    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 91 of 297 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. • Replace damaged or badly eroded components. • If contact pitting is of a minor nature, smooth the surface with clean, fine emery cloth or as the manufacturer recommends. NOTE: Scotch Brite works well on silver contacts when a wire brush cannot be used. • Lubricate the contacts with a thin film of manufacturerrecommended, non-oxide grease for non-self lubricating contacts only. Operate the switch several times and check it for smooth operation. Lubricate the bearings, if applicable. Check the blade latch for adjustment. Ensure the blades move freely and still are rigid enough for proper alignment with contacts. Perform resistance testing on the contacts for each phase using a micro-ohm meter connected bus-to-bus. Record the results. Perform resistance testing on the remaining components including the jaws, hinges, and connectors to determine their condition. Inspect all live parts for scarring, gouging, or sharp points that could contribute to excessive radio noise and corona. Inspect inter-phase linkages, operating rods, levers, bearings, etc., to ensure that adjustments are correct, all joints are tight, and that pipes are not bent. • Clean and lubricate the switch parts, as required. • Check for simultaneous closing of all blades and for proper seating in the closed position. Check the gear boxes for moisture that could cause damage due to corrosion or ice formation, if possible. Ensure all nuts and bolts are tight, including the piercing bolts on the operating shaft. Inspect the flexible braids or slip-ring contacts used for grounding the operating handle and replace those showing signs of corrosion, wear, or having broken strands. Power-operating mechanisms for switches are usually of the motordriven type. Follow the switch manufacturer's instructions for maintaining each mechanism. Check the limit switch including external switches for: • Poor contacts • Burned out coils • Adequacy of supply voltage • Any other conditions that might prevent the proper functioning of the complete switch assembly. Inspect the overall switch and working condition of operating mechanism: • Check that the bolts, nuts, washers, cotter pins, and terminal connectors are in place and in good condition. • Replace items showing excessive wear or corrosion. • Inspect all bus cable connections for signs of overheating or looseness.
  2. Page 92 of 297

    17. 18. 19. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 92 of 297 Inspect and check all safety interlocks while testing for proper operation. Check the switch to ensure equal pole closing and opening. Ensure that each switch-pole toggle mechanism lies against its closed stop, as applicable. Adjust the stop-bolt or crank-arm length as necessary. See the example shown in the figure below and refer to the appropriate manufacturer’s manual Outboard bearing crank arm (adjustable) Stop bolt Figure 1 – Checking Switch Toggle Position on S&C Disconnect 20. 21. Operate the MOD to ensure its smooth operation. Listen for grinding noises or other signs of wear or malfunction. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Motor Control Visual Inspection / Battery Replacement. 1. 2. 3. Visually inspect the switch-control unit for the following: • Condition of the control cable • Condition of the control cabinet • Compartment heater condition • Condition of the indicating lights Check the battery date and replace the battery if it has expired or will expire before the next scheduled maintenance, if applicable. Record any abnormal conditions, any repairs made and any repairs still needed into Cascade. Operational Test 1. 2. Perform the operational test in conjunction with maintenance of the equipment to which the switch is attached. Ensure that the switch is bypassed or transfer the load before performing the test. Record any abnormal conditions, repairs required, or repairs made in the comments section
  3. Page 93 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 93 of 297 Alignment Procedure – S&C 1. Open and close the interrupter switch vigorously through its full travel without hesitation at any point. Be prepared to apply additional force to maintain full speed when operating effort increases as the switch blades engage the interrupters. CAUTION: Failure to properly adjust the handle may cause contact overheating or arcing, damaging the blade contacts. Injury to operating personnel may result 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Adjust the stop plates to remove all excess play from the operating mechanism and to attain proper “windup” tension before energizing the switch. Slack in the operating pipe may allow the switch to creep out of the fully-closed position. Loosen the bolts that secure the adjustable stop plates to the foot bearing support plate. Place the switch in the fully-open position and adjust the openposition stop plate so that the handle, when lowered, fits into the open-position slot. Mark the location of the open-position stop plate on the support plate. Fully close the switch and apply sufficient pressure to the handle in the closing direction to remove all play in the operating-pipe linkage. Adjust the closed-position stop plate so that the handle will require even greater pressure to force it into the closed-position slot. Mark the location of the closed-position stop plate on the support plate. While holding both stop plates in the previously marked positions, torque the bolts to secure the stop plates to the support plate. Move the handle to the switch-open position and verify the handle, when lowered, fits firmly into the open-position slot. Move the handle to the switch-closed position. Verify that all play in the operating pipe linkage has been taken up before the handle can be lowered into the closed-position slot and that substantial pressure is required to force the handle into the closed-position slot. Recheck to ensure that all clamp bolts and piercing set screws are properly tightened
  4. Page 94 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 94 of 297 APPENDIX 8 POLE TOP REGULATORS
  5. Page 95 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 95 of 297 5.01 Regulators General Description Regulators play a significant role in helping electrical loads operate most effectively at their rated voltage. It is important that the rated voltages supplied to these loads are maintained as nearly constant as possible. NOTE: All specific maintenance requirements that are followed by a triangle Symbol “▲” are explained in the Maintenance Basis Documentation Section of this chapter. 5.01.1 Table 1 – Regulator Maintenance Intervals Pole-Mounted Regulator Maintenance Interval PM Task Time-Directed Routine Inspection ▲ 1Y Condition-Based Major Maintenance (Note 1) ▲ A/R Correct any defects found during Routine Inspection, such as low oil level, faulty operation counter, etc. A/R Infrared Survey (Note 2) A/R S/S Regulator Maintenance Time-Directed Routine Inspection Oil Sample (Substation regulators only) ▲ Condition-Based (Note 3) Major Maintenance (Note 1) ▲ Correct any defects found during Routine Inspection, such as low oil level, faulty operation counter, etc. Infrared Survey (Note 2) Interval 1M 5Y A/R A/R A/R (Note 1) Major Maintenance for Substation regulator’s is only required when the results of oil analysis indicate there is a problem with the regulator and is typically performed at the shop. Major Maintenance for all Pole-top regulators is performed at the shop whenever they are taken out of service.
  6. Page 96 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 96 of 297 (Note 2) Infrared surveys are performed on Regulators in accordance with the requirements of EMP Chapter 5.22 – Infrared Inspections. Refer to EMP Chapter 5.22 – Infrared Inspections for inspection requirements and the interval at which inspections are to be performed. (Note 3) The time interval between maintenance activities will depend upon frequency of tap-changer operation and the load on the regulator. Regulators subjected to numerous overloads and a high load factor may require more frequent inspections than those carrying normal loads. The initial maintenance interval will be as listed above, and will be adjusted in the future, based on collected performance data In Table 1, the intersection of the row and column indicates the inspection or maintenance interval for the equipment under the column heading. For example, the interval for Major Maintenance on a Regulator is A/R (or As Required). The abbreviations used for the intervals are: M = Month, i.e. 1M = 1 Month Y = Year, i.e. 2Y = 2 Years A/R = As Required 5.01.2 Maintenance Activities See EMP Instruction 6.01 for details on performing the following maintenance tasks. TIME-DIRECTED 5.01.2.1 Routine Inspection – Energized 5.01.2.2 Oil Top-Off – De-Energized 5.01.2.3 Oil Sampling – Energized or De-Energized CONDITION-BASED 5.01.2.4 Major Maintenance – De-Energized 5.01.2.5 Return to Service 5.01.2.6 Infrared Survey (See EMP Chapter 5.22 – Infrared Inspection.) 5.01.3 Failure finding Failures of Voltage Regulators shall be documented in the equipment failure reporting system used by your region (EFRS, UPER, or Cascade, as appropriate) and placed in “To Eng” status for review. Analysis of a failed Regulator may be performed as deemed necessary. 5.01.4 Regulator Maintenance Basis Documentation Requirement 1Y Inspection interval Basis The regulators manufacturer’s maintenance manuals do not specify a time interval for inspection and oil sampling. They state that inspection and oil sampling functions are conditionbased, and are dependent upon the frequency of tap-changer operation and the load on the regulator. Industry experience with Automatic Voltage
  7. Page 97 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 97 of 297 5Y Substation Oil Sample interval Infrared Inspection Regulator performance testing as listed in: • Council Controls Working Group (WG) Recommendations Policy • U.S. Department of the Interior Bureau of Reclamation Denver,Colorado • US Navy -Publication Number: TM 5684/NAVFAC MO 200/AFJMAN 32-1082 Recommends an annual inspection. Note: The EMP, based on the Work Practice #M4WP-3018 Rev. 1, recommends a 6-month inspection interval, but company experience has proven that a 1-year interval is sufficient for keeping the equipment reliable. Industry experience with Automatic Voltage Regulator performance testing as listed in: Council Controls Working Group (WG) Recommendations Policy U.S. Department of the Interior Bureau of Reclamation Denver, Colorado US Navy -Publication Number: TM 5-684/NAVFAC MO 200/AFJMAN32-1082 Recommends a 5-year oil sampling frequency. The maintenance practice of many other utilities as it pertained to step voltage regulators were examined to determine the frequency of their oil sampling. The examination revealed that some utilities perform an oil sample every two years, other never performed oil sampling. The manufacturer’s instruction states that their regulator are design for many years of trouble free operation, without the need for any maintenance, and that maintenance is condition based. One manufacturer went as far as to say their regulator could possibly function for 20 years without any maintenance. Several manufacturers suggest operation counts in the 100,000 count range as a basis for performing Major Maintenance. Although each manufacturer states that they do not anticipate the need for frequency maintenance, periodic inspection including oil sampling would help to assure continuity of service. Based on these recommendations and of a review of NU regulator failure reports, in which no noticeable failures were observed over a five year period; the 5Y or 50,000 operations count (based on application) oil sampling interval is being established on a regulators. This replaces the previous 2-year oil sample interval. As data is collected, and examined, this interval may be adjusted. Infrared inspection is a proven technique for locating “hot spots” on equipment and connections in order to identify conditions that can be corrected before they become serious problems.
  8. Page 98 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 98 of 297 6.01 Voltage Regulator Maintenance Instructions Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: •TD 211, “When to Wear FR Clothing” •Eversource Employee Safety & Health Handbook Procedure Routine Inspection – Energized Substation and Pole-Top 1. Perform touch potential testing on any metal surface that may be accessible to the public. 2. Verify the condition of the primary taps. 3. Verify the bushing conditions. 4. Verify the Regulator tank is in satisfactory condition. 5. Check the regulator for any oil leaks or foreign material in the area. 6. Visually check to ensure grounding is properly installed and in good condition. 7. Check the condition of the control cabinet for moisture or other problems. 8. Measure regulated voltage at the test terminals to verify correct bandwidth. 9. Check for proper operation of the raise and lower controls. • If the regulator will not operate properly, try using a substitute control before removing the unit from service. • Refer to the manufacturer’s instruction manual for the proper procedures on removing and replacing the control. 10. Verify the tap operations counter is working. 11. Verify and record the tap operations counter and tap indictor readings. 12. If applicable, then verify the Reverse Flow indicator is on. 13. If applicable, then verify the Reverse Flow indicator is operational. 14. Verify the Neutral indicator light is operational. 15. Ensure that all switches are in their normal positions. 16. Reset the Drag Arms. 17. Check to ensure animal guards are present, correctly installed, and in good condition. 18. Properly secure and lock the control cabinet. 19. Use binoculars to view the oil level window, if possible.
  9. Page 99 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 99 of 297 Warning: Siemens MJ-XL controls manufactured prior to August 2005 may have a defect that allows the control to indicate a false position reading. For example, the control may indicate that the switch is in a “manual” position when in reality it is still in “auto” mode. This concerns only the MJ-XL control and not the MJ-X control. Follow the instructions on page 7 of this section when servicing a regulator equipped with the MJ-XL control. 20. Inspect the bypass arrester, if present. Oil Sample – Substation Only Perform this step once every 5 years for Substation regulators. NOTE: Only take an oil sample from those regulators that are equipped with an oil level sight gauge and a drain valve. 1. 2. Check the oil level sight gauge and add oil as necessary so that an oil sample can be taken without leaving the regulator oil level too low. When performing this step, be sure to maintain safe working clearances from conductors and other electrical equipment or de- energize and ground the regulator. • If it is necessary to add oil before taking a sample, use the pressure relief valve to vent the regulator of positive or negative pressure. Take an oil sample to submit for testing in accordance with TD 202 to ensure compliance with ChemLab requirements. • Use the pressure relief valve to vent the regulator of positive or negative pressure before taking the oil sample. • If the dielectric strength is found to be below 24kv, de- energize the regulator, filter or replace the oil, and perform dissolved gas analysis testing to determine the oil’s integrity. Major Maintenance De - Energized NOTE: Prior to beginning maintenance, a clearance must be obtained and the respective equipment must be de-energized and grounded in accordance with the applicable company procedure(s): 1. TD 703 – Temporary Protective Grounds for Personnel in Substations 2. TD 855 – Grounding for Personal Protection on Overhead Lines 3. TD 856 – Temporary Protective Grounding for Personal Protection on Overhead Lines, 69 kV and Above. (Regulator Bypassed) Warning: High pressure or mechanical failure due to improper bypass operation can cause death, severe injury or damage. To prevent these consequences, bypass the regulator only with the regulator on the neutral tap position.
  10. Page 100 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 100 of 297 To ensure the regulator is in neutral: 1. 2. Place the volt meter leads into the appropriate receptacles and observe the voltage readings. Observe the voltage readings as you operate the Raise or Lower switch. Operate the regulator until the Indicating gauge reads neutral, while ensuring the voltage reading is still at appropriate levels. • If the control has a Neutral Light, ensure it turns on when the gauge is on neutral. If the light does not turn on, check the bulb and replace it if necessary. At this point, the indicator position should read neutral and the neutral indicator light should be on. If both of these conditions are not met, then use an approved regulator neutral tester (SC0188570) as an additional means of neutral verification. See Over & Under Issue # 64, dated June ’09 or PSNH Procedure CO-1040 for details on using this tool. PSNH Procedure CO-1040 and Over &Under Issue # 64 are appended to the end of this instruction. Until there are at least two indications of neutral, DO NOT ATTEMPT to bypass the unit. In such event, de-energize the regulator to remove it from service. 1. De – energize the regulator 2. Remove the voltage regulator from the pole or pad/platform to perform de-energized maintenance. CAUTION: W hen untanking the regulator, be sure to use the proper lifting point, NOT the regulator cover. NOTE: • All Pole-Top regulators will receive their Major Maintenance at the shop. • Substation regulators receive their Major Maintenance at the shop except for those units too large to move. U • Untanking the regulator is not to be performed in the field, except for those Substation regulators which are not practical to move due to their size. 3 . n 3. Untank the regulator. NOTE: Avoid removing the main core-and-coil assembly from the oil, except when a winding failure occurs. Use blocking between the cover and tank lip to suspend the core and coil assembly within the oil until inspection of the tap changer or other maintenance is complete. If it is necessary to expose the main core and coil to air, follow the manufacturer’s instructions before returning the unit to service. 4. Make a thorough inspection of all internal components – particularly noting contact wear, springs, and chain • Determine the remaining contact life by noting the amount of contact erosion which has occurred as compared to the amount of arcing material remaining.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)