  1. Page 42 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 42 of 81 DE 24-070 - 42 - Bates Pages 137-138. We are persuaded by Dr. Woolridge’s testimony and analysis, including his critiques of the Company’s witnesses, and find that his recommendations for the Company’s return on equity, capital ratio, and weighted average cost of capital will result in just and reasonable rates. Dr. Woolridge presents his recommendations as a fair compromise between the needs of the Company for a capital-attractive rate of return, the need to ameliorate financial risks associated with debt, and associated costs, Hearing Exhibit 16 at Bates Page 38-41, and the interests of customers in avoiding rate shock. As presented, Dr. Woolridge’s proxy analyses, offer a reasonable approach that conforms with the New Hampshire legal standards governing comparability of earnings, and we adopt them. Appeal of Conservation Law Foundation of New England, Inc., 127 N.H. 606, 635-636 (1986), citing Bluefield Co. v. Pub. Serv. Comm., 262 U.S. 679, 692 (1923), and New England Tel. & Tel. Co., 104 N.H. at 234. As shown in the graphic presented in Ms. Perry’s testimony, filed on behalf of Wal-Mart, Inc., Hearing Exhibit 34 at Bates Page 13, the 9.5 percent ROE level is well within the range of comparability among investor-owned utilities in the Northeastern United States. Furthermore, this ROE is in line with that approved by the Commission recently for Eversource’s New Hampshire investor-owned utility peers: Unitil Electric Systems, Inc. (Order No. 26,623 (May 3, 2022); 9.2 percent ROE, 7.42 percent WACC); and Liberty Utilities (Granite State Electric) d/b/a Liberty (Order No. 28,135 (April 24, 2025), and Order No. 26,376 (June 30, 2020); 9.1 percent ROE, 7.708 WACC). We find that a 9.5 percent ROE is comparable to the returns on equity enjoyed by the Company’s peers, and will allow the Company to attract capital investment; the 50-50 capital-to-debt ratio will serve to control debt-incurred financial risk and serves
  2. Page 43 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 43 of 81 DE 24-070 - 43 - to reduce the financial burden on Eversource’s customers, as compared with the Company’s original proposals. After considering all the evidence presented in this case, we find that the DOE’s recommended ROE, capital-to-debt ratio, and resulting WACC calculation for the Company are just and reasonable and produce just and reasonable rates. We therefore ADOPT and INCORPORATE into our alternative regulation of the Company’s distribution rates the DOE’s recommendations for the Company’s ROE, capital-to-debt ratio, and resulting WACC calculation. In doing so, we are not persuaded by the OCA’s argument and expert testimony, Hearing Exhibits 22 and 24, that a much lower 8.13 percent ROE would still allow the Company to realize a reasonable return or continue to attract investment capital. Instead, we find that the OCA proposed ROE was neither just nor reasonable, nor would it result in just and reasonable rates. Thus, we REJECT OCA’s proposed ROE in favor of the DOE’s recommended ROE. Likewise, we did not find the Company’s arguments in favor of the 10.3 ROE proposal persuasive. The Company’s use of non-regulated companies in its proxy analysis, as criticized by Dr. Woolridge, did not give the Commission confidence regarding the reasonableness of its analysis, nor do we accept the Company’s overoptimistic growth forecasts, and over-stated market risk premiums, applied in Mr. Rea’s analyses. See Hearing Exhibit 16 at Bates Pages 94-136. B. Alternative Regulation Framework, As Modified by the Commission; Default Ordinary Rate-Case Approach Overview Pursuant to the terms of RSA 374:3-a, “Upon petition of a regulated utility or upon its own initiative and after notice and hearing, the [Commission] may approve alternative forms of regulation other than the traditional methods which are based upon cost of service, rate base and rate of return, provided that any such alternative
  3. Page 44 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 44 of 81 DE 24-070 - 44 - results in just and reasonable rates and provides the utility the opportunity to realize a reasonable return on its investment.” RSA 374:3-a. Relying on this authority, the Commission enacted rules governing the approval of alternative regulation, N.H. Code Admin. Rules Puc Part 206. Specifically, under Puc 206.06, when a utility files a petition for Alternative Regulation pursuant to RSA 374:3-a, the utility shall list the impacts of the proposed Alternative Regulation scheme on a list of nine factors established in Puc 206.06(b), including part (3), “The traditional regulatory balance which does not unfairly benefit or disadvantage utility customers, utility investors, and other stakeholders.” Puc 206.06(b)(3). Furthermore, under Puc 206.07, “Standards for Approval,” the Commission “...shall approve an alternative form of regulation if it determines that such alternative: (a) Results in rates that are not unduly discriminatory and are at a level that allows those to whom a service is being marketed to obtain such service; (d) Provides the utility the opportunity to realize a return on its investment which falls within a range that is neither confiscatory nor unduly profitable and that reflects the utility’s investment risk; and (c) Serves the public interest in light of the considerations described in Puc 206.06(b)(1) through (9).” Puc 206.07(a)-(c). Puc 206.08(a) also establishes reporting requirements for utilities under an Alternative Regulation framework, with reports made to the Commission “no later than” March 31st of each year the following information: “(1) Changes in prices of services under an alternative form of regulation during the calendar year just concluded...(2) New services introduced under an alternative form of regulation...(3) The rate of return realized on services under an alternative form of regulation...(4) New construction or improvement to infrastructure introduced under an alternative form of regulation just concluded; and (5) Any further information which the [C]ommission
  4. Page 45 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 45 of 81 DE 24-070 - 45 - determines is necessary to conform that the original bases for approval under Puc 206.07 have still been met.” Puc 206.08(a), emphasis added. In a New Hampshire Attorney General’s Opinion, issued on January 13, 1997 (1997 N.H. AG LEXIS 1), endorsing the form of the Commission’s Alternative Regulation (Puc Part 206) rules, which have remained substantively unchanged since that time, the New Hampshire Department of Justice (DOJ) addressed the following question: “Does the [Commission] have the authority to place conditions on its approval of a utility’s petition for alternative regulation?” 1997 N.H. AG LEXIS 1, 6-7. The N.H. DOJ answered this question in the affirmative: “...it is well settled that the [Commission] has general power to place reasonable conditions on its approvals of utility requests. Appeal of Milford Water Works, 126 N.H. 127, 132 (1985) (conditions imposed by [Commission] in approving request by Milford Water Works held to be reasonable and lawful). Furthermore, the authority to impose conditions on utilities is implicit in the express authority granted to the [Commission] under RSA 374:3-a to commence proceedings on its initiative. To conclude otherwise would require the [Commission] to initiate a new duplicative proceeding whenever it concluded that a utility’s petition pursuant to RSA 374:3-a is approvable, but with conditions. Accordingly, it is our opinion that the [Commission] is authorized under the doctrine set forth in Appeal of Milford Water Works and pursuant to RSA 374:3-a to place conditions on its approval of utility requests for alternative regulation.” Id. The parameters of the Commission’s inherent authority to modify, or establish conditions upon, an approval of a utility’s proposed Alternative Regulation framework was further developed by the Appeal of Pinetree Power, 152 N.H. 92 (2005), New Hampshire Supreme Court case. In an order on reconsideration issued in Docket No.
  5. Page 46 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 46 of 81 DE 24-070 - 46 - DE 03-166, Order No. 24,327 (May 14, 2004), 89 NH PUC 294, upheld by the Commission on a further motion for rehearing, in Order No. 24,342 (June 29, 2004), 89 NH PUC 367, certain modified conditions were applied by the Commission to the Alternative Regulation framework sought by the Company in connection with its investment in a boiler at the Company’s (then-owned) Schiller Station in Portsmouth. The procedural means by which this was accomplished was a further hearing, upon the joint motion for reconsideration of the Company and other parties to the DE 03166 proceeding, followed by an acceptance of proposed modifications to the Alternative Regulation framework. The Commission’s determinations in Orders Nos. 24,327 and 24,342 were upheld by the New Hampshire Supreme Court in Pinetree Power, which held, in relevant part, in the context of Alternative Regulation, “[i]n determining the rates, the [Commission] is to be the ‘arbiter between the interests of the customer and the interests of the regulated utilities.’ RSA 363:17-a...Here, the [Commission] required a sharing of the risks and rewards that were estimated to result from approval of the Schiller Project. This balancing of the customers’ and Company’s interests was both legally permitted, see RSA 374:3, 3-a, and required, see RSA 363:17-a. Accordingly, the [Commission] appropriately used its rate-making authority to approve the joint cost recovery proposal [presented as a modification to the Alternative Regulation framework proposed by the Company]. We conclude, therefore, that [Appellants] failed to meet their burden of proof that the [Commission acted beyond its authority in approving the proposed incentive cost recovery methodology." Appeal of Pinetree Power, 152 N.H. 92, 98-100. In this instance, the Company has sought Commission approval of its proposed PBR framework under our Alternative Regulation authority, RSA 374:3-a, and Puc
  6. Page 47 of 81Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 47 of 81 DE 24-070 - 47 - Part 206. The Commission has the express authority to place reasonable conditions on our approval of an Alternative Regulation framework proposed by a utility, given our role as arbiter under RSA 363:17-a. Appeal of Milford Water Works, 126 N.H. 127; Appeal of Pinetree Power, 152 N.H. 92. In light of this, the Commission may assess the Company’s alternative regulation proposal to properly balance the interests of the Company’s investors and its customers, under the standards elucidated under Puc Part 206. In doing so, we recognize that contra Pinetree, the Company would not be assenting to these modifications in advance, or agreeing to them during the course of a hearing. Therefore, as further discussed below, if Eversource were to not abide by these conditions precedent to the Commission’s approval of an Alternative Regulation framework for the Company going forward, the Company would default to the ordinary course, RSA Chapter 378 ratemaking paradigm under the Commission’s authority, without step increases. Having reviewed the sharp criticisms of the Company’s alternative regulation proposal by the DOE, the OCA, AARP, and Walmart, Inc., the Commission notes that the concern that findings of prudency regarding the investments made by the Company should not be short-circuited by alternative regulation is paramount. The Commission also notes concerns surrounding the proper “cast-off” rate level for the initial alternative regulation rate adjustment, to occur simultaneously with the adjustment to permanent rates to be approved effective August 1, 2025; the over-all level of capital investment to be made by the Company going forward; and concerns surrounding rate shock to Eversource’s customers going forward. The Commission has therefore adjusted, having reviewed the record evidence, the alternative regulation
  7. Page 48 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 48 of 81 DE 24-070 - 48 - framework for the Company subject to the parameters listed below, for the reasons discussed, as a complete substitute for the Company’s proposal. In the first instance, the Commission decides, to guard against the potential for imprudent investments in plant, and imprudent O&M expenditures by the Company, and to also provide a check-in point for Eversource and stakeholders regarding the progress of the alternative regulation framework, to REQUIRE, as a condition precedent for our approval of the alternative regulation framework, that the Company FILE a full distribution rate case no later than on June 1, 2029, for a test year ending December 31, 2028. In this rate case, the Company may wish to advocate for an extension of this alternative regulation framework, but it is not guaranteed. Furthermore, the Company is to provide all elements of a full distribution rate case as part of this filing, as required by Commission rules, including, but not limited to, the elements of depreciation, ROE, O&M expense accounting, Depreciation, and the like. The Commission will engage in a full prudency review for all elements of the Company’s capital and O&M investments and expenditures not already reviewed for prudency, as part of this 2029 rate case. On an annual basis, pursuant to the reporting-requirements elements of Puc 206.08, the Commission hereby REQUIRES, as a condition precedent of our approval of this alternative regulation framework, no later than March 1 of upcoming alternative-regulation rate year, beginning no later than March 1, 2026 (for calendar year 2025 spending), a full overview filing containing the information delineated in Puc 206.08(a), to include all capital and all expenses for the prior year. This shall be filed pursuant to Puc 203.07(a)(1), and delivered with an executive summary with highlevel spending categories along with the appropriate supporting detail. If the
  8. Page 49 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 49 of 81 DE 24-070 - 49 - Company’s spending is under budget, the filing would be informational only, for the benefit of the Commission and stakeholders, to track the Company’s spending. The Commission or stakeholders may request a Company review of this information, but it would be non-adjudicative and would not delve into questions of prudency; but rather, to gain an understanding of core capital for operations, core capital operations support, and overhead with appropriate subcategories with further details to be worked out with the parties. If the Company’s Capital Expenditure Cap or Overhead (O&M) Cap (discussed below) is exceeded, a Mandatory Annual Expenditure Review would be launched, through which a full prudency review of all of the previous calendar year’s expenditures, capital or expenses or both, would be initiated, and would terminate at the end of that calendar year. To be clear, if the capital budget was exceeded, there would be an adjudicative capital prudency review; if the overhead budget was exceeded there would be an adjudicative overhead prudency review. Overhead overspending does not launch an adjudicative capital review and capital overspending does not launch an adjudicative overhead review. In connection with this, we now refer to the updated capital budgeting chart provided in the Company’s attachment RR-006(b), REVISED, provided in response to the Commission’s Record Request 6 (these figures are further updates to figures provided in response to Record Request 1, and in Hearings Exhibits 9 and 11). We therefore establish, to ameliorate rate shock, an annual $250 million dollar cap on all Core Capital (Core Capital for Operations (A) and Core Capital-Operations Support (B), see Attachment RR-006(b)(REVISED), page 12) for the calendar years 2026, 2027, and 2028.
  9. Page 50 of 81Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 50 of 81 DE 24-070 - 50 - If these capped figures were to be exceeded by the Company, as stated above, a full Commission prudency review of all of the previous calendar year’s capital expenditures would be initiated, with parties being able to challenge the Company’s expenditures in that proceeding. If the Company is below these caps, no prudency challenge by other parties for that year shall be permitted until the Company’s next rate case, in 2029. In the case of O&M, we apply the 2023 test-year O&M, as adjusted pursuant to the various adjustments in this Order, and allow a 1 percent increase each year before any adjudicative process would be launched. This approach offers a fair balancing between the Company’s stated desire, through alternative regulation, to have more earnings predictability and more flexibility to spend in most appropriate places, and on the other side of the balance, protecting the customers of the Company from rate shock and imprudent O&M and capital expenditures. For the alternative regulation formula itself, we essentially adopt the Company’s formula, with certain modifications made to the inputs, as discussed below. In particular, the Commission has eliminated the “K-Bar,” but to provide the Company with sufficient revenue in its market, the Commission has provided the Company’s derived X-factor of negative 0.0142. COMMISSION-ESTABLISHED ALTERNATIVE REGULATION FORMULAS Distribution Revenue Requirement DR𝑅𝑅t = DRR𝑡𝑡−1 * AIAFYP + 𝑍𝑍𝑡𝑡 - 𝐸𝐸𝐸𝐸𝐸𝐸FYP Where: DRRt = Distribution Revenue Requirement for the 12-month period beginning August 1st of each year. First DRRt begins August 1, 2026.
  10. Page 51 of 81

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 2 Page 51 of 81 DE 24-070 - 51 - DRRt-1 = approved Distribution Revenue Requirement in the prior 12-month period, beginning with $519 million for the 12-month cast-off period beginning August 1, 2025. AIAFYP = (1 + 𝐼𝐼FYP − 𝑋𝑋 − 𝐶𝐶𝐶𝐶FYP) IFYP = Full Year Prior US Gross Domestic Product Price Index (GDP-PI), beginning with the full year of 2025 as compared to full year 2024 10. Must be between zero and 5%. X = Productivity Factor 11, fixed at -0.0142 (-1.42%). CDFYP = Consumer Dividend, fixed at 0.0015 (0.15%) if IFYP exceeds 2%. Zt = exogenous cost adjustment 12, threshold of $1.5m. ESMFYP = Earnings Sharing Adjustment 13 where customers receive 75% of the company’s ROE exceeding 9.75%. The first ESMFYP is the 12-month period beginning August 1, 2026 using the company’s full year 2025 ROE. Operating Revenue Requirement Where: ORRt = DRRt + ORFYP ORRt = total Operating Revenue Requirement for the 12-month period beginning August 1st of each year. First ORRt begins August 1, 2026. DRRt = Distribution Revenue Requirement for the 12-month period beginning August 1st of each year. First DRRt begins August 1, 2026. ORFYP = Other Revenue as defined by the company; sales for resale, provision for rate refunds, late payment charges, miscellaneous service revenues, rent from electric 10 GDP-PI inflation is the percentage difference of the 4 quarter simple average for the full year prior and full year prior-1 time periods ((FYP)-(FYP-1))/(FYP-1), as published by The Bureau of Economic Analysis in April of current year (t) for effect for the 12 month period beginning August 1, with the first implementation beginning August 1, 2026. 11 This represents an industry wide productivity factor that accounts for the special properties of electric utilities at this time. 12 Specific cost changes from state or federal governments, regulatory cost reassignments, or changes in accounting rules. It is the only factor that can be forward looking (time t) since changes of this sort can be known and measurable prospectively. 13 The ESM credits customers with a 75% share of ROE beyond a 25-basis point threshold (.25%) on the authorized ROE (9.5%). Thus, Eversource will return 75% of ROE in excess of 9.75%. The ROE is calculated with the full year prior, with the first opportunity for a return beginning August 1, 2026, based on the full year prior 2025. The impact of this adjustment would be excluded in calculating the subsequent year’s return, in effect, this is an annual one-time adjustment each year if the company’s ROE exceeds 9.75%.

Text of OCC-905 Attachment 3.pdf

Extracted from the file · 26 pages · 51,406 characters

Text of OCC-905 Attachment 4.pdf

Extracted from the file · 128 pages · 333,681 characters

As listed on the current system

Question(s) Answered 902, 905 (The Connecticut Light and Power Company) Date Filed: 10/21/2026

This filing on the current system (opens in a new tab)