1 page match
1 page match
2 pages match

Text of OCC-905 Attachment 2.pdf

Extracted from the file · 81 pages · 159,161 characters

Text of OCC-905 Attachment 3.pdf

Extracted from the file · 26 pages · 51,406 characters

12 pages match
  1. Page 86 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 86 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 61 Rate GV PRIMARY GENERAL DELIVERY SERVICE RATE GV AVAILABILITY Subject to the Terms and Conditions of the Tariff of which it is a part, this rate is for high voltage Delivery Service. It is available upon the signing of a Service Agreement for such service at specified delivery points to Customers whose maximum demand shall not exceed 1,000 kilowatts. Service rendered hereunder shall exclude backup and standby service provided under Backup Delivery Service Rate B. Outdoor area lighting is available under Outdoor Lighting Delivery Service Rate OL. Suitable transforming, controlling and regulating apparatus, acceptable to and approved by the Company, shall be provided at the expense of the Customer. In locations in which space limitations or other factors make it impossible or inadvisable, in the opinion of the Company, for the Customer to have transforming apparatus devoted to its exclusive use, and in secondary network areas in which primary service is not made available by the Company at its option, Delivery Service shall be supplied from Company-owned transforming apparatus which also supplies other Customers. In such cases, this rate is available provided the Customer pays an annual rental charge equal to eighteen percent (18.0%) of the cost of the equivalent transformer capacity the Customer would furnish or rent to serve the load if exclusive use of a transformer bank by him were possible or if primary, three-phase service were available and provided the Customer pays in full the estimated cost of installing such equivalent transformer capacity at the time Delivery Service is initiated. CHARACTER OF SERVICE Delivery Service supplied under this rate will be three-phase, 60 hertz, alternating current, at a nominal voltage determined by the Company, generally 2,400/4,160, 4,800/8,320, 7,200/12,470, or 19,920/34,500 volts. A reasonably balanced load between phases shall be maintained by the Customer. RATE PER MONTH Customer Charge ...................................................................$242.13 per month Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  2. Page 87 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 87 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY 3rd Revised Page 62 Superseding 2nd Revised Page 62 Rate GV Per Kilowatt of Maximum Demand Demand Charges: Distribution Charges: First 100 kilowatts................................................... $8.73 Excess Over 100 kilowatts ...................................... $8.43 Regulatory Reconciliation Adjustment ..................................... $0.37 Pole Plant Adjustment Mechanism ........................................... $(0.04) Transmission Charge ................................................................ $13.05 Stranded Cost Recovery ............................................................ $0.52 Energy Charges: Per Kilowatt-Hour Distribution Charges: First 200,000 kilowatt-hours .................................. 0.807¢ All additional kilowatt-hours ................................. 0.807¢ Stranded Cost Recovery ........................................................... (0.360)¢ Issued: July 29, 2026 Effective: August 1, 2026 Issued by: Title: Robert S. Coates, Jr. President, Eversource NH Operations Authorized by NHPUC Order No. 28,236 in Docket DE 25-077 dated July 15, 2026 and NHPUC Order No. 28,237 in Docket DE 24-070 dated July 21, 2026.
  3. Page 88 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 88 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 63 Rate GV PRIMARY METERING LOSS ADJUSTMENT When at the Company's option Delivery Service is metered at delivery voltage (2,400 volts nominal and above), all demand and energy meter readings shall be reduced by one and three-quarters percent (1.75%). Where feasible and at the Company's option, a value other than one and three-quarters percent (1.75%) may be used when specific data is available and this value is a more accurate representation of electrical losses. MAXIMUM DEMAND The kilowatt (KW) demand and, at the Company’s option, the kilovolt-ampere (KVA) demand during each thirty-minute interval of the current monthly billing period shall be determined by measurement. Maximum demand shall be determined to the nearest whole (1.0) kilowatt (KW) or kilovolt-ampere (KVA) for billing purposes and shall be defined as the greater of: (1) the highest kilowatt (KW) demand registered during the on-peak hours of said period or if kilovolt-ampere (KVA) demand is measured, the greater of (a) the highest kilowatt (KW) demand during said period or, (b) 80 percent of the highest kilovoltampere (KVA) demand measured of said period or, (2) fifty percent (50%) of the maximum demand, as defined above, occurring during offpeak hours. OFF-PEAK PERIODS The off-peak period shall be the period including the hours after 8:00 p.m. and before 7:00 a.m. Monday through Friday, and the entire day on Saturdays, Sundays, and Holidays as defined in this Tariff. The on-peak period shall be all hours not included in the off-peak period. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  4. Page 89 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 89 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 64 Rate GV CONTRACT TERM The contract term shall be for not less than one year and for such longer periods as maybe determined by the operation of the sections in this rate entitled “Guarantees” and “Apparatus”. GUARANTEES (a) When the estimated expenditure necessary to deliver electrical energy properly to a Customer's premises shall be of such an amount that the income to be derived from the delivery of such energy at the rate herein established, including the monthly minimum charge, will be insufficient to warrant such expenditure, the Company may require the Customer to guarantee a minimum annual payment for a term of years and/or to pay the whole or a part of the cost of extending, enlarging, or rebuilding its facilities to supply the Customer's premises or other reasonable payments in addition to the payments otherwise provided herein. (b) Except as provided by the Terms and Conditions and as modified by the provisions of Paragraph (a) of this section, and exclusive of any charges made under the provisions of the section in this rate entitled "Apparatus" and if applicable, for Default Energy Service, the minimum charge shall be $1,297.23 per month. APPARATUS Substation foundations, structures, and all necessary controlling, regulating, transforming, and protective apparatus shall be furnished, owned, and maintained by the Customer at the Customer’s expense. However, controlling, regulating, and transforming apparatus may be rented from the Company at a charge of eighteen percent (18.0%) per year of the equipment cost. The cost of installing such equipment shall be paid in full at the time service is initiated. In no event shall the Company be required to rent apparatus to the Customer the total cost of which shall exceed $10,000. The Company may refuse to rent pole-mounted apparatus based on environmental and other immediate hazards that are present. In the event the Company refuses to rent a pole-mounted apparatus, the Company shall inform the Customer of the environmental and other immediate hazards that are present and shall provide the Customer with the opportunity to remove the hazards. In the event the environmental and the other immediate hazards are removed by the Customer, the Company shall agree to rent pole-mounted apparatus to the Customer. If a Customer-owned structure supporting a Company owned pole-mounted transformer is deemed insufficient or threatened by trees or other hazards, the Company shall inform the Customer of the hazards and shall provide the Customer with the opportunity to repair or remove the hazard. In the event the Customer refuses to repair or remove the hazard or does not repair or remove the hazard in a timely manner, the Company is authorized to terminate the existing rental agreement and to remove the transformer upon 90 days written notice to the Customer. In cases where the Customer elects to rent apparatus from the Company, the Customer shall guarantee, in addition to any other guarantees, to continue to pay rental therefor for a period of not less than four (4) years. Should the Customer discontinue service before four (4) years shall have elapsed, the guaranteed rental then unpaid shall immediately become due and payable. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  5. Page 90 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 90 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 65 Rate GV METERING The Company may install one or more meters at its option. Metering shall be located on the low voltage side of the Customer’s transforming apparatus provided, however, that metering may be at delivery voltage at the option of the Company. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  6. Page 91 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 91 of 128 NHPUC NO. 11-ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 65-E Rate EV-2 PRIMARY GENERAL DELIVERY SERVICE RATE EV-2 AVAILABILITY This rate is available to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public, and where such customer (1) must have separately metered service, with at least 90 percent of the load at that meter dedicated to EV charging, that has sufficient total load to otherwise qualify for Eversource’s Rate GV, with a maximum demand greater than 100 kilowatts; and (2) must have “publicly accessible” EV charging equipment, meaning that the charging equipment is available to the public without restriction. A potential participant in this rate offering that restricts charging equipment access to customers of the premises (e.g., restaurant patrons or other business visitors, tenants, or employees) shall not qualify as “publicly accessible” and shall not be eligible for this rate. This rate offering, Rate EV-2, will initially be available to enroll in for a three-year period from Commission approval on August 15, 2022 in Order No. 26,667. No new applications or enrollment requests will be accepted after August 15, 2025. Those already enrolled in the rate will continue to be served on it. After the expiration of the three-year term, an administrative proceeding will be conducted to determine whether this rate should be revised, discontinued or continue to be offered unchanged. Upon the conclusion of that proceeding and by Order of the Public Utilities Commission, if the rate is revised or remains unchanged new customers will be able to enroll once again. All existing customers on Rate EV-2 will either be moved to the revised Rate EV-2 if the rate is revised, moved to general service Rate GV if EV-2 is discontinued, or continue on this initial EV-2 rate if it remains unchanged, consistent with all relevant terms of the Commission Order. Subject to the Terms and Conditions of the Tariff of which it is a part, this rate is for high voltage Delivery Service. It is available upon the signing of a Service Agreement for such service at specified delivery points to Customers whose maximum demand shall not exceed 1,000 kilowatts. Service rendered hereunder shall exclude backup and standby service provided under Backup Delivery Service Rate B. Outdoor area lighting is available under Outdoor Lighting Delivery Service Rate OL. Suitable transforming, controlling and regulating apparatus, acceptable to and approved by the Company, shall be provided at the expense of the Customer. In locations in which space limitations or other factors make it impossible or inadvisable, in the opinion of the Company, for the Customer to have transforming apparatus devoted to its exclusive use, and in secondary network areas in which primary service is not made available by the Company at its option, Delivery Service shall be supplied from Company-owned transforming apparatus which also supplies other Customers. In such cases, this rate is available provided the Customer pays an annual rental charge equal to eighteen percent (18.0%) of the cost of the equivalent transformer capacity the Customer would furnish or rent to serve the load if exclusive use of a transformer bank by him were possible or if primary, three-phase service were available and provided the Customer pays in full the estimated cost of installing such equivalent transformer capacity at the time Delivery Service is initiated. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  7. Page 92 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 92 of 128 NHPUC NO. 11-ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY 3rd Revised Page 65F Superseding 2nd Revised Page 65F Rate EV-2 CHARACTER OF SERVICE Delivery Service supplied under this rate will be three-phase, 60 hertz, alternating current, at a nominal voltage determined by the Company, generally 2,400/4,160, 4,800/8,320, 7,200/12,470, or 19,920/34,500 volts. A reasonably balanced load between phases shall be maintained by the Customer. RATE PER MONTH Customer Charge ................................................................... $242.13 per month Energy Charges: Per Kilowatt-Hour Distribution Charges:…………………………………………14.046¢ Transmission Charges:……………………………..…………17.648¢ Regulatory Reconciliation Adjustment………………………...0.529¢ Pole Plant Adjustment Mechanism………………..………….(0.056)¢ Stranded Cost Recovery Charges………………………..……..0.363¢ PRIMARY METERING LOSS ADJUSTMENT When at the Company's option Delivery Service is metered at delivery voltage (2,400 volts nominal and above), all energy meter readings shall be reduced by one and three-quarters percent (1.75%). Where feasible and at the Company's option, a value other than one and three-quarters percent (1.75%) may be used when specific data is available and this value is a more accurate representation of electrical losses. CONTRACT TERM The contract term shall be for not less than one year and for such longer periods as maybe determined by the operation of the sections in this rate entitled "Guarantees" and "Apparatus". Issued: July 29, 2026 Effective: August 1, 2026 Issued by: Title: Robert S. Coates, Jr. President, Eversource, NH Operations Authorized by NHPUC Order No. 28,236 in Docket DE 25-077 dated July 15, 2026 and NHPUC Order No. 28,237 in Docket DE 24-070 dated July 21, 2026.
  8. Page 93 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 93 of 128 NHPUC NO. 11-ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Original Page 65-G Rate EV-2 GUARANTEES (a) When the estimated expenditure necessary to deliver electrical energy properly to a Customer's premises shall be of such an amount that the income to be derived from the delivery of such energy at the rate herein established, including the monthly minimum charge, will be insufficient to warrant such expenditure, the Company may require the Customer to guarantee a minimum annual payment for a term of years and/or to pay the whole or a part of the cost of extending, enlarging, or rebuilding its facilities to supply the Customer's premises or other reasonable payments in addition to the payments otherwise provided herein. (b) Except as provided by the Terms and Conditions and as modified by the provisions of Paragraph (a) of this section, and exclusive of any charges made under the provisions of the section in this rate entitled "Apparatus" and if applicable, for Default Energy Service, the minimum charge shall be the Customer Charge. APPARATUS Substation foundations, structures, and all necessary controlling, regulating, transforming, and protective apparatus shall be furnished, owned, and maintained by the Customer at the Customer's expense. However, controlling, regulating, and transforming apparatus may be rented from the Company at a charge of eighteen percent (18.0%) per year of the equipment cost. The cost of installing such equipment shall be paid in full at the time service is initiated. In no event shall the Company be required to rent apparatus to the Customer the total cost of which shall exceed $10,000. The Company may refuse to rent pole-mounted apparatus based on environmental and other immediate hazards that are present. In the event the Company refuses to rent a pole-mounted apparatus, the Company shall inform the Customer of the environmental and other immediate hazards that are present and shall provide the Customer with the opportunity to remove the hazards. In the event the environmental and the other immediate hazards are removed by the Customer, the Company shall agree to rent pole-mounted apparatus to the Customer. If a Customer-owned structure supporting a Company owned pole­ mounted transformer is deemed insufficient or threatened by trees or other hazards, the Company shall inform the Customer of the hazards and shall provide the Customer with the opportunity to repair or remove the hazard. In the event the Customer refuses to repair or remove the hazard or does not repair or remove the hazard in a timely manner, the Company is authorized to terminate the existing rental agreement and to remove the transformer upon 90 days written notice to the Customer. In cases where the Customer elects to rent apparatus from the Company, the Customer shall guarantee, in addition to any other guarantees, to continue to pay rental therefor for a period of not less than four (4) years. Should the Customer discontinue service before four (4) years shall have elapsed, the guaranteed rental then unpaid shall immediately become due and payable. METERING The Company may install one or more meters at its option. Metering shall be located on the low voltage side of the Customer's transforming apparatus provided, however, that metering may be at delivery voltage at the option of the Company. Issued: January 20, 2026 Issued by: Effective: February 1, 2026 Title: Robert S. Coates, Jr. President, Eversource NH Operations
  9. Page 94 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 94 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY 3rd Revised Page 66 Superseding 2nd Revised Page 66 Rate LG LARGE GENERAL DELIVERY SERVICE RATE LG AVAILABILITY Subject to the Terms and Conditions of the Tariff of which it is a part, this rate is for high voltage Delivery Service. It is available upon the signing of a Service Agreement for such service at specified delivery points to Customers whose loads are larger than those that would be permitted under Rate GV of this Tariff. Service rendered hereunder shall exclude all backup and standby service provided under Backup Delivery Service Rate B. Outdoor area lighting is available under Outdoor Lighting Delivery Service Rate OL. Substation foundations and structures, and suitable controlling, regulating, and transforming apparatus, all of which shall be acceptable to and approved by the Company, together with such protective equipment as the Company shall deem necessary for the protection and safe operation of its system, shall be provided at the expense of the Customer. CHARACTER OF SERVICE Delivery Service supplied under this rate will be three-phase, 60 hertz, alternating current, at a nominal delivery voltage determined by the Company, generally 34,500 volts or higher. A reasonably balanced load between phases shall be maintained by the Customer. RATE PER MONTH Customer Charge ....................................................................... $800.00 per month Demand Charges: Per Kilovolt-Ampere of Maximum Demand Distribution Charge .................................................................. $7.32 Regulatory Reconciliation Adjustment .................................... $0.31 Pole Plant Adjustment Mechanism .......................................... $(0.03) Transmission Charge ............................................................... $13.25 Stranded Cost Recovery ........................................................... $0.30 Energy Charges: Per Kilowatt-Hour Distribution Charges: On-Peak Hours ...............................................................0.694¢ Off-Peak Hours ..............................................................0.591¢ Issued: July 29, 2026 Effective: August 1, 2026 Issued by: Title: Robert S. Coates, Jr. President, Eversource, NH Operations Authorized by NHPUC Order No. 28,236 in Docket DE 25-077 dated July 15, 2026 and NHPUC Order No. 28,237 in Docket DE 24-070 dated July 21, 2026.
  10. Page 95 of 128Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 OCC-905 Attachment 4 Page 95 of 128 NHPUC NO. 11 - ELECTRICITY DELIVERY PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DBA EVERSOURCE ENERGY Energy Charges (Continued...) 2nd Revised Page 67 Superseding 1st Revised Page 67 Rate LG Per Kilowatt-Hour Stranded Cost Recovery: On-Peak Hours ............................................................... (0.580)¢ Off-Peak Hours .............................................................. (0.665)¢ MAXIMUM DEMAND The kilovolt-ampere (KVA) demand during each thirty-minute interval of the current monthly billing period shall be determined by measurement. Maximum demand shall be determined for billing purposes to the nearest whole (1.0) kilovolt-ampere and shall be defined as the greater of: (1) the highest kilovolt-ampere demand registered during the on-peak hours of said period, or (2) fifty percent (50%) of the highest kilovolt-ampere demand registered during the off-peak hours of said period, except that for any portion of the Customer's highest off-peak kilovolt-ampere demand in excess of 30,000 kilovolt-amperes the multiplier applicable to the amount of such demand within each successive 10,000 kilovolt-ampere block of such excess portion shall be increased from fifty percent (50%) by successive ten percent (10%) increments, up to a maximum multiplier of one hundred percent (100%) for that portion of demand in excess of 70,000 kilovolt amperes, or (3) eighty percent (80%) of the amount by which the greatest amount defined in (1) and (2) above during the eleven (11) preceding months exceeds 1,000 kilovolt-amperes. OFF-PEAK PERIOD The off-peak period shall be the period including the hours after 8:00 p.m. and before 7:00 a.m., Monday through Friday, and the entire day on Saturdays, Sundays, and Holidays. The on-peak period shall be all hours not included in the off-peak period. CONTRACT TERM The contract term shall be for not less than one year and for such longer periods as maybe determined by the operation of the sections in this rate entitled “Guarantees” and “Apparatus”. Issued: July 29, 2026 Issued by: Effective: August 1, 2026 Title: Robert S. Coates, Jr President, NH Electric Operations Authorized by NHPUC Order No. 28,236 in Docket DE 25-077 dated July 15, 2026.

As listed on the current system

Question(s) Answered 902, 905 (The Connecticut Light and Power Company) Date Filed: 10/21/2026