Interrogatory responses
Answers to questions 923, 925, 927
Files5
OCC-923_Final.pdf
PDF · 146 KB · 2 pagesText searchable
Download OCC-923_Final.pdfRead the text of OCC-923_Final.pdf
OCC-925_Final.pdf
PDF · 116 KB · 2 pagesText searchable
Download OCC-925_Final.pdfRead the text of OCC-925_Final.pdf
OCC-925 Attachment 1.pdf
PDF · 3.9 MB · 34 pagesText searchable
Download OCC-925 Attachment 1.pdfRead the text of OCC-925 Attachment 1.pdf
OCC-925 Attachment 2.pdf
PDF · 3.6 MB · 35 pagesText searchable
Download OCC-925 Attachment 2.pdfRead the text of OCC-925 Attachment 2.pdf
OCC-927_Final.pdf
PDF · 180 KB · 4 pagesText searchable
Download OCC-927_Final.pdfRead the text of OCC-927_Final.pdf
Page 26 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 26 of 35 Capital Project Approval Process Attendee Attendee Attendee Attendee Attendee Attendee Attendee Attendee Attendee Supervisor(s)/Manager(s) of Outage and Ops Planning Manager of Standards Manager of Budget and Investment Manager of Generation Interconnections Manager of Asset Management Manager of Operational Compliance Manager(s) of Line Operations Manager(s) of Substation Technical Engineering Manager(s) of System Planning Roles and Responsibilities Executive Sponsor • Provide senior management vision, direction and feedback to the EPAC • Appoint the Chairperson(s) Chairperson(s) • Preside at EPAC meetings • Designate a Member Director as an alternate to preside at meetings in his/her absence • Solicit Member Director appointments from the leadership team • Appoint a EPAC administrator • Determine the meeting schedule and location(s) • Approve meeting agendas • Review meeting materials on the agenda prior to the EPAC meeting • Hold votes as required • Participate in discussions and votes to meet the EPAC objectives • Initiate the biennial review of the EPAC process in coordination with the other EPACs • Create subcommittees as required Member Director • If required, designate a manager in the same organization as a voting alternate to participate in the EPAC • Review meeting materials on the agenda prior to the EPAC meeting • Participate in discussions and votes to meet the EPAC objectives • Participate in the biennial review of the EPAC process as required Administrator • Schedule meetings • Prepare draft meeting agendas • Quality Screening and Quality Measurement of Project Documentation. • Distribute meeting materials to attendees three working days prior to a scheduled EPAC meeting Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 24Page 27 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 27 of 35 Capital Project Approval Process • • • • • Record the result of any votes Prepare and distribute meeting notes Record PAFs and SRFs presented and meeting results Submit PAFs and SRFs approved to Investment Planning for Delegation of Authority approvals in PowerPlan Attend to and manage the [email removed] email inbox Project Lead/Initiator • Complete a PAF (including financial and technical details, cost estimate, project checklist, and Constructability Review Form) for any proposed capital project or change, ensuring that EPAC objective one items are fully met, and obtain any necessary reviews and approvals prior to submittal to the EPAC • Submit the PAF to the EPAC administrator via [email removed] at least seven working days prior to the next scheduled EPAC meeting for engineering approval (ensures document screening and review by committee members) • Attend the EPAC meeting and present the PAF to EPAC members • Revise the PAF and/or respond to comments from the EPAC as required Quorum The Chairperson(s) (or alternate) plus a minimum of four Member Directors (or alternates) shall constitute a quorum for voting purposes if all appropriate disciplines are present to challenge the merits of the project(s). Meeting Schedule and Location The EPAC shall schedule meetings twice monthly. The Chairperson(s) may cancel a meeting or require more frequent meetings from time to time as required. Voting The Member Directors and the Chairpersons, or their designated alternates, are eligible to vote. A vote is carried by a simple majority. Each person has one vote. Subcommittees The Chairperson may establish standing or ad hoc subcommittees as required to meet the objectives of the EPAC. Subcommittees shall be chaired by a voting member of the EPAC or their designated alternate. Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 25Page 28 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 28 of 35 Capital Project Approval Process Attachment C, State Project Approval Committee (State PAC) Charter Purpose The State Project Approval Committees (State PACs) review and challenge the technical merit of proposed distribution projects, and approve them as consistent with Eversource priorities (e.g. safety, reliability, cost efficiency). Applicability This charter applies to the three state PACs in Connecticut, Massachusetts and New Hampshire that are responsible for all Eversource electrical distribution projects originating in their respective states. Objectives The objectives of a state PAC are as follows: 1. Receive, review and approve Project Authorization Forms (PAFs) for all projects that meet the Accounting Policy Statement No. 1 threshold. A lower threshold may be imposed by the state PAC, if desired. a. Ensure that the PAF justification is valid. b. Review and approve the project’s technical merits. c. Ensure the scope and cost estimates are reasonable to ± 25% for projects seeking full authorization and to -25%/+50% for projects seeking initial funding. d. Ensure that all reasonable alternatives were evaluated and appropriately rejected. e. The committee has the ability to review detailed engineering designs, ensuring the proposed work is in accordance with our Standards, evaluate load implications, assess root cause / reliability and vet out all possible alternatives. f. Not all projects presented are requesting funding and require a vote – these projects will be noted “FOR DISCUSSION ONLY”. g. Ensure risks and mitigation plans are identified. h. Ensure the PAF project checklist is complete. i. Ensure the Constructability Review Form is complete. j. Ensure the financial analysis is reasonable to the accuracy appropriate to the project phase. k. Ensure the project schedule is achievable and reasonable to the accuracy appropriate to the project phase. l. If CEO or subsidiary board approval is required, ensure project and cost analysis has been reviewed by the Enterprise Risk Management and Financial Planning & Analysis departments. 2. Release engineering labor and funds for detailed engineering on approved PAFs. 3. Review projects authorized for detailed engineering at least monthly to control engineering spend. Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 26Page 29 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 29 of 35 Capital Project Approval Process 4. Review state PAC process performance and lessons learned and coordinate with the other state PACs and the EPAC to initiate any needed changes on at least a biennial basis. 5. Provide a forum for design review for more complex distribution street and line projects. The state PAC chairperson will use their judgement to determine which projects require distribution design review prior to state PAC approval. Membership Each state PAC shall consist of an executive sponsor, a chairperson, voting member directors, an administrator and non-voting attendees as shown in the below table. The chairperson may designate additional voting member directors, if required. State PAC Membership List State PAC Role Executive Sponsor Chairperson Administrator Voting Member Voting Member Voting Member Voting Member Voting Member Voting Member Voting Member Voting Member Voting Member Attendee Company Position VP, Engineering Director, Distribution Engineering Appointed by Chairperson Manager, Distribution Engineering Manager, Investment Planning Manager, Distributed Generation Manager/Supervisor, Field Engineering Manager, Integrated Planning, Scheduling Manager, System Operations Manager, Field Operations Manager, Substation Technical Engineering Manager, Engineering Standards Project Manager(s) Roles and Responsibilities Executive Sponsor • Provide senior management vision, direction and feedback to the state PAC • Appoint the Chairperson Chairperson • Preside at state PAC meetings • Designate a Member Director as an alternate to preside at meetings in his/her absence • Solicit Member Director appointments from the leadership team • Appoint a state PAC administrator • Determine the meeting schedule and location(s) • Approve meeting agendas • Review meeting materials on the agenda prior to the state PAC meeting Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 27Page 30 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 30 of 35 Capital Project Approval Process • • • • • • Hold votes as required Participate in discussions and votes to meet the state PAC objectives Release funds on approved PAFs for detailed engineering Initiate the biennial review of the state PAC process in coordination with the other state PACs Create subcommittees as required Determine which projects should complete a design review prior to state PAC approval Voting Member • If required, designate a voting alternate to participate in the state PAC • Review meeting materials on the agenda prior to the state PAC meeting • Participate in discussions and votes to meet the state PAC objectives • Participate in the biennial review of the state PAC process as required Administrator • Schedule meetings • Prepare draft meeting agendas • Distribute meeting materials to attendees three days prior to a scheduled state PAC meeting • Record the result of any votes • Prepare and distribute meeting notes • Record PAFs presented and meeting results in the capital project database Project Initiator (typically engineer level) • Complete a PAF for any proposed capital project, ensuring that state PAC objective 1 items are fully met, and obtain any necessary reviews and approvals prior to submittal to the state PAC • Submit the PAF to the state PAC administrator at least three working days prior to the next scheduled state PAC meeting for engineering approval • Attend the state PAC meeting and present the PAF to state PAC members • Revise the PAF and/or respond to comments from the state PAC as required • Once fully authorized, if costs exceed the approved PAF levels by more than the amounts shown in Accounting Policy Statement No. 1, create a SRF, attach to the previously approved PAF, and resubmit for review and approval. Quorum The Chairperson(s) (or alternate) plus a minimum of two Member Directors (or alternates) shall constitute a quorum for voting purposes if all appropriate disciplines are present to challenge the merits of the project(s). Meeting Schedule Each of the state PACs shall schedule meetings at least bimonthly. The Chairperson may cancel a meeting or require more frequent meetings from time to time as required. Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 28Page 31 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 31 of 35 Capital Project Approval Process Voting The Member Directors and the Chairperson, or their designated alternates, are eligible to vote. A vote is carried by a simple majority. Each person has one vote. Subcommittees The Chairperson may establish standing or ad hoc subcommittees as required to meet the objectives of the state PAC. Subcommittees shall be chaired by a voting member of the state PAC or their designated alternate. Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 29Page 32 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 32 of 35 Capital Project Approval Process Attachment D, Transmission and Substation Project Approval Process Flow Charts Supplemental Authorization Process (if required per APS guidelines) Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 30Page 33 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 33 of 35 Capital Project Approval Process Attachment E, Transmission and Substation Project Approval Process Detailed Flow Chart Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 31Page 34 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 34 of 35 Capital Project Approval Process Attachment F, Distribution Project Approval Process Flow Chart Initiator Chooses Starting Point Authorization Type: Preliminary Funding (Am ount required to obtain detailed scope) (State-PAC) 1. Preliminary Scope (Optional) i.e. Large System Planning Projects, Complex/Long Range, Requires Investigation Conceptual Engineering -25%/+50% Conceptual Grade Estimate or Detailed Assumptions Prepare PAF State – Technical & Financial Review Committee DOA Authorization Type: Full Funding (State-PAC) 2. Detailed Scope i.e. Asset Replacement (like for like), Defined Programs, Less Complex Projects Preliminary Engineering +/-25% Planning Grade Estimate Prepare/ Update PAF State – Technical & Financial Review Committee DOA (State-PAC) Supplemental Authorization (If required Per APS Guidelines) Prepare SAF State – Technical & Financial Review Committee DOA Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 32Page 35 of 35
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 5, 2026 OCC-925 Attachment 2 Page 35 of 35 Capital Project Approval Process Attachment G, PAF Schedule Milestone Requirements Use the appropriate list of milestones for the authorization type to populate the project milestone schedule within the IFR or PAF. Inclusion of the appropriate milestones is required for IFR and PAF submittal. These milestones support baselining of the project schedule. In the case of initial funding the initial project baseline schedule is defined within twenty business days of IFR approval. The IFR milestones are used as reference to support the initial baseline. In the cases of partial funding and full funding the included milestones are representative of the schedule baseline established ahead of submittal. Projects can re-baseline at each funding stage of a project. INITIAL FUNDING REQUEST FORM PROEJCT AUTHORIZATION FORM [PARTIAL AND FULL FUNDING REQUESTS] Project initiator leads this effort Project Manager leads this effort Required Items Required Items SDC Approval (for applicable projects) IFR Approval Conversion of Tx development costs, 183 to 107 SDC Approval (for applicable projects) (applicable to projects that require SSF approval and/or ISO preferred Conversion of Tx development costs, 183 to 107 alternative selection) (applicable to projects that require SSF approval and/or ISO preferred EPAC Partial Funding Approval (for applicable projects) alternative selection) EPAC Full Funding Approval EPAC Partial Funding Approval (for applicable projects) Start of Construction Preliminary Design Completion (or latest pre-full funding design phase) Project In-Service Date (ISD) EPAC Full Funding Approval Project Need Date (for applicable projects) Siting Approval (for applicable projects) Start of Construction Project In-Service Date (ISD) In certain cases partial funding may not be necessary and the project can proceed directly from initial to full funding. Connect with Project Manager to Project Need Date (for applicable projects) identify the appropriate project stage. ISO Related Milestones (for applicable projects) • ISO Preferred Alternative Selected • PAC Presentation • TCA Submittal Capital Project Approval Process - JA-AM-2001-A, Rev. 7 Page 33
Text of OCC-927_Final.pdf
Extracted from the file · 4 pages · 12,932 characters
As listed on the current system
Question(s) Answered 923, 925, 927 (The Connecticut Light and Power Company) Date Filed: 10/20/2026