Eversource rate increase is on 53 pages across 6 files of the text below, highlighted. Go to the first matchClear highlighting
1 page match
1 page match
2 pages match

Text of OCC-905 Attachment 2.pdf

Extracted from the file · 81 pages · 159,161 characters

Text of OCC-905 Attachment 3.pdf

Extracted from the file · 26 pages · 51,406 characters

12 pages match
  1. Page 35 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 35 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 23 Terms and Conditions 33. Late Payment Charge The rates and charges billed under this Tariff are net, billed monthly and payable upon presentation of the bill. However, Customers who receive Delivery Service under Residential Rate R, Residential Time-of-Day Rate R-OTOD, R-OTOD 2, General Service Rate G, or General Service Time-of-Day Rate G-OTOD may elect to pay for all service rendered under these rates, as well as Default Energy Service, on a Level Payment Plan available upon application to the Company. For Customers rendered Delivery Service under Primary General Delivery Service Rate GV or Large General Delivery Service Rate LG or Backup Delivery Service Rate B, all amounts previously billed but remaining unpaid after the due date printed on the bill shall be subject to a late payment charge of one and one-half percent (1 ½ %) thereof, such amounts to include any prior unpaid late payment charges. For all other Customers, all amounts previously billed but remaining unpaid after the due date printed on the bill shall be subject to a late payment charge of one percent (1%) thereof, such amounts to include any prior unpaid late payment charges. The late payment charge is not applicable to a) residential Customers who are taking service under the statewide Electric Assistance Program (EAP) as approved by the Commission; b) residential Customers receiving protection from disconnection of service under any enhanced winter protection programs offered by the Company; c) residential Customers whose electric bill is paid on their behalf (whether in part or in whole) through the Low Income Home Energy Assistance Program (LIHEAP); and d) past due balances of Residential Rate R, Residential Time-of-Day Rate ROTOD,R-OTOD 2, General Service Rate G, General Service Time-of-Day Rate G-OTOD, Outdoor Lighting Rate OL, or Energy Efficient Outdoor Lighting Rate EOLand EOL-2 Customers who are abiding by the terms of an extended payment arrangement agreed to by the Company. 34. Loss of Service Investigation Charge For Customers rendered Delivery Service under Primary General Delivery Service Rate GV, Large General Delivery Service Rate LG or Backup Delivery Service Rate B: If at the request of a Customer, the Company responds to investigate any loss of electric service at the Customer’s premises, and finds the interruption of service has been caused by the Customer’s equipment, the Company shall charge the Customer for the total cost incurred to investigate the loss of service. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  2. Page 36 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 36 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24 Terms and Conditions 35. Rates for Purchases from Qualifying Facilities Availability: This short-term purchase arrangement shall be available to Qualifying Facilities (QFs) interconnected with the Company. Qualifying Facilities shall mean small power producers and cogenerators that meet the criteria specified by (i) FERC in 18 C.F.R. §§ 292.203 (a) and (b); or; (ii) the definition of "limited producer" or "limited electrical energy producer” in NHRSA 362-A:1-a and who meet the requirements of RSA 362-A:3, II. Nothing shall prohibit the Company from separately contracting for generation purchases from QFs. Nothing herein shall be construed to affect, modify or amend terms and conditions of an existing Qualifying Facility's contract or rate order with respect to the sale of its energy or capacity. Selling Options: QFs may sell to the Company or wheel through the Company. All generation sold to the Company shall be resold at the ISO-NE market clearing price and subject to appropriate charges as if the power was wheeled through the Company and sold directly to ISO-NE. Metering: Generators selling to the Company shall install metering as specified by the Company to satisfy ISO-NE requirements as they may change from time to time. Projects shall be charged a standard monthly service fee for metering service as approved by the appropriate regulatory agency. Net Metering: Projects 1,000 kilowatts and under using renewable generation shall have the option of being served under the Net Energy Billing Service as specified by NH RSA 362-A:9 and the rules promulgated by the appropriate regulatory agency. Projects receiving a utility net metering capacity allocation prior to March 2, 2017 and not in excess of the applicable net metering cap will continue to be billed and receive credit for their generation in accordance with RSA 362-A:9 and Puc 903.02(f) and Puc 903.02(g) (the “Standard Net Metering Tariff”) through December 31, 2040. Projects receiving a utility net metering capacity allocation beginning on March 2, 2017 and ending on August 31, 2017 and not in excess of the applicable net metering cap will continue to be billed and receive credit for their generation in accordance with the interim alternative net metering tariff adopted by the Commission in Order No. 25,972 (December 21, 2016) (the “Interim Net Metering Tariff”) through December 31, 2040. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  3. Page 37 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 37 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24A Terms and Conditions Projects receiving a utility net metering capacity allocation on or after September 1, 2017 will be billed and credited under the “Alternative Net Metering Tariff” provisions described below once the Company is capable of implementing these provisions. Until such time, customers will be billed and credited under the Standard Net Metering Tariff. Customers receiving a net metering capacity allocation while this Alternative Net Metering Tariff is in effect will be entitled to the net metering design and structure then in effect through December 31, 2040. 1. Eligibility A customer-generator whose facility has a total peak generating capacity less than or equal to 100 kilowatts is eligible to participate as a small customer-generator. A customer-generator whose facility has a total peak generating capacity greater than 100 kilowatts up to and including 1,000 kilowatts is eligible to participate as a large customergenerator if they consume at least twenty percent (20%) of their actual or estimated annual system electric production on-site and behind the meter. Otherwise, the customer must register as a group host under RSA 362-A:9, XIV. A large customer-generator meeting the on-site consumption threshold may switch to the Alternative Net Metering Tariff upon written notice of such election to the Company. 2. Application Fees The Company shall collect fees for all applications to interconnect by customer-generators on and after January 1, 2025. Generating Capacity (AC) Up to 25 kW Greater than 25 kW, up to 100 kW Greater than 100 kW Application Fee $200 $500 $1000 Costs associated with Pre-Application Reviews conducted pursuant to Puc 904.01, Studies and Analysis conducted pursuant to Puc 905.06, or Upgrades or Improvements to the Electric Distribution System identified pursuant to Puc 905.07 shall continue to be funded by individual customer-generators through Pre-Application Fees, Supplemental Review Fees and payments for Upgrades and Improvements and shall not be offset by the Application Fees designated above. 3 Metering The Company will install a bidirectional meter to record in separate channels the quantities of electric imports from the distribution utility grid and electric exports to the distribution utility grid over a billing period. At the time of interconnection, a customer may request, at no cost, installation of a Company-owned production meter. The Customer must provide and install an appropriate meter socket in a physical location acceptable to the Company. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  4. Page 38 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 38 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24B Terms and Conditions 4. Billing Customers will be billed in accordance with the delivery and energy service rate schedules that would apply in the absence of generation, except as specifically provided otherwise hereunder. During each billing period, credits for electricity exports will be issued in the form of monetary bill credits which will carry forward on a customer’s account from month to month until used. Customers may receive a cash payment for any accumulated excess credit when they move or discontinue service, or on an annual basis if they have accumulated a credit balance in excess of $100 as of the end of the March billing cycle. Small customer-generators will be assessed the Stranded Cost Recovery Charge and System Benefits Charge based on the full amount of their electricity imports without any netting of exports during the billing period. All other kilowatt-hour-based rate components will be assessed on the customer’s net energy usage, which is the quantity of kilowatt-hours equal to electric imports minus electric exports (if positive). If such net energy usage is less than zero, customers that receive Default Energy Service from the Company will receive a monetary bill credit for their net electric exports during each billing period calculated at twenty-five percent (25%) of any Distribution charges assessed on a per-kilowatt-hour basis; any Transmission charges assessed on a perkilowatt-hour basis; and the Default Energy Service Rate. If net energy usage is less than zero, customers that do not receive Default Energy Service from the Company will receive a monetary bill credit for their net electric exports during each billing period calculated at twenty-five percent (25%) of any Distribution charges assessed on a per-kilowatt-hour basis; and any Transmission charges assessed on a perkilowatt-hour basis. Large customer-generators will be assessed all charges associated with their rate class based on the full amount of their electricity imports without any netting of exports during the billing period. Customers who receive Default Energy Service from the Company will receive a monetary bill credit for their electric exports during each billing period calculated at the Default Energy Service Rate. For both Small and Large customer-generators, a competitive Energy Service Provider may determine the terms, conditions and prices under which it agrees to provide generation supply to and purchase net generation output from the customer-generator. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  5. Page 39 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 39 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 24C Terms and Conditions 5. Grandfathering Provisions Subsequent sales or other transfers of ownership of a net-metered system or the property upon which the system is located shall not impact the terms and conditions under which the customer-generator is rendered net metering service. New owners shall be allowed to continue to take service under the same terms and conditions in effect at the time of such sale or transfer until 2040, in accordance with RSA 362-A:9,XV and Order No. 25,972, or pursuant to Order No. 26,029, provided that the system is not moved to a different location by the purchaser, transferee, or otherwise. Residential small customer-generators may expand their systems without limitation, provided that the expansion does not result in total system capacity in excess of 100 kW. Non-residential small customer-generators may expand the capacity of their systems by an amount up to the greater of either 20 kW or 50 percent of the system capacity allocated into the standard net metering program prior to September 1, 2017, or the original capacity of a system installed under the alternative net metering tariff effective as of September 1, 2017, as applicable, provided that in neither case can any such expansion have the effect of increasing the system’s capacity to an amount in excess of 100 kW. Non-residential large customer-generators may expand the capacity of their systems by an amount up to the greater of either (1) 50 kW, or (2) a capacity amount such that the expanded system is sized to produce 110 percent of the customer-generator’s annual kilowatt-hour on-site usage, as clearly demonstrated through the customer-generator’s documentation of any consecutive 12-months within the previous two years. In neither case, can any such expansion have the effect of increasing the system’s capacity to a level in excess of one megawatt. Expansion of a net-metered system by or for a commercial or industrial customer-generator smaller than the applicable limitation will allow the customer-generator to continue to be grandfathered, while any such expansion in excess of the applicable limitation will result in the entire net-metered system losing its net metering grandfathered status. Any system modifications must be reported to the Company within 30 days of modification or earlier if so required under the Company’s distributed generation interconnection procedures. 6. Renewable Energy Certificates The Company will offer to serve as independent monitor for a customer-generator who elects to receive a Company-owned production meter. The Company will report the electricity production of such customer-generator at least quarterly to NEPOOL-GIS at no cost to the customer. The Company will file an application on behalf of the customer for Commission certification of the eligibility of the installation to produce renewable energy certificates pursuant to RSA 362-F and the Commission’s Puc 2500 rules. Any customer requesting a Company-owned production meter or requesting the Company to serve as the independent monitor must respond in a timely manner to requests for information from the Company. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  6. Page 40 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 40 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY Original Page 24D PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Terms and Conditions DBA EVERSOURCE ENERGY Rates: Qualifying Facilities selling their output to the Company will be eligible to receive Short Term Avoided Cost Rates equal to the payments received by the Company for the sale of QF generation to the ISO-NE power exchange, adjusted for line losses, wheeling costs and administrative costs incurred by the Company for the transaction. Projects shall be charged a standard monthly service fee for billing service as approved by the appropriate regulatory agency. Wheeling Charges: The Company reserves the right to impose any appropriate wheeling charges (including distribution wheeling charges) for generation transmitted through the Company and sold to ISO-NE and others as may be approved by the appropriate regulatory agency. Issued: February 19, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  7. Page 41 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 41 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 25 Terms and Conditions 36. Line Extensions In areas in which Delivery Service by the Company is authorized, the Company will extend its single-phase or three-phase distribution facilities or upgrade its single-phase distribution facilities to three-phase distribution facilities to a maximum of 5,280 feet in length to serve Customers under Residential Delivery Service Rate R , Rate R-OTOD, Rate ROTOD 2 and General Delivery Service Rate G and Rate G-OTOD, at their request. Extensions or upgrades greater than 5,280 feet in length will be constructed at the discretion of the Company. Additionally, per RSA 370:12, customers requiring a line extension on private property may opt to hire and pay a private line contractor, licensed by the state and approved by the Company, to construct a required overhead or underground power line extension on private property. The contractor shall supply and install all materials as specified by the Company. Line extensions must be designed by the Company and built to its specifications in order for the Company to assume ownership of the line. The Company has the right to not accept a customer built line extension that does not conform to the Company’s specifications. Customers may not contract with private line contractors to construct line extensions along public ways. 1. Location of Distribution Facilities The order of preference for the location of line extensions are (i) along public ways; (ii) along private roads maintained year-round; (iii) along private roads maintained on a seasonal basis; (iv) over rights of way accessible by standard Company equipment; and (v) over rights of way not accessible by standard Company equipment. The Company may choose a higher preference location even if a lower preference location may result in a shorter line extension. The final placement of all line extensions must be preapproved by the Company. 2. Calculation of Line Extension Construction Costs Definitions Overhead Service Drop: The final span of cable providing secondary voltage to a Customer’s meter or point of attachment location, whichever is applicable, from a utility pole. The maximum length of an overhead service drop is determined by the characteristics of the Customer’s load and the terrain over which the overhead service drop passes. Underground Service Drop: The final run of cable providing secondary voltage to a Customer’s meter from a transformer or from a secondary conductor located on the Company’s distribution system. Distribution Facilities Provided by the Company at No Charge to the Customer There shall be no separate charge for a pole-mounted transformer which the Company determines is needed to adequately serve a Customer’s load and up to 300 feet of distribution facilities. The 300 feet of distribution facilities must include the length of an Overhead or Underground Service Drop currently being installed to serve a customer premise. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  8. Page 42 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 42 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY 1st Revised Page 26 Superseding Original Page 26 Terms and Conditions Additional Distribution Facilities Any overhead or underground distribution facilities required to serve a Customer in addition to a pole-mounted transformer and up to 300 feet of distribution as defined above, are subject to the charges specified below. Adding Additional Phases to Existing Overhead Single-phase Facilities The estimated cost in excess of 300 feet of distribution facilities, including the length of an Overhead Service Drop shall be derived based on the Customer-specific job requirements and shall include all costs related to the construction of the distribution facilities, including but not limited to design and inspection and construction labor; researching and recording easements; materials; traffic control; tree trimming; blasting and overheads. Overhead Single-Phase Facilities The estimated cost shall be derived by multiplying the length of the distribution facilities by the average cost per foot of overhead single-phase distribution facilities based on the following schedule of charges. The length of the distribution facilities shall be based on the length of single-phase primary and secondary line to be installed in excess of 300 feet, including the length of an Overhead Service Drop. Overhead, Single-Phase Effective Dates* Average Cost per Foot April 1, 2026 – March 31, 2027 $49.74 Overhead Three-Phase Facilities The estimated cost in excess of 300 feet of distribution facilities, including the length of an Overhead Service Drop shall be derived based on the customer-specific job requirements and shall include all costs related to the construction of the distribution facilities, including but not limited to design and inspection and construction labor; researching and recording easements; materials; traffic control; tree trimming; blasting and overheads. Underground Single-Phase Facilities The estimated cost shall be derived by multiplying the length of the distribution facilities by the average cost per foot of underground single-phase distribution facilities based on the following schedule of charges and adding the result to the excess cost of any padmounted transformers to be installed. The length of the distribution facilities shall be based on the length of single-phase primary and secondary line to be installed in excess of 300 feet, including the length of an Underground Service Drop. The excess cost of a padmounted transformer is the amount by which the cost of a padmounted transformer exceeds the cost of an equivalent pole-mounted transformer. The Company will determine the excess cost on the basis of average cost formulas consistently and equitably applied to all underground installations. Effective Dates* April 1, 2026 – March 31, 2027 Underground, Single-Phase Average Cost per Foot $26.33 Issued: April 8, 2026 Issued by: Effective: April 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations Approved by the NHPUC Order No. 28,212 in Docket DE 26-002 dated April 1, 2026
  9. Page 43 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 43 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY 1st Revised Page 27 Superseding Original Page 27 Terms and Conditions Underground Three-Phase Facilities The estimated cost in excess of 300 feet of distribution facilities, including the length of an Underground Service Drop shall be derived based on the customer-specific job requirements and shall include all costs related to the construction of the distribution facilities, including but not limited to design and inspection and construction labor; researching and recording easements; materials; traffic control; tree trimming; blasting, overheads and the excess cost of any padmounted transformers to be installed. The excess cost of a padmounted transformer is the amount by which the cost of a padmounted transformer exceeds the cost of an equivalent pole-mounted transformer. The Company will determine the excess cost on the basis of average cost formulas consistently and equitably applied to all underground installations. Annual Average Cost per Foot The Company will update the overhead single-phase and underground single-phase average cost per foot figures for effect on April 1 each year based upon a sampling of actual line extensions completed in the preceding three calendar years using the methodology contained in the Settlement Agreement in Docket No. DE 08-135 and as approved by the Commission in its Order No. 25,046 dated November 20, 2009. All costs related to the construction of the distribution facilities will be included in the average cost per foot figures, including but not limited to design and inspection and construction labor; researching and recording easements; materials; traffic control; tree trimming; blasting and overheads. 3. Customer Responsibilities i) Payments: The Customer is responsible to pay to the Company their proportional share of any line extension construction costs in accordance with any line extension agreements in effect when service is requested by the Customer (for line extensions constructed after September 1, 2016) prior to the start of the Company’s construction. In addition, the Customer is responsible to pay to the Company any line extension construction costs as defined in section 2 above, and any special costs as defined in section ix below prior to the start of the Company’s construction if the total cost is $3,000 or less. If the total cost is greater than $3,000, the Customer has the option to either pay the total amount prior to the start of construction, or to sign an agreement to pay the amount in excess of $3,000 in 60 equal monthly payments, plus interest at the rate of interest applicable to the Company’s Customer deposit accounts at the time of execution of the agreement (“Line Extension Monthly Surcharge”). The Company reserves the right to place a lien on the property until such time that the payment obligation is fulfilled. The Customer must agree, as a condition of the line extension monthly payment option, that if the Customer sells, leases or otherwise transfers control and use of the home to another individual (“New Occupant”), and such “New Occupant” opens a new account with the Company, the Customer will obtain an agreement from the “New Occupant” to pay the remaining balance as prescribed in the agreement that would have been owed by the Customer at that location. Unless the “New Occupant” signs a new superseding payment agreement with the Company, the original Customer will remain personally liable for the balance owed to the Company. Any retail Customer that fails to pay the Line Extension Monthly Surcharge shall be subject to disconnection of service to the same extent that such Customer would, under applicable law and regulations, be subject to disconnection of service for failure to pay any other charge payable to the Company. Issued: April 8, 2026 Effective: April 1, 2026 Issued by: Title: Robert S. Coates, Jr President, Eversource NH Operations Approved by the NHPUC Order No. 28,212 in Docket DE 26-002 dated April 1, 2026
  10. Page 44 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 44 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 28 Terms and Conditions ii) Easements: The Customer is responsible to provide, without expense or cost to the Company, the necessary permits, consents or easements for a right-of-way satisfactory to the Company on the Customer’s property for the construction, maintenance and operation of the Company’s distribution facilities, including the right to cut and trim trees and bushes. iii) Environmental Permits: The Customer is responsible to provide, without expense or cost to the Company, the necessary environmental permits for the construction, maintenance and operation of the Company’s distribution facilities on the Customer’s property. iv) Plans: The Customer is responsible to provide the Company with details of the intended installation, including property lines, building locations, service entrance specifications and major electrical load information. v) Other Documents: If the Customer intends to use an existing easement area to cross the property of others with the Company’s distribution facilities, the Customer is responsible to provide evidence that the easement permits the installation of such facilities by the Company. vi) Code Compliance: The Customer is responsible to obtain the necessary approvals from the local inspection authorities before the Customer’s service entrance equipment is connected to the Company’s distribution system. vii) Site Plans: Developers must provide to the Company a site plan or other documentation identifying the maximum number of lots or self-contained living units. The developer shall also provide the Company additional notice should the number of lots or living units increase or decrease from the initial documentation. The developer is responsible to pay any additional costs, including design costs, resulting from changes to the number of lots or units developed subsequent to the original documentation. Upon request, all other Customers requesting service shall provide a site plan for the Company to design the distribution facilities. viii) Underground Distribution Facilities: The Customer shall furnish to the Company’s specifications all trench excavation, back-fill, conduit, duct bank, manholes, vaults, pedestals and transformer foundations necessary for the installation of underground electric distribution facilities. Underground distribution facilities shall be provided in accordance with the Company’s “Information and Requirements for Electric Supply”. ix) Special Costs: The Customer shall pay for all costs incurred by the Company for extensions that require construction which would result in special costs, such as railroad or National Forest crossings, crossing rivers and ponds, crossing wetlands, extending to an island, use of submarine cable or any additional costs incurred to protect the environment and comply with the Company’s environmental policy and procedures. x) The Customer shall be responsible for any other requirements as specified in the Company’s “Information and Requirements for Electric Service”. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations

As listed on the current system

Question(s) Answered 902, 905 (The Connecticut Light and Power Company) Date Filed: 10/21/2026