Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 61 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 61 of 297 Capacitor fuse(s) often blow with no visible damage, or indication of failure, of the capacitor. Failure of the newer all-film capacitors are particularly hard to discern since they generate considerably less gas than paper-film capacitors. Field inspection of capacitors, at best, only indicates some probability that a capacitor has not failed. Field inspections provide no assurance as to the functional condition and expected life of a capacitor. Facilities/Equipment • Substation Capacitors – Rack-Mounted or Metal-Enclosed • Pole-Top Capacitor Banks 5.05.1 Inspection and Maintenance Activity Schedules WARNING: Wait at least FIVE MINUTES after de-energizing the capacitors before beginning servicing them. 5.05.1.1 Table 1 – Capacitor Maintenance Intervals Substation Capacitor Bank Maintenance Schedule Interval Time-Directed Maintenance Routine Check – Energized (Rack Mounted and Enclosed) 1M Major Inspection – De-Energized (Enclosed only) 1Y Condition-Based Maintenance (CBM) – S/S only Fuse replacement (replace if failed) A/R Major Test - De-Energized A/R Major Maintenance – De-Energized A/R Unit replacement (physical damage or failed test) A/R Block openings (if signs of animal or debris entry) A/R Clean the unit (if contaminated) A/R Repair all defects as they are found during Inspection and Test. A/R Pole-Top Capacitor Bank Maintenance Schedule Interval Time-Directed Maintenance Inspection 1Y Infrared - Backbone only, while energized 1Y Condition-Based Maintenance (CBM)Page 62 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 62 of 297 Perform Test A/R Scheduling Requirements Perform Capacitor Inspection at same time as controller inspection A/R Maintain attached Potential Transformer at time of Capacitor Inspection, if possible. A/R Capacitor Bank - 69kV and above Maintenance Schedule Interval Time-Directed Maintenance Routine Check – Energized Infrared Inspection Major Inspection – De-Energized (Note 1) 1M 6M 1Y Condition-Based Maintenance (CBM) Fuse replacement (replace if failed) Major Test - De-Energized Major Maintenance – De-Energized Unit replacement (physical damage or failed test) Block openings (if signs of animal or debris entry) Clean the unit (if contaminated) Diagnostic Testing Repair all defects as they are found during Inspection and Test. A/R A/R A/R A/R A/R A/R A/R A/R Continuous Monitoring Overvoltage condition Imbalanced condition. C C Scheduling Requirements Perform Capacitor Inspection at same time as controller inspection A/R Maintain attached Potential Transformer at time of Capacitor Inspection, if possible. A/R In Table 1, the type of maintenance is listed in the left column and the interval required for that type of maintenance is listed in the right column. For example, the interval for a Major Inspection of a Substation Capacitor is 1Y (or 1 Year). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years M = Month, i.e. 1M = 1 Month A/R = As Required Note 1 = The Major Inspection for enclosed units is to replace one of the monthly Routine Checks, so that the unit is only maintained 12 times per year. 5.05.2 Substation (S/S) Capacitor Maintenance Categories See EMP Instruction 6.05 for details on performing the following maintenance activities. Condition-Based Repair all defects as they are found.Page 63 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 63 of 297 Time-Directed • 5.05.2.1 S/S Routine Check - Energized Rack-Mounted Units Metal-Enclosed U • 5.05.2.2 S/S Major Inspection – De-Energized Metal-Enclosed Units • 5.05.2.3 S/S Major Test – De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.2.4 S/S Major Maintenance - De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.2.5 Infrared Testing – Rack Mounted Only 5.05.3 Pole-Top Capacitor Maintenance See EMP Instruction 6.05 for details on performing the following maintenance activities. Time-Directed 5.05.3.1 Pole-Top Capacitor Inspection 5.05.4 Capacitor – 69KV and Above Maintenance See EMP Instruction 6.05 for details on performing the following maintenance activities. Time-Directed • 5.05.4.1 Routine Check - Energized Rack-Mounted Units and Metal-Enclosed Units • 5.05.4.2 Major Inspection – De-Energized Metal-Enclosed Units Only • 5.05.4.3 Major Test – De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.4.4 Major Maintenance - De-Energized Rack-Mounted and Metal-Enclosed Units • 5.05.4.5 Infrared Testing 5.05.5 FAILURE FINDING Failures of capacitors shall be documented in the equipment failure reporting system used by your region (EFRS, UPER, or Cascade, as appropriate) and placed in “To Eng” status for review by Distribution Standards. 5.05.6 References Supporting References include: • TD 832, “Capacitor Bank Inspection” • Accident Prevention Manual – “Capacitors” • NoMAX 1000 & 2000 series capacitor control Instruction Manual • Fisher Pierce POWERFLEX Instruction Manual • Supervisors’ Briefing Sheet No. SBS-05-017. Issued 12-08-2005Page 64 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 64 of 297 5.05.7 Capacitor Maintenance Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from service technicians, and the subject matter experts. Requirement Basis Substation Capacitors Routine Check – Energized @ 1M interval Monthly inspections performed energized have historically been the accepted frequency cycle for this equipment. No information, either internal or external to NU, has been found to suggest a change to this frequency cycle is warranted. Major Inspection (Metal-Enclosed only) – Deenergized @ 1Y Manufacturer’s literature recommends periodic de-energized maintenance, but does not provide a recommended frequency. Because components of a metal enclosed bank cannot be inspected during the monthly inspection, a de-energized inspection on an annual basis is necessary. Infrared Inspection Infrared inspection is a proven technique for locating “hot spots” on equipment and connections in order to identify conditions that can be corrected before they become serious problems. Pole Top Capacitors Inspection 1Y (Minimum) A yearly inspection (at a minimum) has historically been the accepted frequency cycle for this equipment, as recommended by the MFR. No information, either internal or external to NU, has been found to suggest a change to this frequency cycle is warranted. This is supported by TD832 that indicates “One capacitor inspection is required annually in the spring. An optional inspection may be performed in the fall.” Capacitors – 69KV and above Infrared Inspection 6M(Minimum) Thermography should be performed every 6 months with capacitors in service. 6.05 Capacitor Maintenance Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource Employee Safety & Health Handbook • TD 832, “Capacitor Bank Inspection” • TD 800, “Distribution System Protective Work Clearances”Page 65 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 65 of 297 • • • • (Connecticut & Western MA) DTR 19.133 – “Capacitor Fusing Guide” PSNH Procedure CO-1155, “Isolation of Capacitor Banks on Distribution Circuits” TD 703 – Temporary Protective Grounds for Personnel in Substations TD 855 – Grounding for Personal Protection on Overhead Lines Capacitor Maintenance Instructions Routine Check – Energized – Substation Rack-Mounted Units 1. Check the fence enclosure, warning and caution signs, and locks for proper installation and condition (if applicable). 2. Visually check all fuses. 3. Check for oil leaks. 4. Visually check the condition of each capacitor. 5. Visually check for objects or animals/birds’ nests on the capacitors and on the rack. 6. Visually check any associated primary connected equipment (i.e., switches, lightning arresters, reactors) for abnormalities. 7. Visually check the breaker or interrupter counter(s) for normal operation without cycling the equipment. 8. Visually check the controls (i.e., voltage, current, time clock, radio and lights) for proper operation without cycling the equipment. 9. Listen for unusual noises. 10. Check the condition of the control cable, if possible. 11. Record the operations counter reading and other conditions pertinent to the unit (i.e., targets, fuses). 12. Notify Supervisor & create MxO Alert or Work Order if unusual conditions found. Metal – Enclosed Units 1. 2. 3. 4. 5. 6. 7. 8. Visually check the enclosure for damage and security (i.e., proper locking, unrestricted ventilation, signs of animal entry). If the breaker, switch, or interrupter is safely accessible, visually check the condition and counter for normal operation without cycling the equipment. If applicable, Check the condition of the control cable, if possible. Visually check the controls (i.e., voltage, current, time clock, radio and lights) for proper operation without cycling the equipment. Record the operations counter reading and other conditions pertinent to the unit (i.e., targets, fuses). Check for oil leaks, if possible. Listen for unusual noises. Notify Supervisor & Create MxO Work Order if unusual conditions found.Page 66 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 66 of 297 Major Inspection – De-Energized – Substation NOTE: Prior to beginning maintenance, ensure that all switching and notifications are performed in accordance with Company requirements. Metal-Enclosed Units Only Isolate and ground the capacitor bank using appropriate operating and safety procedures (allow 5 minutes before grounding bank after isolation). 1. Isolate and ground the capacitor bank from service in accordance with Company requirements. 2. Remove the capacitor bank from service in accordance with Company requirements. 3. Visually inspect the bank for the following: • Bulging cans • Oil leaks • Cracked housings 3. Check the ground switch and interlocking mechanism for damage or abnormalities. 5. I f a p p lic a b le , Open all compartment doors and check for water leaks, oil leaks, moisture, and contamination. 6. Check for foreign material or signs of animal entry. If an opening exists that may allow entry, repair or safely block the opening before returning the bank to service. 7. If applicable, Check the condition of ventilators and filters. 8. If applicable, Check the fans and thermostats, if applicable, for proper operation. 9. If applicable, Check all fuses. 10.If applicable, Check all capacitor tanks and connections for abnormalities. 11. If applicable, Clean the unit before re-energizing if it is dirty. 12. If applicable, Remove Worker’s grounds and short circuits from the bushings, if installed. 13. If applicable, Disconnect the phase jumpers between the capacitor cans, if installed. 14. Calibrate and functionally checked monitoring equipment (relays, etc) used to alarm or trip the bank under abnormal conditions. 15. Test any capacitors found to have blown fuses as follows: a). Review the capacitance meter manufacturer’s instructions. b). Calibrate the capacitance meter. c). Connect test leads to capacitor-can bushings. d). Ensure good test lead connection. e). Measure the capacitance of each capacitor can. See Appendix 1 for acceptable test values. Fail any can that tests outside of these values. NOTES:Page 67 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 67 of 297 • • Acceptable capacitance readings and a satisfactory visual inspection are indications of a good capacitor can. The capacitance meter test may not always be correct. A failed capacitor may read within the range which that indicates that the capacitor is good. Because this is not a conclusive test, every precaution shall be taken when energizing a capacitor. 16. Refer to Appendix 1, Capacitor Test Benchmarks and the following to determine if the capacitor can(s) are acceptable: 17. Compare test results to the indicated values for the size and voltage of the can. 18. Refer to Appendix 1 and verify the meter reading is within the acceptable range specified by upper and lower limits. 19. If the capacitance meter reading is outside of the acceptable range specified by the upper and lower limits, identify the cans as failed. 20. Replace failed capacitor can(s) if visual inspection and/or capacitance test results indicate capacitor can failure(s). Refer to TD 832, “Capacitor Bank Inspection”. 21. Restore the capacitor bank to service in accordance with Company requirements. 22. Check the operation of the oil switches when initiating a close (to re-energize the bank) Major Test – De-Energized – Substation Rack-Mounted and Metal-Enclosed Units 1. Test the voltage, current, time and/or radio operating controls for proper operation; check and verify their settings NOTE: Prior to performing the remainder of this maintenance, ensure that all switching and notifications are performed in accordance with Company requirements. 2. Isolate and ground the capacitor bank using appropriate operating and safety procedures. Allow 5 minutes before grounding the bank after isolating it. 3. Remove the capacitor from service in accordance with Company requirements. 4. Visually inspect the bank for the following: • Bulging cans • Oil leaks • Cracked housings 5. Open all compartment doors and check for water leaks, oil leaks, moisture, and contamination. 6. Check for foreign material or signs of animal entry. If an opening exists that may allow entry, repair or safely block the opening before returning the bank to service. 7. Check the condition of ventilators and filters. 8. Check the fans and thermostats, if applicable, for proper operation. 9. Operationally check all associated switches and interlockingPage 68 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 68 of 297 mechanisms (disconnect, ground, vacuum, etc). 10. Wipe clean all insulators, bus supports, fusses, and bushings. 11. Check all capacitor tanks and connections to ensure that connections are tight and that there are no abnormalities. 12. Visually check and verify proper fusing of capacitors. 13. Check for blown fuses. 14. Test any capacitors found to have blown fuses as follows: a) Review the capacitance meter manufacturer’s instructions. b) Calibrate the capacitance meter. c) Connect test leads to capacitor-can bushings. d) Ensure good test lead connections. e) Measure the capacitance of each capacitor can. See Appendix 1 for acceptable test values. Fail any can that tests outside of these values. NOTES: • Acceptable capacitance readings and a satisfactory visual inspection are indications of a good capacitor can. • The capacitance meter test may not always be correct. A failed capacitor may read within the range that would indicate that the capacitor is good. Because this is not a conclusive test, every precaution shall be taken when energizing a capacitor. 2. Refer to Appendix 1, Capacitor Test Benchmarks and the following to determine if the capacitor can(s) are acceptable: a) Compare test results to the indicated values for the size and voltage of the can. b) Refer to Appendix 1 and verify the meter reading is within the acceptable range specified by upper and lower limits. c) If the capacitance meter reading is outside of the acceptable range specified by the upper and lower limits, identify the cans as failed. 3. Replace failed capacitor can(s) if visual inspection and/or capacitance test results indicate capacitor can failure(s). Refer to TD 832, “Capacitor Bank Inspection”. NOTE: See Appendix 2 for a matrix to be used for determining when to replace capacitors based on inspection findings and maintenance history. Clean the unit before re-energization, if it is dirty. Restore the capacitor bank to service in accordance with Company requirements. Check the operation of the oil switches when initiating a close (to re energize the bank). Major Maintenance – De-Energized – Substation Rack-Mounted and Metal-Enclosed UnitsPage 69 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 69 of 297 1. Test the voltage, current, time and/or radio operating controls for proper operation; check and verify their settings. NOTE: Prior to performing the remainder of this maintenance, ensure that all switching and notifications are performed in accordance with Company requirements. 1. Isolate and ground the capacitor bank using appropriate operating and safety procedure (allow 5 minutes before grounding bank after isolating). Remove the capacitor from service in accordance with Company requirements. 2. Visually inspect the bank for the following: • Bulging cans • Oil leaks • Cracked housing 3. Open all compartment doors and check for water leaks, oil leaks, moisture, and contamination. 4. Check for foreign material or signs of animal entry. If an opening exists that may allow entry, repair or safely block the opening before returning the bank to service. 5. Check the condition of ventilators and filters. Check the fans and thermostats, if applicable, for proper operation. Test the voltage, current, time and/or radio operating controls for proper operation; check and verify settings. (If the bank is de- energized, it may not be possible to functionally check the controls. Functional check of a bank should be done prior to switching it out. This will allow for repairs to the controls while the bank is out). Operationally check all associated switches and interlocking mechanisms (disconnect, ground, vacuum, etc). Wipe clean all insulators, bus supports, fuses, and bushings. Check all capacitor tanks and connections to ensure that connections are tight and that there are no abnormalities. Visually check and verify proper fusing of capacitors. Check for blown fuses. Test any capacitors found to have blown fuses as follows: a) Review the capacitance meter manufacturer’s instructions. b) Calibrate the capacitance meter. c) Connect test leads to capacitor-can bushings. d) Ensure good test lead connection. e) Measure the capacitance of each capacitor can. See Appendix 1 for acceptable test values. Fail any can that tests outside of these values. NOTES:Page 70 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 70 of 297 • • Acceptable capacitance readings and a satisfactory visual inspection are indications of a good capacitor can. The capacitance meter test may not always be correct. A failed capacitor may read within the range which would indicate that the capacitor is good. Because this is not a conclusive test, every precaution shall be taken when energizing a capacitor. Refer to Appendix 1, Capacitor Test Benchmarks and the following to determine if the capacitor can(s) are acceptable: f) Compare test results to the indicated values for the size and voltage of the can. g) Refer to Appendix 1 and verify the meter reading is within the acceptable range specified by upper and lower limits. h) If the capacitance meter reading is outside of the acceptable range specified by the upper and lower limits, identify the cans as failed. Replace failed capacitor can(s) if visual inspection and/or capacitance test results indicate capacitor can failure(s). Refer to TD 832 “Capacitor Bank Inspection”. NOTE: See Appendix 2 for a matrix to be used for determining when to replace capacitors based on inspection findings and maintenance history. Clean the exterior of the capacitor can, if it is dirty. Test the breaker, interrupters, or switches as directed in their individual sections if on cycle with this work activity. Replace any faulty equipment prior to returning the capacitor bank to service. Restore the capacitor bank to service in accordance with company requirements. Check the operation of the oil switches when initiating a close (to re energize the bank). Pole-Top Capacitor Maintenance (Refer to TD 832) 1. Visually inspect the bank for the following: • Bulging cans • Oil leaks • Cracked or broken bushings, if possible • Loose connections, if possible • Blown fuses • Blown arresters • Grounds and grounding connections Visually inspect the Pole, related equipment, and surrounding area as
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026