Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 902, 905

Files6

Search terms highlighted
Eversource rate increase is on 53 pages across 6 files of the text below, highlighted. Go to the first matchClear highlighting
1 page match
1 page match
2 pages match

Text of OCC-905 Attachment 2.pdf

Extracted from the file · 81 pages · 159,161 characters

Text of OCC-905 Attachment 3.pdf

Extracted from the file · 26 pages · 51,406 characters

12 pages match
  1. Page 32 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 32 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22D Terms and Conditions (15) Productivity Trend is the measure of change in productivity associated with providing regulated distribution services. (16) Rate Year is the 12-month period that the adjusted Base Rates shall be effective beginning on August 1st. (17) Return on Equity is the authorized return on common equity as established in Docket No. DE 24-070. (18) Return on Rate Base is the Pre-Tax Rate of Return multiplied by rate base associated with the total capital investment, including plant in service adjusted for accumulated depreciation, and accumulated deferred income tax for assets ending as of the Capital Investment Year. 1.05 Determination of Initial Base Rates The Initial Base Rates shall be those established by the Commission in Docket No. DE 24-070. The first adjustment to the Initial Base Rates under the ARA shall be effective August 1, 2026. 1.06 ARAF Formula (1) Distribution Revenue Requirement DRRt = DRR𝑡𝑡-1 * AIAFYP + 𝑍𝑍𝑡𝑡 - ESMFYP Where: DRRt = Distribution Revenue Requirement for the 12-month period beginning August 1st of each year. First DRRt begins August 1, 2026. DRRt-1 = approved Distribution Revenue Requirement in the prior 12-month period, beginning with $519 million for the 12-month cast-off period beginning August 1, 2025. AIAFYP = (1 + 𝐼𝐼FYP − 𝑋𝑋 − CDFYP) Where: IFYP = Full Year Prior US Gross Domestic Product Price Index (GDP-PI), beginning with the full year of 2025 as compared to full year 2024. Must be between zero and 5%. GDPPI inflation is the percentage difference of the 4 quarter simple average for the full year prior and full year prior-1 time periods ((FYP)-(FYP-1))/(FYP-1), as published by The Bureau of Economic Analysis in April of current year (t) for effect for the 12 month period beginning August 1, with the first implementation beginning August 1, 2026. Issued: January 22, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH Operations
  2. Page 33 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 33 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22E Terms and Conditions X = Productivity Factor, fixed at -0.0142 (-1.42%). CDFYP = Consumer Dividend, fixed at 0.0015 (0.15%) if IFYP exceeds 2%. Zt = exogenous cost adjustment, threshold of $1.5m ESMFYP = Earnings Sharing Adjustment4 where customers receive 75% of the company’s ROE exceeding 9.75%. The first ESMFYP is the 12-month period beginning August 1, 2026 using the company’s full year 2025 ROE. (2) Operating Revenue Requirement ORRt = DRRt + ORFYP Where: ORRt = total Operating Revenue Requirement for the 12-month period beginning August 1st of each year. First ORRt begins August 1, 2026. DRRt = Distribution Revenue Requirement for the 12-month period beginning August 1st of each year. First DRRt begins August 1, 2026. ORFYP = Other Revenue as defined by the Company; sales for resale, provision for rate refunds, late payment charges, miscellaneous service revenues, rent from electric property, other electric revenue, revenues – transmission of electric others, based on the full year prior. First ORFYP begins August 1, 2026 and is based on 2025 actuals. Issued: January 22, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH Operations
  3. Page 34 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 34 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 22F Terms and Conditions 1.07 Annual ARA and Performance Metric If any of the Company's Operating Regions falls below the applicable reliability standards for any given year, as indicated in the Company’s annual November 15 Vegetation Management Program review filing, a $1.5 million (revenue-requirement) penalty shall be assessed, to offset the next year's alternative regulation rate adjustment. Issued: January 22, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr President, Eversource NH Operations
  4. Page 35 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 35 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 23 Terms and Conditions 33. Late Payment Charge The rates and charges billed under this Tariff are net, billed monthly and payable upon presentation of the bill. However, Customers who receive Delivery Service under Residential Rate R, Residential Time-of-Day Rate R-OTOD, R-OTOD 2, General Service Rate G, or General Service Time-of-Day Rate G-OTOD may elect to pay for all service rendered under these rates, as well as Default Energy Service, on a Level Payment Plan available upon application to the Company. For Customers rendered Delivery Service under Primary General Delivery Service Rate GV or Large General Delivery Service Rate LG or Backup Delivery Service Rate B, all amounts previously billed but remaining unpaid after the due date printed on the bill shall be subject to a late payment charge of one and one-half percent (1 ½ %) thereof, such amounts to include any prior unpaid late payment charges. For all other Customers, all amounts previously billed but remaining unpaid after the due date printed on the bill shall be subject to a late payment charge of one percent (1%) thereof, such amounts to include any prior unpaid late payment charges. The late payment charge is not applicable to a) residential Customers who are taking service under the statewide Electric Assistance Program (EAP) as approved by the Commission; b) residential Customers receiving protection from disconnection of service under any enhanced winter protection programs offered by the Company; c) residential Customers whose electric bill is paid on their behalf (whether in part or in whole) through the Low Income Home Energy Assistance Program (LIHEAP); and d) past due balances of Residential Rate R, Residential Time-of-Day Rate ROTOD,R-OTOD 2, General Service Rate G, General Service Time-of-Day Rate G-OTOD, Outdoor Lighting Rate OL, or Energy Efficient Outdoor Lighting Rate EOLand EOL-2 Customers who are abiding by the terms of an extended payment arrangement agreed to by the Company. 34. Loss of Service Investigation Charge For Customers rendered Delivery Service under Primary General Delivery Service Rate GV, Large General Delivery Service Rate LG or Backup Delivery Service Rate B: If at the request of a Customer, the Company responds to investigate any loss of electric service at the Customer’s premises, and finds the interruption of service has been caused by the Customer’s equipment, the Company shall charge the Customer for the total cost incurred to investigate the loss of service. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  5. Page 36 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 36 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24 Terms and Conditions 35. Rates for Purchases from Qualifying Facilities Availability: This short-term purchase arrangement shall be available to Qualifying Facilities (QFs) interconnected with the Company. Qualifying Facilities shall mean small power producers and cogenerators that meet the criteria specified by (i) FERC in 18 C.F.R. §§ 292.203 (a) and (b); or; (ii) the definition of "limited producer" or "limited electrical energy producer” in NHRSA 362-A:1-a and who meet the requirements of RSA 362-A:3, II. Nothing shall prohibit the Company from separately contracting for generation purchases from QFs. Nothing herein shall be construed to affect, modify or amend terms and conditions of an existing Qualifying Facility's contract or rate order with respect to the sale of its energy or capacity. Selling Options: QFs may sell to the Company or wheel through the Company. All generation sold to the Company shall be resold at the ISO-NE market clearing price and subject to appropriate charges as if the power was wheeled through the Company and sold directly to ISO-NE. Metering: Generators selling to the Company shall install metering as specified by the Company to satisfy ISO-NE requirements as they may change from time to time. Projects shall be charged a standard monthly service fee for metering service as approved by the appropriate regulatory agency. Net Metering: Projects 1,000 kilowatts and under using renewable generation shall have the option of being served under the Net Energy Billing Service as specified by NH RSA 362-A:9 and the rules promulgated by the appropriate regulatory agency. Projects receiving a utility net metering capacity allocation prior to March 2, 2017 and not in excess of the applicable net metering cap will continue to be billed and receive credit for their generation in accordance with RSA 362-A:9 and Puc 903.02(f) and Puc 903.02(g) (the “Standard Net Metering Tariff”) through December 31, 2040. Projects receiving a utility net metering capacity allocation beginning on March 2, 2017 and ending on August 31, 2017 and not in excess of the applicable net metering cap will continue to be billed and receive credit for their generation in accordance with the interim alternative net metering tariff adopted by the Commission in Order No. 25,972 (December 21, 2016) (the “Interim Net Metering Tariff”) through December 31, 2040. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  6. Page 37 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 37 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24A Terms and Conditions Projects receiving a utility net metering capacity allocation on or after September 1, 2017 will be billed and credited under the “Alternative Net Metering Tariff” provisions described below once the Company is capable of implementing these provisions. Until such time, customers will be billed and credited under the Standard Net Metering Tariff. Customers receiving a net metering capacity allocation while this Alternative Net Metering Tariff is in effect will be entitled to the net metering design and structure then in effect through December 31, 2040. 1. Eligibility A customer-generator whose facility has a total peak generating capacity less than or equal to 100 kilowatts is eligible to participate as a small customer-generator. A customer-generator whose facility has a total peak generating capacity greater than 100 kilowatts up to and including 1,000 kilowatts is eligible to participate as a large customergenerator if they consume at least twenty percent (20%) of their actual or estimated annual system electric production on-site and behind the meter. Otherwise, the customer must register as a group host under RSA 362-A:9, XIV. A large customer-generator meeting the on-site consumption threshold may switch to the Alternative Net Metering Tariff upon written notice of such election to the Company. 2. Application Fees The Company shall collect fees for all applications to interconnect by customer-generators on and after January 1, 2025. Generating Capacity (AC) Up to 25 kW Greater than 25 kW, up to 100 kW Greater than 100 kW Application Fee $200 $500 $1000 Costs associated with Pre-Application Reviews conducted pursuant to Puc 904.01, Studies and Analysis conducted pursuant to Puc 905.06, or Upgrades or Improvements to the Electric Distribution System identified pursuant to Puc 905.07 shall continue to be funded by individual customer-generators through Pre-Application Fees, Supplemental Review Fees and payments for Upgrades and Improvements and shall not be offset by the Application Fees designated above. 3 Metering The Company will install a bidirectional meter to record in separate channels the quantities of electric imports from the distribution utility grid and electric exports to the distribution utility grid over a billing period. At the time of interconnection, a customer may request, at no cost, installation of a Company-owned production meter. The Customer must provide and install an appropriate meter socket in a physical location acceptable to the Company. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  7. Page 38 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 38 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24B Terms and Conditions 4. Billing Customers will be billed in accordance with the delivery and energy service rate schedules that would apply in the absence of generation, except as specifically provided otherwise hereunder. During each billing period, credits for electricity exports will be issued in the form of monetary bill credits which will carry forward on a customer’s account from month to month until used. Customers may receive a cash payment for any accumulated excess credit when they move or discontinue service, or on an annual basis if they have accumulated a credit balance in excess of $100 as of the end of the March billing cycle. Small customer-generators will be assessed the Stranded Cost Recovery Charge and System Benefits Charge based on the full amount of their electricity imports without any netting of exports during the billing period. All other kilowatt-hour-based rate components will be assessed on the customer’s net energy usage, which is the quantity of kilowatt-hours equal to electric imports minus electric exports (if positive). If such net energy usage is less than zero, customers that receive Default Energy Service from the Company will receive a monetary bill credit for their net electric exports during each billing period calculated at twenty-five percent (25%) of any Distribution charges assessed on a per-kilowatt-hour basis; any Transmission charges assessed on a perkilowatt-hour basis; and the Default Energy Service Rate. If net energy usage is less than zero, customers that do not receive Default Energy Service from the Company will receive a monetary bill credit for their net electric exports during each billing period calculated at twenty-five percent (25%) of any Distribution charges assessed on a per-kilowatt-hour basis; and any Transmission charges assessed on a perkilowatt-hour basis. Large customer-generators will be assessed all charges associated with their rate class based on the full amount of their electricity imports without any netting of exports during the billing period. Customers who receive Default Energy Service from the Company will receive a monetary bill credit for their electric exports during each billing period calculated at the Default Energy Service Rate. For both Small and Large customer-generators, a competitive Energy Service Provider may determine the terms, conditions and prices under which it agrees to provide generation supply to and purchase net generation output from the customer-generator. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  8. Page 39 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 39 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24C Terms and Conditions 5. Grandfathering Provisions Subsequent sales or other transfers of ownership of a net-metered system or the property upon which the system is located shall not impact the terms and conditions under which the customer-generator is rendered net metering service. New owners shall be allowed to continue to take service under the same terms and conditions in effect at the time of such sale or transfer until 2040, in accordance with RSA 362-A:9,XV and Order No. 25,972, or pursuant to Order No. 26,029, provided that the system is not moved to a different location by the purchaser, transferee, or otherwise. Residential small customer-generators may expand their systems without limitation, provided that the expansion does not result in total system capacity in excess of 100 kW. Non-residential small customer-generators may expand the capacity of their systems by an amount up to the greater of either 20 kW or 50 percent of the system capacity allocated into the standard net metering program prior to September 1, 2017, or the original capacity of a system installed under the alternative net metering tariff effective as of September 1, 2017, as applicable, provided that in neither case can any such expansion have the effect of increasing the system’s capacity to an amount in excess of 100 kW. Non-residential large customer-generators may expand the capacity of their systems by an amount up to the greater of either (1) 50 kW, or (2) a capacity amount such that the expanded system is sized to produce 110 percent of the customer-generator’s annual kilowatt-hour on-site usage, as clearly demonstrated through the customer-generator’s documentation of any consecutive 12-months within the previous two years. In neither case, can any such expansion have the effect of increasing the system’s capacity to a level in excess of one megawatt. Expansion of a net-metered system by or for a commercial or industrial customer-generator smaller than the applicable limitation will allow the customer-generator to continue to be grandfathered, while any such expansion in excess of the applicable limitation will result in the entire net-metered system losing its net metering grandfathered status. Any system modifications must be reported to the Company within 30 days of modification or earlier if so required under the Company’s distributed generation interconnection procedures. 6. Renewable Energy Certificates The Company will offer to serve as independent monitor for a customer-generator who elects to receive a Company-owned production meter. The Company will report the electricity production of such customer-generator at least quarterly to NEPOOL-GIS at no cost to the customer. The Company will file an application on behalf of the customer for Commission certification of the eligibility of the installation to produce renewable energy certificates pursuant to RSA 362-F and the Commission’s Puc 2500 rules. Any customer requesting a Company-owned production meter or requesting the Company to serve as the independent monitor must respond in a timely manner to requests for information from the Company. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  9. Page 40 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 40 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY Original Page 24D PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Terms and Conditions DBA EVERSOURCE ENERGY Rates: Qualifying Facilities selling their output to the Company will be eligible to receive Short Term Avoided Cost Rates equal to the payments received by the Company for the sale of QF generation to the ISO-NE power exchange, adjusted for line losses, wheeling costs and administrative costs incurred by the Company for the transaction. Projects shall be charged a standard monthly service fee for billing service as approved by the appropriate regulatory agency. Wheeling Charges: The Company reserves the right to impose any appropriate wheeling charges (including distribution wheeling charges) for generation transmitted through the Company and sold to ISO-NE and others as may be approved by the appropriate regulatory agency. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  10. Page 41 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 41 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 25 Terms and Conditions 36. Line Extensions In areas in which Delivery Service by the Company is authorized, the Company will extend its single-phase or three-phase distribution facilities or upgrade its single-phase distribution facilities to three-phase distribution facilities to a maximum of 5,280 feet in length to serve Customers under Residential Delivery Service Rate R , Rate R-OTOD, Rate ROTOD 2 and General Delivery Service Rate G and Rate G-OTOD, at their request. Extensions or upgrades greater than 5,280 feet in length will be constructed at the discretion of the Company. Additionally, per RSA 370:12, customers requiring a line extension on private property may opt to hire and pay a private line contractor, licensed by the state and approved by the Company, to construct a required overhead or underground power line extension on private property. The contractor shall supply and install all materials as specified by the Company. Line extensions must be designed by the Company and built to its specifications in order for the Company to assume ownership of the line. The Company has the right to not accept a customer built line extension that does not conform to the Company’s specifications. Customers may not contract with private line contractors to construct line extensions along public ways. 1. Location of Distribution Facilities The order of preference for the location of line extensions are (i) along public ways; (ii) along private roads maintained year-round; (iii) along private roads maintained on a seasonal basis; (iv) over rights of way accessible by standard Company equipment; and (v) over rights of way not accessible by standard Company equipment. The Company may choose a higher preference location even if a lower preference location may result in a shorter line extension. The final placement of all line extensions must be preapproved by the Company. 2. Calculation of Line Extension Construction Costs Definitions Overhead Service Drop: The final span of cable providing secondary voltage to a Customer’s meter or point of attachment location, whichever is applicable, from a utility pole. The maximum length of an overhead service drop is determined by the characteristics of the Customer’s load and the terrain over which the overhead service drop passes. Underground Service Drop: The final run of cable providing secondary voltage to a Customer’s meter from a transformer or from a secondary conductor located on the Company’s distribution system. Distribution Facilities Provided by the Company at No Charge to the Customer There shall be no separate charge for a pole-mounted transformer which the Company determines is needed to adequately serve a Customer’s load and up to 300 feet of distribution facilities. The 300 feet of distribution facilities must include the length of an Overhead or Underground Service Drop currently being installed to serve a customer premise. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations

As listed on the current system

Question(s) Answered 902, 905 (The Connecticut Light and Power Company) Date Filed: 10/21/2026

This filing on the current system (opens in a new tab)