  1. Page 86 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 86 of 297 2. Ensure the battery cables are clearly marked at the battery terminal and battery charger ends to avoid improper connection. 3. Clearly mark the date of installation on the battery for replacement purposes. Removing the old battery: 1. Open the front enclosure door. 2. Place the switch control on “local” control. 3. Ensure that voltage sensing is turned “OFF”, if applicable. 4. Decouple the unit. 5. Turn OFF the AC low voltage supply. 6. Open the DC knife blades. 7. Open the battery enclosure. 8. Disconnect the battery (negative terminal first, followed by the positive terminal) and remove it. Installing the new battery: 9. Before installing the new battery, verify the settings on the constant burden battery charger as follows: a) Short-circuit the output terminals of the battery charger with a jumper. b) Turn ON the low voltage supply to energize the battery charger and verify that charging current reads 225 milli-amperes. Adjust the “burden adjust” to 225 mA, as necessary and lock it in. c) Turn OFF the AC low voltage supply to de-energize the battery charger. Remove the short-circuiting jumper from the output terminals. d) Turn ON the AC low voltage supply to energize the battery charger. e) Using a voltmeter, verify or adjust the charger to a voltage output of 13.3 volts DC. Adjustment is made using the “output adjust” control. 10. Turn OFF the AC low voltage supply to de-energize the battery charger. 11. Install the new battery and connect it – positive terminal first, followed by the negative terminal. 12. Perform a load check on the battery to ensure it is good. 13. Ensure the constant burden battery charger functions correctly as follows: a). Clip the voltmeter leads to the output terminals of the charger and observe the battery voltage. b). Turn ON the AC low voltage supply to energize the battery charger and observe the output voltage as well as the DC charging current. c). Verify that as the output recovers to 13.3 volts DC, the charging current tapers off to a “trickle-charge” level. 14. With the AC low voltage supply still ON, close the DC knife blades. 15. Couple the unit. 16. Turn ON voltage sensing (if applicable).
  2. Page 87 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 87 of 297 17. Place the unit on “supervisory” or “auto” control. 18. Close and lock both enclosures. 19. Notify the dispatcher that the battery replacement is complete and the switch is back in its normal state. Operational Test 1. 2. Perform the operational test in conjunction with the 6 year DeEnergized Major Maintenance for Pole-Mounted GOD / GOAB. Ensure that the switch is bypassed or transfer the load before performing the test. Record any conditions that require follow-up repair onto EMP Form 6.15A. Follow-up repairs require the initiation of a corrective work order /request. NOTE: The use of EMP Form 6.15A is optional and is a worker’s aid only and not a permanent record. Alignment Procedure – S&C 1. Open and close the interrupter switch vigorously through its full travel without hesitation at any point. Be prepared to apply additional force to maintain full speed when operating effort increases as the switch blades engage the interrupters. CAUTION: Failure to properly adjust the handle may cause contact overheating or arcing, damaging the blade contacts. Injury to operating personnel may result. 2. 3. Adjust the stop plates to remove all excess play from the operating mechanism and to attain proper “windup” tension before energizing the switch. Slack in the operating pipe may allow the switch to creep out of the fully-closed position. Loosen the bolts that secure the adjustable stop plates to the foot bearing support plate. See Figure 1.
  3. Page 88 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 88 of 297 Figure 1 – Foot Bearing Assembly and Operating Handle Assembly 4. 5. 6. 7. 8. 9. 10. 11. 12. Place the switch in the fully-open position and adjust the openposition stop plate so that the handle, when lowered, fits into the open-position slot. Mark the location of the open-position stop plate on the support plate. Fully close the switch and apply sufficient pressure to the handle in the closing direction to remove all play in the operating-pipe linkage. Adjust the closed-position stop plate so that the handle will require even greater pressure to force it into the closed-position slot. Mark the location of the closed-position stop plate on the support plate. While holding both stop plates in the previously marked positions, torque the bolts to secure the stop plates to the support plate. Move the handle to the switch-open position and verify the handle, when lowered, fits firmly into the open-position slot. Move the handle to the switch-closed position. Verify that all play in the operating pipe linkage has been taken up before the handle can be lowered into the closed-position slot and that substantial pressure is required to force the handle into the closed-position slot.
  4. Page 89 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 89 of 297 13. Recheck to ensure that all clamp bolts and piercing set screws are properly tightened. 6.15B Switches, Disconnect – Substation – Maintenance Instructions. Disconnect Switch Maintenance – Substation Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource System Employee Safety & Health Handbook Procedure Visual Inspection – Energized 1. Visually inspect the three phase disconnect switch for the following: • Insulators - damage • Frayed or broken flexible connections • Taps - from switch to line conductors and/or bus connections • Overheating (visual) • Condition of operating mechanism • Alignment of blades and proper contact • Signs of abnormal discharge, alignment and tripping linkage on load breaking devices • Mechanical condition of frame • Condition or pitting of arcing horns, if applicable • Grounds and ground attachments • Obstructions that might obstruct operation or create a contact hazard • Debris - bird nests, kite string, etc. on switch • Squirrel Guards - missing or damaged, if applicable • Confirm all switch numbers and phase markings are installed. 2. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Major Inspection – Energized Note: This inspection is performed with the switch energized, but not under load. 1. 2. 3. 4. Check the structural grounds for mechanical security. Inspect the flexible braids or slipping contacts used for grounding the operating handle. Replace any braids showing signs of corrosion, wear, or having broken strands. Examine the structure, mechanism enclosure and linkage for general condition. Ensure mechanical locking devices are secure and in good operating condition.
  5. Page 90 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 90 of 297 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Check both the open and close mechanical indicators. Ensure that all Motor Operated Drive (MOD) control switches are in their normal position or are properly tagged. Check MOD red and green indicating lights, if applicable. Verify that rotating blades are fully seated and rotated, if applicable. Visually check the alignment of the blade and jaw on each pole and verify the blades are latched, if applicable. Check the insulator for chipped or cracked porcelain, and the accumulation of dirt or other contamination deposits (bird nest, strings, etc.). Check the condition of arcing horns and / or whips for pitting, burning and missing parts, if applicable. Verify the operation of heaters and proper operation of the thermostats. Note the position of the safety relief valve and check the indicator on switches using a vacuum or gas interrupting unit. Visually check all electrical and mechanical connections for tightness and unusual wear. Check for proper pressure and air leaks on switches employing an Air Blast attachment. Check for the condition and presence of all signage and phase designations. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Major Maintenance – De-Energized NOTE: Prior to beginning maintenance, a clearance must be obtained and the respective equipment must be de-energized and grounded in accordance with the applicable company procedure(s): 1. TD 703 – Temporary Protective Grounds for Personnel in Substations 2. TD 855 – Grounding for Personal Protection on Overhead Lines 3. TD 856 – Temporary Protective Grounding for Personal Protection on Overhead Lines, 69 kV and Above 1. Isolate and ground the work zone. 2. Disconnect the switch from all electric power sources before servicing. 3. Check for broken plastic cams on the blades. 4. Inspect the insulators for breaks, cracks, burns, or cement deterioration. • Clean the insulators particularly where abnormal conditions such as salt deposits, cement dust, or acid fumes exist. This is important as it will minimize the possibility of flashover resulting from the accumulation of foreign substances on the insulator surfaces. • Replace any broken or defective insulators immediately. NOTE: The S&C disconnect switches require inspection / adjustment to ensure proper blade alignment. See the section “Alignment Procedure – S&C” following the Operational Test section for instructions on adjusting the S&C Disconnect Switches. 5. Check the switch for alignment, contact pressure, eroded contacts, corrosion, and mechanical malfunction. NOTE: S&C Omni-Rupter® Switch blade contacts are greaseless and selflubricating. Do not apply lubricant to the blade contacts.
  6. Page 91 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 91 of 297 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. • Replace damaged or badly eroded components. • If contact pitting is of a minor nature, smooth the surface with clean, fine emery cloth or as the manufacturer recommends. NOTE: Scotch Brite works well on silver contacts when a wire brush cannot be used. • Lubricate the contacts with a thin film of manufacturerrecommended, non-oxide grease for non-self lubricating contacts only. Operate the switch several times and check it for smooth operation. Lubricate the bearings, if applicable. Check the blade latch for adjustment. Ensure the blades move freely and still are rigid enough for proper alignment with contacts. Perform resistance testing on the contacts for each phase using a micro-ohm meter connected bus-to-bus. Record the results. Perform resistance testing on the remaining components including the jaws, hinges, and connectors to determine their condition. Inspect all live parts for scarring, gouging, or sharp points that could contribute to excessive radio noise and corona. Inspect inter-phase linkages, operating rods, levers, bearings, etc., to ensure that adjustments are correct, all joints are tight, and that pipes are not bent. • Clean and lubricate the switch parts, as required. • Check for simultaneous closing of all blades and for proper seating in the closed position. Check the gear boxes for moisture that could cause damage due to corrosion or ice formation, if possible. Ensure all nuts and bolts are tight, including the piercing bolts on the operating shaft. Inspect the flexible braids or slip-ring contacts used for grounding the operating handle and replace those showing signs of corrosion, wear, or having broken strands. Power-operating mechanisms for switches are usually of the motordriven type. Follow the switch manufacturer's instructions for maintaining each mechanism. Check the limit switch including external switches for: • Poor contacts • Burned out coils • Adequacy of supply voltage • Any other conditions that might prevent the proper functioning of the complete switch assembly. Inspect the overall switch and working condition of operating mechanism: • Check that the bolts, nuts, washers, cotter pins, and terminal connectors are in place and in good condition. • Replace items showing excessive wear or corrosion. • Inspect all bus cable connections for signs of overheating or looseness.
  7. Page 92 of 297

    17. 18. 19. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 92 of 297 Inspect and check all safety interlocks while testing for proper operation. Check the switch to ensure equal pole closing and opening. Ensure that each switch-pole toggle mechanism lies against its closed stop, as applicable. Adjust the stop-bolt or crank-arm length as necessary. See the example shown in the figure below and refer to the appropriate manufacturer’s manual Outboard bearing crank arm (adjustable) Stop bolt Figure 1 – Checking Switch Toggle Position on S&C Disconnect 20. 21. Operate the MOD to ensure its smooth operation. Listen for grinding noises or other signs of wear or malfunction. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Motor Control Visual Inspection / Battery Replacement. 1. 2. 3. Visually inspect the switch-control unit for the following: • Condition of the control cable • Condition of the control cabinet • Compartment heater condition • Condition of the indicating lights Check the battery date and replace the battery if it has expired or will expire before the next scheduled maintenance, if applicable. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Operational Test 1. 2. Perform the operational test in conjunction with maintenance of the equipment to which the switch is attached. Ensure that the switch is bypassed or transfer the load before performing the test. Record any abnormal conditions, repairs required, or repairs made in the comments section
  8. Page 93 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 93 of 297 Alignment Procedure – S&C 1. Open and close the interrupter switch vigorously through its full travel without hesitation at any point. Be prepared to apply additional force to maintain full speed when operating effort increases as the switch blades engage the interrupters. CAUTION: Failure to properly adjust the handle may cause contact overheating or arcing, damaging the blade contacts. Injury to operating personnel may result 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Adjust the stop plates to remove all excess play from the operating mechanism and to attain proper “windup” tension before energizing the switch. Slack in the operating pipe may allow the switch to creep out of the fully-closed position. Loosen the bolts that secure the adjustable stop plates to the foot bearing support plate. Place the switch in the fully-open position and adjust the openposition stop plate so that the handle, when lowered, fits into the open-position slot. Mark the location of the open-position stop plate on the support plate. Fully close the switch and apply sufficient pressure to the handle in the closing direction to remove all play in the operating-pipe linkage. Adjust the closed-position stop plate so that the handle will require even greater pressure to force it into the closed-position slot. Mark the location of the closed-position stop plate on the support plate. While holding both stop plates in the previously marked positions, torque the bolts to secure the stop plates to the support plate. Move the handle to the switch-open position and verify the handle, when lowered, fits firmly into the open-position slot. Move the handle to the switch-closed position. Verify that all play in the operating pipe linkage has been taken up before the handle can be lowered into the closed-position slot and that substantial pressure is required to force the handle into the closed-position slot. Recheck to ensure that all clamp bolts and piercing set screws are properly tightened
  9. Page 94 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 94 of 297 APPENDIX 8 POLE TOP REGULATORS
  10. Page 95 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 95 of 297 5.01 Regulators General Description Regulators play a significant role in helping electrical loads operate most effectively at their rated voltage. It is important that the rated voltages supplied to these loads are maintained as nearly constant as possible. NOTE: All specific maintenance requirements that are followed by a triangle Symbol “▲” are explained in the Maintenance Basis Documentation Section of this chapter. 5.01.1 Table 1 – Regulator Maintenance Intervals Pole-Mounted Regulator Maintenance Interval PM Task Time-Directed Routine Inspection ▲ 1Y Condition-Based Major Maintenance (Note 1) ▲ A/R Correct any defects found during Routine Inspection, such as low oil level, faulty operation counter, etc. A/R Infrared Survey (Note 2) A/R S/S Regulator Maintenance Time-Directed Routine Inspection Oil Sample (Substation regulators only) ▲ Condition-Based (Note 3) Major Maintenance (Note 1) ▲ Correct any defects found during Routine Inspection, such as low oil level, faulty operation counter, etc. Infrared Survey (Note 2) Interval 1M 5Y A/R A/R A/R (Note 1) Major Maintenance for Substation regulator’s is only required when the results of oil analysis indicate there is a problem with the regulator and is typically performed at the shop. Major Maintenance for all Pole-top regulators is performed at the shop whenever they are taken out of service.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)