Interrogatory responses
Answers to questions 902, 905
Files6
OCC-902_Final.pdf
PDF · 119 KB · 3 pagesText searchable
Download OCC-902_Final.pdfRead the text of OCC-902_Final.pdf
OCC-905_Final.pdf
PDF · 187 KB · 14 pagesText searchable
Download OCC-905_Final.pdfRead the text of OCC-905_Final.pdf
OCC-905 Attachment 1 .pdf
PDF · 1.9 MB · 8 pagesText searchable
Download OCC-905 Attachment 1 .pdfRead the text of OCC-905 Attachment 1 .pdf
OCC-905 Attachment 2.pdf
PDF · 1.6 MB · 81 pagesText searchable
Download OCC-905 Attachment 2.pdfRead the text of OCC-905 Attachment 2.pdf
OCC-905 Attachment 3.pdf
PDF · 944 KB · 26 pagesText searchable
Download OCC-905 Attachment 3.pdfRead the text of OCC-905 Attachment 3.pdf
OCC-905 Attachment 4.pdf
PDF · 1.8 MB · 128 pagesText searchable
Download OCC-905 Attachment 4.pdfRead the text of OCC-905 Attachment 4.pdf
Text of OCC-905 Attachment 2.pdf
Extracted from the file · 81 pages · 159,161 characters
Text of OCC-905 Attachment 3.pdf
Extracted from the file · 26 pages · 51,406 characters
Page 22 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 22 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY Original Page 20 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Terms and Conditions DBA EVERSOURCE ENERGY 23. Customer Choice of Rate Upon a Customer’s request, the Company shall provide information as to what may be the most advantageous rates and charges available to the Customer under this Tariff. However, the responsibility for the selection of a rate lies with the Customer and the Company does not warrant or represent in any way that a Customer will save money by taking service under a particular rate. The Company will not be liable for any claim that service provided to a Customer might have been less expensive or more advantageous to such Customer if supplied under another available rate. 24. Statement by Agent No representative of the Company or Eversource Energy System Companies has the authority to modify any rule, provision or rate contained in this Tariff, or bind the Company for any promise or representation contrary thereto. 25. Third Party Claims and Non-Negligent Performance Each Party agrees to indemnify and hold the other Party and its affiliated companies and the trustees, directors, officers, employees, and agents of each of them (collectively "Affiliates") harmless from and against any and all damages, costs (including attorneys' fees), fines, penalties, and liabilities, in tort, contract, or otherwise (collectively "Liabilities") resulting from claims of third parties arising, or claimed to have arisen, from the acts or omissions of such Party in connection with this Tariff. Each Party hereby waives recourse against the other Party and its Affiliates for, and releases the other Party and its Affiliates from, any and all Liabilities for or arising from damage to its property due to a non-negligent performance by such other Party. 26. Charges for Temporary Services The Company shall have the right to charge the Customer for the total cost incurred in constructing and removing temporary services at locations under construction where the temporary service will not be converted to a permanent service. Such costs shall include the costs of labor, overheads and all materials except for the costs of transformers and meters. The Company shall not charge for the construction and removal of such temporary service whenever the temporary service is to be replaced at approximately the same location with a permanent service when construction is completed, provided that the permanent service is run from the same pole and utilizes the same material which was utilized for the temporary service. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH OperationsPage 23 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 23 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 21 Terms and Conditions 27. Underground Service Underground electric distribution facilities will be provided by the Company, in accordance with the provisions of the Company's “Information and Requirements for Electric Supply” and this Tariff, when feasible and practicable and when consistent with the normal availability of Company personnel, the orderly scheduling of construction projects, and all as reasonably determined by the Company. Subject to the above-stated limitations on the availability of underground facilities, such facilities will be provided by the Company on a consistent and equitable basis to all who qualify. 28. Diversion and Metering Tampering If a Customer receives unmetered service as the result of any tampering with a meter or other Company equipment, the Company may take appropriate immediate corrective action without notice to the Customer, including making changes to the meter or other equipment. In addition, the Customer shall be subject to a meter diversion charge of $250, and may be required to reimburse the Company for lost revenue associated with the unmetered service, including late payment charges, damages to equipment, expenses incurred during the investigation, and may be subject to criminal prosecution. 29. Stranded Cost Recovery Charge The Stranded Cost Recovery Charge (SCRC) is the portion of the unbundled retail delivery service bill that is a non-bypassable charge as provided by RSA 369-B:4,IV and RSA 374-F:3, XII to recover the portion of the Company’s Part 1 and Part 2 Stranded Costs that are allowed by the Settlement Agreement. The SCRC include the RRB Charge defined in RSA Chapter 369-B, over-market or under-market IPP and Power Purchase Agreement costs, Non-Securitized Stranded Costs, and other costs and expenses allowed or as authorized by the Commission. Part 1 of the SCRC is the RRB Charge, and is the source of payment for Rate Reduction Bonds issued pursuant to RSA Chapter 369-B. One or more special purpose financing entities shall own the right to receive all collections in respect to the Part 1 charge. The Company will collect the RRB Charge in Part 1 of the SCRC on behalf of such special purpose financing entities. The special purpose financing entities’ ownership of the RRB Charge recovered via Part I of the SCRC will be reflected by an appropriate notation on customers’ bills. Part 1 of the SCRC will be billed until the rate reduction bonds issued by the special purpose financing entities and all on-going RRB Costs are paid in full. Part 1 of the SCRC shall be adjusted as necessary via the True-Up mechanism approved by the Commission in its Order No. 26,099 in Docket No. DE 17-096, and such changes in Part 1 shall become effective as set forth in that Order. Part 2 will recover all other non-securitized stranded costs and charges as approved by the Commission and will continue for as long as there are such costs to be recovered by the Company. The SCRC shall be non-bypassable per RSA 369-B:4, IV and RSA 374-F:3, XII, and shall be collected from each retail customer of the Company. If a retail customer located in the Company’s service territory purchases or otherwise obtains retail electric service from any person other than the Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH OperationsPage 24 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 24 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 21A Terms and Conditions Company, including, without limitation, any successor referred to in RSA 369-B:8, the servicer or such new electricity service provider or successor shall collect the SCRC, from the retail customer by or on behalf of the Company and remit those revenues to the Company as a condition to the provision of retail electric service to such retail customer. Any retail customer that fails to pay the SCRC shall be subject to disconnection of service to the same extent that such customer would, under applicable law and regulations, be subject to disconnection of service for failure to pay any other charge payable to the Company. The revenue requirement necessary to recover all Part 1 and Part 2 stranded costs will be allocated among rate classes as follows: Percentage of Total Revenue Requirement 48.75 25.00 20.00 5.75 0.50 Rate Class Residential Service (R, R-OTOD), (ROTOD-2) General Service (G, G-OTOD) Primary General Service (GV, B*) Large General Service (LG, B**) Outdoor Lighting Service (OL, EOL, EOL-2) *Rate B customers who would qualify for Rate GV except for their own generation. **Rate B customers who would qualify for Rate LG except for their own generation. The actual SCRC will vary by the rate schedule, may vary by separately metered rate options contained in certain rate schedules, may vary by time of use, and may include demand- as well as kWh-based charges. The Company, every twelve months, shall compare the amount to be recovered through the SCRC, as defined under the Settlement Agreement and this Tariff with the revenue received from the billing of the SCRC. Any difference between the amount to be recovered by Part 2 of the SCRC during any twelve month period and the actual revenue received during that period shall be refunded or recovered by PSNH with a return during the subsequent twelve month period by reducing or increasing Part 2 of the SCRC for the subsequent twelve month period. The return will be calculated using the Stipulated Rate of Return set forth in the Settlement Agreement. If any customer class is materially reduced or consolidated to zero, its applicable allocation factor will be reallocated on a pro-rata basis between remaining rate classes based on the then current allocation responsibility. The SCRC also includes the Regional Greenhouse Gas Initiative (“RGGI”) refund as required by RSA 125-O:23,II and Order No. 25,664 dated May 9, 2014, which directs the Company to refund RGGI auction revenue it receives to its Customers through the SCRC. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH OperationsPage 25 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 25 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY 1st Revised Page 21B Superseding Original Page 21B Terms and Conditions In accordance with Order Nos. 27,053 (August 30, 2024) and 27,066 (October 16, 2024), any difference between the amount of Ch. 340 costs to be recovered during the nine month period February 2024 to October 2024 and the revenue received during that period shall be refunded or recovered by PSNH with a return during the subsequent three month period November 2024 to January 2025 by reducing or increasing Part 2 costs, with an interim rate change to the SCRC rate effective November 1, 2024 to reflect the modified Part 2 rate and the elimination of the Ch. 340 Adder rate.1 The return prior to August 1, 2025 was calculated using the Stipulated Rate of Return set forth in the Settlement Agreement. Beginning August 1, 2025, the return will be calculated using the average cost of debt as approved in Order No. 28,170 (July 25, 2025) in DE 24-070. The SCRC also includes the costs of implementing Section 7.1 of the DE 19-057 Settlement Agreement as approved in Order No. 26,433 to recover Environmental Remediation costs. The revenue requirement to recover Environmental Remediation costs will be allocated on an equal cents/kWh basis for all customer classes. Any difference between the amount to be recovered during any twelve-month period and the actual revenue received during that period shall be refunded or recovered by PSNH with a return during the subsequent twelve-month period by reducing or increasing the Environmental Remediation costs for the subsequent twelve-month period. The return prior to August 1, 2025 was calculated using the Stipulated Rate of Return. Beginning August 1, 2025, the return will be calculated using the average cost of debt as approved in Order No. 28,170 (July 25, 2025) in DE 24-070. The SCRC also includes the costs of the DE 20-136 Settlement Agreement to recover Net Metering and Group Host costs. Per the terms of the Settlement Agreement the revenue requirement to recover Net Metering and Group Host costs will be allocated on an equal cents/kWh basis for all customer classes. Any difference between the amount to be recovered during any twelve-month period and the actual revenue received during that period shall be refunded or recovered by PSNH with a return during the subsequent twelve-month period by reducing or increasing the Net Metering and Group Host costs for the subsequent twelve-month period. The return prior to August 1, 2025 was calculated using the Prime Rate. Beginning August 1, 2025, the return will be calculated using the average cost of debt as approved in Order No. 28,170 (July 25, 2025) in DE 24-070. The overall average SCRC by rate class and by component effective August 1, 2026 through January 31, 2027 are as follows: SCRC Rate Component (¢/kWh) Residential Service General Service Part 1 Part 2 RGGI Environmental Remediation Net Metering Total SCRC 0.745 (0.137) (0.975) (0.194) 0.408 (0.153) 0.805 (0.152) (0.975) (0.194) 0.408 (0.108) Issued: July 29, 2026 Issued by: Effective: August 1, 2026 Title: Rate Class Primary General Service 0.663 (0.127) (0.975) (0.194) 0.408 (0.226) Large General Service 0.262 (0.051) (0.975) (0.194) 0.408 (0.550) Outdoor Lighting Service 1.250 (0.227) (0.975) (0.194) 0.408 0.261 Robert S. Coates, Jr. President, Eversource NH Operations Authorized by NHPUC Order No. 28,236 in Docket DE 25-077 dated July 15, 2026. 1 The estimated under recovered Chapter 340 balance existing as of October 31, 2024 is allocated on an equal cents per kWh basis for all customer classes as filed on October 29, 2024 in Docket No. DE 23-091, and is reflected in the modified Part 2 rate line item. The Chapter 340 Adder rate has been eliminated effective October 31, 2024.Page 26 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 26 of 128 NHPUC NO. 11 ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 21C Terms and Conditions 30. Transmission Cost Adjustment Mechanism The Transmission Cost Adjustment Mechanism (“TCAM”) will recover, on a fully reconciling basis, the costs incurred by the Company for transmission related services. These costs include charges under the ISO-NE Tariff; charges billed to the Company by Other Transmission Providers; third party charges billed to the Company for transmission related services such as charges relating to the stability of the transmission system which the Company is authorized to recover by order of the regulatory agency having jurisdiction over such charges; and transmission-based assessments or fees billed by or through regulatory agencies, including those associated with the ISONE, regional transmission organization (“RTO”) and the FERC. For purposes of this mechanism, “Other Transmission Providers” shall be defined as any transmission provider and any regional transmission group, an independent system operator, an RTO and their successors, or other such body with the oversight of regional transmission, in the event that any of these entities are authorized to bill the Company directly for their services. The TCAM rates shall be established annually based on a forecast of includable costs, and shall also include a full reconciliation with interest for any over-recovery or under-recovery occurring in the prior year. The Company may file to change the TCAM rates at any time if a significant overrecovery or under-recovery occurs. Interest on over-recoveries or under-recoveries shall be calculated at the prime rate prior to August 1, 2025. After August 1, 2025, interest shall be calculated at the average cost of debt as approved in Order No. 28,170 (July 25, 2025) in DE 24-070. Any changes to rates determined under the TCAM shall only be made following a notice filed with the Commission setting forth the amount of the increase or decrease, the new rates for each rate class, and the effective date of such new rates. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH OperationsPage 27 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 27 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22 Terms and Conditions 31. System Benefits Charge On and after the Customer Choice Date, and subject to Commission review, all Customers shall be obligated to pay the following System Benefits Charge in addition to all other applicable rates and charges under this Tariff. The System Benefits Charge shall appear separately on all Customer bills. System Benefits Charge .................................................... 0.618 cents per kilowatt-hour 32. Regulatory Reconciliation Adjustment The Regulatory Reconciliation Adjustment (“RRA”) mechanism, shall be calculated consistent with the Settlement Agreement approved in Order No. 26,433 and the Commission’s directives in Order No. 28,170 and Order No. 28,201 and will recover or refund the reconciled costs associated with the following elements: (a) Regulatory Commission annual assessments and consultants hired or retained by the Commission and OCA. (b) Vegetation management program variances prior to August 1, 2025. (c) Remaining property tax expenses and 2024 property tax expenses per Order No. 28,170 in DE 24-070. (d) Lost-base distribution revenues associated with net metering prior to August 1, 2025, as calculated consistent with RSA 362-A:9, VII and the Commission’s approved method in Order No. 26,029 (June 23, 2017) in Docket No. DE 16-576 and per Order No. 28,170 in DE 24-070. (e) Unrecovered storm costs in excess of the Major Storm Cost Reserve per Order No. 28,170 in DE 24-070. (f) Amortization of New Start program expenses and reconciliation of costs incremental to amounts in base distribution raters per Order No. 28,170 and Order No. 28,201 in DE 24070. (g) Remaining rate case expense per Order No. 26,634 in DE 19-057 and rate case expense per Order No. 28,170 in DE 24-070. (h) Amortization of Fee Free program expenses for electronic customer payments per Order No. 28,170 in DE 24-070. (i) Reconciliation of temporary rates to permanent rates per Order No. 28,170 in DE 24070. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH OperationsPage 28 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 28 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22-1 Terms and Conditions The RRA shall be established annually based a full reconciliation with interest for any over- or under-recoveries occurring in prior year(s). Prior to August 1, 2025, interest shall be calculated at the prime rate, to be fixed on a quarterly basis and to be established as reported in The Wall Street Journal on the first business day of the month preceding the calendar quarter. If more than one interest rate is reported, the average of the reported rates shall be used. After August 1, 2025, interest shall be calculated at the average cost of debt per Commission directives in DE 24-070. There will be no adjustment for Accumulated Deferred Income Tax (“ADIT”) in the interest calculation. For purposes of billing under the alternative net metering tariff that became effective September 1, 2017, the RRA will be considered part of the credit to net metering customers. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH OperationsPage 29 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 29 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22A Terms and Conditions 32A. Pole Plant Adjustment Mechanism The Pole Plant Adjustment Mechanism (“PPAM”) mechanism, shall recover or refund the reconciled costs associated with the following elements prior to August 1, 2025: (a) Pole Replacement O&M Transfer Costs: The actual costs associated with replacement poles for the prior calendar year based on the actual number of poles replaced and the actual Eversource cost to transfer the conductor from the old to the new poles. (b) Annual Inspection Costs: The actual inspection costs and other upfront costs for the prior calendar year consisting of the number of poles inspected in the former Consolidated maintenance area and the per pole rate in effect. Upfront costs of $250,000 in years 1 and 2 and $75,000 in year 3 will also be included. (c) Pole Attachment Revenue: Incremental third-party pole attachment revenues will be applied as an offset to the items in (a) and (b). Pole attachment revenues for formerly Consolidated owned poles will be tracked separately and billed at the Consolidated rate at the time of closing until a full pole attachment survey is conducted and, or a single, unified rate is applied to all poles. (d) Vegetation Management Expense: The incremental vegetation management expense will be calculated as the vegetation management expenses formerly billed to Consolidated. The PPAM shall be established annually based a full reconciliation with interest for any over- or underrecoveries occurring in prior year(s). Interest shall be calculated at the prime rate, to be fixed on a quarterly basis and to be established as reported in The Wall Street Journal on the first business day of the month preceding the calendar quarter. If more than one interest rate is reported, the average of the reported rates shall be used. There will be no adjustment for Accumulated Deferred Income Tax (“ADIT”) in the interest calculation. For purposes of billing under the alternative net metering tariff that became effective September 1, 2017, the PPAM will be considered part of the credit to net metering customers. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH OperationsPage 30 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 30 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22B Terms and Conditions 32B. Alternative Regulation Adjustment 1.01 Purpose The Alternative Regulation Adjustment (“ARA”) mechanism enables the Company, subject to the jurisdiction of the Commission, to adjust, on an annual basis, its Distribution Revenue Requirement pursuant to Section 1.06], as approved in Docket No. DE 24-070. The ARA includes a revenueindexing mechanism and earnings sharing if the earned return on equity is higher than established thresholds, and recovery of exogenous costs. The ARA adjusts Base Rates using the rate of input price inflation representative of the electric distribution industry and a consumer dividend. The exogenous cost component allows the Company to reflect cost changes, both positive and negative, that are beyond the control of the Company and, because the Company is subject to a stay-out provision, are deemed appropriate to recover (or return) through the ARA. The earnings-sharing component provides for sharing of earnings above an established threshold. 1.02 Effective Date The initial rates established in accordance with Section 1.05 shall remain in effect until the Company’s next base-rate proceeding subject to any adjustments that may be ordered by the Commission. The ARA is authorized for a four-year term starting August 1, 2025. The first annual adjustment pursuant to the ARA shall be effective August 1, 2026. Subsequent annual adjustments shall occur within the four-year term, with the last adjustment taking effect on August 1, 2028.. The Company shall petition the Commission for a base distribution rate change to take effect no earlier than August 1, 2029. In the event the ARA expires or is terminated, the Company’s Base Rates, as adjusted pursuant to the ARA, shall remain in effect, unless and until otherwise determined by the Commission. Because the earnings-sharing adjustment provided for herein lags the ARA by one year, the last earnings-sharing adjustment would take effect on August 1, 2029, unless the ARA tariff is extended as described above. 1.03 Applicability This mechanism applies an adjustment to the Base Rates of the Company’s effective distribution service tariffs subject to the jurisdiction of the Commission, as determined in accordance with the provisions of this tariff. 1.04 Definitions (1) Base Revenue Requirement is the distribution revenue approved for collection through the Company’s rate schedules as established by the Commission in its most recent base-rate case and as adjusted annually through the ARAF. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH OperationsPage 31 of 128
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 31 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22C Terms and Conditions (2) Base Rate Component is any customer, demand or energy charge reflected in the Company’s Rate Schedules that recovers a portion of the Company’s Base Revenue Requirement as established by the Commission in its most recent base-rate case. (3) Basis Point shall be one one-hundredth of a percentage point. (4) Calendar Year is the annual period beginning on January 1st and ending on December 31st. (5) Capital Investment Year is the period in which assets are placed in service beginning on January st 1st and ending on December 31 . (6) Consumer Dividend is the benefit to consumers of future productivity gains attributable to Alternative Ratemaking for the Company’s distribution service as established by the Commission in Docket No. DE 24-070. (7) Customer Class is the group of customers all taking service pursuant to the same rate schedule. (8) Class Allocation Factors in a Rate Year for which the ARAF is being applied are proportional shares of Base Revenue Requirement for each Customer Class in the Prior Year. (9) Distribution Return on Equity (ROE) is Total Net Utility Income as reported on the Company’s Form F-1, Schedule 1 to the Commission in the Prior Year. (10) Earnings-Sharing Threshold is the percentage range equal to 25 Basis Points above the percentage Return on Equity authorized by the Commission in Docket No. DE 24-070. (11) Exogenous Events are specific cost changes from state or federal governments, regulatory cost reassignments, or changes in accounting rules. It is the only factor that can be forward looking as changes of this sort can be known and measurable prospectively. (12) ARAF Formula is the mathematical expression set forth in Section 1.06 used to calculate the percentage change in the Base Revenue Requirement for the Rate Year. (13) Pre-Tax Rate of Return is the after-tax weighted average cost of capital established by the Commission in Docket No. DE 24-070, adjusted to a pre-tax basis using currently effective federal and state income tax rates. (14) Prior Year is the annual calendar year period ending immediately prior to the Rate Year. Issued: January 22, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH Operations
As listed on the current system
Question(s) Answered 902, 905 (The Connecticut Light and Power Company) Date Filed: 10/21/2026