Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 962, 963

Files18

Search terms highlighted
Eversource rate increase is on 409 pages across 16 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
44 pages match

Text of OCC-962 Attachment 7.pdf

Extracted from the file · 144 pages · 700,506 characters

40 pages match
  1. Page 49 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 49 of 136 A summary of the significant estimates and assumptions included in the 2023 impairment charges is as follows: Second Quarter 2023 (Millions of Dollars) Lower expected sales proceeds across all three wind projects $ Fourth Quarter 2023 401 $ Total 525 $ 926 Expected cost overruns not recovered in the sales price Loss of sales value from the sale price offered by GIP, including loss of ITC adders value, cancellation costs and other impacts assuming Sunrise Wind project is abandoned — — 800 800 Impairment Charges, pre-tax 401 1,766 2,167 Tax Benefit 441 (70) Impairment Charges, after-tax $ 331 $ 441 (144) (214) 1,622 1,953 A summary of the carrying value by investee and by project as of December 31, 2023 is as follows: Investments Expected to be Disposed of North East Offshore Sunrise Wind (Millions of Dollars) Carrying Value as of December 31, 2023, before Impairment Charge $ 699 Fourth Quarter 2023 Impairment Charge Carrying Value as of December 31, 2023 Revolution Wind $ 799 (1,218) $ South Fork Wind Holdings, LLC Class A Total Offshore Wind Investments $ $ $ (544) (519) $ 255 Investment to be Held South Fork Class B Member, LLC 299 485 — $ 299 (4) $ 481 2,282 (1,766) $ 516 Management will continue to monitor and evaluate all facts and circumstances in the offshore wind sales process and the impact on its investment balance. Adverse changes in facts and circumstances of estimates and timing of future cash flows and the factors described above could result in the recognition of additional, significant impairment charges that could be material to the financial statements. The impairment charge was a non-cash charge and did not impact Eversource’s cash position. Eversource will continue to make future cash expenditures for required cash contributions to its offshore wind investments up to the time of disposition of each of the offshore wind projects. Capital contributions are expected until the sales are completed and changes in the timing and amounts of these contributions would be adjusted in the sales prices and therefore not result in an additional impairment charge. Proceeds from the transactions will be used to pay off parent company debt. Eversource’s offshore wind investments do not meet the criteria to qualify for presentation as a discontinued operation. Contracts, Permitting and Construction of Offshore Wind Projects: The following table provides a summary of the Eversource and Ørsted major projects with announced contracts: Wind Project State Servicing Size (MW) Term (Years) Price per MWh Pricing Terms Contract Status Revolution Wind Rhode Island 400 20 $98.43 Fixed price contract; no price escalation Approved Revolution Wind Connecticut 304 20 $98.43 - $99.50 Fixed price contracts; no price escalation Approved South Fork Wind New York (LIPA) 90 20 $160.33 2 percent average price escalation Approved South Fork Wind New York (LIPA) 40 20 $86.25 2 percent average price escalation Approved The offshore wind projects require receipt of federal, state and local approvals necessary to construct and operate the projects. The federal permitting process is led by BOEM, and state approvals are required from New York, Rhode Island and Massachusetts. South Fork Wind and Revolution Wind have received all required approvals to start construction. Significant delays in the siting and permitting process resulting from the timeline for obtaining approval from BOEM and the state and local agencies could adversely impact the timing of Sunrise Wind’s' in-service date. Federal Siting and Permitting Process: The federal siting and permitting process for each of our offshore wind projects commence with the filing of a Construction and Operations Plan (COP) application with BOEM. BOEM provides a review schedule for the project’s COP approval and conducts environmental and technical reviews of the COP. BOEM issues an Environmental Impact Statement (EIS) that assesses the environmental, social, and economic impacts of constructing the project and recommends measures to minimize impacts. The Final EIS will inform BOEM in deciding whether to approve the project or to approve with modifications and BOEM will then issue its Record of Decision. BOEM issues its final approval of the COP following the Record of Decision. Revolution Wind and Sunrise Wind filed their COP applications with BOEM in March 2020 and September 2020, respectively. For the Revolution Wind project, BOEM released its Draft EIS on September 2, 2022 and its Final EIS on July 17, 2023. On August 21, 2023, BOEM issued its Record of Decision, which concluded BOEM’s environmental review of the project and identified the recommended configuration. Final approval of the Revolution Wind project was received on November 20, 2023. For the Sunrise Wind project, BOEM released its Draft EIS on December 16, 2022 and its Final EIS on December 15, 2023. The Record of Decision is expected in the first quarter of 2024 and final approval of Sunrise Wind is expected in the second quarter of 2024. South Fork Wind, Revolution Wind and Sunrise Wind are each designated as a “Covered Project” pursuant to Title 41 of the Fixing America’s Surface Transportation Act (FAST41) and a Major Infrastructure Project under Section 3(e) of Executive Order 13807, which provides greater federal attention on meeting the projects’ permitting timelines. 37
  2. Page 50 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 50 of 136 State and Local Siting and Permitting Process: State permitting applications in Rhode Island for Revolution Wind and in New York for Sunrise Wind were filed in December 2020. On July 8, 2022, the Rhode Island Energy Facilities Siting Board issued a Final Decision and Order approving the Revolution Wind project and granting a license to construct and operate. On November 17, 2022, the New York Public Service Commission approved an order adopting a Joint Proposal filed by Sunrise Wind and granting a Certificate of Environmental Compatibility and Public Need. On November 18, 2022, Sunrise Wind filed its Phase 1 Environmental Management and Construction Plan (EM&CP) with the New York Public Service Commission, which details the plans on limited onshore construction activities subject to state and local jurisdiction. On March 27, 2023, Sunrise Wind filed its EM&CP for Phase 2, which covers the remainder of the project components. On June 22, 2023, Sunrise Wind received approval of the Phase 1 EM&CP. On July 13, 2023, the New York State Public Service Commission approved Sunrise Wind’s notice for authorization to proceed with construction for Phase 1. On December 18, 2023, Sunrise Wind received approval of the Phase 2 EM&CP. On November 9, 2022, the Towns of Brookhaven and Suffolk County executed the easements and other real estate rights necessary to construct the Sunrise Wind project. On November 28, 2022, the Town of North Kingstown and the Quonset Development Corporation approved Revolution Wind’s real estate PILOT terms and the personal property PILOT agreement necessary to construct the Revolution Wind project. Construction Process: South Fork Wind received all required approvals to start construction and the project entered the construction phase in early 2022. All major onshore construction activities, including the project’s underground onshore transmission line and the onshore interconnection facility located in East Hampton, New York are complete. Offshore construction activities began in the fourth quarter of 2022, and installation of the subsea transmission cable, the monopile foundations and offshore substation was completed in 2023. Installation of the project’s 11-megawatt wind turbines continued throughout 2023 and four of South Fork Wind’s twelve turbines were placed into service by January 1, 2024, meeting the project commercial operation date requirements under the power purchase agreement with LIPA. All wind turbines are expected to be installed and placed into service by the end of March 2024. South Fork Wind faces several challenges and appeals of New York State and federal agency approvals, however we believe it is probable we will be able to overcome these challenges. For Revolution Wind, on October 31, 2023, the joint venture made its final investment decision to advance to full onshore and offshore construction and installation, and major construction began in the fourth quarter of 2023 upon receipt of all necessary federal, state and local approvals. For Sunrise Wind, once all necessary federal, state and local approvals are received and the joint venture has made its final investment decision, informed in part by the outcome of the New York fourth solicitation, then major construction is expected to begin. Sunrise Wind has started limited onshore construction activities. Projected In-Service Dates: We expect the South Fork Wind project to be in-service by the end of March 2024 and the Revolution Wind project to be in-service in late 2025. For Sunrise Wind, based on the updated BOEM permit schedule outlining when BOEM will complete its review of the COP, we currently expect an in-service date in 2026. FERC Regulatory Matters FERC ROE Complaints: Four separate complaints were filed at the FERC by combinations of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties (collectively, the Complainants). In each of the first three complaints, filed on October 1, 2011, December 27, 2012, and July 31, 2014, respectively, the Complainants challenged the NETOs' base ROE of 11.14 percent that had been utilized since 2005 and sought an order to reduce it prospectively from the date of the final FERC order and for the separate 15-month complaint periods. In the fourth complaint, filed April 29, 2016, the Complainants challenged the NETOs' base ROE billed of 10.57 percent and the maximum ROE for transmission incentive (incentive cap) of 11.74 percent, asserting that these ROEs were unjust and unreasonable. The ROE originally billed during the period October 1, 2011 (beginning of the first complaint period) through October 15, 2014 consisted of a base ROE of 11.14 percent and incentives up to 13.1 percent. On October 16, 2014, FERC issued Opinion No. 531-A and set the base ROE at 10.57 percent and the incentive cap at 11.74 percent for the first complaint period. This was also effective for all prospective billings to customers beginning October 16, 2014. This FERC order was vacated on April 14, 2017 by the U.S. Court of Appeals for the D.C. Circuit (the Court). All amounts associated with the first complaint period have been refunded. Eversource has recorded a reserve of $39.1 million (pre-tax and excluding interest) for the second complaint period as of both December 31, 2023 and 2022. This reserve represents the difference between the billed rates during the second complaint period and a 10.57 percent base ROE and 11.74 percent incentive cap. The reserve consisted of $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH as of both December 31, 2023 and 2022. On October 16, 2018, FERC issued an order on all four complaints describing how it intends to address the issues that were remanded by the Court. FERC proposed a new framework to determine (1) whether an existing ROE is unjust and unreasonable and, if so, (2) how to calculate a replacement ROE. Initial briefs were filed by the NETOs, Complainants and FERC Trial Staff on January 11, 2019 and reply briefs were filed on March 8, 2019. The NETOs' brief was supportive of the overall ROE methodology determined in the October 16, 2018 order provided the FERC does not change the proposed methodology or alter its implementation in a manner that has a material impact on the results. The FERC order included illustrative calculations for the first complaint using FERC's proposed frameworks with financial data from that complaint. Those illustrative calculations indicated that for the first complaint period, for the NETOs, which FERC concludes are of average financial risk, the preliminary just and reasonable base ROE is 10.41 percent and the preliminary incentive cap on total ROE is 13.08 percent. If the results of the illustrative calculations were included in a final FERC order for each of the complaint periods, then a 10.41 percent base ROE and a 13.08 percent incentive cap would not have a significant impact on our financial statements for all of the complaint periods. These preliminary calculations are not binding and do not represent what we believe to be the most likely outcome of a final FERC order. 38
  3. Page 51 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 51 of 136 On November 21, 2019, FERC issued Opinion No. 569 affecting the two pending transmission ROE complaints against the Midcontinent ISO (MISO) transmission owners, in which FERC adopted a new methodology for determining base ROEs. Various parties sought rehearing. On December 23, 2019, the NETOs filed supplementary materials in the NETOs' four pending cases to respond to this new methodology because of the uncertainty of the applicability to the NETOs' cases. On May 21, 2020, the FERC issued its order in Opinion No. 569-A on the rehearing of the MISO transmission owners' cases, in which FERC again changed its methodology for determining the MISO transmission owners' base ROEs. On November 19, 2020, the FERC issued Opinion No. 569-B denying rehearing of Opinion No. 569-A and reaffirmed the methodology previously adopted in Opinion No. 569-A. The new methodology differs significantly from the methodology proposed by FERC in its October 16, 2018 order to determine the NETOs' base ROEs in its four pending cases. FERC Opinion Nos. 569-A and 569-B were appealed to the Court. On August 9, 2022, the Court issued its decision vacating MISO ROE FERC Opinion Nos. 569, 569-A and 569-B and remanded to FERC to reopen the proceedings. The Court found that FERC’s development of the new return methodology was arbitrary and capricious due to FERC’s failure to offer a reasonable explanation for its decision to reintroduce the risk-premium financial model in its new methodology for calculating a just and reasonable return. At this time, Eversource cannot predict how and when FERC will address the Court’s findings on the remand of the MISO FERC opinions or any potential associated impact on the NETOs’ four pending ROE complaint cases. Given the significant uncertainty regarding the applicability of the FERC opinions in the MISO transmission owners’ two complaint cases to the NETOs’ pending four complaint cases, Eversource concluded that there is no reasonable basis for a change to the reserve or recognized ROEs for any of the complaint periods at this time. As well, Eversource cannot reasonably estimate a range of loss for any of the four complaint proceedings at this time. Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order. A change of 10 basis points to the base ROE used to establish the reserves would impact Eversource’s after-tax earnings by an average of approximately $3 million for each of the four 15-month complaint periods. Prospectively from the date of a final FERC order implementing a new base ROE, based off of estimated 2023 rate base, a change of 10 basis points to the base ROE would impact Eversource’s future annual after-tax earnings by approximately $5.5 million per year, and will increase slightly over time as we continue to invest in our transmission infrastructure. FERC Notice of Proposed Rulemaking on Transmission Incentives: On March 20, 2020, FERC issued a Notice of Proposed Rulemaking (NOPR) on transmission incentives. The NOPR intends to revise FERC’s electric transmission incentive policies to reflect competing uses of transmission due to generation resource mix, technological innovation and shifts in load patterns. FERC proposes to grant transmission incentives based on measurable project economics and reliability benefits to consumers rather than its current project risks and challenges framework. On July 1, 2020, Eversource filed comments generally supporting the NOPR. On April 15, 2021, FERC issued a Supplemental NOPR that proposes to eliminate the existing 50 basis point return on equity for utilities that have been participating in a regional transmission organization (RTO ROE incentive) for more than three years. On June 25, 2021, the NETOs jointly filed comments strongly opposing FERC’s proposal. On July 26, 2021, the NETOs filed Supplemental NOPR reply comments responding to various parties advocating for the elimination of the RTO Adder. If FERC issues a final order eliminating the RTO ROE incentive as proposed in the Supplemental NOPR, the estimated annual impact (using 2023 estimated rate base) on Eversource's after-tax earnings is approximately $19.5 million. The Supplemental NOPR contemplates an effective date 30 days from the final order. At this time, Eversource cannot predict the ultimate outcome of these proceedings, including possible appellate review, and the resulting impact on its transmission incentives. Regulatory Developments and Rate Matters Electric, Natural Gas and Water Utility Retail Tariff Rates: Each Eversource utility subsidiary is subject to the regulatory jurisdiction of the state in which it operates: CL&P, Yankee Gas and Aquarion operate in Connecticut and are subject to PURA regulation; NSTAR Electric, NSTAR Gas, EGMA and Aquarion operate in Massachusetts and are subject to DPU regulation; and PSNH and Aquarion operate in New Hampshire and are subject to NHPUC regulation. The regulated companies' distribution rates are set by their respective state regulatory commissions, and their tariffs include mechanisms for periodically adjusting their rates for the recovery of specific incurred costs. Base Distribution Rates: In Connecticut, electric, natural gas and water utilities serving more than seventy-five thousand customers are required to file a distribution rate case within four years of the last rate case. PURA can elect to convene a general rate hearing at an interval of less than four years unless prohibited from doing so by an agency decision or other law. CL&P's and Yankee Gas' base distribution rates were each established in 2018 PURA-approved rate case settlement agreements. On October 27, 2021, PURA approved a settlement agreement for CL&P that included a current base distribution rate freeze until no earlier than January 1, 2024. The approval of the settlement agreement satisfied the Connecticut statute of rate review requirements that requires electric utilities to file a distribution rate case within four years of the last rate case. On March 15, 2023, PURA issued a final decision that rejected Aquarion Water Company of Connecticut’s (AWC-CT) application with PURA to amend its existing rate schedules. AWC-CT filed an appeal on the decision and on May 25, 2023, the State of Connecticut Superior Court granted a permanent stay of certain orders affecting base rates, which will keep existing rates in place until the appeal is completed. For further information, see "Regulatory Developments and Rate Matters - Connecticut," below. In Massachusetts, electric distribution companies are required to file distribution rate schedules every five years, and natural gas local distribution companies to file distribution rate schedules every 10 years, and those companies are limited to one settlement agreement in any 10-year period. NSTAR Electric's base distribution rates were established in a November 2022 DPU-approved rate case. NSTAR Gas' base distribution rates were established in an October 2020 DPU-approved rate case. EGMA's base distribution rates were established in an October 2020 DPU-approved rate settlement agreement. Aquarion is not required to initiate a rate review with the DPU. Aquarion’s base distribution rates were established in a 2018 DPU-approved rate case. 39
  4. Page 52 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 52 of 136 In New Hampshire, PSNH's base distribution rates were established in a December 2020 NHPUC-approved rate case settlement agreement. Aquarion's base distribution rates were established in a July 2022 NHPUC-approved rate case settlement agreement, with a single step adjustment approved on January 19, 2023. Rates were effective March 1, 2023. Rate Reconciling Mechanisms: The Eversource electric distribution companies obtain and resell power to retail customers who choose not to buy energy from a competitive energy supplier. CL&P, NSTAR Electric and PSNH enter into full requirements energy supply procurement contracts for its customers that choose to purchase power from the electric distribution company (standard offer, basic service or default energy service, respectively). The natural gas distribution companies procure natural gas for firm and seasonal customers. These energy supply and natural gas supply procurement costs are recovered from customers in supply rates that are approved by the respective state regulatory commission. The rates are reset periodically (every six months for electric residential customers) and are fully reconciled to their costs. New energy supply rates for residential customers are established effective July 1st at CL&P and NSTAR Electric and effective August 1st at PSNH. Each electric and natural gas distribution company fully recovers its energy supply costs through approved regulatory rate mechanisms on a timely basis and, therefore, such costs have no impact on earnings. Increases or decreases in energy supply retail rates result in corresponding fluctuations in both energy supply procurement revenues and purchased power or purchased natural gas expenses on the statements of income. The electric and natural gas distribution companies also recover certain other costs in retail rates on a fully reconciling basis through regulatory commission-approved cost tracking mechanisms and, therefore, recovery of these costs has no impact on earnings. Costs recovered through cost tracking mechanisms include, among others, electric retail transmission charges, energy efficiency program costs, electric restructuring and stranded cost recovery revenues (including securitized RRB charges), certain capital tracking mechanisms for infrastructure improvements, and additionally for the Massachusetts utilities, pension and PBOP benefits, net metering for distributed generation, and solar-related programs. The reconciliation filings compare the total actual costs allowed to revenue requirements related to these services and the difference between the costs incurred (or the rate recovery allowed) and the actual costs allowed is deferred and included, to be either recovered or refunded, in future customer rates. These cost tracking mechanisms also include certain incentives earned, return on capital tracking mechanisms, and carrying charges that are billed in rates to customers, which do impact earnings. Connecticut: CL&P Performance Based Rate Making: On May 26, 2021, in accordance with an October 2020 Connecticut law, PURA opened a proceeding to begin to evaluate and eventually implement performance based regulation (PBR) for electric distribution companies. PURA is conducting the proceeding in two phases. On January 25, 2023, PURA staff issued a proposal outlining a suggested portfolio of PBR elements for further exploration and potential implementation in the second phase of the proceeding. On April 26, 2023, PURA issued a final decision on the first phase and identified various objectives to guide PBR development and evaluate adoption of a PBR framework. The decision commenced Phase 2 by initiating three reopener dockets focused on revenue adjustment mechanisms, performance metrics and integrated distribution system planning with final decisions expected in 2025. On November 16, 2023, PURA issued a straw proposal in the first reopener that focused on revenue adjustment mechanisms. The proposal outlines potential additions and reforms to the current revenue adjustment mechanisms, such as multi-year rate plans, earnings sharing mechanisms and the revenue decoupling mechanism, which would apply at the time of CL&P’s next distribution rate case. The straw proposal is not authoritative and technical sessions are continuing prior to a final decision. PURA is expected to issue a straw proposal in the second reopener focusing on performance incentive mechanisms (PIMs) in the first quarter of 2024. The three reopener dockets continue to progress through the Phase 2 process. We continue to monitor developments in this proceeding, and at this time, we cannot predict the ultimate outcome of this proceeding and the resulting impact to CL&P. CL&P Storm Filing: On December 22, 2023, CL&P initiated a docket seeking a prudency review of approximately $634 million of catastrophic storm costs for twenty-four weather events from January 1, 2018 to December 31, 2021. In the filing, CL&P requested PURA establish a rate to collect $50 million annually from customers from the date of the final decision in this proceeding. This rate would be effective until the next distribution rate case and would replenish the under-collected storm reserve and reduce future carrying charges for customers. CL&P Advanced Metering Infrastructure Filing: On July 31, 2020, CL&P submitted to PURA its proposed $512 million Advanced Metering Infrastructure investment and implementation plan. On August 17, 2021, PURA issued a Notice of Request for an Amended EDC Advanced Metering Infrastructure Proposal. On November 8, 2021, CL&P submitted an Amended Proposal in response to this request with an updated schedule for the years 2022 through 2028, which included additional information as required by PURA. As required, the plan includes a full deployment of advanced metering functionality and a composite business case in support of the Advanced Metering Infrastructure plan. On January 3, 2024, PURA issued a final decision regarding CL&P’s Advanced Metering Infrastructure investment and implementation plan, which CL&P most recently estimated at $766.4 million for capital costs and one-time operating expenses. In CL&P’s view, the final decision does not provide a reasonable path for cost recovery and delays implementation by a year. In addition, the final decision modifies the prudence standard for recovery of costs expended on the project, improperly linking recovery to outcomes not known at the outset of the project. On January 18, 2024, CL&P submitted a motion for reconsideration to PURA asking that the agency modify these aspects of the decision. Termination of Park City Wind’s Power Purchase Agreement with CL&P: On October 2, 2023, Park City Wind LLC and CL&P signed an agreement to terminate the Park City Wind offshore wind generation PPA, at the request of Park City Wind LLC. The termination agreement was effective on October 13, 2023, the date of PURA approval. In October 2023, Park City Wind LLC paid a termination payment of $12.9 million to CL&P resulting from the termination of the PPA, which CL&P will return to customers. 40
  5. Page 53 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 53 of 136 Aquarion Water Company of Connecticut Distribution Rate Case: On August 29, 2022, Aquarion Water Company of Connecticut (AWC-CT) filed an application with PURA to amend its existing rate schedules to address an operating revenue deficiency. AWC-CT’s rate application requested approval of rate increases of $27.5 million, an additional $13.6 million, and an additional $8.8 million, effective March 15, 2023, 2024, and 2025, respectively. On March 15, 2023, PURA issued a final decision that rejected this request. In this decision, PURA ordered a base distribution rate decrease of $2.0 million effective March 15, 2023. The decision allows an authorized regulatory ROE of 8.70 percent. On March 30, 2023, AWCCT filed an appeal on the decision and requested a stay of the decision with the State of Connecticut Superior Court. On April 5, 2023, the Court temporarily granted AWC-CT’s request to stay and on May 25, 2023 granted a permanent stay of certain orders affecting base rates, which will keep existing rates in place until the appeal is completed. The stay included the condition that AWC-CT place any revenue received from customers above the rates and amounts authorized in the March 15, 2023 decision in a separate, interest bearing account until further order. A hearing on the merits of the appeal was held on January 11, 2024. A decision from the State of Connecticut Superior Court is pending. Massachusetts: NSTAR Electric Distribution Rates: On November 30, 2022, the DPU issued its decision in the NSTAR Electric distribution rate case and approved a base distribution rate increase of $64 million effective January 1, 2023. NSTAR Electric’s PBR mechanism allows for an annual adjustment to base distribution rates for inflation, exogenous events and future capital additions based on a historical five-year average of total capital additions. NSTAR Electric submitted its first annual PBR Adjustment filing on September 15, 2023 and on December 26, 2023, the DPU approved a $104.9 million increase to base distribution rates effective January 1, 2024. The base distribution rate increase was comprised of a $50.6 million inflation-based adjustment and a $54.3 million K-bar adjustment for capital additions based on the difference between the historical five-year average of total capital additions and the base capital revenue requirement. NSTAR Electric’s Electric Sector Modernization Plan (ESMP) Filing: Massachusetts state law requires the electric distribution companies to file a comprehensive distribution system plan by January 29, 2024, to proactively upgrade the distribution system (and, where applicable, the associated transmission system) to: (i) improve grid reliability, communications and resiliency; (ii) enable increased, timely adoption of renewable energy and distributed energy resources; (iii) promote energy storage and electrification technologies necessary to decarbonize the environment and economy; (iv) prepare for future climate-driven impacts on the transmission and distribution systems; (v) accommodate increased transportation electrification, increased building electrification and other potential future demands on distribution and, where applicable, the transmission system; and (vi) minimize or mitigate impacts on Massachusetts ratepayers, thereby helping the state realize its statewide greenhouse gas emissions limits and sublimits under the law. On January 29, 2024, NSTAR Electric filed its ESMP with the DPU. NSTAR Electric’s plan meets these requirements by providing a comprehensive view of all the investments required to build a safer, more reliable, more resilient electric distribution system taking into account the needs of environmental justice communities. For the five-year period from 2025 through 2029, the proposed incremental capital investment is $608 million and the incremental expense amount is $211 million. The DPU must approve, approve with modification, or reject the ESMP filing within seven months after filing. Termination of SouthCoast Wind’s Power Purchase Agreements with NSTAR Electric: On August 28, 2023, SouthCoast Wind Energy LLC and NSTAR Electric signed agreements to terminate three SouthCoast Wind offshore wind generation PPAs, at the request of SouthCoast Wind Energy LLC. The termination agreements were effective on September 29, 2023, the date of DPU approval. In October 2023, SouthCoast Wind Energy, LLC paid a termination payment totaling $32.5 million to NSTAR Electric resulting from the termination of the PPAs, which NSTAR Electric will return to customers. Termination of Commonwealth Wind’s Power Purchase Agreement with NSTAR Electric: On July 13, 2023, Commonwealth Wind, LLC and NSTAR Electric signed an agreement to terminate the Commonwealth Wind offshore wind generation PPA, at the request of Commonwealth Wind, LLC. The termination agreement was effective on August 23, 2023, the date of DPU approval. In October 2023, Commonwealth Wind, LLC paid a termination payment of $25.9 million to NSTAR Electric, which NSTAR Electric will return to customers. NSTAR Gas Distribution Rates: NSTAR Gas’ PBR mechanism allows for an annual adjustment to base distribution rates for inflation and exogenous events. NSTAR Gas submitted its third annual PBR Adjustment filing on September 15, 2023 and on October 30, 2023, the DPU approved a $25.4 million increase to base distribution rates, of which, $15.5 million was associated with a base rate adjustment and the remainder for a prior period exogenous cost adjustment, for effect on November 1, 2023. New Hampshire: PSNH Pole Acquisition Approval: On November 18, 2022, the NHPUC issued a decision that approved a proposed purchase agreement between PSNH and Consolidated Communications, in which, PSNH would acquire both jointly-owned and solely-owned poles and pole assets. The NHPUC also authorized PSNH to recover certain expenses associated with the operation and maintenance of the transferred poles, pole inspections, and vegetation management expenses through a new cost recovery mechanism, the PPAM, subject to consummation of the purchase agreement. The purchase agreement was finalized on May 1, 2023 for a purchase price of $23.3 million. Upon consummation of the purchase agreement, PSNH established a regulatory asset of $16.9 million for operation and maintenance expenses and vegetation management expenses associated with the purchased poles incurred from February 10, 2021 through April 30, 2023 that PSNH is authorized to collect through the PPAM regulatory tracking mechanism. The establishment of the PPAM regulatory asset resulted in a pre-tax benefit recorded in Amortization expense on the PSNH statement of income in 2023. PSNH Energy Efficiency Plan: On February 24, 2022, a state law was enacted that directed that the joint utility energy efficiency plan and programming framework in effect on January 1, 2021 be utilized going forward, including utility performance incentive payments, lost base revenue calculations, and Evaluation, Measurement, and Verification process. Additionally, the law established a process for future plan proposals, including the 2024 through 2026 triennial plan, and includes a mechanism for future rate increases based on the consumer price index. 41
  6. Page 54 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 54 of 136 On November 30, 2023, the NHPUC approved a three-year joint utility energy efficiency plan for 2024 through 2026, of which, $158 million is the PSNH program budget over the next three years. Additionally, on December 22, 2023, the NHPUC approved the annual LBR rate for 2024, allowing PSNH to recover approximately $14 million in revenue that would have been collected if not for the implementation of energy efficiency measures. Legislative and Policy Matters Connecticut: On June 29, 2023, Connecticut enacted Public Act No. 23-102 (Substitute Senate Bill No. 7) (the Act) that encompasses 40 sections. The Act prohibits recovery in retail rates of certain costs incurred by utilities, including costs for consultants and outside counsel for rate cases, membership dues, and lobbying. None of the rate-setting provisions will result in an immediate change to rates, as all will require some future process, primarily a general distribution rate proceeding before PURA. The Act also makes prospective adjustments to the timing and procedures used in the retail rate setting process, including (1) requiring additional procedural steps to be satisfied for proposed settlements of cases; (2) increasing the deadline to issue a final decision on an application from a water company to amend base rates from 200 days to 270 days; (3) authorizing PURA to elect to evaluate if rates should be reduced on an interim basis if a utility earns an ROE that exceeds its authorized ROE by 50 basis points over a rolling 12-month period ending with the two most recent consecutive financial quarters (instead of the current standard of 100 basis points); and (4) authorizing PURA to elect to convene a general rate hearing at an interval of less than four years unless prohibited from doing so by an agency decision or other law. The Act is prospective, not retroactive and therefore, does not change obligations or rate provisions established by settlements implemented prior to the Act. The Act also prohibits CL&P’s electric system improvements (ESI) capital tracking mechanism from being reauthorized in the next general distribution proceeding. The ESI will therefore remain in place until base distribution rates are adjusted in CL&P’s next general distribution rate proceeding. The Act also excludes storms and other emergencies affecting 70 percent or more of an electric distribution company’s customers from the 2020 law requiring credits for residential customers who are without power for 96 or more consecutive hours. Lastly, the Act was amended by Public Act No. 23-204 (House Bill No. 6941) to require the Governor to designate the chairperson of PURA from among the sitting commissioners by June 30, 2023 and every two years thereafter; and to delete the changes in Section 21 of the Act to the duties and powers of PURA commissioners. Designation of the chairperson does not constitute a renomination for a full commission term, as otherwise provided by law. Critical Accounting Policies The preparation of financial statements in conformity with GAAP requires management to make estimates, assumptions and, at times, difficult, subjective or complex judgments. Changes in these estimates, assumptions and judgments, in and of themselves, could materially impact our financial position, results of operations or cash flows. Our management discusses with the Audit Committee of our Board of Trustees significant matters relating to critical accounting policies. Our critical accounting policies are discussed below. See the combined notes to our financial statements for further information concerning the accounting policies, estimates and assumptions used in the preparation of our financial statements. Regulatory Accounting: Our regulated companies are subject to rate regulation that is based on cost recovery and meets the criteria for application of accounting guidance for rate-regulated operations, which considers the effect of regulation on the timing of the recognition of certain revenues and expenses. The regulated companies' financial statements reflect the effects of the rate-making process. The rates charged to the customers of our regulated companies are designed to collect each company's costs to provide service, plus a return on investment. We believe that the operations of each of our regulated companies currently satisfy the criteria for application of regulatory accounting. If events or circumstances should change in a future period so that those criteria are no longer satisfied, we would be required to eliminate any associated regulatory assets and liabilities and the impact would be recognized in the statement of income and may result in a material adverse effect on results of operations and financial condition. The application of accounting guidance for rate-regulated enterprises results in recording regulatory assets and liabilities. Regulatory assets represent the deferral of incurred costs that are probable of future recovery in customer rates. Regulatory assets are amortized as the incurred costs are recovered through customer rates. In some cases, we record regulatory assets before approval for recovery has been received from the applicable regulatory commission. We must use judgment to conclude that costs deferred as regulatory assets are probable of future recovery. We base our conclusion on certain factors, including, but not limited to, regulatory precedent. Regulatory liabilities represent either revenues received from customers to fund expected costs that have not yet been incurred or probable future refunds to customers. We make judgments regarding the future outcome of regulatory proceedings that involve potential future refund to customers and record liabilities for these loss contingencies when probable and reasonably estimable based upon available information. Regulatory liabilities are recorded at the best estimate, or at a low end of the range of possible loss. The amount recorded may differ from when the uncertainty is resolved. Such differences could have a significant impact on our financial statements. We continually assess whether the regulatory assets and liabilities continue to meet the criteria for probable future recovery or refund. This assessment includes consideration of recent orders issued by regulatory commissions, the passage of new legislation, historical regulatory treatment for similar costs in each of our jurisdictions, discussions with legal counsel, the status of any appeals of regulatory decisions, and changes in applicable regulatory and political environments. We believe that we will continue to be able to defer and recover prudently incurred costs, including additional storm costs, based on the legal and regulatory framework. 42
  7. Page 55 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 55 of 136 We use judgment when recording regulatory assets and liabilities; however, regulatory commissions can reach different conclusions about the recovery of costs, and those conclusions could have a material impact on our financial statements. The ultimate outcome of regulatory rate proceedings could have a significant effect on our ability to recover costs or earn an adequate return. Established rates are also often subject to subsequent prudency reviews by state regulators, whereby various portions of rates could be adjusted, subject to refund or disallowed. Storm restoration and pre-staging costs are subject to prudency reviews from our regulators. We have $1.75 billion of deferred storm costs that either have yet to be filed with the applicable regulatory commission, are pending regulatory approval, or are subject to prudency review as of December 31, 2023. Tropical Storm Isaias resulted in deferred storm restoration costs of approximately $232 million at CL&P as of December 31, 2023. While it is possible that some amount of the Tropical Storm Isaias costs may be disallowed by PURA, any such amount cannot be estimated at this time. We believe that our storm restoration costs were prudently incurred, meet the criteria for cost recovery and are probable of recovery. We believe it is probable that each of our regulated companies will recover its respective investments in long-lived assets and the regulatory assets that have been recorded. If we determine that we can no longer apply the accounting guidance applicable to rate-regulated enterprises, or that we cannot conclude it is probable that costs will be recovered from customers in future rates, the applicable costs would be charged to net income in the period in which the determination is made. Pension, SERP and PBOP: We sponsor Pension, SERP and PBOP Plans to provide retirement benefits to our employees. Plan assets and the benefit obligation are presented on a net basis and we recognize the overfunded or underfunded status of the plans as an asset or liability on the balance sheet. These amounts are remeasured annually using a December 31st measurement date. For each of these plans, several significant assumptions are used to determine the projected benefit obligation, funded status and net periodic benefit expense/income. These assumptions include the expected long-term rate of return on plan assets, discount rate, compensation/progression rate and mortality and retirement assumptions. We evaluate these assumptions annually and adjust them as necessary. Changes in these assumptions could have a material impact on our financial position, results of operations or cash flows. Expected Long-Term Rate of Return on Plan Assets Assumption: In developing the expected long-term rate of return, we consider historical and expected returns, as well as input from our consultants. Our expected long-term rate of return on assets is based on assumptions regarding target asset allocations and corresponding expected rates of return for each asset class. We routinely review the actual asset allocations and periodically rebalance the investments to the targeted asset allocations. For the year ended December 31, 2023, our expected long-term rate-of-return assumption used to determine our pension and PBOP expense was 8.25 percent for the Eversource Service Pension and PBOP plans. For the forecasted 2024 pension and PBOP expense, an expected long-term rate of return of 8.25 percent for the Eversource Service Pension and PBOP plans will be used reflecting our target asset allocations. Discount Rate Assumptions: Payment obligations related to the Pension, SERP and PBOP Plans are discounted at interest rates applicable to the expected timing of each plan's cash flows. The discount rate that was utilized in determining the pension, SERP and PBOP obligations was based on a yield-curve approach. This approach utilizes a population of bonds with an average rating of AA based on bond ratings by Moody's, S&P and Fitch, and uses bonds with above median yields within that population. As of December 31, 2023, the discount rates used to determine the funded status were within a range of 4.9 percent to 5.0 percent for the Pension and SERP Plans, and 5.0 percent to 5.2 percent for the PBOP Plans. As of December 31, 2022, the discount rates used were within a range of 5.1 percent to 5.2 percent for the Pension and SERP Plans, and 5.2 percent for the PBOP Plans. The decrease in the discount rates used to calculate the funded status resulted in an increase to the Pension and SERP Plans’ projected benefit obligation of $98.9 million and an increase to the PBOP Plans' projected benefit obligation of $12.0 million as of December 31, 2023. The Company uses the spot rate methodology for the service and interest cost components of Pension, SERP and PBOP expense because it provides a relatively precise measurement by matching projected cash flows to the corresponding spot rates on the yield curve. The discount rates used to estimate the 2023 expense were within a range of 4.9 percent to 5.3 percent for the Pension and SERP Plans, and within a range of 5.1 percent to 5.4 percent for the PBOP Plans. Mortality Assumptions: Assumptions as to mortality of the participants in our Pension, SERP and PBOP Plans are a key estimate in measuring the expected payments a participant may receive over their lifetime and the corresponding plan liability we need to record. The mortality assumption is composed of a base table that represents the current expectation of life expectancy of the population adjusted by an improvement scale that attempts to anticipate future improvements in life expectancy. In 2023, our mortality assumption utilized the Society of Actuaries base mortality tables (Pri-2012), adjusted to reflect Eversource’s own mortality experience, and projected generationally using the MP-2021 improvement scale. Compensation/Progression Rate Assumptions: This assumption reflects the expected long-term salary growth rate, including consideration of the levels of increases built into collective bargaining agreements, and impacts the estimated benefits that Pension and SERP Plan participants will receive in the future. As of December 31, 2023 and 2022, the compensation/progression rates used to determine the funded status were within a range of 3.5 percent to 4.0 percent. Health Care Cost Assumptions: The Eversource Service PBOP Plan is not subject to health care cost trends. As of December 31, 2023, for the Aquarion PBOP Plan, the health care trend rate used to determine the funded status for pre-65 retirees is 6.75 percent, with an ultimate rate of 5 percent in 2031, and for post-65 retirees, the health care trend rate and ultimate rate is 3.5 percent. 43
  8. Page 56 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 56 of 136 Actuarial Gains and Losses: Actuarial gains and losses represent the differences between actuarial assumptions and actual information or updated assumptions. Unamortized actuarial gains or losses arising at the December 31st measurement date are primarily from differences in actual investment performance compared to our expected return and changes in the discount rate assumption. The Eversource Service Pension and PBOP Plans use the corridor approach to determine the amount of gain or loss to amortize into net periodic benefit expense/income. The corridor approach defers all actuarial gains and losses arising at remeasurement and the net unrecognized actuarial gain or loss balance is amortized as a component of expense if, as of the beginning of the year, that net gain or loss exceeds 10 percent of the greater of the market value of the plan’s assets or the projected benefit obligation. The amount of net unrecognized actuarial gain or loss in excess of the 10 percent corridor is amortized to expense over the estimated average future employee service period. For the Eversource Service Pension Plan, the net actuarial gain or loss is amortized as a component of expense over the estimated average future employee service period of seven years. For the Eversource Service PBOP Plan, the net unrecognized actuarial gain or loss was within the 10 percent corridor and therefore there was no amortization to expense during 2023. A decrease in the discount rate used to determine our pension funded status would increase our projected benefit obligation at December 31st, resulting in a higher unamortized actuarial loss to be recognized in future years’ pension expense, subject to exceeding the 10 percent corridor. A decrease in the discount rate at December 31st would also result in a decrease in the interest cost component and an increase in the service cost component of the subsequent year’s benefit plan expense. The calculated expected return on plan assets is compared to the actual return or loss on plan assets at the end of each year to determine the investment gains or losses to be immediately reflected in unamortized actuarial gains and losses. An underperformance of our pension plan investment returns relative to the expected returns would increase our pension liability at December 31st, resulting in a higher unamortized actuarial loss to be recognized in future years’ pension expense, subject to exceeding the 10 percent corridor, and a lower expected return on assets component of pension expense in future years’ pension expense. Net Periodic Benefit Expense/Income: Pension, SERP and PBOP expense/income is determined by our actuaries and consists of service cost and prior service cost/credit, interest cost based on the discounting of the obligations, amortization of actuarial gains and losses, and the expected return on plan assets. For the Pension and SERP Plans, pre-tax net periodic benefit income was $108.4 million and $181.6 million for the years ended December 31, 2023 and 2022, respectively, and there was pre-tax net periodic benefit expense of $23.6 million for the year ended December 31, 2021. For the PBOP Plans, pre-tax net periodic benefit income was $57.3 million, $79.8 million and $60.5 million for the years ended December 31, 2023, 2022 and 2021, respectively. The change in pension, SERP and PBOP expense/income arising from the annual remeasurement does not fully impact earnings. Our Massachusetts utilities recover qualified pension and PBOP expenses related to their distribution operations through a rate reconciling mechanism that fully tracks the change in net pension and PBOP expenses each year, therefore the change in their pension and PBOP expense does not impact earnings. Our electric transmission companies' rates provide for an annual true-up of estimated to actual costs, which include pension expenses, therefore the change in their pension expense does not impact earnings. Any differences between the fixed level of PBOP expense included in our formula rate and the PBOP expense calculated in accordance with authoritative accounting guidance is accumulated as a regulatory asset or liability, and is expected, over time, to be recovered from or returned to customers. Additionally, the portion of our pension and PBOP expense that relates to company labor devoted to capital projects is capitalized on the balance sheet instead of being charged to expense. Forecasted Expense/Income and Expected Contributions: We estimate that net periodic benefit income in 2024 for the Pension and SERP Plans will be approximately $90 million and for the PBOP Plans will be approximately $65 million. The decrease in pension income from 2023 to 2024 is driven primarily by higher amortization of actuarial loss due to unrecognized actuarial loss arising in 2023, partially offset by the absence in 2024 of a 2023 SERP settlement charge and a decrease in the interest cost component due to a lower discount rate. The increase in PBOP income from 2023 to 2024 is driven primarily by favorable expected return on assets due to a higher asset balance and a decrease in the interest cost component due to a lower discount rate. For the PBOP Plans, there is no amortization of actuarial loss in 2024. Pension, SERP and PBOP expense/income for subsequent years will depend on future investment performance, changes in future discount rates and other assumptions, and various other factors related to the populations participating in the plans. Our policy is to fund the Pension Plans annually in an amount at least equal to the amount that will satisfy all federal funding requirements. Based on the current status of the Pension Plans and federal pension funding requirements, there is no minimum funding requirement for our Eversource Service Pension Plan in 2024 and we do not expect to make pension contributions in 2024. It is our policy to fund the PBOP Plans annually through tax deductible contributions to external trusts. We do not expect to make any contributions to the Eversource Service PBOP Plan in 2024. Sensitivity Analysis: The following table illustrates the hypothetical effect on reported annual net periodic benefit income as a result of a change in the following assumptions by 50 basis points: Pension Plans (excluding SERP Plans) PBOP Plans Decrease in Plan Income Decrease in Plan Income (Millions of Dollars) For the Years Ended December 31, Eversource 2023 Lower expected long-term rate of return Lower discount rate Higher compensation rate $ 29.1 24.7 $ 2022 8.1 For the Years Ended December 31, 32.5 32.6 7.6 44 $ 2023 0.2 4.7 N/A $ 2022 5.6 1.7 N/A
  9. Page 57 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 57 of 136 Goodwill: We recorded goodwill on our balance sheet associated with previous mergers and acquisitions, all of which totaled $4.53 billion as of December 31, 2023. We have identified our reporting units for purposes of allocating and testing goodwill as Electric Distribution, Electric Transmission, Natural Gas Distribution and Water Distribution. Electric Distribution and Electric Transmission reporting units include carrying values for the respective components of CL&P, NSTAR Electric and PSNH. The Natural Gas Distribution reporting unit includes the carrying values of NSTAR Gas, Yankee Gas and EGMA. The Water Distribution reporting unit includes the Aquarion water utility businesses. As of December 31, 2023, goodwill was allocated to the reporting units as follows: $2.54 billion to Electric Distribution, $577 million to Electric Transmission, $451 million to Natural Gas Distribution and $961 million to Water Distribution. We are required to test goodwill balances for impairment at least annually by considering the fair values of the reporting units, which requires us to use estimates and judgments. Additionally, we monitor all relevant events and circumstances during the year to determine if an interim impairment test is required. We have selected October 1st of each year as the annual goodwill impairment test date. Goodwill impairment is deemed to exist if the carrying amount of a reporting unit exceeds its estimated fair value. If goodwill were deemed to be impaired, it would be written down in the current period to the extent of the impairment. In assessing goodwill for impairment, an entity is permitted to first assess qualitatively whether it is more likely than not that goodwill impairment exists as of the annual impairment test date. A quantitative impairment test is required only if it is concluded that it is more likely than not that a reporting unit’s fair value is less than its carrying amount. We performed an impairment assessment of goodwill as of October 1, 2023 for the Electric Distribution, Electric Transmission, Natural Gas Distribution and Water Distribution reporting units. Our qualitative assessment included an evaluation of multiple factors that impact the fair value of the reporting units, including general, macroeconomic and market conditions, and entity-specific assumptions that affect the future cash flows of the reporting units. Key considerations include discount rates, utility sector market performance and merger transaction multiples, the Company's share price and credit ratings, analyst reports, financial performance, cost and risk factors, internal estimates and projections of future cash flows and net income, long-term strategy, the timing and outcome of rate cases, and recent regulatory and legislative proceedings. The 2023 goodwill impairment assessment resulted in a conclusion that goodwill is not impaired. We believe that the fair value of the reporting units was substantially in excess of carrying value. Adverse regulatory actions, changes in the regulatory and political environment, or changes in significant assumptions could potentially result in future goodwill impairment indicators. Long-Lived Assets: Impairment evaluations of long-lived assets, including property, plant and equipment and other assets, involve a significant degree of estimation and judgment, including identifying circumstances that indicate an impairment may exist. An impairment analysis is required when events or changes in circumstances indicate that the carrying value of a long-lived asset may not be recoverable. Indicators of potential impairment include a deteriorating business climate, unfavorable regulatory action, decline in value that is other than temporary in nature, plans to dispose of a long-lived asset significantly before the end of its useful life, and accumulation of costs that are in excess of amounts allowed for recovery. The review of long-lived assets for impairment utilizes significant assumptions about operating strategies and external developments, including assessment of current and projected market conditions that can impact future cash flows. If indicators are present for a long-lived asset or asset group, a comparison of the undiscounted expected future cash flows to the carrying value is performed. No impairments occurred during the year 2023. Equity Method Investments: Investments in affiliates where we have the ability to exercise significant influence, but not control, over an investee are initially recognized as an equity method investment at cost. Any differences between the cost of an investment and the amount of underlying equity in net assets of an investee are considered basis differences and are determined based upon the estimated fair values of the investee's identifiable assets and liabilities. Equity method investments are assessed for impairment when conditions exist as of the balance sheet date that indicate that the fair value of the investment may be less than book value. Eversource continually monitors and evaluates its equity method investments to determine if there are indicators of an other-than-temporary impairment. If the decline in value is considered to be other-than-temporary, the investment is written down to its estimated fair value, which establishes a new cost basis in the investment. Subsequent declines or recoveries after the reporting date are not considered in the impairment recognized. Investments that are other-than-temporarily impaired and written down to their estimated fair value cannot subsequently be written back up for increases in estimated fair value. Impairment evaluations involve a significant degree of judgment and estimation, including identifying circumstances that indicate an impairment may exist at the equity method investment level, selecting discount rates used to determine fair values, and developing an estimate of discounted future cash flows expected from investment operations or the sale of the investment. In connection with the process to divest its offshore wind business, Eversource identified indicators for impairment in both the second and fourth quarters of 2023. In each impairment assessment, Eversource evaluated its investments and determined that the carrying value of the equity method offshore wind investments exceeded the fair value of the investments and that the decline was other-than-temporary. The impairment evaluations involved judgments in developing the estimate and timing of future cash flows, including key judgments in determining the most likely outcome of the projects, the likelihood of realization of investment tax credit adders, and the likelihood of future spending amounts and cost overruns, as well as potential cancellation costs and salvage values of Sunrise Wind assets. The assumptions used in the discounted cash flow analyses are subject to inherent uncertainties and subjectivity. The use of different assumptions, estimates, or judgments with respect to the estimation of future cash flows could materially change the impairment charges. The impairment evaluations were based on best information available at the impairment assessment date. 45
  10. Page 58 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 6 Page 58 of 136 Management will continue to monitor and evaluate all facts and circumstances in the offshore wind sales process and the impact on its investment balance. Adverse changes in facts and circumstances of estimates and timing of future cash flows and the factors described above could result in the recognition of additional, significant impairment charges and could be material to the financial statements. See Note 6, “Investments in Unconsolidated Affiliates,” to the financial statements for further information on the impairments to Eversource’s offshore wind equity method investments carrying value. Income Taxes: Income tax expense is estimated for each of the jurisdictions in which we operate and is recorded each quarter using an estimated annualized effective tax rate. This process to record income tax expense involves estimating current and deferred income tax expense or benefit and the impact of temporary differences resulting from differing treatment of items for financial reporting and income tax return reporting purposes. Such differences are the result of timing of the deduction for expenses, as well as any impact of permanent differences, or other items that directly impact income tax expense as a result of regulatory activity (flow-through items). The temporary differences and flow-through items result in deferred tax assets and liabilities that are included in the balance sheets. We also account for uncertainty in income taxes, which applies to all income tax positions previously filed in a tax return and income tax positions expected to be taken in a future tax return that have been reflected on our balance sheets. The determination of whether a tax position meets the recognition threshold under applicable accounting guidance is based on facts and circumstances available to us. The interpretation of tax laws and associated regulations involves uncertainty since tax authorities may interpret the laws differently. Ultimate resolution or clarification of income tax matters may result in favorable or unfavorable impacts to net income and cash flows, and adjustments to tax-related assets and liabilities could be material. Significant management judgment is required in determining the provision for income taxes, primarily due to the uncertainty related to tax positions taken, as well as deferred tax assets and liabilities and valuation allowances. We evaluate the probability of realizing deferred tax assets by reviewing a forecast of future taxable income and our intent and ability to implement tax planning strategies, if necessary, to realize deferred tax assets. We also assess negative evidence, such as the expiration of historical operating loss or tax credit carryforwards, that could indicate the inability to realize the deferred tax assets. Valuation allowances are provided to reduce deferred tax assets to the amount that will more likely than not be realized in future periods. This requires management to make judgments and estimates regarding the amount and timing of the reversal of taxable temporary differences, expected future taxable income, and the impact of tax planning strategies. Actual income taxes could vary from estimated amounts due to the future impacts of various items, including future changes in income tax laws, not realizing expected tax planning strategy amounts, as well as results of audits and examinations of filed tax returns by taxing authorities. Accounting for Environmental Reserves: Environmental reserves are accrued when assessments indicate it is probable that a liability has been incurred and an amount can be reasonably estimated. Increases to estimates of environmental liabilities could have an adverse impact on earnings. We estimate these liabilities based on findings through various phases of the assessment, considering the most likely action plan from a variety of available remediation options (ranging from no action required to full site remediation and long-term monitoring), current site information from our site assessments, remediation estimates from third party engineering and remediation contractors, and our prior experience in remediating contaminated sites. If a most likely action plan cannot yet be determined, we estimate the liability based on the low end of a range of possible action plans. A significant portion of our environmental sites and reserve amounts relate to former MGP sites that were operated several decades ago and manufactured natural gas from coal and other processes, which resulted in certain by-products remaining in the environment that may pose a potential risk to human health and the environment, for which we may have potential liability. Estimates are based on the expected remediation plan. Our estimates are subject to revision in future periods based on actual costs or new information from other sources, including the level of contamination at the site, the extent of our responsibility or the extent of remediation required, recently enacted laws and regulations or a change in cost estimates. Fair Value Measurements: We follow fair value measurement guidance that defines fair value as the price that would be received for the sale of an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date (an exit price). We have applied this guidance to our Company's derivative contracts that are not elected or designated as "normal purchases” or “normal sales,” to marketable securities held in trusts, and to our investments in our Pension and PBOP Plans. Fair value measurements are also incorporated into the accounting for goodwill, long-lived assets, equity method investments, AROs, and in the valuation of business combinations and asset acquisitions. The fair value measurement guidance was also applied in estimating the fair value of preferred stock, long-term debt and RRBs. Changes in fair value of our derivative contracts are recorded as Regulatory Assets or Liabilities, as we recover the costs of these contracts in rates charged to customers. These valuations are sensitive to the prices of energy-related products in future years and assumptions made. We use quoted market prices when available to determine the fair value of financial instruments. When quoted prices in active markets for the same or similar instruments are not available, we value derivative contracts using models that incorporate both observable and unobservable inputs. Discounted cash flow valuations incorporate estimates of premiums or discounts, reflecting risk-adjusted profit that would be required by a market participant to arrive at an exit price, using available historical market transaction information. Valuations of derivative contracts also reflect our estimates of nonperformance risk, including credit risk. 46

Text of OCC-962 Attachment 5.pdf

Extracted from the file · 128 pages · 641,445 characters

Text of OCC-962 Attachment 4.pdf

Extracted from the file · 120 pages · 653,488 characters

Text of OCC-962 Attachment 3.pdf

Extracted from the file · 136 pages · 666,916 characters

Text of OCC-962 Attachment 2.pdf

Extracted from the file · 128 pages · 591,550 characters

Text of OCC-962 Attachment 1.pdf

Extracted from the file · 136 pages · 612,504 characters

Text of OCC-963 Attachment 8.pdf

Extracted from the file · 96 pages · 352,588 characters

Text of OCC-963 Attachment 7.pdf

Extracted from the file · 105 pages · 381,994 characters

Text of OCC-963 Attachment 6.pdf

Extracted from the file · 101 pages · 366,377 characters

Text of OCC-963 Attachment 5.pdf

Extracted from the file · 105 pages · 393,802 characters

Text of OCC-963 Attachment 4.pdf

Extracted from the file · 88 pages · 321,021 characters

Text of OCC-963 Attachment 3.pdf

Extracted from the file · 86 pages · 305,704 characters

Text of OCC-963 Attachment 2.pdf

Extracted from the file · 77 pages · 270,743 characters

Text of OCC-963 Attachment 1.pdf

Extracted from the file · 76 pages · 279,055 characters

As listed on the current system

Question(s) Answered 962, 963 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)