Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 71 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 71 of 297 follows: • • Verify the Pole Number is present and correctly installed. Verify Tree/Vegetation growth is not encroaching on the equipment. • Verify a continuous ground wire is present from the pole base to the capacitor bank. • Verify a ground rod is present at the base of the pole • Verify a ground wire is present between the ground rod and system neutral. • Verify that oil switches and vacuum interrupters are in good condition. • Verify that radio-controlled switches are in good condition. Verify that all control switches are in their normal positions. Schedule a replacement of the capacitor can if any obvious problems are found, such as physical damage, etc. • If a fuse is blown, test the capacitor. From capacitor control, record the voltage, KVAR and Power Factor. (Note: this information may not be available on some controls). Initiate a close. The recorded values should have changed because of the added capacitance. NOTES: • Refer to PR-153 (Appendix 3 of this document for a description of SC 434202, Transformer and Capacitor tester. • A satisfactory visual inspection is an indication of a good capacitor can only. • If the capacitor is not functional and has oil switches, the bank should be replaced with new. Continuous Monitoring - Capacitor banks 69kV and above 1. Continuous monitoring of the input voltage and voltage or current imbalance within the capacitor banks is performed via SCADA alarm monitoring when the capacitor banks are in operation. Condition Based Maintenance Diagnostic Testing (performed with Bank de-energized) 1. Capacitor can values are recorded. 2. Neutral voltage imbalance protection relaying (if utilized) is tested for proper operation and settings are verified. 3. Over-voltage protection relaying (if utilized) is tested for proper operation and settings are verified. Failure Finding: (Refer to TD 832) See appendix 2 for a matrix to be used for determining when toPage 72 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 72 of 297 replace capacitors based on inspection findings and maintenance history. • Replace the entire capacitor bank (see Appendix 2): o If there have been three or more can failures on the capacitor bank. o If there have been more than two trips to the capacitor bank for repairs other than Cans and Switches. o If the capacitor is not functional and has oil switches. • Repair the capacitor bank if none of the above conditions for replacement exist. (See Appendix 2)Page 73 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 73 of 297 Appendix 1 – Capacitor Test Benchmarks System Line Voltage: kV Capacitor-Can Voltage Rating: kV 4.16Y/2.4 4.8Δ 8.32Y / 4.8 12.4Y / 7.20 13.2Y / 7.62 13.8Y / 7.96 34.5 / 19.92 23.0Y / 13.28 27.6Y / 15.93 2 * Capacitor microfarads = 2.65 x (kVAR ÷ kV ) (1) This is an ideal capacitor test reading. (2) Replace the capacitor can if the reading is below this value. (3) Replace the capacitor can if the reading is above this value. 2.40 4.80 7.20 7.62 7.96 19.92 13.28 15.93 Capacitor Rating: Mircrofarads * -5% 2 +15% 6.90 6.555 7.935 25 11.50 10.925 13.225 50 23.0 21.850 26.450 100 46.0 43.700 52.90 15 1.725 1.639 1.983 25 2.875 2.731 3.306 50 5.751 5.463 6.614 100 11.50 10.925 13.225 200 23.0 21.85 26.45 50 2.556 2.428 2.939 100 5.112 4.856 5.879 150 7.668 7.284 8.818 200 10.224 9.713 11.757 50 2.282 2.168 2.624 100 4.564 4.336 5.249 200 9.128 8.671 10.498 50 2.09 1.986 2.404 100 4.18 3.971 4.807 200 8.36 7.942 9.614 100 0.668 0.634 0.768 150 1.002 0.952 1.152 200 1.336 1.269 1.536 300 2.003 1.903 2.304 400 2.671 2.538 3.072 100 1.503 1.428 1.728 200 3.006 2.856 3.457 300 4.508 4.282 5.184 200 2.089 1.984 2.402 Kvar Ideal 15 1 3Page 74 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 74 of 297 Appendix 2 – Replacement Decision Matrix Eversource Capacitor Replacement Decision Matrix Total Number of Failures Quantity 2 3 1 Repair Equipment on Can Failures Pole during Inspection 4 Trips to bank for failures other than Cans and Switches Oil Switch Failures Replace the Entire Capacitor BankPage 75 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 75 of 297 Appendix – 3 PR-153 – Capacitor TesterPage 76 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 76 of 297 APPENDIX 7 POLE-MOUNTED, THREE-PHASE, GROUP OPERATED SWITCHESPage 77 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 77 of 297 5.15 Disconnect Switches General Description Switches are essential elements of the electrical power distribution systems. They provide positive, visible air gap isolation of equipment and line sections for safe examination, maintenance, and repair. Switches are built in a variety of physical forms to accommodate the various requirements of electrical clearances, operational requirements, and space limitations. They can be divided into three main categories: • Regulator Bypass switches • Disconnect switches • Interrupter switches REGULATOR BYPASS SWITCHES Bypass switches are generally used at regulator installations to provide a quick, reliable means of taking such apparatus in and out of service without de-energizing the feeder circuits and to prevent winding burnouts from open-circuit windings. DISCONNECTS – Single Phase Switches (not including fused cutouts) There are two general classifications for disconnect switches: • Loadbreak and • Non-loadbreak Loadbreak disconnects may be used to make or break current up to the ampere rating of the switch/Load Buster tool combination. Non – Loadbreak disconnects are rated for use as a means to energize or de-energize: • Unloaded bus or bus segments only within the substation • Unloaded circuit breakers, lightning arresters, and other switches. and under certain circumstances, may be used to make or break a parallel connection to another switch. All overhead and some substation disconnects include a loadbreak hooks for use with a loadbreak tool. To open the switch under load, use only an approved loadbreak tool or device designed for use with switches. Follow the instructions provided with the loadbreak tools. See DTR Substation Section 18.41 for the complete list of applications and restrictions for Loadbreak and Non-Loadbreak disconnect switches. Three Phase Disconnect Switches – Gang-Operated Disconnects (GOD) sometimes referred to as Gang-Operated Air Brake (GOAB) Gang-operated disconnects are used where more than one phase of a circuit must be opened simultaneously. The most common gang-Page 78 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 78 of 297 operated disconnect switches are the air-brake type manufactured with up to 1200-ampere ratings in voltage classes up to 46 kV. They are used at substations, switching structures, and on the lines for energizing and de-energizing transformer banks and other apparatus. They are also used for sectionalizing. Although they can be MODs (Motor-Operated Disconnects), they are more commonly provided with a switch handle for hand operation. This type of switch is ideal because it lends itself to operation from the ground, often permitting service to be restored to sections of the circuit without pole climbing. Although there are distinctions between the three categories of switches, for the purpose of simplicity, they will be collectively referred to as “disconnects”, in the remainder of this procedure. Motor Control – Some three phase group-operated disconnects are equipped with electric motors to open or close them. These disconnects may be operated remotely. SCADA – Some disconnect switches are connected to SCADA – an automated system that monitors the switch position, current and voltage and provides the data to a remote location. It also allows for remote operation of the switch if the switch is motor operated. Scadamate – A three phase group-operated disconnect type switch with SCADA capability. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. Facilities/Equipment • Line bypass, Disconnect, and Interrupter Switches NOTE: The inspection and maintenance for single phase Pole-top disconnects is the same for “inline suspension” disconnects. 5.15.1 Inspection and Maintenance Schedules 5.15.1.1 Table 1 – Disconnect Switch Maintenance Intervals Disconnect Switch Interval Maintenance Schedule PM Task Condition Monitoring Motor Operated Drives/Control A/R Time-Directed Maintenance Infrared Inspection (GODs & S/S) – Energized ▲ 1Y Infrared Inspection – Vertical Pole Top and Inline Suspension Single Phase Disconnects (Note 2) 1YPage 79 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 79 of 297 Visual Inspection (In Substations) – Energized 1M Visual as part of the Overhead Plan Inspection 1Y Motor Control Visual Inspection/Battery Replacement (Note 1) 3Y Condition-Based Maintenance (CBM) Infrared Inspection – Vertical Pole Top and Inline Suspension Single Phase Disconnects (Note 2) A/R Visual Inspection (“outside of the fence”) – Energized (Note 3) A/R Major Inspection (Note 4) A/R Major Maintenance (Substation – “within the fence”) (Note 5) A/R Major Maintenance (Pole-Top GOD / GOAB– “outside of the fence”) A/R Major Maintenance – De-Energized (Lines – “outside of the fence”) A/R Replace Braids A/R Any Visual Findings A/R Operational Test (Note 6) A/R In Table 1, the type of maintenance is listed in the left column and the interval required for that type of maintenance is listed in the right column. For example, the interval for an Infrared Inspection of a Disconnect Switch is 1Y (or 1 Year). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years N/A = Not Applicable M = Month, i.e. 1M = 1 Month A/R = As Required S/S = Substation Within the Fence refers to those components within the substation. Outside of the Fence refers to those components beginning on the first Distribution pole outside of the substation. (Note 1) = Routine Switch Controller maintenance consists of replacing the battery packs. The frequency of replacement depends on designed battery life, ambient temperature, float charge voltage and frequency of discharge. Industry experience has shown that batteries should be replaced every two years for hot environments and three years for colder environments. (Note 2) = Infrared surveys are performed on Disconnect Switches in accordance with EMP Chapter 5.22 – Infrared Inspections. Refer to Chapter 5.22 – Infrared Inspections for inspection requirements and the interval at which inspections are to be performed. (Note 3) = Visual Inspection of Disconnects (“outside the fence”) shall be performed prior to every manual operation. This inspection may be performed either from a bucket or from the ground. (Note 4) = A Major Inspection is performed for those Substation Disconnects that are not practical to de-energize, even when the associated equipment is being maintained and is out of service. Those units that fail this inspection are replaced. (Note 5) = Major Maintenance – De-Energized for Substation DisconnectsPage 80 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 80 of 297 (those that can be de-energized) is performed when the equipment to which it is associated is being maintained and is out of service. (Note 6) = The Operational Test is performed at the time of Major Maintenance. See EMP Instructions 6.15A for details on performing maintenance on 3-Phase Overhead disconnects and 6.15B for performing maintenance on Substation disconnects. 5.15.2 Disconnect Switch Maintenance Categories See EMP Instructions 6.15A and 6.15B for details on performing the following maintenance activities for Overhead Disconnects and Substation Disconnects respectively. TIME-DIRECTED 5.15.2.1 Visual Inspection – In Substations – Energized 5.15.2.2 Major Inspection – Energized 5.15.2.3 Motor Control Visual Inspection / Battery Replacement CONDITION-BASED 5.15.2.4 Major Maintenance – De-Energized 5.15.2.5 Operational Test 5.15.2.6 Visual Inspection – “Outside the Fence” 5.15.2.7 Infrared Inspection – Energized NOTE: Due to operating criteria and mounting configurations, pole-top and inline suspension switches are not readily serviced or required to be serviced at frequent intervals. However, inspection and annual infrared scanning are recommended. Refer to EMP Chapter 5.22 – Infrared Inspection. 5.15.3 Failure Finding Failures of major disconnect switches shall be documented in the equipment failure reporting system used by your region (EFRS, UPER, or Cascade, as appropriate). Analysis of disconnect switch failures should be performed when deemed necessary by Distribution Standards.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026