Eversource rate increase is on 409 pages across 16 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
44 pages match
  1. Page 46 of 144Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 46 of 144 Total net proceeds could also be adjusted for a benefit due to Eversource if there are lower operation costs or higher availability of the projects through the period that is four years following the commercial operation of Revolution Wind. Eversource recognized an aggregate, net after-tax charge of $75.0 million, or $0.20 per share, in 2025 resulting from our previous offshore wind investments. This charge consists of the pre-tax $284 million increase to the offshore wind contingent liability, offset by $209 million of tax benefits associated with tax losses on the sale of the South Fork Wind and Revolution Wind projects that Eversource expects to realize. Liquidity Sources and Uses of Cash: Eversource’s regulated business is capital intensive and requires considerable capital resources. Eversource’s regulated companies’ capital resources are provided by cash flows generated from operations, short-term borrowings, long-term debt issuances, capital contributions from Eversource parent, and existing cash, and are used to fund their liquidity and capital requirements. Eversource’s regulated companies typically maintain minimal cash balances and use short-term borrowings to meet their working capital needs and other cash requirements. Short-term borrowings are also used as a bridge to long-term debt financings. The levels of short-term borrowing may vary significantly over the course of the year due to the impact of fluctuations in cash flows from operations (including timing of storm costs and regulatory recoveries), dividends paid, capital contributions received and the timing of long-term debt financings. Eversource, CL&P, NSTAR Electric and PSNH each uses its available capital resources to fund its respective construction expenditures, meet debt requirements, pay operating costs, including storm-related costs, pay dividends, and fund corporate obligations. Eversource's regulated companies recover their electric, natural gas and water distribution construction expenditures as the related project costs are depreciated over the life of the assets. This impacts the timing of the revenue stream designed to fully recover the total investment including a return on the equity and debt used to finance the investments. Eversource's regulated companies spend a significant amount of cash on capital improvements and construction projects that have a long-term return on investment and recovery period. These factors have resulted in current liabilities exceeding current assets by $2.73 billion, $268.6 million, $9.0 million and $19.6 million at Eversource, CL&P, NSTAR Electric and PSNH, respectively, as of December 31, 2025. We expect the future operating cash flows of Eversource, CL&P, NSTAR Electric and PSNH, along with our existing borrowing availability and access to both debt and equity markets, will be sufficient to meet any working capital and future operating requirements, and capital investment forecasted opportunities. As of December 31, 2025, $1.39 billion of Eversource's long-term debt, including $1.00 billion at Eversource parent and $300.0 million at NSTAR Electric, matures within the next 12 months. Eversource, with its current credit ratings, has several options available in the financial markets to repay or refinance these maturities with the issuance of new long-term debt. Eversource, CL&P, NSTAR Electric and PSNH will reduce their short-term borrowings with operating cash flows or with the issuance of new long-term debt, determined by considering capital requirements and maintenance of Eversource's credit rating and profile. Cash totaled $135.4 million as of December 31, 2025, compared with $26.7 million as of December 31, 2024. Short-Term Debt - Commercial Paper Programs and Credit Agreements: Eversource parent has a $2.00 billion commercial paper program allowing Eversource parent to issue commercial paper as a form of short-term debt. Eversource parent, CL&P, PSNH, NSTAR Gas, Yankee Gas, EGMA and Aquarion Water Company of Connecticut are parties to a five-year $2.00 billion revolving credit facility. Effective October 11, 2025, the revolving credit facility’s termination date was extended for one additional year to October 11, 2030, pursuant to the extension provisions contained in the existing credit agreement. This revolving credit facility serves to backstop Eversource parent's $2.00 billion commercial paper program. NSTAR Electric has a $650 million commercial paper program allowing NSTAR Electric to issue commercial paper as a form of short-term debt. NSTAR Electric is also a party to a five-year $650 million revolving credit facility. Effective October 11, 2025, the revolving credit facility’s termination date was extended for one additional year to October 11, 2030, pursuant to the extension provisions contained in the existing credit agreement. This revolving credit facility serves to backstop NSTAR Electric's $650 million commercial paper program. The amount of borrowings outstanding and available under the commercial paper programs were as follows: Borrowings Outstanding as of December 31, 2025 (Millions of Dollars) Eversource Parent Commercial Paper Program NSTAR Electric Commercial Paper Program $ 1,280.0 245.4 Available Borrowing Capacity as of December 31, 2024 $ 1,538.0 504.8 2025 $ 720.0 404.6 2024 $ Weighted-Average Interest Rate as of December 31, 2025 2024 462.0 3.98 % 4.76 % 145.2 3.87 % 4.55 % There were no borrowings outstanding on the revolving credit facilities as of December 31, 2025 or 2024. CL&P and PSNH have uncommitted line of credit agreements totaling $375 million and $250 million, respectively, all of which will expire in either May 2026, September 2026 or October 2026. There are no borrowings outstanding on either the CL&P or PSNH uncommitted line of credit agreements as of December 31, 2025. Amounts outstanding under the commercial paper programs are included in Notes Payable and classified in current liabilities on the Eversource and NSTAR Electric balance sheets, as all borrowings are outstanding for no more than 364 days at one time. 32
  2. Page 47 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 47 of 144 Intercompany Borrowings: Eversource parent uses its available capital resources to provide loans to its subsidiaries to assist in meeting their shortterm borrowing needs. Eversource parent records intercompany interest income from its loans to subsidiaries, which is eliminated in consolidation. Intercompany loans from Eversource parent to its subsidiaries are eliminated in consolidation on Eversource's balance sheets. As of December 31, 2025 and 2024, there were intercompany loans from Eversource parent to PSNH of $49.3 million and $131.1 million, respectively. As of December 31, 2024, there were intercompany loans from Eversource parent to CL&P of $280.0 million. Eversource parent charges interest on these intercompany loans at the same weighted-average interest rate as its commercial paper program. Intercompany loans from Eversource parent are included in Notes Payable to Eversource Parent and classified in current liabilities on the respective subsidiary's balance sheets, as these intercompany borrowings are outstanding for no more than 364 days at one time. Availability under Long-Term Debt Issuance Authorizations: On May 1, 2024, the DPU approved NSTAR Electric’s request for authorization to issue up to $2.40 billion in long-term debt through December 31, 2026. On August 12, 2024, the DPU approved EGMA’s request for authorization to issue up to $325 million in long-term debt through December 31, 2026. On December 18, 2024, the DPU approved NSTAR Gas’ request for authorization to issue up to $475 million in long-term debt through December 31, 2027. On March 26, 2025, PURA approved Yankee Gas’ request for authorization to issue up to $360 million in long-term debt through December 31, 2026. PSNH has utilized its long-term debt authorizations in place with NHPUC. CL&P has no long-term debt authorization remaining with PURA. Long-Term Debt Issuances and Repayments: The following table summarizes long-term debt issuances and repayments: (Millions of Dollars) Interest Rate Issuance/ (Repayment) Issue Date or Repayment Date Maturity Date Use of Proceeds for Issuance/ Repayment Information CL&P 2025 Series A First Mortgage Bonds 4.95 % 400.0 January 2025 January 2030 Repaid short-term debt, paid capital expenditures and working capital CL&P 2020 Series A First Mortgage Bonds 0.75 % (400.0) December 2025 December 2025 Paid at maturity NSTAR Electric Debentures 4.85 % 400.0 February 2025 March 2030 Repaid 3.25% Debentures at maturity, repaid short-term debt, paid capital expenditures and working capital NSTAR Electric Debentures 5.20 % 400.0 February 2025 March 2035 Repaid 3.25% Debentures at maturity, repaid short-term debt, paid capital expenditures and working capital NSTAR Electric Debentures 5.20 % 300.0 October 2025 March 2035 Repaid short-term debt, paid capital expenditures and working capital NSTAR Electric Debentures 3.25 % (250.0) November 2025 November 2025 PSNH Series Y First Mortgage Bonds 4.40 % 300.0 June 2025 July 2028 Repaid short-term debt, paid capital expenditures and working capital Eversource Parent Series HH Senior Notes 4.45 % 600.0 October 2025 December 2030 Repay Series J bonds at maturity and repaid shortterm debt Eversource Parent Series H Senior Notes 3.15 % (300.0) January 2025 January 2025 Paid at maturity Eversource Parent Series Q Senior Notes 0.80 % (300.0) August 2025 August 2025 Paid at maturity NSTAR Gas Series Y First Mortgage Bonds 4.86 % 205.0 June 2025 June 2030 NSTAR Gas Series Z First Mortgage Bonds 5.30 % 20.0 June 2025 June 2035 Repaid short-term debt, paid capital expenditures and working capital Repaid short-term debt, paid capital expenditures and working capital NSTAR Gas Series R First Mortgage Bonds 2.33 % (75.0) May 2025 May 2025 Paid at maturity January 2031 Repaid Series M bonds at maturity, repaid shortterm debt, paid capital expenditures and working capital Repaid Series M bonds at maturity, repaid shortterm debt, paid capital expenditures and working capital Yankee Gas Series Y First Mortgage Bonds 5.02 % 148.0 July 2025 Paid at maturity Yankee Gas Series Z First Mortgage Bonds 5.55 % 37.0 July 2025 July 2035 Yankee Gas Series M First Mortgage Bonds 3.35 % (75.0) September 2025 September 2025 Paid at maturity EGMA Series F First Mortgage Bonds 4.77 % 125.0 September 2025 October 2030 Repaid short-term debt, paid capital expenditures and working capital Rate Reduction Bonds: PSNH's RRB payments consist of principal and interest and are paid semi-annually. PSNH paid $43.2 million of RRB principal payments in each of 2025 and 2024, and paid $13.4 million and $14.9 million of interest payments in 2025 and 2024, respectively. Common Share Issuances and Equity Distribution Agreement: On May 30, 2025, Eversource entered into an equity distribution agreement pursuant to which it may offer and sell up to $1.2 billion of its common shares from time to time through an ATM equity offering program. In 2025, Eversource issued 7,130,134 common shares, which resulted in proceeds of $465.4 million, net of issuance costs. Eversource used the net proceeds received for general corporate purposes. Cash Flows: Cash flows from operating activities primarily result from the transmission and distribution of electricity, and the distribution of natural gas and water. Cash flows provided by operating activities totaled $4.11 billion in 2025, compared with $2.16 billion in 2024. Operating cash flows were favorably impacted by an improvement in regulatory recoveries driven primarily by the timing of collections for CL&P’s nonbypassable FMCC, CL&P’s SBC, energy efficiency costs, wholesale and retail transmission costs, and other regulatory tracking mechanisms. The CL&P non-bypassable FMCC retail rates in effect for 2025 were higher than those set in 2024 and the net Millstone and Seabrook contract cash 33
  3. Page 48 of 144Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 48 of 144 flows were higher in 2025 as compared to 2024. These higher collections within the non-bypassable FMCC resulted in an improvement to operating cash flows of $428.2 million for the year. Higher collections from CL&P’s SBC mechanism resulted in a cash flow improvement of $113.3 million. The impacts of regulatory collections are included in both Regulatory Recoveries and Amortization on the statements of cash flows. Additionally, CL&P received general obligation bond proceeds from the State of Connecticut for the reimbursement of hardship costs and for electric vehicle charging program costs of $107.8 million in 2025, which are reflected in Regulatory Recoveries. Operating cash flows were also favorably impacted by a $321.4 million decrease in cash payments to vendors for storm costs, the timing of cash collections on our accounts receivable, the timing of cash payments made on our accounts payable, a $19.1 million decrease in cost of removal expenditures, and the timing of other working capital items. These favorable impacts were partially offset by an increase in capitalized implementation costs for cloud-based service arrangements and a $21.2 million decrease in income tax refunds received in 2025 as compared to 2024. In 2025, we paid cash dividends of $1.09 billion and issued non-cash dividends of $23.4 million in the form of treasury shares, totaling dividends of $1.12 billion, or $3.01 per common share. In 2024, we paid cash dividends of $1.00 billion and issued non-cash dividends of $23.5 million in the form of treasury shares, totaling dividends of $1.03 billion, or $2.86 per common share. Our quarterly common share dividend payment was $0.7525 per share in 2025, as compared to $0.715 per share in 2024. On January 27, 2026, our Board of Trustees approved a common share dividend payment of $0.7875 per share, payable on March 31, 2026 to shareholders of record as of March 5, 2026. Eversource issues treasury shares to satisfy awards under the Company's incentive plans, shares issued under the dividend reinvestment and share purchase plan, and matching contributions under the Eversource 401k Plan. In 2025, CL&P, NSTAR Electric and PSNH paid $430.0 million, $436.0 million and $175.0 million, respectively, in common stock dividends to Eversource parent. Investments in Property, Plant and Equipment on the statements of cash flows do not include amounts incurred on capital projects but not yet paid, cost of removal, AFUDC related to equity funds, and the capitalized and deferred portions of pension and PBOP income/expense. In 2025, investments for Eversource, CL&P, NSTAR Electric, and PSNH were $4.16 billion, $867.8 million, $1.56 billion and $537.8 million, respectively. Capital expenditures were primarily for continuing projects to maintain and improve infrastructure and operations, including enhancing reliability to the transmission and distribution systems. Contractual Obligations: For information regarding our cash requirements from contractual obligations and payment schedules, see Note 9, "Long-Term Debt," Note 10, "Rate Reduction Bonds and Variable Interest Entities," Note 11A, "Employee Benefits - Pension Benefits and Postretirement Benefits Other Than Pension," Note 13, "Commitments and Contingencies," and Note 14, "Leases," to the financial statements. Estimated interest payments on existing long-term fixed-rate debt are calculated by multiplying the coupon rate on the debt by its scheduled notional amount outstanding for the period of measurement as of December 31, 2025 and are as follows: 2026 (Millions of Dollars) Eversource $ 2027 1,214.9 $ 2028 1,153.1 $ 2029 1,041.4 $ 2030 919.7 $ 828.8 Thereafter $ 6,540.8 Total $ 11,698.7 Our commitments to make payments in addition to these contractual obligations include other liabilities reflected on our balance sheets, and guarantees of certain obligations primarily associated with construction of our previously owned offshore wind investments. For information regarding our projected capital expenditures over the next five years, see "Business Development and Capital Expenditures Projected Capital Expenditures" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations. Credit Ratings: A summary of our current corporate credit ratings and outlooks by S&P, Moody's, and Fitch is as follows: S&P Moody's Fitch Current Outlook Current Outlook Current Outlook Eversource Parent CL&P BBB+ A- Stable Stable Baa2 Baa1 Negative Stable BBB A- Negative Negative NSTAR Electric A- Stable A2 Negative A- Negative PSNH A- Stable A3 Stable A- Negative A summary of the current credit ratings and outlooks by S&P, Moody's, and Fitch for senior unsecured debt of Eversource parent and NSTAR Electric, and senior secured debt of CL&P and PSNH is as follows: S&P Moody's Fitch Current Outlook Current Outlook Current Outlook Eversource Parent CL&P BBB A Stable Stable Baa2 A2 Negative Stable BBB A+ Negative Negative NSTAR Electric A- Stable A2 Negative A Negative PSNH A Stable A1 Stable A+ Negative 34
  4. Page 49 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 49 of 144 Business Development and Capital Expenditures Our consolidated capital expenditures, including amounts incurred but not paid, cost of removal, AFUDC, and the capitalized and deferred portions of pension and PBOP income/expense (all of which are non-cash factors), totaled $4.61 billion in 2025, $4.64 billion in 2024, and $4.59 billion in 2023. These amounts included $240.2 million in 2025, $260.5 million in 2024, and $214.4 million in 2023 related to information technology and facilities upgrades and enhancements, primarily at Eversource Service and The Rocky River Realty Company. Electric Transmission Business: Our consolidated electric transmission business capital expenditures decreased by $118.8 million in 2025, as compared to 2024. A summary of electric transmission capital expenditures by company is as follows: For the Years Ended December 31, 2025 (Millions of Dollars) CL&P NSTAR Electric 2024 $ 398.6 522.9 $ 1,209.0 PSNH 450.0 502.0 $ 1,327.8 287.5 Total Electric Transmission 2023 $ $ 470.4 567.4 $ 1,447.8 375.8 410.0 Our transmission projects are designed to improve the reliability of the electric grid, meet customer demand for power, and strengthen the electric grid's resilience against extreme weather and other safety and security threats. In Connecticut, Massachusetts and New Hampshire, our transmission projects include transmission line upgrades, the installation of new transmission interconnection facilities, substations and lines, and transmission substation enhancements. Greater Cambridge Energy Program: The Greater Cambridge Energy Program will construct Eversource’s first underground transmission substation in Cambridge, Massachusetts, along with associated transmission and distribution lines. The project will address the increased electric demand in the region, enhance the resiliency of the transmission system, and ensure a flexible grid to reliably serve customers. The flexibility to transmit and distribute mixed energy sources will support the decarbonization and electrification goals of both the City of Cambridge and the state of Massachusetts. The new 115/13.8-kV, 35,000 square foot substation will be located in an underground vault and includes three distribution power transformers supplying thirty-six distribution circuits. The project also includes five underground duct banks housing eight new 115-kV transmission lines. The Massachusetts Energy Facilities Siting Board approved the project on June 28, 2024. Environmental permits are acquired to support ongoing construction activities. Additional required permits for transmission line trenchless crossings, including a license from the MA DEP, are expected to be approved by the end of 2026. The initial in-service date for the project is June 2029, which includes two 115-kV transmission lines and the transmission portion of the substation. The first distribution circuits and substation distribution will be placed in-service by the end of 2029. The remaining transmission and distribution circuits will be placed in-service throughout 2030 and into 2031. The total estimated project cost is approximately $1.84 billion, with $1.38 billion allocated for transmission and $460 million for distribution. As of December 31, 2025, $200.9 million has been spent on the project, with $154.7 million for transmission and $46.2 million for distribution. Distribution Business: A summary of distribution capital expenditures is as follows: For the Years Ended December 31, CL&P (Millions of Dollars) NSTAR Electric PSNH Total Electric Natural Gas Water Total 2025 Basic Business $ Aging Infrastructure $ 132.5 Load Growth and Other Total Distribution 300.8 558.1 $ 403.6 115.8 118.0 $ 92.1 228.3 976.9 $ 628.2 60.1 201.0 $ 731.6 404.2 42.9 $ 549.1 $ 1,190.0 $ 270.2 $ 2,009.3 $ $ 298.8 $ 471.7 $ 136.2 $ 906.7 $ 19.4 $ 152.5 0.8 975.5 $ 226.9 $ 1,197.3 1,512.3 447.9 172.7 $ 21.8 $ 3,157.5 2024 Basic Business Aging Infrastructure 161.3 Load Growth and Other Total Distribution 365.8 110.6 65.4 194.3 592.5 66.4 $ 570.7 $ 1,031.8 $ $ 280.3 $ 376.6 $ 743.6 371.3 140.5 52.3 268.0 $ 1,870.5 $ 91.1 $ 748.0 $ 0.8 1,022.8 $ 208.2 $ 1,155.4 1,476.6 424.4 163.1 $ 18.5 $ 3,056.4 2023 Basic Business Aging Infrastructure 260.7 Load Growth and Other Total Distribution 310.0 138.0 $ 679.0 86.4 191.3 $ 877.9 657.1 37.2 $ 214.7 719.5 366.5 $ 1,771.6 142.3 70.1 $ 997.8 0.9 $ 161.7 974.7 1,518.9 437.5 $ 2,931.1 For the electric distribution business, basic business includes the purchase of meters, tools, vehicles, information technology, transformer replacements, equipment facilities, and the relocation of plant. Aging infrastructure relates to reliability and the replacement of overhead lines, plant substations, underground cable replacement, and equipment failures. Load growth and other includes requests for new business and capacity additions on distribution lines and substation additions and expansions. We are also focused on making strategic AI investments currently in outage discovery, maintenance management and data analytics to better maintain our system and provide value to our customers. 35
  5. Page 50 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 50 of 144 For the natural gas distribution business, basic business addresses daily operational needs including meters, pipe relocations due to public works projects, vehicles, and tools. Aging infrastructure projects seek to improve the reliability of the system through enhancements related to cast iron and bare steel replacement of main and services, corrosion mediation, and station upgrades. Load growth and other reflects growth in existing service territories including new developments, installation of services, and expansion. For the water distribution business, basic business addresses daily operational needs including periodic meter replacement, water main relocation, facility maintenance, and tools. Aging infrastructure relates to reliability and the replacement of water mains, regulators, storage tanks, pumping stations, wellfields, reservoirs, and treatment facilities. Load growth and other reflects growth in our service territory, including improvements of acquisitions, installation of new services, and interconnections of systems. Aquarion Sale Status and Regulatory Denial: In December 2024, Eversource obtained approval from its Board of Trustees to sell the Aquarion water distribution business. On January 27, 2025, Eversource entered into a definitive agreement to sell Aquarion to the Aquarion Water Authority (AWA), a quasi-public corporation and political subdivision of the State of Connecticut and a standalone, newly created water authority alongside the South Central Connecticut Regional Water Authority. In June 2024, a Connecticut law chartered AWA and enabled it to acquire, own and operate Aquarion as a not-for-profit water authority. Subject to certain closing adjustments, the aggregate enterprise value of the sale is approximately $2.4 billion in cash, which included approximately $1.6 billion for the equity and $800 million of net debt that will either be extinguished at closing or transferred to the buyer. The sale requires approval by PURA and the DPU, as well as other approvals pursuant to the Hart-Scott-Rodino Antitrust Improvements Act, for which the relevant waiting period has expired, as well as other customary closing conditions. Regulatory approvals in New Hampshire and Maine were received. Eversource plans to use the net proceeds from sale to pay down parent company debt. In the fourth quarter of 2024, upon classifying the assets and liabilities as held for sale, Eversource concluded that the likely sale of Aquarion at a loss resulted in the requirement to test water distribution goodwill for impairment. Eversource performed an impairment test by comparing the fair value of the business to its carrying value and recorded a goodwill impairment of $297 million, as the estimated fair value of the business based on the anticipated sale was less than the carrying value. The fair value included future cash outflows of approximately $140 million of estimated income taxes as a result of the transaction. The goodwill impairment charge was presented separately within Operating Income on the Eversource statement of income for the year ended December 31, 2024. On November 19, 2025, PURA denied the application to approve the sale, finding that the transaction did not meet managerial suitability and responsibility requirements due to concerns with governance and oversight structure over Aquarion and its consumer advocate. On December 2, 2025, the denial was appealed to the Connecticut Superior Court. On January 15, 2026, the Court issued its decision, sustaining the appeal and remanding back to PURA, finding that PURA acted illegally in denying the application as those disputed governance elements were mandated under Connecticut law. The Court upheld that operational aspects of the consumer advocate were within PURA’s statutory authority and regulatory discretion. A final decision is expected by PURA on March 25, 2026. Based on PURA’s November 19, 2025 denial of the sale and the uncertainty of the ultimate outcome, the Aquarion water distribution business no longer met the criteria to be classified as held for sale and its assets and liabilities were reclassified as held and used on the balance sheet as of December 31, 2025. The reclassification to held and used did not result in an adjustment to Aquarion’s carrying values. Projected Capital Expenditures: A summary of the projected capital expenditures for the regulated companies' electric transmission and for the total electric distribution and natural gas distribution for 2026 through 2030, including information technology and facilities upgrades and enhancements on behalf of the regulated companies, is as follows: Years 2026 (Millions of Dollars) CL&P Transmission NSTAR Electric Transmission $ PSNH Transmission 2027 520 574 $ 2028 358 727 $ 2029 349 852 $ 2030 241 1,181 $ 2026 - 2030 Total 130 1,381 $ 1,598 4,715 181 275 291 85 97 929 Total Electric Transmission 1,275 1,360 1,492 1,507 1,608 7,242 Electric Distribution Natural Gas Distribution 2,291 1,247 2,278 1,320 2,180 1,404 2,197 1,456 2,296 1,376 11,242 6,803 Total Electric and Natural Gas Distribution 3,538 3,598 3,584 3,653 3,672 18,045 259 217 276 219 256 Information Technology and All Other Total $ 5,072 $ 5,175 $ 5,352 $ 5,379 $ 5,536 1,227 $ Additionally, investments for the water distribution business are expected to total approximately $1.3 billion from 2026 through 2030. Actual capital expenditures could vary from the projected amounts for the companies and years above. 36 26,514
  6. Page 51 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 51 of 144 FERC Regulatory Matters FERC ROE Complaints: Four separate complaints were filed at the FERC by combinations of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties (collectively, the Complainants). In each of the first three complaints, filed on October 1, 2011, December 27, 2012, and July 31, 2014, respectively, the Complainants challenged the NETOs' base ROE of 11.14 percent that had been utilized since 2005 and sought an order to reduce it prospectively from the date of the final FERC order and for the separate 15-month complaint periods. In the fourth complaint, filed April 29, 2016, the Complainants challenged the NETOs' base ROE billed of 10.57 percent and the maximum ROE for transmission incentive (incentive cap) of 11.74 percent, asserting that these ROEs were unjust and unreasonable. The ROE originally billed during the period October 1, 2011 (beginning of the first complaint period) through October 15, 2014 consisted of a base ROE of 11.14 percent and incentives up to 13.1 percent. On October 16, 2014, FERC issued Opinion No. 531-A and set the base ROE at 10.57 percent and the incentive cap at 11.74 percent for the first complaint period. This was also effective for all prospective billings to customers beginning October 16, 2014. This FERC order was vacated on April 14, 2017 by the U.S. Court of Appeals for the D.C. Circuit (the Court). All amounts associated with the first complaint period have been refunded. Eversource has recorded a reserve of $39.1 million (pre-tax and excluding interest) for the second complaint period as of both December 31, 2025 and 2024. This reserve represents the difference between the billed rates during the second complaint period and a 10.57 percent base ROE and 11.74 percent incentive cap. The reserve consisted of $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH as of both December 31, 2025 and 2024. On October 16, 2018, FERC issued an order on all four complaints describing how it intends to address the issues that were remanded by the Court. FERC proposed a new framework to determine (1) whether an existing ROE is unjust and unreasonable and, if so, (2) how to calculate a replacement ROE. Initial briefs were filed by the NETOs, Complainants and FERC Trial Staff on January 11, 2019 and reply briefs were filed on March 8, 2019. The NETOs' brief was supportive of the overall ROE methodology determined in the October 16, 2018 order provided the FERC does not change the proposed methodology or alter its implementation in a manner that has a material impact on the results. The FERC order included illustrative calculations for the first complaint using FERC's proposed frameworks with financial data from that complaint. Those illustrative calculations indicated that for the first complaint period, the preliminary just and reasonable base ROE for the NETOs, which FERC concludes are of average financial risk, is 10.41 percent and the preliminary incentive cap on total ROE is 13.08 percent. If the results of the illustrative calculations were included in a final FERC order for each of the complaint periods, then a 10.41 percent base ROE and a 13.08 percent incentive cap would not have a significant impact on our financial statements for all of the complaint periods. These preliminary calculations are not binding and do not represent what we believe to be the most likely outcome of a final FERC order. On November 21, 2019, FERC issued Opinion No. 569 affecting the two pending transmission ROE complaints against the Midcontinent ISO (MISO) transmission owners, in which FERC adopted a new methodology for determining base ROEs. Various parties sought rehearing. On December 23, 2019, the NETOs filed supplementary materials in the NETOs' four pending cases to respond to this new methodology because of the uncertainty of the applicability to the NETOs' cases. On May 21, 2020, the FERC issued its order in Opinion No. 569-A on the rehearing of the MISO transmission owners' cases, in which FERC again changed its methodology for determining the MISO transmission owners' base ROEs. On November 19, 2020, the FERC issued Opinion No. 569-B denying rehearing of Opinion No. 569-A and reaffirmed the methodology previously adopted in Opinion No. 569-A. The new methodology differs significantly from the methodology proposed by FERC in its October 16, 2018 order to determine the NETOs' base ROEs in their four pending cases. FERC Opinion Nos. 569-A and 569-B were appealed to the Court. On August 9, 2022, the Court issued its decision vacating MISO ROE FERC Opinion Nos. 569, 569-A and 569-B and remanded to FERC to reopen the proceedings. The Court found that FERC’s development of the new return methodology was arbitrary and capricious due to FERC’s failure to offer a reasonable explanation for its decision to reintroduce the risk-premium financial model in its new methodology for calculating a just and reasonable return. On October 17, 2024, FERC issued an order on the remand of the MISO ROE proceedings. The order addressed the Court’s decision that the reintroduction of the risk-premium financial model in the ROE methodology was arbitrary and capricious by removing the risk-premium financial model from the ROE methodology. The removal of the risk-premium financial model was the only revision to FERC’s ROE methodology and resulted in a two-model approach utilizing the two-step discounted cash flow model and the capital asset pricing model. MISO transmission owners were directed to provide refunds for the period November 12, 2013 to February 11, 2015 (the first MISO ROE complaint refund period) and for the period from September 28, 2016 (the date of FERC’s order on the first MISO ROE complaint) to October 17, 2024 by December 1, 2025. The order also stated that FERC does not preclude the use of the risk-premium financial model in future proceedings if the parties can demonstrate that FERC’s stated concerns around the inclusion of the model have been addressed. On March 25, 2025, FERC issued an order addressing arguments raised on rehearing, sustaining the result, and denying rehearing. On November 13, 2024, the NETOs filed a supplemental brief in their four pending ROE proceedings to explain to FERC that it cannot apply the reasoning and methodologies of the MISO ROE case to the NETOs’ cases due to the entirely different set of facts in the MISO and NETOs ROE proceedings. Doing so would violate the substance of the Court’s April 14, 2017 order and would violate the legal standard required by the Federal Power Act. On February 4, 2025, the MISO transmission owners submitted a petition for review with the Court requesting review of the October 17, 2024 MISO ROE order on remand and a December 19, 2024 notice of denial of rehearing. The petition requests review of FERC’s decision to retroactively backdate the MISO transmission owners’ base ROE to the date of an earlier order that FERC abandoned when it issued Order No. 569, treat an underlying unlawful complaint as if it were legitimate, and order eight years of interest as part of the directed refunds. On August 21, 2025, the NETOs submitted a brief in support of the MISO transmission owners with the Court. Final briefs in the Court proceeding were submitted on January 26, 2026 and oral argument is scheduled for March 17, 2026. 37
  7. Page 52 of 144Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 52 of 144 Given the significant uncertainty regarding the applicability of the FERC order in the MISO transmission owners’ two complaint cases to the NETOs’ pending four complaint cases due to the complex differences between the cases, Eversource concluded that there is no reasonable basis for a change to the reserve or recognized ROEs for any of the complaints or subsequent periods at this time and Eversource cannot reasonably estimate any potential range of loss for any of the four complaint proceedings at this time. The resolution of these proceedings could have a material impact on the financial condition, results of operations, and cash flows. Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order. A change of 10 basis points to the base ROE used to establish the reserves would impact Eversource’s after-tax earnings by an average of approximately $3 million for each of the four 15-month complaint periods. Prospectively from the date of a final FERC order implementing a new base ROE, based off of estimated 2025 rate base, a change of 10 basis points to the base ROE would impact Eversource’s future annual after-tax earnings by approximately $7 million per year, and will increase slightly over time as we continue to invest in our transmission infrastructure. Transmission Rates and Other Transmission Rates-Related Proceedings: CL&P, NSTAR Electric and PSNH transmission rates are calculated in accordance with a FERC-approved formula ratemaking framework and each utility is required to file an annual update on or before July 31st with resulting rates effective January 1st the following year. The formula rate framework provides for an annual reconciliation of the prior calendar year actual costs incurred related to our transmission facilities, including an allowed ROE, plus forecasted information through the next rate period. The annual update process includes formula rate protocols that provide disclosure of cost inputs, an opportunity for informal discovery procedures and a challenge process, which provides transparency to stakeholders. From time to time, various matters are pending before FERC relating to transmission rates, incentives, interconnections and transmission planning. Depending on the outcome, any of these matters could materially impact our results of operations and financial condition. At this time, Eversource cannot predict the ultimate outcome of the matters currently pending before FERC, and the resulting impact on its transmission incentives or planning. Regulatory Developments and Rate Matters Electric, Natural Gas and Water Utility Retail Tariff Rates: Each Eversource utility subsidiary is subject to the regulatory jurisdiction of the state in which it operates: CL&P, Yankee Gas and Aquarion operate in Connecticut and are subject to PURA regulation; NSTAR Electric, NSTAR Gas, EGMA and Aquarion operate in Massachusetts and are subject to DPU regulation; and PSNH and Aquarion operate in New Hampshire and are subject to NHPUC regulation. The regulated companies' distribution rates are set by their respective state regulatory commissions, and their tariffs include mechanisms for periodically adjusting their rates for the recovery of specific incurred costs. Base Distribution Rates: In Connecticut, PURA is required to conduct a review and investigation of the financial and operating records of each electric, natural gas and water utility serving more than seventy-five thousand customers within four years of its last general rate hearing. PURA can elect to convene a general rate hearing at an interval of less than four years unless prohibited from doing so by an agency decision or other law. In Massachusetts, electric distribution companies are required to file distribution rate schedules every five years, and natural gas local distribution companies to file distribution rate schedules every 10 years, and those companies are limited to one settlement agreement in any 10-year period. Aquarion is not required to initiate a rate review with the DPU. In New Hampshire, PSNH is not required to initiate a rate review with the NHPUC on any set timeframe, and the NHPUC has no obligation to hear any rate matter that it has investigated within a period of two years, though it may elect to do so at its discretion. Rate Reconciling Mechanisms: The Eversource electric distribution companies obtain and resell power to retail customers who choose not to buy energy from a competitive energy supplier. CL&P, NSTAR Electric and PSNH enter into full requirements energy supply procurement contracts for its customers that choose to purchase power from the electric distribution company (standard offer, basic service or default energy service, respectively). The natural gas distribution companies procure natural gas for firm and seasonal customers. These energy supply and natural gas supply procurement costs are recovered from customers in supply rates that are approved by the respective state regulatory commission. The rates are reset periodically (every six months for electric residential customers) and are fully reconciled to their costs. New energy supply rates for residential customers are established effective July 1st at CL&P and NSTAR Electric and effective August 1st at PSNH. Each electric and natural gas distribution company fully recovers its energy supply costs through approved regulatory rate mechanisms on a timely basis and, therefore, such costs have no impact on earnings. Increases or decreases in energy supply retail rates result in corresponding fluctuations in both energy supply procurement revenues and purchased power or purchased natural gas expenses on the statements of income. The electric and natural gas distribution companies also recover certain other costs from customers in retail rates on a fully reconciling basis through regulatory commission-approved cost tracking mechanisms and therefore, recovery of these costs has no impact on earnings. Costs recovered through cost tracking mechanisms include, among others, state mandated energy purchase agreements and other energy-related costs, electric retail transmission charges, energy efficiency program costs, electric restructuring and stranded cost recovery revenues (including securitized RRB charges), certain capital tracking mechanisms for infrastructure improvements, and additionally for the Massachusetts utilities, pension and PBOP benefits, net metering for distributed generation, and solar-related programs. The reconciliation filings compare the total actual costs allowed to revenue requirements related to these services and the difference between the costs incurred (or the rate recovery allowed) and the actual costs allowed is deferred and included, to be either recovered or refunded, in future customer rates. These cost tracking mechanisms also include certain incentives earned, return on capital tracking mechanisms, and carrying charges that are billed in rates to customers, which do impact earnings. 38
  8. Page 53 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 53 of 144 Connecticut: CL&P Performance Based Rate Making: On May 26, 2021, in accordance with an October 2020 Connecticut law, PURA opened a proceeding to begin to evaluate and eventually implement performance-based regulation (PBR) for electric distribution companies. PURA is conducting the proceeding in two phases. On April 26, 2023, PURA issued a final decision on the first phase and identified various objectives to guide PBR development and evaluate adoption of a PBR framework. The decision commenced Phase 2 by initiating three reopener dockets focused on revenue adjustment mechanisms, performance metrics, and integrated distribution system planning. On November 16, 2023, PURA issued a straw proposal in the first reopener that focused on revenue adjustment mechanisms. The proposal outlined potential additions and reforms to the current revenue adjustment mechanisms, such as multi-year rate plans, earnings sharing mechanisms and the revenue decoupling mechanism. On March 14, 2024, PURA issued a straw proposal in the second reopener docket that concentrated on performance mechanisms in a PBR framework. The proposal suggested the development of performance incentive mechanisms, reported metrics and scorecards. On February 27, 2025, PURA issued revised straw proposals for both the first and second reopener dockets, resulting in some edits to the previous proposals based on participant feedback. On April 4, 2025, PURA issued a straw proposal in the third reopener docket that focused on the establishment of integrated distribution system planning under a PBR framework. On July 14, 2025, PURA issued proposed final decisions in the first two reopener dockets. The proposed final decision in the first reopener docket adopted a PBR framework inclusive of a multi-year rate plan with an attrition relief mechanism that uses a revenue-cap formula approach to adjust revenues based on a variety of factors including inflation, a productivity factor, a customer dividend percentage, an exogenous cost factor and a capital funding mechanism, as well as an earnings sharing mechanism and a revenue decoupling mechanism for implementation in CL&P’s next distribution rate case. The multi-year rate plan has a stay out period of four years, but certain situations, such as deteriorating financial condition, exceeding authorized return, falling interest rates, or excess storm costs, could trigger the initiation of a new rate amendment proceeding during the multi-year rate plan. The proposed final decision in the second reopener docket established reporting parameters, including the commencement of scorecards and reported metrics and the development of company specific performance incentive mechanisms. Results of scorecards and reported metrics are proposed to be reported annually to PURA, beginning March 1, 2026. Company specific performance incentive mechanisms will be implemented in CL&P’s next rate case proceeding. On August 8, 2025, PURA issued a proposed final decision in the third reopener docket, adopting the contents and reporting process for an integrated distribution system plan (IDSP) under a PBR framework. The IDSP report will document the grid planning process for available distribution system capacity and system needs, including the development, operation, and evolution of the electrical distribution grid. The IDSP report will include CL&P’s planned investments over a four-year plan period and long-term capital investment strategy, and will be utilized by PURA in determining the amount of allowable capital additions within a multi-year rate plan included in the calculation of the capital funding mechanism adopted in the first reopener docket. The draft decision requires CL&P to submit a comprehensive IDSP filing every four years in alignment with the submittal of a rate amendment application and to also submit an annual IDSP filing to report on IDSP investments throughout the four-year period. Final decisions on the three reopener dockets have not yet been scheduled. We continue to monitor developments in this proceeding, and at this time, we cannot predict the ultimate outcome of this proceeding and the resulting impact to CL&P. CL&P Storm Filings: On March 28, 2024, PURA established a prudency review proceeding for the purpose of receiving and reviewing evidence of the costs reported by CL&P in response to catastrophic storms and pre-staging events totaling approximately $634 million that occurred between January 1, 2018 and December 31, 2021. On December 31, 2024, CL&P filed a supplement to its March 2024 prudency review application to request that PURA evaluate the prudence of its costs for nine additional catastrophic storms and two additional pre-staging events for the period January 1, 2022 through January 31, 2023 totaling approximately $173 million. On July 10, 2025, CL&P filed a second supplement to its March 2024 prudency review application to request that PURA evaluate the prudence of its costs for ten additional catastrophic storms for the period February 1, 2023 through December 31, 2023 totaling approximately $171 million. On July 25, 2025, CL&P filed a third supplement in this application to include carrying charges calculated at the weighted average cost of capital on the deferred storm costs totaling $246 million, which reflects CL&P’s actual financing costs on the unpaid storm costs from the date the deferred storm costs first began to accrue through May 2025. These carrying charges have not been deferred on the balance sheet. On December 13, 2025, PURA opened a new proceeding for the prudency determination of CL&P’s 2018 to 2023 storm costs either by a settled or litigated process and a separate future docket will be needed to consider CL&P’s application to issue rate reduction bonds for the securitization of approved storm costs. A final decision is expected on or about July 29, 2026. Although we cannot predict the ultimate outcome of these storm proceedings, we continue to believe these deferred storm restoration costs were prudently incurred and are probable of recovery. CL&P RAM Filing: On March 28, 2025, PURA issued an interim decision in CL&P’s Rate Adjustment Mechanisms (RAM) filing and approved rates for six RAM components, with rates effective May 1, 2025 through April 30, 2026. The rates include recovery of over- or under-collection balances as of December 31, 2024, actual costs from the prior year, and adjustments to incorporate certain known and measurable cost changes not reflected in prior year costs that CL&P will incur in 2025. On August 13, 2025, PURA issued a final decision that approved a further adjustment to the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC) and System Benefits Charge (SBC) rates based on a July 1, 2025 Connecticut law that authorized the State of Connecticut to issue new general obligation bonds to reduce certain hardship costs and electric vehicle program costs recovered from customers. Proceeds from the general obligation bond funding of $107.8 million will be provided back to customers through a reduction to the NBFMCC and SBC rates. The updated NBFMCC and SBC rates are effective September 1, 2025 through April 30, 2026. These rates are included in the “Public Benefits” portion of the customer bills in Connecticut. On September 19, 2025, CL&P received $107.8 million in general obligation bond proceeds from the State of Connecticut, which represent reimbursement of incurred costs that were previously recognized as regulatory assets on CL&P’s balance sheets. The proceeds received for the reimbursement of hardship costs and for electric vehicle charging program costs were credited against the SBC and NBFMCC regulatory deferrals 39
  9. Page 54 of 144Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 54 of 144 on CL&P’s balance sheet as of December 31, 2025. The proceeds from the state bond funding are presented as a cash inflow in Regulatory Recoveries within operating activities on CL&P’s statement of cash flows. CL&P Advanced Metering Infrastructure Filing: On January 3, 2024, PURA issued a final decision regarding CL&P’s Advanced Metering Infrastructure (AMI) investment and implementation plan. In CL&P’s view, the final decision did not provide a reasonable path for cost recovery and would delay implementation. In addition, in CL&P’s view, the final decision modifies the prudence standard for recovery of costs expended on the project, improperly linking recovery to outcomes not known at the outset of the project. On January 18, 2024, CL&P submitted a motion for reconsideration to PURA, asking that the agency modify these aspects of the decision, which PURA subsequently denied on February 14, 2024. On March 6, 2024, CL&P filed written comments citing four major problems associated with PURA’s guidelines for recovery of the costs of AMI implementation, which if not addressed, represent obstacles to AMI implementation in Connecticut. On April 16, 2024, PURA issued a procedural order directing Eversource and inviting all parties and intervenors to submit pre-filed testimony pertaining to AMI. CL&P witnesses filed testimony, including an updated estimate of $855 million for capital costs and operating expenses, and then subsequently participated in the AMI cost recovery hearing on June 6, 2024. On October 17, 2024, PURA issued a proposed final decision on recovery of the costs for AMI implementation. On October 31, 2024, CL&P filed written exceptions focused on three main aspects of the proposed decision, which included (1) clarifying the prudence standard to be used in evaluating AMI investments, (2) timing of prudency reviews, and (3) cost recovery related to incremental O&M expenses. On December 4, 2024, PURA issued a final decision on the recovery of costs for AMI implementation. On December 9, 2024, CL&P filed a petition for reconsideration because PURA had not fully resolved the issues CL&P raised in its October 31, 2024 written exceptions. On November 25, 2025, PURA issued correspondence in connection with CL&P’s October 31, 2025 annual AMI compliance filing asserting that it was no longer evaluating the merits of CL&P’s petition for reconsideration, that PURA approval is not required for CL&P to deploy AMI, and that CL&P may invest in AMI at any time and seek cost recovery under the AMI tariff after meeting established filing criteria. On December 19, 2025, CL&P filed a motion responding to the legal issues raised in PURA’s correspondence and requested that PURA reopen the prior proceeding for the purpose of lawfully acting upon CL&P’s December 9, 2024 petition for reconsideration and resolving the open questions on AMI cost recovery. Yankee Gas Distribution Rate Case: On November 12, 2024, Yankee Gas filed an application with PURA to amend its existing distribution rates for effect on November 1, 2025. Yankee Gas had subsequently amended its rate application to request approval of a distribution rate increase of $193 million. On September 22, 2025, PURA issued a proposed final (draft) decision in Yankee Gas’s distribution rate case that included a distribution rate increase of $55.6 million, effective November 1, 2025. On November 5, 2025, PURA issued a final decision in the Yankee Gas distribution rate case that included a distribution rate increase of $82.2 million and a total distribution revenue requirement of $802.2 million, effective November 1, 2025. The approved revenue requirement includes a previously recorded rate credit of $37.4 million plus carrying charges for non-firm margin credits over three years beginning November 1, 2025. Excluding the rate credit, the distribution rate increase totaled $95.7 million. The final decision also established an authorized net regulatory ROE of 9.32 percent, adopting a 9.48 percent ROE net of certain reductions totaling 16 basis points, and a 53 percent common equity ratio for Yankee Gas’ capital structure. PURA declined to approve the multi-year performance-based rate making plan that would adjust rates annually as proposed by Yankee Gas. PURA also implemented an annual cap on contemporaneous cost recovery of aging infrastructure replacement spending in the Distribution Integrity Management Program (DIMP) rate tracking mechanism of $139.9 million, in which spending above the annual cap will be deferred for recovery until the next distribution rate case. The final decision resulted in a net pre-tax loss to earnings of $8.5 million in the fourth quarter of 2025, primarily for the write off of certain capitalized employee compensation costs that were disallowed from rate base. Yankee Gas filed motions to request PURA reconsider the disallowances of these capitalized costs, certain computational errors, and other issues identified in its final decision. On December 15, 2025, PURA issued a notice of reconsideration to reconsider the final decision. A final decision on the reconsideration is expected from PURA by March 15, 2026. Aquarion Water Company of Connecticut Distribution 2022 Rate Case: On August 29, 2022, Aquarion Water Company of Connecticut (AWCCT) filed an application with PURA to amend its existing rate schedules to address an operating revenue deficiency. AWC-CT’s rate application requested approval of rate increases of $27.5 million, an additional $13.6 million, and an additional $8.8 million, effective March 15, 2023, 2024, and 2025, respectively. On March 15, 2023, PURA issued a final decision that rejected this request. In this decision, PURA ordered a decrease to total authorized revenues of $4.0 million effective March 15, 2023. The decision allows an authorized regulatory ROE of 8.70 percent. On March 30, 2023, AWC-CT filed an appeal on the decision. On March 25, 2024, the State of Connecticut Superior Court issued a decision on the appeal which dismissed nine, remanded back to PURA two, and partially remanded one of AWC-CT’s twelve claims of error in its appeal. On April 18, 2024, PURA initiated a docket to address the matters on remand. On July 31, 2024, PURA issued a final decision in this docket and increased AWC-CT’s approved revenue requirement by $0.1 million above the amount authorized in the March 15, 2023 decision. Rates went into effect on July 31, 2024. On September 13, 2024, AWC-CT filed an appeal of PURA’s July 31, 2024 final decision to the Connecticut Superior Court. On December 9, 2025, the Connecticut Superior Court remanded the disallowance of approximately $0.4 million of rate case expenses back to PURA. PURA’s decision on the remand is pending. On March 28, 2024, AWC-CT filed an appeal of the March 25, 2024 Connecticut Superior Court decision to the Connecticut Appellate Court, and that appeal was subsequently transferred to the Connecticut Supreme Court. On July 9, 2025, the Connecticut Supreme Court issued a decision that overturned PURA’s disallowance of $1.5 million in water conservation program expenses, but affirmed the remaining portions of PURA’s decision that were challenged on appeal. The Connecticut Supreme Court decision also validated AWC-CT’s argument that the correct legal standard PURA must use in determining whether costs can be recovered through customer rates is the longstanding prudence standard, which evaluates the prudence of management decision-making as of the time the utility made the decision to incur costs; PURA cannot use improper hindsight analysis to evaluate prudence. On December 10, 2025, PURA revised its July 31, 2024 decision and increased AWC-CT’s approved revenue requirement by $0.3 million reflecting recovery of the $1.5 million conservation program expenses over six years. 40
  10. Page 55 of 144Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 8 Page 55 of 144 Massachusetts: NSTAR Electric Distribution Rates: NSTAR Electric’s PBR mechanism allows for an annual adjustment to base distribution rates for inflation, exogenous events and future capital additions based on a historical five-year average of total capital additions. On September 15, 2025, NSTAR Electric submitted its annual PBR Adjustment filing for a $55.1 million increase to base distribution rates and a total base distribution revenue requirement of $1.34 billion for effect on January 1, 2026. The requested base distribution rate increase is comprised of a $25.2 million inflationbased adjustment and a $29.9 million K-bar adjustment for capital additions based on the difference between the historical five-year average of total capital additions and the base capital revenue requirement. On December 30, 2025, the DPU approved this filing. NSTAR Electric’s Electric Sector Modernization Plan (ESMP) Filing: On August 29, 2024, the DPU approved the overall ESMP as a strategic plan for a five-year period commencing July 1, 2025 through June 30, 2030. The initial five-year plan proposed incremental distribution capital investments of $608 million and incremental distribution expense of $211 million. On November 21, 2024, the DPU opened a second phase of the proceeding (Phase II) to consider a short-term ESMP-focused cost recovery mechanism and metrics. The DPU limited the review of investment in this docket and excluded NSTAR Electric’s ESMP capital proposals regarding the EV Phase II extension and the new capital investment projects, and expense for the funding of low and moderate income solar. These investments will be reviewed in separate proceedings. This reduced the amount of company-proposed incremental capital investment to $295 million and the incremental expense to $44 million related to resiliency and grid modernization for a total spending cap of $339 million. NSTAR Electric filed its proposed tariff and testimony on December 18, 2024. On June 13, 2025, the DPU issued an order in the Phase II proceeding on the interim cost recovery mechanism for the ESMP, which approved the interim cost recovery mechanism with certain modifications. In the order, the DPU emphasized its attempt to balance affordability and the goals of advancing Massachusetts’ clean energy goals through proactive investments to support electrification and distributed generation. NSTAR Electric received approval for its proposed grid modernization and resiliency investments and incremental expense for a total spending cap of $139 million, reflecting an ordered reduction in capital spending on undergrounding for resiliency. In compliance with the Phase II order, a revised tariff was filed June 23, 2025, and the revised ESMP spending cap for the first term of July 1, 2025 through June 30, 2030, which included companyproposed incremental capital investment of $95 million and incremental expense of $44 million, was filed June 30, 2025. The DPU is conducting another phase of this proceeding to establish a long-term cost recovery mechanism, which is expected to be through base distribution rates. NSTAR Gas Distribution Rates: NSTAR Gas’ PBR mechanism allows for an annual adjustment to base distribution rates for inflation and exogenous events. On June 16, 2025, NSTAR Gas submitted its annual PBR Adjustment filing for rates to be effective on November 1, 2025. On September 11, 2025, NSTAR Gas updated its filing to request approval of a $162.6 million increase to base distribution rates and a total base distribution revenue requirement of $447.7 million. The base distribution rate increase is comprised of a $10.3 million inflation-based adjustment and, in accordance with the DPU’s final decision in the 2020 NSTAR Gas rate case, a $152.3 million rate-base reset to incorporate capital additions for the period 2021 through 2024, which includes the transfer of GSEP revenues totaling $107.3 million into base rates, as well as other non-GSEP plant additions totaling $45.0 million. On October 29, 2025, the DPU issued a decision determining that NSTAR Gas was not eligible to increase its distribution rates for the rate base reset because it did not achieve certain performance metrics under its PBR plan, and did not allow the base rate increase of $45.0 million for the incorporation of non-GSEP plant additions into base rates. The decision stated that those investments could be considered for inclusion in base distribution rates in NSTAR Gas’s next base rate proceeding. The DPU did allow NSTAR Gas to transfer its GSEP revenues through 2024 of $107.3 million for recovery through base distribution rates effective November 1, 2025. The DPU approved the base distribution rate increase of $10.3 million for the inflation-based adjustment. The DPU also approved NSTAR Gas’ mitigation proposal, in which NSTAR Gas paused recovery of the Gas System Enhancement Adjustment Factor (GSEAF) and reduced the current GSEAF to zero on November 1, 2025 in order to align this decrease with the base rate increase and to mitigate November 1, 2025 bill impacts to customers. NSTAR Gas will begin to recover the remaining 2025 GSEP revenue requirement on May 1, 2026 over 18 months. On November 4, 2025, NSTAR Gas filed a motion requesting the DPU to reconsider its decision denying the rate base reset citing legal concerns and arguing that the decision will ultimately result in higher costs for customers. NSTAR Gas also notified the DPU of its intention to file a base distribution rate case. On December 30, 2025, NSTAR Gas and the Massachusetts Office of the Attorney General reached a joint settlement agreement that allowed for the reinstatement of the rate base reset of $45.0 million increase to base distribution rates effective January 1, 2026, for NSTAR Gas to not petition for a rate case with new rates effective December 1, 2026, and for continuation of NSTAR Gas’ PBR program through November 1, 2030. The settlement agreement also required NSTAR Gas to provide a credit to customers of $10.2 million over a ten-month period beginning January 2026 as penalty for its failure to meet three performance metrics as required for eligibility for the rate base reset, pay a $2 million concession to the Office of the Attorney General to fund customer energy assistance programs, waive recovery of certain carrying charges, delay recovery of $53 million of capital pipeline investments until the next rate case, and provide bill stabilization credit deferrals. The DPU approved the settlement agreement on January 16, 2026. The settlement agreement resulted in a pre-tax charge to earnings of $12.2 million in the fourth quarter of 2025. NSTAR Electric and EGMA Settlement: On November 3, 2025, EGMA, NSTAR Electric, and the Massachusetts Office of the Attorney General reached a joint settlement agreement that resolved outstanding issues in multiple open Pension Adjustment Mechanism (PAM) dockets and open Resiliency Tree Work (RTW) dockets at NSTAR Electric and allows recovery of transaction and integration costs related to Eversource’s acquisition of EGMA. Certain PAM and RTW collections are being refunded to NSTAR Electric’s customers over a one-year period beginning January 1, 2026 and the transaction and integration costs of $82.3 million will be collected from EGMA customers over a ten-year period from the time of the next EGMA rate case. The settlement agreement was approved by the DPU on December 1, 2025. The settlement resulted in a net pretax benefit to earnings of $64.8 million on the Eversource income statement in the fourth quarter of 2025 ($82.3 million benefit at Eversource Parent and Other Companies for the allowed recovery of previously expensed acquisition-related and integration costs and $17.5 million charge at NSTAR Electric) and a net increase to regulatory assets on the Eversource balance sheet. 41
41 pages match

Text of OCC-962 Attachment 6.pdf

Extracted from the file · 136 pages · 685,692 characters

Text of OCC-962 Attachment 5.pdf

Extracted from the file · 128 pages · 641,445 characters

Text of OCC-962 Attachment 4.pdf

Extracted from the file · 120 pages · 653,488 characters

Text of OCC-962 Attachment 3.pdf

Extracted from the file · 136 pages · 666,916 characters

Text of OCC-962 Attachment 2.pdf

Extracted from the file · 128 pages · 591,550 characters

Text of OCC-962 Attachment 1.pdf

Extracted from the file · 136 pages · 612,504 characters

Text of OCC-963 Attachment 8.pdf

Extracted from the file · 96 pages · 352,588 characters

Text of OCC-963 Attachment 7.pdf

Extracted from the file · 105 pages · 381,994 characters

Text of OCC-963 Attachment 6.pdf

Extracted from the file · 101 pages · 366,377 characters

Text of OCC-963 Attachment 5.pdf

Extracted from the file · 105 pages · 393,802 characters

Text of OCC-963 Attachment 4.pdf

Extracted from the file · 88 pages · 321,021 characters

Text of OCC-963 Attachment 3.pdf

Extracted from the file · 86 pages · 305,704 characters

Text of OCC-963 Attachment 2.pdf

Extracted from the file · 77 pages · 270,743 characters

Text of OCC-963 Attachment 1.pdf

Extracted from the file · 76 pages · 279,055 characters

As listed on the current system

Question(s) Answered 962, 963 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)