance in Connecticut. This organization is made up of seven groups in Connecticut. These are Station Operations Central, Station Operations Eastern, Station Operations Western, Technical Services, Station Services, and Maintenance Engineering. The Station Operations Central, Station Operations Eastern, and Station Operations Western groups, each headed by a Manager – CL&P Station Operations, have jurisdiction over all distribution substation electrical equipment maintenance and selected overhead electrical equipment maintenance in their respective geographic regions. Each region is divided into multiple districts, each with a supervisor who has responsibility for completing the maintenance work in the district. District Station Operations Supervision oversees crew complements, makes assignments for crew assignments, arranges for staffing, materials and equipment with local Operations and Technical personnel, and monitors work in progress to determine adherence to safety rules, performance, and construction standards. The Technical Services group is headed by a Manager – CL&P Technical Services, who is responsible for all Connecticut test department activity. The test department is made up of three groups with a Supervisor – CL&P Test for each of three regionalPage 8 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 8 of 297 groups. Test Department Supervision oversees crew staffing, makes assignments for crew assignments, arranges for staffing, materials and equipment with local Operations and Station Operations personnel, and monitors work in progress to determine adherence to safety rules, performance, and construction standards. The Station Services group provides centralized support of maintenance activities, hazardous waste management, distribution transformer repair, and other specialized maintenance services. The Maintenance Engineering group is responsible for utilizing the work management and maintenance management systems, developing new maintenance methods and programs, investigating equipment problems and failures, the Supervisory Control and Data Acquisition (SCADA) equipment and other maintenance related studies. This group is also responsible for the chemistry laboratory and infrared inspection program. Frequency of Inspection and/or Maintenance As an ongoing activity, Company employees routinely observe the condition of distribution plant. This is done as they travel about the Company’s service area to perform field assignments as well as going to and from work. In addition, inspection of the plant goes on as field work is being engineered and as it is physically performed. Eversource also has a comprehensive inspection, testing, and maintenance program for its distribution facilities. A table of the inspection and maintenance procedures, their frequency, and any frequency changes in the past two years is included as Appendix 4. Appendices 5-20 provide complete procedures and brief outlines of policies pertinent to line inspection and maintenance. This program has the following among its primary objectives: • The prevention or mitigation of service interruptions • Extending the useful life of equipment • Avoiding future, more costly maintenance and repairs • Assuring compliance with: safety rules and regulations Legal requirements contractual agreements The Eversource Maintenance Program (“EMP”) identifies maintenance areas to be addressed by the Distribution Maintenance organization in order to reduce outages, add to the useful life of equipment, and reduce system operating costs. The following is a brief description of the highlights for major topics regarding the inspection, testing, and maintenance practices for distribution lines and equipment: 1. The following Direct Buried equipment is inspected at as required with a max of 15-year intervals:Page 9 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 9 of 297 Company Owned direct buried facilities including: • • • • • • • • • Pad Mounted Transformers Submersible Transformers Switch Enclosures Switchgear Transclosures Handholes (HH) Risers Fault Indicators Primary and secondary cable Refer to EMP 5.11 & 6.11 in Appendix 5 for further details. 2. Capacitor Banks All pole top and substation capacitor banks are visually inspected once every year. Substation capacitor banks are routinely inspected monthly. This inspection is intended to determine the condition of the tanks, bushings, terminals, connections, etc. The reactive characteristic of air conditioning load requires a high availability of capacitor banks during summer load periods. The inspection is scheduled for March and repairs are scheduled as problems are identified to ensure repairs are completed by June 1st to prepare for summer loads. An annual infrared survey of capacitor banks is also performed. Refer to EMP 5.05 & 6.05 in Appendix 6 for further details. 3. Inspection and Maintenance of pole top Automatic Voltage Regulating Equipment Pole top regulators are inspected annually and receive major maintenance as required. All three-phase voltage regulating equipment on circuit backbones receive an annual infrared inspection (Appendix 19). Refer to EMP 5.01 & 6.01 in Appendix 8 for further details. 4. Inspection and Maintenance of Reclosers Presently, SCADA controlled pole top distribution line reclosers are inspected annually and Non-SCADA controlled pole top distribution line reclosers are inspected bi-monthly. The vast majority of line reclosers now have microprocessor-based monitoring and are alarmed via the SCADA System. In 2020 Eversource Connecticut will pilot a yearly based inspection on all reclosers as part of the distribution line inspection and perform condition based inspections bas on alarms received via the SCADA System. Substation distribution line reclosers are inspected monthly. Refer to EMP 5.44 & 6.44 in Appendix 9 for further details.Page 10 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 10 of 297 5. Inspection and Maintenance – Network Transformers Network vaults containing network transformers are handled as follows: A. B. Maintenance inspection – Energized - Annually Major Maintenance - De-Energized - Every four years Refer to EMP 5.30 & 6.30 in Appendix 12 for further details. 6. Inspection and Maintenance - Underground System - Cable See Underground Vaults & Manholes Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. Infrared Inspections in Underground Vaults and Networks are conducted to identify potential problems in primary and secondary cables, network protectors and other underground equipment. 7. Inspection and Maintenance - Street lighting Street lighting supplied from the underground system is inspected at five-year intervals. Refer to EMP 5.48, 5.52 and EMP 6.52 in Appendix 16 for further details. 8. Infrared Inspection The three-phase backbone portions of all circuits are surveyed annually with infrared. Refer to EMP 5.22 Appendix 19 for further details. 9. Distribution Wood Pole Inspection and Treatment The Company will continue to evaluate the effectiveness of a pole inspection and treatment program along with a capital pole replacement program. Refer to EMP 5.61 & 6.61 and 6.61A in Appendix 10 for further details. 10. Three-Phase Group Operated Switches Inspection and Maintenance All three-phase group operated switches are visually inspected once per year. As required, these switches are operated to check for blade alignment, contact condition, interrupting devices, insulators, arresters, etc. An annual infrared survey of three-phase switches is also performed. Refer to EMP 5.15, 6.15a and 6.15b in Appendix 7 for further details. 11. Inspection and Maintenance of Underground Transformers.Page 11 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 11 of 297 Radial supplied underground transformers are inspected as required with a max of 15-year intervals. Refer to EMP 5.55 & 6.55 in Appendix 15 for further details. 12. Inspection and Maintenance-Underground System - Vaults and Manholes Vaults and manholes are inspected at five-year intervals. Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. 13. Inspection and Maintenance-Underground System-Corrosion See Underground Vaults & Manholes Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. • Current Actual Annual Expenditures The 12-month expenditure for maintenance of overhead distribution plant for the period December 1, 2018 through November 30, 2019 was $106.3 million. This equates to $6,527.49 per primary circuit mile when divided by 16,239 overhead primary circuit miles. • Completed maintenance CL&P performs maintenance of its distribution system on a continuing scheduled basis. A copy of the CL&P’s Inspection and Maintenance System Report for the period January 1 through November 30, 2019 including a listing of the appropriate staffing levels necessary to complete the 2019 activities outlined in the Plan as follows:Page 12 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 12 of 297 The Connecticut Light and Power Company Inspection and Maintenance System Report January 1 Through November 30, 2019 System Report Number of scheduled and completed % Total Completed Scheduled Group Procedure completed Unit Description Number by for 2019 Responsible Number by of Units 11/30/2019 11/30/2019 Ref. No I&M Program Description 1 DB Facilities Operations EMP 5.11 Switch/Transformer 72,633 5,103 5,103 100% 1 2 Capacitor Banks Maintenance EMP 5.05 Capacitor Bank 1,678 1,678 1,678 100% 4 3 Automatic Voltage Regulators Maintenance EMP 5.01 Regulator 869 869 869 100% 4 4 5 Reclosers UG System Network Transformers Maintenance EMP 5.44 Inspections 2,658 Recloser EMP 5.44 Major EMP 5.29, 5.30 Routine Inspection Maintenance 2,658 2,658 0 235 Transformer/Protector 235 EMP 5.29, 5.30 Major Maintenance 2,658 100% 0 100% Notes 2, 4,5 3, 4 235 100% 4, 9 163 82% 4, 9 6, 8 (I) 199 (M) 6 7 8 UG Plant Subway-Street Lights Infrared Inspection Operations EMP 5.59 UG Structure (Manholes & Vaults) Operations EMP 5.52 Pole 5,993 885 960 108% Maintenance EMP 5.22 Circuit 1,019 1,019 1,019 100% 10,792 1,986 1,986 100%Page 13 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 13 of 297 NOTES 1- Number of units to be done in a given year may vary from the quantities called for in the Frequency Table in Appendix #4 of CL&P's Line Maintenance Plan due to anticipated changes to the units of equipment in service at any time due to upgrades, conversions, retirements, and other adjusments. 2- Electronic reclosers are inspected Bi-Monthly. Hydraulic reclosers and reclosers with DSCADA are inspected once per year. 3- With regard to reclosers, the Company is transitioning from a years-based major maintenance cycle to an operational-based maintenance cycle (i.e. in the future these units will be maintained based upon their number of operations, fault duty, or diagnostic tests rather than once every six years). 4- This work may be performed by a combination of Company and contractor crews depending on work load and available resources. 5- In 2008, the Company suspended its annual inspection cycle to eliminate energized oil tests to comply with an interim practice in accordance with a settlement agreement with OSHA. 6- These values may be adjusted at year-end 2019. 7- The cumulative staffing levels allocated and necssary for the implementation of these inspection and maintenance programs is equivalent to 72 people working full time, including contractor resources. 8- Total units inspected include company owned manholes and vaults only. 9- Total Units for networks counts Transformers and Protectors as one. Major Maintenance includes Network Transformers Majors and Protector Majors as separate items.Page 14 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 14 of 297 INDEX OF APPENDICES Appendix 1 No./Letter/Section Title Transmission and Distribution System Miles per Construction Type and Voltage Level 2 Transmission System Maps 3 CL&P Annual Vegetation Management Plan Section 1 Section 2 Section 3 Section 4 4 5 6 7 8 9 10 11 12 13 CL&P Vegetation Management Annual Plan Specification for Tree Work & Brush Control CL&P Line Clearance Organization CL&P Property owner notification and consent procedures. Table of Inspection and Maintenance Frequencies EMP 5.11 Inspection of Direct-Buried Facilities 6.11 EMP 5.05 Capacitor Bank Inspection 6.05 EMP 5.15 Pole-Mounted, Three-phase, Group Operated 6.15A Switches 6.15B EMP 5.01 Pole Top Regulators 6.01 EMP 5.44 Reclosers and Sectionalizers 6.44 EMP 5.61 Inspection, Treatment, Restoration and 6.61 Replacement Guidelines for Distribution System Wood Poles 6.61A EMP 5.51 Underground Switches 6.51 EMP 5.30 Network Transformers 6.30 EMP 5.29 & 6.29 Network Protectors 6.29A, 6.29B, 6.29C & 6.29D 14 Appendix no longer used 15 EMP 5.55 6.55 EMP 5.48 & 5.52 6.52 EMP 5.59 6.59A 6.59B 16 17 18 Underground Transformers Street Lighting Underground Vaults and Manholes Appendix no longer usedPage 15 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 15 of 297 19 20 EMP 5.22 Infrared Survey Program Appendix no longer used
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026