  1. Page 81 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 81 of 297 5.15.4 Disconnect Switch Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from the service technicians, and the subject matter expert, who in this case, is an engineer for Distribution Engineering and Design. Requirement Infrared (IR) Inspection – 1Y • Pole Mounted (3 phase and single phase) • Substation Visual Inspection – 1M • In Substation Visual Inspection – A/R • “Outside the Fence” Major Maintenance – DeEnergized • 3 Phase Pole Top – A/R • Substation – W hen associated equipment is taken out of service. Major Inspection – Energized • Substation – W hen associated equipment is taken out of service. Operational Test Basis Infrared inspection is a proven technique for locating “hot spots” on equipment and connections in order to identify conditions that can be corrected before they become serious problems. Following a review of the recommendations contained within IEEE Std C37.35-1995 by the WG on 5/22/12, the WG determined that the existing practice of Infrared inspection of single phase disconnect switches along with the existing work practice of multiple operations meetings the guideline. In addition the WG expressed the opinion that additional periodic maintenance beyond this was not warranted based on the observed failure rates and potential cost and operational impact such activities would entail. This inspection is performed to look for conditions that may require immediate attention or unplanned maintenance. This interval has proven effective in detecting problems that could impact equipment performance. This inspection is performed to look for conditions that may require immediate attention or unplanned maintenance. This interval has proven effective in detecting problems that could impact equipment performance. De-Energized Major Maintenance is performed on Pole Top disconnects on an as needed basis, based upon visual and IR findings. Substation disconnects are difficult to de-energize and therefore receive Major Maintenance only when its associated equipment is taken out of service for maintenance. This is an energized inspection for Substation disconnects. It is used to determine the overall condition of the disconnect and if the disconnect requires replacement. Recommended by IEEE STD C.37.35-1995, SME Tino Dangelo and manufacturer S&C.
  2. Page 82 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 82 of 297 6.15A Switches, Disconnect – Three Phase Overhead GOAB – Maintenance Instructions. Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource System Employee Safety & Health Handbook Procedure Visual Inspection – All 3 Phase Disconnects – Energized 1. Visually inspect the three phase disconnect switch for the following: • Insulators - damage • Frayed or broken flexible connections • Taps - from switch to line conductors • Overheating (visual) • Condition of operating mechanism • Alignment of blades and proper contact • Signs of abnormal discharge, alignment and tripping linkage on load breaking devices • Operating rod insulator for damage and proper position, or missing insulator • Mechanical condition of frame • Condition or pitting of arcing horns, if applicable • Condition of grounds and ground attachments • Obstructions / Tree Branches that might obstruct operation or create a contact hazard • Debris - bird nests, kite string, etc. on switch • Squirrel Guards - missing or damaged, if applicable • Confirm all switch numbers and phase markings are installed, where applicable. • Visually check the condition of the Lightning Arresters, if applicable. • Condition of the motor operator, if applicable. Ensure that the condensation heaters are operational and the control box is free of debris or foreign objects. 2. Record any conditions that require follow-up repair onto EMP Form 6.15A.Follow-up repairs require the initiation of a corrective work order / request. NOTE: This use of this form is optional and it is intended for use as a Worker’s aid – not for use as a permanent record.
  3. Page 83 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 83 of 297 Major Maintenance – Energized 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Perform touch potential testing on all components that may be accessible to the public. Ensure that the switch is bypassed or transfer the load before performing this inspection. Check the structural grounds for mechanical security. Inspect the flexible braids or slipping contacts used for grounding the operating handle. Replace any braids showing signs of corrosion, wear, or having broken strands. Examine the structure, mechanism enclosure and linkage for general condition Ensure mechanical locking devices are secure and in good operating condition Operate all switches several times. Check the switch for smooth operation. Ensure the open and close mechanical indicators are working. Ensure that all Motor Operated Drive (MOD) control switches are in their normal position or are properly tagged, if applicable. Check MOD red and green indicating lights, if applicable. NOTE: The S&C disconnect switches require inspection / adjustment to ensure proper blade alignment. See the section “Alignment Procedure – S&C” following the Operational Test section for instructions on adjusting the S&C Disconnect Switches. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Verify that rotating blades are fully seated and rotated, if applicable. Visually check the alignment of the blade and jaw on each pole and verify the blades are latched, if applicable. Check the insulator for chipped or cracked porcelain, and the accumulation of dirt or other contamination deposits (bird nest, strings, etc.). Check the condition of arcing horns and / or whips for pitting, burning and missing parts, if applicable. Verify the operation of heaters and proper operation of the thermostats, if applicable. Note the position of the safety relief valve and check the indicator on switches using a vacuum or gas interrupting unit, if applicable. Visually check all electrical and mechanical connections for tightness and unusual wear. Check for proper pressure and air leaks on switches employing an Air Blast attachment. Check for the condition and presence of all signage and phase designations, where applicable. Record any conditions that require follow-up repair onto EMP Form 6.15A. Follow-up repairs require the initiation of a corrective work order /request. NOTE: The use of EMP Form 6.15A is optional and is a worker’s aid only and not a permanent record.
  4. Page 84 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 84 of 297 Major Maintenance – De-Energized 1. 2. 3. Disconnect the switch from all electric power sources before servicing. Check for broken plastic cams on the blades. Inspect the insulators for breaks, cracks, burns, or cement deterioration. • Clean the insulators particularly where abnormal conditions such as salt deposits, cement dust, or acid fumes exist. This is important as it will minimize the possibility of flashover resulting from the accumulation of foreign substances on the insulator surfaces. • Replace any broken or defective insulators immediately. NOTE: The S&C disconnect switches require inspection / adjustment to ensure proper blade alignment. See the section “Alignment Procedure – S&C” following the Operational Test section for instructions on adjusting the S&C Disconnect Switches. 4. Check the switch for alignment, contact pressure, eroded contacts, corrosion, and mechanical malfunction. NOTE: S&C Omni-Rupter® Switch blade contacts are greaseless and selflubricating. Do not apply lubricant to the blade contacts. Replace damaged or badly eroded components. If contact pitting is of a minor nature, smooth the surface with clean, fine emery cloth or as the manufacturer recommends. NOTE: Scotch Brite works well on silver contacts when a wire brush cannot be used. • Lubricate the contacts with a thin film of manufacturerrecommended, non-oxide grease for non-self lubricating contacts only. Lubricate the bearings, if applicable. Check the blade latch for adjustment. Ensure the blades move freely and still are rigid enough for proper alignment with contacts. Inspect all live parts for scarring, gouging, or sharp points that could contribute to excessive radio noise and corona. Inspect inter-phase linkages, operating rods, levers, bearings, etc., to ensure that adjustments are correct, all joints are tight, and pipes are not bent or cracked. • Clean and lubricate the switch parts, as required. • Check for simultaneous closing of all blades and for proper seating in the closed position. Check the gear boxes for moisture that could cause damage due to corrosion or ice formation, if possible. Ensure all nuts and bolts are tight, including the piercing bolts on the operating shaft. Inspect the flexible braids or slip-ring contacts used for grounding the operating handle and replace those showing signs of corrosion, wear, or having broken strands. • • 5. 6. 7. 8. 9. 10. 11.
  5. Page 85 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 85 of 297 12. Power-operating mechanisms for switches are usually of the motordriven type. Follow the switch manufacturer's instructions for maintaining each mechanism. Check the limit switch including external switches for: •Poor contacts •Burned out coils •Adequacy of supply voltage •Any other conditions that might prevent the proper functioning of the complete switch assembly. 13. Inspect the overall switch and working condition of operating mechanism: •Check that the bolts, nuts, washers, cotter pins, and terminal connectors are in place and in good condition. •Replace items showing excessive wear or corrosion. •Inspect all bus cable connections for signs of overheating or looseness. 14. Inspect and check all safety interlocks while testing for proper operation. 15. Check the switch to ensure equal pole closing and opening. 16. Operate the switch to ensure its smooth operation. Listen for grinding noises or other signs of wear or malfunction. 17. Record any conditions that require follow-up repair onto EMP Form 6.15A. Follow-up repairs require the initiation of a corrective work order /request. NOTE: The use of EMP Form 6.15A is optional and is a worker’s aid only and not a permanent record. Motor Control Visual Inspection / Battery Replacement 1. Visually inspect the switch-control unit for the following: • Condition of the control cable • Condition of the control cabinet • Compartment heater condition • Condition of the indicating lights 2. Check the battery date and replace the battery if it has expired or will expire within the next three (3) years. 3. Record any conditions that require follow-up repair onto EMP Form 6.15A. Follow-up repairs require the initiation of a corrective work order / request. NOTE: The use of EMP Form 6.15A is optional and is a worker’s aid only and not a permanent record. Battery Replacement Instructions Before you begin: 1. Notify Dispatch before beginning work.
  6. Page 86 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 86 of 297 2. Ensure the battery cables are clearly marked at the battery terminal and battery charger ends to avoid improper connection. 3. Clearly mark the date of installation on the battery for replacement purposes. Removing the old battery: 1. Open the front enclosure door. 2. Place the switch control on “local” control. 3. Ensure that voltage sensing is turned “OFF”, if applicable. 4. Decouple the unit. 5. Turn OFF the AC low voltage supply. 6. Open the DC knife blades. 7. Open the battery enclosure. 8. Disconnect the battery (negative terminal first, followed by the positive terminal) and remove it. Installing the new battery: 9. Before installing the new battery, verify the settings on the constant burden battery charger as follows: a) Short-circuit the output terminals of the battery charger with a jumper. b) Turn ON the low voltage supply to energize the battery charger and verify that charging current reads 225 milli-amperes. Adjust the “burden adjust” to 225 mA, as necessary and lock it in. c) Turn OFF the AC low voltage supply to de-energize the battery charger. Remove the short-circuiting jumper from the output terminals. d) Turn ON the AC low voltage supply to energize the battery charger. e) Using a voltmeter, verify or adjust the charger to a voltage output of 13.3 volts DC. Adjustment is made using the “output adjust” control. 10. Turn OFF the AC low voltage supply to de-energize the battery charger. 11. Install the new battery and connect it – positive terminal first, followed by the negative terminal. 12. Perform a load check on the battery to ensure it is good. 13. Ensure the constant burden battery charger functions correctly as follows: a). Clip the voltmeter leads to the output terminals of the charger and observe the battery voltage. b). Turn ON the AC low voltage supply to energize the battery charger and observe the output voltage as well as the DC charging current. c). Verify that as the output recovers to 13.3 volts DC, the charging current tapers off to a “trickle-charge” level. 14. With the AC low voltage supply still ON, close the DC knife blades. 15. Couple the unit. 16. Turn ON voltage sensing (if applicable).
  7. Page 87 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 87 of 297 17. Place the unit on “supervisory” or “auto” control. 18. Close and lock both enclosures. 19. Notify the dispatcher that the battery replacement is complete and the switch is back in its normal state. Operational Test 1. 2. Perform the operational test in conjunction with the 6 year DeEnergized Major Maintenance for Pole-Mounted GOD / GOAB. Ensure that the switch is bypassed or transfer the load before performing the test. Record any conditions that require follow-up repair onto EMP Form 6.15A. Follow-up repairs require the initiation of a corrective work order /request. NOTE: The use of EMP Form 6.15A is optional and is a worker’s aid only and not a permanent record. Alignment Procedure – S&C 1. Open and close the interrupter switch vigorously through its full travel without hesitation at any point. Be prepared to apply additional force to maintain full speed when operating effort increases as the switch blades engage the interrupters. CAUTION: Failure to properly adjust the handle may cause contact overheating or arcing, damaging the blade contacts. Injury to operating personnel may result. 2. 3. Adjust the stop plates to remove all excess play from the operating mechanism and to attain proper “windup” tension before energizing the switch. Slack in the operating pipe may allow the switch to creep out of the fully-closed position. Loosen the bolts that secure the adjustable stop plates to the foot bearing support plate. See Figure 1.
  8. Page 88 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 88 of 297 Figure 1 – Foot Bearing Assembly and Operating Handle Assembly 4. 5. 6. 7. 8. 9. 10. 11. 12. Place the switch in the fully-open position and adjust the openposition stop plate so that the handle, when lowered, fits into the open-position slot. Mark the location of the open-position stop plate on the support plate. Fully close the switch and apply sufficient pressure to the handle in the closing direction to remove all play in the operating-pipe linkage. Adjust the closed-position stop plate so that the handle will require even greater pressure to force it into the closed-position slot. Mark the location of the closed-position stop plate on the support plate. While holding both stop plates in the previously marked positions, torque the bolts to secure the stop plates to the support plate. Move the handle to the switch-open position and verify the handle, when lowered, fits firmly into the open-position slot. Move the handle to the switch-closed position. Verify that all play in the operating pipe linkage has been taken up before the handle can be lowered into the closed-position slot and that substantial pressure is required to force the handle into the closed-position slot.
  9. Page 89 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 89 of 297 13. Recheck to ensure that all clamp bolts and piercing set screws are properly tightened. 6.15B Switches, Disconnect – Substation – Maintenance Instructions. Disconnect Switch Maintenance – Substation Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource System Employee Safety & Health Handbook Procedure Visual Inspection – Energized 1. Visually inspect the three phase disconnect switch for the following: • Insulators - damage • Frayed or broken flexible connections • Taps - from switch to line conductors and/or bus connections • Overheating (visual) • Condition of operating mechanism • Alignment of blades and proper contact • Signs of abnormal discharge, alignment and tripping linkage on load breaking devices • Mechanical condition of frame • Condition or pitting of arcing horns, if applicable • Grounds and ground attachments • Obstructions that might obstruct operation or create a contact hazard • Debris - bird nests, kite string, etc. on switch • Squirrel Guards - missing or damaged, if applicable • Confirm all switch numbers and phase markings are installed. 2. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Major Inspection – Energized Note: This inspection is performed with the switch energized, but not under load. 1. 2. 3. 4. Check the structural grounds for mechanical security. Inspect the flexible braids or slipping contacts used for grounding the operating handle. Replace any braids showing signs of corrosion, wear, or having broken strands. Examine the structure, mechanism enclosure and linkage for general condition. Ensure mechanical locking devices are secure and in good operating condition.
  10. Page 90 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 90 of 297 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Check both the open and close mechanical indicators. Ensure that all Motor Operated Drive (MOD) control switches are in their normal position or are properly tagged. Check MOD red and green indicating lights, if applicable. Verify that rotating blades are fully seated and rotated, if applicable. Visually check the alignment of the blade and jaw on each pole and verify the blades are latched, if applicable. Check the insulator for chipped or cracked porcelain, and the accumulation of dirt or other contamination deposits (bird nest, strings, etc.). Check the condition of arcing horns and / or whips for pitting, burning and missing parts, if applicable. Verify the operation of heaters and proper operation of the thermostats. Note the position of the safety relief valve and check the indicator on switches using a vacuum or gas interrupting unit. Visually check all electrical and mechanical connections for tightness and unusual wear. Check for proper pressure and air leaks on switches employing an Air Blast attachment. Check for the condition and presence of all signage and phase designations. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Major Maintenance – De-Energized NOTE: Prior to beginning maintenance, a clearance must be obtained and the respective equipment must be de-energized and grounded in accordance with the applicable company procedure(s): 1. TD 703 – Temporary Protective Grounds for Personnel in Substations 2. TD 855 – Grounding for Personal Protection on Overhead Lines 3. TD 856 – Temporary Protective Grounding for Personal Protection on Overhead Lines, 69 kV and Above 1. Isolate and ground the work zone. 2. Disconnect the switch from all electric power sources before servicing. 3. Check for broken plastic cams on the blades. 4. Inspect the insulators for breaks, cracks, burns, or cement deterioration. • Clean the insulators particularly where abnormal conditions such as salt deposits, cement dust, or acid fumes exist. This is important as it will minimize the possibility of flashover resulting from the accumulation of foreign substances on the insulator surfaces. • Replace any broken or defective insulators immediately. NOTE: The S&C disconnect switches require inspection / adjustment to ensure proper blade alignment. See the section “Alignment Procedure – S&C” following the Operational Test section for instructions on adjusting the S&C Disconnect Switches. 5. Check the switch for alignment, contact pressure, eroded contacts, corrosion, and mechanical malfunction. NOTE: S&C Omni-Rupter® Switch blade contacts are greaseless and selflubricating. Do not apply lubricant to the blade contacts.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)