Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 8 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 8 of 297 groups. Test Department Supervision oversees crew staffing, makes assignments for crew assignments, arranges for staffing, materials and equipment with local Operations and Station Operations personnel, and monitors work in progress to determine adherence to safety rules, performance, and construction standards. The Station Services group provides centralized support of maintenance activities, hazardous waste management, distribution transformer repair, and other specialized maintenance services. The Maintenance Engineering group is responsible for utilizing the work management and maintenance management systems, developing new maintenance methods and programs, investigating equipment problems and failures, the Supervisory Control and Data Acquisition (SCADA) equipment and other maintenance related studies. This group is also responsible for the chemistry laboratory and infrared inspection program. Frequency of Inspection and/or Maintenance As an ongoing activity, Company employees routinely observe the condition of distribution plant. This is done as they travel about the Company’s service area to perform field assignments as well as going to and from work. In addition, inspection of the plant goes on as field work is being engineered and as it is physically performed. Eversource also has a comprehensive inspection, testing, and maintenance program for its distribution facilities. A table of the inspection and maintenance procedures, their frequency, and any frequency changes in the past two years is included as Appendix 4. Appendices 5-20 provide complete procedures and brief outlines of policies pertinent to line inspection and maintenance. This program has the following among its primary objectives: • The prevention or mitigation of service interruptions • Extending the useful life of equipment • Avoiding future, more costly maintenance and repairs • Assuring compliance with: safety rules and regulations Legal requirements contractual agreements The Eversource Maintenance Program (“EMP”) identifies maintenance areas to be addressed by the Distribution Maintenance organization in order to reduce outages, add to the useful life of equipment, and reduce system operating costs. The following is a brief description of the highlights for major topics regarding the inspection, testing, and maintenance practices for distribution lines and equipment: 1. The following Direct Buried equipment is inspected at as required with a max of 15-year intervals:
  2. Page 9 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 9 of 297 Company Owned direct buried facilities including: • • • • • • • • • Pad Mounted Transformers Submersible Transformers Switch Enclosures Switchgear Transclosures Handholes (HH) Risers Fault Indicators Primary and secondary cable Refer to EMP 5.11 & 6.11 in Appendix 5 for further details. 2. Capacitor Banks All pole top and substation capacitor banks are visually inspected once every year. Substation capacitor banks are routinely inspected monthly. This inspection is intended to determine the condition of the tanks, bushings, terminals, connections, etc. The reactive characteristic of air conditioning load requires a high availability of capacitor banks during summer load periods. The inspection is scheduled for March and repairs are scheduled as problems are identified to ensure repairs are completed by June 1st to prepare for summer loads. An annual infrared survey of capacitor banks is also performed. Refer to EMP 5.05 & 6.05 in Appendix 6 for further details. 3. Inspection and Maintenance of pole top Automatic Voltage Regulating Equipment Pole top regulators are inspected annually and receive major maintenance as required. All three-phase voltage regulating equipment on circuit backbones receive an annual infrared inspection (Appendix 19). Refer to EMP 5.01 & 6.01 in Appendix 8 for further details. 4. Inspection and Maintenance of Reclosers Presently, SCADA controlled pole top distribution line reclosers are inspected annually and Non-SCADA controlled pole top distribution line reclosers are inspected bi-monthly. The vast majority of line reclosers now have microprocessor-based monitoring and are alarmed via the SCADA System. In 2020 Eversource Connecticut will pilot a yearly based inspection on all reclosers as part of the distribution line inspection and perform condition based inspections bas on alarms received via the SCADA System. Substation distribution line reclosers are inspected monthly. Refer to EMP 5.44 & 6.44 in Appendix 9 for further details.
  3. Page 10 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 10 of 297 5. Inspection and Maintenance – Network Transformers Network vaults containing network transformers are handled as follows: A. B. Maintenance inspection – Energized - Annually Major Maintenance - De-Energized - Every four years Refer to EMP 5.30 & 6.30 in Appendix 12 for further details. 6. Inspection and Maintenance - Underground System - Cable See Underground Vaults & Manholes Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. Infrared Inspections in Underground Vaults and Networks are conducted to identify potential problems in primary and secondary cables, network protectors and other underground equipment. 7. Inspection and Maintenance - Street lighting Street lighting supplied from the underground system is inspected at five-year intervals. Refer to EMP 5.48, 5.52 and EMP 6.52 in Appendix 16 for further details. 8. Infrared Inspection The three-phase backbone portions of all circuits are surveyed annually with infrared. Refer to EMP 5.22 Appendix 19 for further details. 9. Distribution Wood Pole Inspection and Treatment The Company will continue to evaluate the effectiveness of a pole inspection and treatment program along with a capital pole replacement program. Refer to EMP 5.61 & 6.61 and 6.61A in Appendix 10 for further details. 10. Three-Phase Group Operated Switches Inspection and Maintenance All three-phase group operated switches are visually inspected once per year. As required, these switches are operated to check for blade alignment, contact condition, interrupting devices, insulators, arresters, etc. An annual infrared survey of three-phase switches is also performed. Refer to EMP 5.15, 6.15a and 6.15b in Appendix 7 for further details. 11. Inspection and Maintenance of Underground Transformers.
  4. Page 11 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 11 of 297 Radial supplied underground transformers are inspected as required with a max of 15-year intervals. Refer to EMP 5.55 & 6.55 in Appendix 15 for further details. 12. Inspection and Maintenance-Underground System - Vaults and Manholes Vaults and manholes are inspected at five-year intervals. Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. 13. Inspection and Maintenance-Underground System-Corrosion See Underground Vaults & Manholes Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. • Current Actual Annual Expenditures The 12-month expenditure for maintenance of overhead distribution plant for the period December 1, 2018 through November 30, 2019 was $106.3 million. This equates to $6,527.49 per primary circuit mile when divided by 16,239 overhead primary circuit miles. • Completed maintenance CL&P performs maintenance of its distribution system on a continuing scheduled basis. A copy of the CL&P’s Inspection and Maintenance System Report for the period January 1 through November 30, 2019 including a listing of the appropriate staffing levels necessary to complete the 2019 activities outlined in the Plan as follows:
  5. Page 12 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 12 of 297 The Connecticut Light and Power Company Inspection and Maintenance System Report January 1 Through November 30, 2019 System Report Number of scheduled and completed % Total Completed Scheduled Group Procedure completed Unit Description Number by for 2019 Responsible Number by of Units 11/30/2019 11/30/2019 Ref. No I&M Program Description 1 DB Facilities Operations EMP 5.11 Switch/Transformer 72,633 5,103 5,103 100% 1 2 Capacitor Banks Maintenance EMP 5.05 Capacitor Bank 1,678 1,678 1,678 100% 4 3 Automatic Voltage Regulators Maintenance EMP 5.01 Regulator 869 869 869 100% 4 4 5 Reclosers UG System Network Transformers Maintenance EMP 5.44 Inspections 2,658 Recloser EMP 5.44 Major EMP 5.29, 5.30 Routine Inspection Maintenance 2,658 2,658 0 235 Transformer/Protector 235 EMP 5.29, 5.30 Major Maintenance 2,658 100% 0 100% Notes 2, 4,5 3, 4 235 100% 4, 9 163 82% 4, 9 6, 8 (I) 199 (M) 6 7 8 UG Plant Subway-Street Lights Infrared Inspection Operations EMP 5.59 UG Structure (Manholes & Vaults) Operations EMP 5.52 Pole 5,993 885 960 108% Maintenance EMP 5.22 Circuit 1,019 1,019 1,019 100% 10,792 1,986 1,986 100%
  6. Page 13 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 13 of 297 NOTES 1- Number of units to be done in a given year may vary from the quantities called for in the Frequency Table in Appendix #4 of CL&P's Line Maintenance Plan due to anticipated changes to the units of equipment in service at any time due to upgrades, conversions, retirements, and other adjusments. 2- Electronic reclosers are inspected Bi-Monthly. Hydraulic reclosers and reclosers with DSCADA are inspected once per year. 3- With regard to reclosers, the Company is transitioning from a years-based major maintenance cycle to an operational-based maintenance cycle (i.e. in the future these units will be maintained based upon their number of operations, fault duty, or diagnostic tests rather than once every six years). 4- This work may be performed by a combination of Company and contractor crews depending on work load and available resources. 5- In 2008, the Company suspended its annual inspection cycle to eliminate energized oil tests to comply with an interim practice in accordance with a settlement agreement with OSHA. 6- These values may be adjusted at year-end 2019. 7- The cumulative staffing levels allocated and necssary for the implementation of these inspection and maintenance programs is equivalent to 72 people working full time, including contractor resources. 8- Total units inspected include company owned manholes and vaults only. 9- Total Units for networks counts Transformers and Protectors as one. Major Maintenance includes Network Transformers Majors and Protector Majors as separate items.
  7. Page 14 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 14 of 297 INDEX OF APPENDICES Appendix 1 No./Letter/Section Title Transmission and Distribution System Miles per Construction Type and Voltage Level 2 Transmission System Maps 3 CL&P Annual Vegetation Management Plan Section 1 Section 2 Section 3 Section 4 4 5 6 7 8 9 10 11 12 13 CL&P Vegetation Management Annual Plan Specification for Tree Work & Brush Control CL&P Line Clearance Organization CL&P Property owner notification and consent procedures. Table of Inspection and Maintenance Frequencies EMP 5.11 Inspection of Direct-Buried Facilities 6.11 EMP 5.05 Capacitor Bank Inspection 6.05 EMP 5.15 Pole-Mounted, Three-phase, Group Operated 6.15A Switches 6.15B EMP 5.01 Pole Top Regulators 6.01 EMP 5.44 Reclosers and Sectionalizers 6.44 EMP 5.61 Inspection, Treatment, Restoration and 6.61 Replacement Guidelines for Distribution System Wood Poles 6.61A EMP 5.51 Underground Switches 6.51 EMP 5.30 Network Transformers 6.30 EMP 5.29 & 6.29 Network Protectors 6.29A, 6.29B, 6.29C & 6.29D 14 Appendix no longer used 15 EMP 5.55 6.55 EMP 5.48 & 5.52 6.52 EMP 5.59 6.59A 6.59B 16 17 18 Underground Transformers Street Lighting Underground Vaults and Manholes Appendix no longer used
  8. Page 15 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 15 of 297 19 20 EMP 5.22 Infrared Survey Program Appendix no longer used
  9. Page 16 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 16 of 297 APPENDIX 1 TRANSMISSION AND DISTRIBUTION SYSTEM MILES PER CONSTRUCTION TYPE AND VOLTAGE LEVEL
  10. Page 17 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 17 of 297 APPENDIX 1 TRANSMISSION AND DISTRIBUTION SYSTEM MILES PER CONSTRUCTION TYPE AND VOLTAGE CLASS Transmission Construction Type 69 kV Circuit Miles Overhead Conductor Underground Cable 97.2 2.8 115 kV Circuit Miles 345 kV Circuit Miles 1085.7 86.7* 491.9 47.3 Distribution Construction Type 5 kV Circuit Miles 15 kV Circuit Miles 25 kV Circuit Miles 35 kV Circuit Miles Covered Wire Aerial Cable Spacer Cable Other Overhead Underground** 433.5 33.07 86 31.32 2133.72 268.59 3965.72 100.1 297.43 3381.6 3291.7 2909.22 43.43 166.38 2491.42 3032.91 54.03 44.49 28.02 155.25 68.87 * This includes three cable circuits 5.8 miles long operating at 138 kV across Long Island Sound to the New York State line that is owned by CL&P. The remaining length is owned by the Long Island Power Authority. ** Includes both Direct Buried and Conventional Duct-Type Circuit Miles.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)