Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 962, 963

Files18

Search terms highlighted
Eversource rate increase is on 409 pages across 16 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
44 pages match

Text of OCC-962 Attachment 7.pdf

Extracted from the file · 144 pages · 700,506 characters

Text of OCC-962 Attachment 6.pdf

Extracted from the file · 136 pages · 685,692 characters

Text of OCC-962 Attachment 5.pdf

Extracted from the file · 128 pages · 641,445 characters

Text of OCC-962 Attachment 4.pdf

Extracted from the file · 120 pages · 653,488 characters

Text of OCC-962 Attachment 3.pdf

Extracted from the file · 136 pages · 666,916 characters

32 pages match
  1. Page 93 of 128Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 93 of 128 2017 Federal Legislation: On December 22, 2017, the Tax Cuts and Jobs Act became law, which amended existing federal tax rules and included numerous provisions that impacted corporations. In particular, the act reduced the U.S. federal corporate income tax rate from 35 percent to 21 percent effective January 1, 2018. For our regulated companies, the most significant changes are (1) the benefit of incurring a lower federal income tax expense and (2) the reduction in ADIT liabilities (now excess ADIT or EDIT), which are estimated to be approximately $2.8 billion and are included in regulatory liabilities as of December 31, 2019. In 2019, Eversource refunded $51.5 million ($7.9 million at CL&P, $31.5 million at NSTAR Electric, $5.6 million at PSNH, $1.4 million at Yankee Gas and $5.1 million at NSTAR Gas) to customers. See Note 2, "Regulatory Accounting," to the financial statements for further information. 2019 Federal Legislation: On December 20, 2019, the "Further Consolidated Appropriations Act, 2020," became law, which provided a one-year extension of the production tax credit or the investment tax credit for renewable wind projects under Section 45 of the Internal Revenue Code of 1986 on which construction begins before January 1, 2021. If construction begins on a qualifying wind project in 2020, the project will qualify for a production tax credit of $15 per MWh or an 18 percent investment tax credit. Carryforwards: The following table provides the amounts and expiration dates of state tax credit and loss carryforwards and federal tax credit and net operating loss carryforwards: As of December 31, 2019 (Millions of Dollars) Eversource Federal Net Operating Loss $ Federal Charitable Contribution State Net Operating Loss State Tax Credit State Charitable Contribution CL&P 19.8 $ — 65.5 NSTAR Electric PSNH 2018 Expiration Range Eversource $ — $ — $ — 2033 - 2037 — — — 2020 - 2022 NSTAR Electric CL&P 103.6 $ 2.2 Expiration Range — $ — $ — 2033 - 2037 — — — 2020 - 2022 168.1 122.3 — — — 2020 - 2038 2019 - 2024 148.9 107.0 — — — 2019 - 2038 9.9 — — — 2019 - 2023 9.6 — — — 2019 - 2023 — — 80.7 PSNH — — 2018 - 2023 In 2019, the company increased its valuation allowance reserve for state credits by $18.5 million ($14.2 million for CL&P), net of tax, to reflect an update for expired tax credits. In 2018, the Company increased its valuation allowance reserve for state credits by $5.2 million ($4.4 million for CL&P), net of tax, to reflect an update for expired tax credits. For 2019 and 2018, state credit and state loss carryforwards have been partially reserved by a valuation allowance of $43.0 million and $19.5 million (net of tax), respectively. Unrecognized Tax Benefits: A reconciliation of the activity in unrecognized tax benefits, all of which would impact the effective tax rate if recognized, is as follows: Eversource (Millions of Dollars) Balance as of January 1, 2017 Gross Increases - Current Year $ CL&P 48.4 $ 11.4 Gross Decreases - Prior Year 15.3 4.7 (0.9) Lapse of Statute of Limitations (0.5) (7.2) Balance as of December 31, 2017 Gross Increases - Current Year 51.7 9.2 Lapse of Statute of Limitations (8.5) Gross Decreases - Prior Year (1.4) 18.1 3.2 (6.5) (0.9) (2.2) Balance as of December 31, 2018 Gross Increases - Current Year 45.9 12.1 18.2 4.0 Lapse of Statute of Limitations (6.4) (2.4) Gross Increases - Prior Year Balance as of December 31, 2019 3.4 $ 3.3 55.0 $ 23.1 Interest and Penalties: Interest on uncertain tax positions is recorded and generally classified as a component of Other Interest Expense on the statements of income. However, when resolution of uncertainties results in the Company receiving interest income, any related interest benefit is recorded in Other Income, Net on the statements of income. No penalties have been recorded. The amount of interest expense/(income) on uncertain tax positions recognized and the related accrued interest payable/(receivable) are as follows: Other Interest Expense/(Income) Accrued Interest Expense For the Years Ended December 31, (Millions of Dollars) Eversource $ 2019 — $ 2018 (1.7) $ 81 As of December 31, 2017 — $ 2019 0.1 $ 2018 0.1
  2. Page 94 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 94 of 128 Tax Positions: During 2019 and 2018, Eversource did not resolve any of its uncertain tax positions. Open Tax Years: The following table summarizes Eversource, CL&P, NSTAR Electric and PSNH's tax years that remain subject to examination by major tax jurisdictions as of December 31, 2019: Description Tax Years Federal Connecticut 2019 2016 - 2019 Massachusetts 2016 - 2019 New Hampshire 2017 - 2019 Eversource does not estimate to have an earnings impact related to unrecognized tax benefits during the next twelve months. 13. COMMITMENTS AND CONTINGENCIES A. Environmental Matters Eversource, CL&P, NSTAR Electric and PSNH are subject to environmental laws and regulations intended to mitigate or remove the effect of past operations and improve or maintain the quality of the environment. These laws and regulations require the removal or the remedy of the effect on the environment of the disposal or release of certain specified hazardous substances at current and former operating sites. Eversource, CL&P, NSTAR Electric and PSNH have an active environmental auditing and training program and each believes it is substantially in compliance with all enacted laws and regulations. Environmental reserves are accrued when assessments indicate it is probable that a liability has been incurred and an amount can be reasonably estimated. The approach used estimates the liability based on the most likely action plan from a variety of available remediation options, including no action required or several different remedies ranging from establishing institutional controls to full site remediation and monitoring. These liabilities are estimated on an undiscounted basis and do not assume that the amounts are recoverable from insurance companies or other third parties. The environmental reserves include sites at different stages of discovery and remediation and do not include any unasserted claims. These reserve estimates are subjective in nature as they take into consideration several different remediation options at each specific site. The reliability and precision of these estimates can be affected by several factors, including new information concerning either the level of contamination at the site, the extent of Eversource's, CL&P's, NSTAR Electric's and PSNH's responsibility for remediation or the extent of remediation required, recently enacted laws and regulations or changes in cost estimates due to certain economic factors. It is possible that new information or future developments could require a reassessment of the potential exposure to required environmental remediation. As this information becomes available, management will continue to assess the potential exposure and adjust the reserves accordingly. The amounts recorded as environmental reserves are included in Other Current Liabilities and Other Long-Term Liabilities on the balance sheets and represent management's best estimate of the liability for environmental costs, and take into consideration site assessment, remediation and long-term monitoring costs. The environmental reserves also take into account recurring costs of managing hazardous substances and pollutants, mandated expenditures to remediate contaminated sites and any other infrequent and non-recurring clean-up costs. A reconciliation of the activity in the environmental reserves is as follows: Eversource (Millions of Dollars) Balance as of January 1, 2018 Additions $ 54.9 $ 23.5 Payments/Reductions Balance as of December 31, 2019 (10.2) 5.7 — (1.5) (0.3) (3.4) (0.7) 5.4 7.0 10.9 0.5 11.4 $ 8.0 $ (1.0) 81.0 $ PSNH 2.7 $ 9.7 (1.2) 64.7 26.5 $ NSTAR Electric 4.7 $ 1.9 (13.7) Balance as of December 31, 2018 Additions Payments/Reductions CL&P 5.4 2.8 7.5 The number of environmental sites for which remediation or long-term monitoring, preliminary site work or site assessment is being performed are as follows: Eversource 2019 2018 CL&P 57 60 NSTAR Electric 15 15 15 16 PSNH 9 9 The increase in the reserve balance was due primarily to changes in cost estimates at certain MGP sites at the natural gas companies, at CL&P and at PSNH, for which additional remediation will be required. 82
  3. Page 95 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 95 of 128 Included in the number of sites and reserve amounts above are former MGP sites that were operated several decades ago and manufactured natural gas from coal and other processes, which resulted in certain by-products remaining in the environment that may pose a potential risk to human health and the environment, for which Eversource may have potential liability. The reserve balances related to these former MGP sites were $67.9 million and $50.1 million as of December 31, 2019 and 2018, respectively, and related primarily to the natural gas business segment. As of December 31, 2019, for 6 environmental sites (1 for CL&P) that are included in the Company's reserve for environmental costs, the information known and the nature of the remediation options allow for the Company to estimate the range of losses for environmental costs. As of December 31, 2019, $35.9 million (including $0.4 million for CL&P) had been accrued as a liability for these sites, which represents the low end of the range of the liabilities for environmental costs. Management believes that additional losses of up to approximately $35 million ($0.5 million at CL&P) may be incurred in executing current remediation plans for these sites. As of December 31, 2019, for 15 environmental sites (7 for CL&P and 4 for NSTAR Electric) that are included in the Company's reserve for environmental costs, management cannot reasonably estimate the exposure to loss in excess of the reserve, or range of loss, as these sites are under investigation and/or there is significant uncertainty as to what remedial actions, if any, the Company may be required to undertake. As of December 31, 2019, $7.4 million (including $2.3 million for CL&P and $1.9 million for NSTAR Electric) had been accrued as a liability for these sites. As of December 31, 2019, for the remaining 36 environmental sites (including 7 for CL&P, 11 for NSTAR Electric and 9 for PSNH) that are included in the Company's reserve for environmental costs, the $37.7 million accrual (including $8.7 million for CL&P, $6.1 million for NSTAR Electric and $7.5 million for PSNH) represents management's best estimate of the probable liability and no additional loss is anticipated at this time. PSNH, NSTAR Gas and Yankee Gas have rate recovery mechanisms for MGP related environmental costs, therefore, changes in their respective environmental reserves do not impact Net Income. CL&P is allowed to defer certain environmental costs for future recovery. NSTAR Electric does not have a separate environmental cost recovery regulatory mechanism. B. Long-Term Contractual Arrangements Estimated Future Annual Costs: The estimated future annual costs of significant executed, non-cancelable, long-term contractual arrangements in effect as of December 31, 2019 are as follows: Eversource 2020 (Millions of Dollars) Renewable Energy Purchased Power and Capacity $ Peaker CfDs Total $ 2022 2023 2024 Thereafter Total 594.3 $ 69.0 651.7 $ 75.1 629.1 $ 81.6 624.8 $ 75.9 3,590.6 $ 71.5 6,705.1 446.6 266.2 255.3 202.8 166.7 165.7 1,093.3 2,150.0 998.8 $ 941.6 $ 946.5 $ 897.5 $ 881.9 $ 4,785.2 $ 9,451.5 22.4 Natural Gas Procurement Transmission Support Commitments 2021 614.6 $ 73.5 22.1 23.0 16.9 — — 20.1 — 15.5 — 29.8 — 127.7 22.1 CL&P 2020 (Millions of Dollars) Renewable Energy Purchased Power and Capacity $ Peaker CfDs Transmission Support Commitments Total 2021 2023 2024 Thereafter 457.3 $ 69.8 459.6 $ 65.3 514.4 $ 71.4 516.2 78.0 517.4 72.9 2,790.6 $ 55.5 8.7 — — — — — 22.4 $ 2022 558.2 $ 23.0 16.9 547.9 $ 602.7 $ 20.1 614.3 $ 15.5 605.8 $ 29.8 2,875.9 $ Total 5,255.5 412.9 127.7 8.7 5,804.8 NSTAR Electric 2020 (Millions of Dollars) 2021 2022 2023 2024 Thereafter Total Renewable Energy Purchased Power and Capacity $ 95.5 $ 3.1 91.2 $ 3.1 91.4 $ 3.1 66.6 $ 3.0 63.8 $ 3.0 418.1 $ 16.0 826.6 31.3 Total $ 107.3 $ 94.3 $ 94.5 $ 69.6 $ 66.8 $ 434.1 $ 866.6 Transmission Support Commitments 8.7 — — — — — 8.7 PSNH 2020 (Millions of Dollars) 2021 2022 2023 2024 Thereafter Total Renewable Energy Purchased Power and Capacity $ 61.8 $ 0.6 43.5 $ 0.6 45.9 $ 0.6 46.3 $ 0.6 43.6 $ — 381.9 $ — 623.0 2.4 Total $ 67.1 $ 44.1 $ 46.5 $ 46.9 $ 43.6 $ 381.9 $ 630.1 Transmission Support Commitments 4.7 — — — — — 4.7 Renewable Energy: Renewable energy contracts include non-cancellable commitments under contracts of CL&P, NSTAR Electric and PSNH for the purchase of energy and capacity from renewable energy facilities. Such contracts extend through 2039 for CL&P, 2040 for NSTAR Electric and 2033 for PSNH. 83
  4. Page 96 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 96 of 128 On December 28, 2018, under Public Act 17-3, "An Act Concerning Zero Carbon Procurement," DEEP selected the Millstone Nuclear Power Station generation facility and Seabrook Nuclear Power Plant, along with smaller generation facilities, in DEEP’s zero-carbon request for proposal. CL&P and UI were directed by DEEP to enter into ten-year contracts to purchase a combined total of approximately 9 million MWh annually from the Millstone generation facility. On March 15, 2019, CL&P and UI each signed a ten-year contract with the owner of Millstone Nuclear Power Station in order to purchase a combined amount of approximately 50 percent of the facility's output (approximately 40 percent by CL&P). The Millstone Nuclear Power Station has a 2,112 MW nameplate capacity. PURA approved the contracts on September 18, 2019. Energy deliveries and payments under these contracts began in the fourth quarter of 2019. CL&P and UI were also directed by DEEP to enter into eight-year contracts to purchase a combined amount of approximately 18 percent of the facility's output (approximately 15 percent by CL&P), from the Seabrook Nuclear Power Plant beginning January 1, 2022. The Seabrook Nuclear Power Plant has an approximate 1,250 MW nameplate capacity. On November 22, 2019, CL&P and UI each signed an eight-year contract with the owner of the Seabrook Nuclear Power Plant. PURA approved the contracts on November 27, 2019. The total estimated cost of the Millstone Nuclear Power Station and Seabrook Nuclear Power Plant energy purchase contracts are $4.1 billion and are reflected in the table above. CL&P sells the energy purchased under these contracts into the market and uses the proceeds from these energy sales to offset the contract costs. As the net costs under these contracts are recovered from customers in future rates, the contracts do not have an impact on the net income of CL&P. These new contracts do not meet the definition of a derivative, and accordingly, the costs of these contracts are being accounted for as incurred. The contractual obligations table above does not include long-term commitments signed by CL&P and NSTAR Electric, as required by the PURA and DPU, respectively, for the purchase of renewable energy and related products that are contingent on the future construction of energy facilities. Purchased Power and Capacity: These contracts include capacity CfDs of CL&P through 2026, and various IPP contracts or purchase obligations for electricity which extend through 2024 for CL&P, 2031 for NSTAR Electric and 2023 for PSNH. CL&P, along with UI, has three capacity CfDs for a total of approximately 676 MW of capacity consisting of two generation units and one demand response project. The capacity CfDs extend through 2026 and obligate both CL&P and UI to make or receive payments on a monthly basis to or from the generation facilities based on the difference between a set contractual capacity price and the capacity market prices received by the generation facilities in the ISO-NE capacity markets. CL&P has a sharing agreement with UI, whereby UI shares 20 percent of the costs and benefits of these contracts. CL&P's portion of the costs and benefits of these contracts will be paid by, or refunded to, CL&P's customers. The contractual obligations table above does not include CL&P's, NSTAR Electric's or PSNH's standard/basic service contracts for the purchase of energy supply, the amounts of which vary with customers' energy needs. Peaker CfDs: CL&P, along with UI, has three peaker CfDs for a total of approximately 500 MW of peaking capacity through 2042. CL&P has a sharing agreement with UI, whereby CL&P is responsible for 80 percent and UI for 20 percent of the net costs or benefits of these CfDs. The Peaker CfDs pay the generation facility owner the difference between capacity, forward reserve and energy market revenues and a cost-of-service payment stream for 30 years. The ultimate cost or benefit to CL&P under these contracts will depend on the costs of plant operation and the prices that the projects receive for capacity and other products in the ISO-NE markets. CL&P's portion of the amounts paid or received under the Peaker CfDs will be recoverable from, or refunded to, CL&P's customers. Natural Gas Procurement: Eversource's natural gas distribution businesses have long-term contracts for the purchase, transportation and storage of natural gas as part of its portfolio of supplies, which extend through 2038. Transmission Support Commitments: Along with other New England utilities, CL&P, NSTAR Electric and PSNH entered into agreements in 1985 to support transmission and terminal facilities that were built to import electricity from the Hydro-Québec system in Canada. CL&P, NSTAR Electric and PSNH are obligated to pay, over a 30-year period ending in 2020, their proportionate shares of the annual operation and maintenance expenses and capital costs of those facilities. Future transmission support agreements beginning in the second half of 2020 are under negotiation. The total costs incurred under these agreements were as follows: Eversource For the Years Ended December 31, 2019 (Millions of Dollars) Renewable Energy Purchased Power and Capacity 2018 2017 320.8 $ 62.1 218.5 $ 72.0 235.5 103.9 Natural Gas Procurement 448.5 432.4 377.0 Coal, Wood and Other (1) — — 47.7 Peaker CfDs Transmission Support Commitments $ 13.0 20.9 21.8 23.4 84 38.7 19.8
  5. Page 97 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 97 of 128 For the Years Ended December 31, CL&P (Millions of Dollars) Renewable Energy Purchased Power and Capacity Peaker CfDs Transmission Support Commitments Coal, Wood and Other (1) (1) $ 2019 2018 2017 NSTAR Electric NSTAR Electric NSTAR Electric PSNH 160.6 $ 50.4 89.9 $ 5.1 70.3 6.6 8.6 8.6 4.6 13.0 — — — CL&P $ — 89.8 $ 4.4 65.5 18.2 9.2 9.2 5.0 20.9 — PSNH 63.2 $ 49.4 — — — CL&P $ — 123.7 $ 4.0 60.8 18.9 7.8 7.8 4.2 38.7 — PSNH 51.0 $ 81.0 — — — — 47.7 PSNH previously entered into various arrangements for the purchase of coal, wood and the transportation services for fuel supply for its electric generating assets. In 2018, Eversource and PSNH completed the sales of PSNH's thermal and hydroelectric generation assets. Upon sale, the remaining future contractual obligations were transferred to the respective buyers. See Note 14, "Generation Asset Sale," for further information. C. Spent Nuclear Fuel Obligations - Yankee Companies CL&P, NSTAR Electric and PSNH have plant closure and fuel storage cost obligations to the Yankee Companies, which have each completed the physical decommissioning of their respective nuclear power facilities and are now engaged in the long-term storage of their spent fuel. The Yankee Companies fund these costs through litigation proceeds received from the DOE and, to the extent necessary, through wholesale, FERCapproved rates charged under power purchase agreements with several New England utilities, including CL&P, NSTAR Electric and PSNH. CL&P, NSTAR Electric and PSNH, in turn recover these costs from their customers through state regulatory commission-approved retail rates. The Yankee Companies collect amounts that management believes are adequate to recover the remaining plant closure and fuel storage cost estimates for the respective plants. Management believes CL&P and NSTAR Electric will recover their shares of these obligations from their customers. PSNH has recovered its total share of these costs from its customers. Spent Nuclear Fuel Litigation: The Yankee Companies have filed complaints against the DOE in the Court of Federal Claims seeking monetary damages resulting from the DOE's failure to accept delivery of, and provide for a permanent facility to store, spent nuclear fuel pursuant to the terms of the 1983 spent fuel and highlevel waste disposal contracts between the Yankee Companies and the DOE. The court previously awarded the Yankee Companies damages for Phases I, II and III of litigation resulting from the DOE's failure to meet its contractual obligations. These Phases covered damages incurred in the years 1998 through 2012, and the awarded damages have been received by the Yankee Companies with certain amounts of the damages refunded to their customers. DOE Phase IV Damages - On May 22, 2017, each of the Yankee Companies filed a fourth set of lawsuits against the DOE in the Court of Federal Claims. The Yankee Companies sought monetary damages totaling $104.4 million for CYAPC, YAEC and MYAPC, resulting from the DOE's failure to begin accepting spent nuclear fuel for disposal covering the years from 2013 to 2016 (“DOE Phase IV”). On February 21, 2019, the Yankee Companies received a partial summary judgment and partial final judgment in their favor for the undisputed amount of monetary damages of $103.2 million. The court awarded CYAPC, YAEC, and MYAPC damages of $40.7 million, $28.1 million and $34.4 million, respectively. The DOE did not appeal the court's judgment and the decision became final on April 23, 2019. On June 12, 2019, each of the Yankee Companies received the damages proceeds. On June 12, 2019, the court accepted an offer of judgment in the amount of $0.5 million to settle the disputed amount of approximately $1 million in Phase IV contested damages. The Yankee Companies received the $0.5 million payment in July 2019. CYAPC's and YAEC's proceeds received were classified as operating activities on the Eversource consolidated statement of cash flows. In September 2019, the Yankee Companies made a required informational filing with FERC as to the use of proceeds, for which approval was received in the fourth quarter of 2019. In December 2019, YAEC and MYAPC returned proceeds of $5.4 million and $21.0 million, respectively, to its member companies, of which the Eversource utilities (CL&P, NSTAR Electric and PSNH) received a total of $2.8 million from YAEC and $5.0 million from MYAPC. The Eversource utilities will ultimately refund these proceeds to utility customers. Also, in December 2019, CYAPC paid $29.0 million to the DOE to partially settle its pre-1983 spent nuclear fuel obligation. D. Guarantees and Indemnifications In the normal course of business, Eversource parent provides credit assurances on behalf of its subsidiaries, including CL&P, NSTAR Electric and PSNH, in the form of guarantees. Management does not anticipate a material impact to net income or cash flows as a result of these various guarantees and indemnifications. The following table summarizes Eversource parent's exposure to guarantees and indemnifications of its subsidiaries and affiliates to external parties as of December 31, 2019: Company Various Surety Bonds (1) Rocky River Realty Company and Eversource Service Lease Payments for Real Estate Sunrise Wind LLC Offshore Wind (2) Bay State Wind LLC (1) Description Real Estate Purchase Maximum Exposure (in millions) $ Expiration Dates 29.2 2020 - 2021 2.5 2020 6.5 2.2 2024 — Surety bond expiration dates reflect termination dates, the majority of which will be renewed or extended. Certain surety bonds contain credit ratings triggers that would require Eversource parent to post collateral in the event that the unsecured debt credit ratings of Eversource parent are downgraded. 85
  6. Page 98 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 98 of 128 (2) On October 25, 2019, Eversource parent issued a guaranty on behalf of its 50 percent-owned affiliate, Sunrise Wind LLC, whereby Eversource parent will guaranty Sunrise Wind LLC's performance of certain obligations, in an amount not to exceed $15.4 million, under the Offshore Wind Renewable Energy Certificate Purchase and Sale Agreement (the Agreement). The Agreement was executed on October 25, 2019, by and between NYSERDA and Sunrise Wind LLC. Obligations of Eversource parent under the guaranty expire at such time as the guaranteed obligations have been fully performed. The Company regularly reviews performance risk under this arrangement, and in the event it becomes probable that Eversource parent will be required to perform under the guarantee, the amount of probable payment will be recorded. As of December 31, 2019, the fair value of the guarantee was immaterial. Eversource parent issued a guaranty on behalf of its subsidiary, NPT, under which, beginning at the time the Northern Pass Transmission line would go into commercial operation, Eversource parent would guarantee the financial obligations of NPT under the TSA with HQ in an amount not to exceed $25 million. Eversource parent's obligations under the guaranty expire upon the full, final and indefeasible payment of the guaranteed obligations. In the second quarter of 2019, Eversource concluded that construction of the NPT project was no longer probable. For further information regarding the impairment of NPT, see Note 1D, "Summary of Significant Accounting Policies - Impairment of Northern Pass Transmission," to the financial statements. While this guaranty is currently outstanding, it is expected to be extinguished in connection with the final dissolution of NPT. E. FERC ROE Complaints Four separate complaints were filed at the FERC by combinations of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties (collectively, the Complainants). In each of the first three complaints, filed on October 1, 2011, December 27, 2012, and July 31, 2014, respectively, the Complainants challenged the NETOs' base ROE of 11.14 percent that had been utilized since 2005 and sought an order to reduce it prospectively from the date of the final FERC order and for the separate 15-month complaint periods. In the fourth complaint, filed April 29, 2016, the Complainants challenged the NETOs' base ROE billed of 10.57 percent and the maximum ROE for transmission incentive (incentive cap) of 11.74 percent, asserting that these ROEs were unjust and unreasonable. The ROE originally billed during the period October 1, 2011 (beginning of the first complaint period) through October 15, 2014 consisted of a base ROE of 11.14 percent and incentives up to 13.1 percent. On October 16, 2014, the FERC set the base ROE at 10.57 percent and the incentive cap at 11.74 percent for the first complaint period. This was also effective for all prospective billings to customers beginning October 16, 2014. This FERC order was vacated on April 14, 2017 by the U.S. Court of Appeals for the D.C. Circuit (the Court). All amounts associated with the first complaint period have been refunded, which totaled $38.9 million (pre-tax and excluding interest) at Eversource and reflected both the base ROE and incentive cap prescribed by the FERC order. The refund consisted of $22.4 million for CL&P, $13.7 million for NSTAR Electric and $2.8 million for PSNH. Eversource has recorded a reserve of $39.1 million (pre-tax and excluding interest) for the second complaint period as of December 31, 2019. This reserve represents the difference between the billed rates during the second complaint period and a 10.57 percent base ROE and 11.74 percent incentive cap. The reserve consisted of $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH as of December 31, 2019. On October 16, 2018, FERC issued an order on all four complaints describing how it intends to address the issues that were remanded by the Court. FERC proposed a new framework to determine (1) whether an existing ROE is unjust and unreasonable and, if so, (2) how to calculate a replacement ROE. Initial briefs were filed by the NETOs, Complainants and FERC Trial Staff on January 11, 2019 and reply briefs were filed on March 8, 2019. The NETOs' brief was supportive of the overall ROE methodology determined in the October 16, 2018 order provided the FERC does not change the proposed methodology or alter its implementation in a manner that has a material impact on the results. The FERC order included illustrative calculations for the first complaint using FERC's proposed frameworks with financial data from that complaint. Those illustrative calculations indicated that for the first complaint period, for the NETOs, which FERC concludes are of average financial risk, the preliminary just and reasonable base ROE is 10.41 percent and the preliminary incentive cap on total ROE is 13.08 percent. If the results of the illustrative calculations were included in a final FERC order for each of the complaint periods, then a 10.41 percent base ROE and a 13.08 percent incentive cap would not have a significant impact on our financial statements for all of the complaint periods. These preliminary calculations are not binding and do not represent what we believe to be the most likely outcome of a final FERC order. On November 21, 2019, FERC issued an order concerning the transmission ROEs for the Midcontinent ISO transmission owners (MISO). In that order, FERC adopted another new methodology for determining base ROEs for MISO, which differed significantly from the methodology and framework set forth in its October 16, 2018 FERC order on the NETOs’ ROE dockets. On December 23, 2019, the NETOs filed a Supplemental Paper Hearing Brief and a Motion to supplement the record in the NETO ROE dockets to respond to the new methodology proposed in the MISO order, as there is uncertainty to whether it may be applied to the NETOs’ cases. On January 21, 2020, the FERC issued an order granting rehearing for further consideration to give the FERC more time to act on the substantive issues of the MISO ROE proceedings. Further changes to the methodology by FERC are possible as a result of the arguments in both the MISO and NETO proceedings. Given the significant uncertainty relating to the October 2018 FERC order, the November 2019 FERC order to MISO, and the FERC's rehearing of the MISO order, the Company is unable to predict the potential effect of the MISO order on the NETO complaints or the outcome of the four complaints and concluded that there is no reasonable basis for a change to the reserve or recognized ROEs for any of the complaint periods at this time. Further, the Company cannot reasonably estimate a range of gain or loss for any of the four complaint proceedings. Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order. 86
  7. Page 99 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 99 of 128 A change of 10 basis points to the base ROE used to establish the reserves would impact Eversource’s after-tax earnings by an average of approximately $3 million for each of the four 15-month complaint periods. F. Eversource and NSTAR Electric Boston Harbor Civil Action On July 15, 2016, the United States Attorney on behalf of the United States Army Corps of Engineers filed a civil action in the United States District Court for the District of Massachusetts under provisions of the Rivers and Harbors Act of 1899 and the Clean Water Act against NSTAR Electric, HEEC, and the Massachusetts Water Resources Authority (together with NSTAR Electric and HEEC, the Defendants). The action alleged that the Defendants failed to comply with certain permitting requirements related to the placement of the HEEC-owned electric distribution cable beneath Boston Harbor. The action sought an order to compel HEEC to comply with cable depth requirements in the United States Army Corps of Engineers' permit or alternatively to remove the electric distribution cable and cease unauthorized work in U.S. waterways. The action also sought civil penalties and other costs. The parties reached a settlement pursuant to which HEEC agreed to install a new 115kV distribution cable across Boston Harbor to Deer Island, utilizing a different route, and remove portions of the existing cable. Upon the installation and completion of the new cable and the removal of the portions of the existing cable, all issues surrounding the current permit from the United States Army Corps of Engineers are expected to be resolved, and such litigation is expected to be dismissed with prejudice. Construction of the new distribution cable was completed in August 2019 and removal of the portions of the existing cable was completed in January 2020. NSTAR Electric agreed to provide a rate base credit of $17.5 million to the Massachusetts Water Resources Authority for the new cable. This negotiated credit resulted in the initial $17.5 million of construction costs on the new cable being expensed as incurred, all of which was fully expensed in 2018. In connection with the new cable that was placed into service, a corresponding ARO was recognized for approximately $32 million within Other Long-Term Liabilities on the Eversource and NSTAR Electric balance sheets as of December 31, 2019. For further information on the ARO, see Note 7, "Asset Retirement Obligations," to the financial statements. G. Litigation and Legal Proceedings Eversource, including CL&P, NSTAR Electric and PSNH, are involved in legal, tax and regulatory proceedings regarding matters arising in the ordinary course of business, which involve management's assessment to determine the probability of whether a loss will occur and, if probable, its best estimate of probable loss. The Company records and discloses losses when these losses are probable and reasonably estimable, and discloses matters when losses are probable but not estimable or when losses are reasonably possible. Legal costs related to the defense of loss contingencies are expensed as incurred. 14. GENERATION ASSET SALE On January 10, 2018, PSNH completed the sale of its thermal generation assets. The original purchase price of $175 million was adjusted to reflect working capital adjustments, closing date adjustments and proration of taxes and fees prior to closing. As a result of these adjustments, net proceeds from the sale of the thermal assets totaled $116.8 million. On August 26, 2018, PSNH completed the sale of its hydroelectric generation assets. The original purchase price of $83 million was adjusted to reflect contractual adjustments totaling $5.8 million, resulting in net proceeds of $77.2 million. The difference between the carrying value of the hydroelectric generation assets and the sale proceeds resulted in a gain of $17.3 million. An estimated gain from the sale of these assets was included as an offset to the total remaining costs associated with the sale of generation assets that were securitized on May 8, 2018. On May 8, 2018, PSNH Funding issued $635.7 million of securitized RRBs to finance PSNH's unrecovered remaining costs resulting from the divestiture of its generation assets, which included the deferred costs resulting from the sale of the thermal generation assets. These RRBs are secured by a non-bypassable charge recoverable from PSNH customers. PSNH recorded regulatory assets and other deferred costs in connection with the generation asset divestiture and the securitization of remaining costs, which are probable of recovery through collection of the nonbypassable charge. As of December 31, 2019 and 2018, unamortized securitized stranded costs totaled $565.3 million and $608.4 million, respectively, and are included in Regulatory Assets on the Eversource and PSNH balance sheets. For further information on the securitized RRB issuance, see Note 10, "Rate Reduction Bonds and Variable Interest Entities." On November 27, 2019, PSNH filed a motion for the commencement of audit of divestiture-related costs. PSNH’s actual balance of costs eligible for recovery as divestiture-related costs is $654.0 million, which is above the $635.7 million amount securitized in May 2018. PSNH proposed to recover this balance through the SCRC tracker mechanism and believes the amount deferred is probable of recovery. These deferred costs are recorded in Other Long-Term Assets on the balance sheet. For the year ended December 31, 2018, pre-tax income associated with the hydroelectric assets prior to the sale on August 26, 2018 was $9.9 million. For the year ended December 31, 2017, pre-tax income associated with PSNH's generation assets was $60.0 million. As of December 31, 2018, all generation assets had been sold. 87
  8. Page 100 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 100 of 128 15. LEASES Eversource, including CL&P, NSTAR Electric and PSNH, has entered into lease agreements as a lessee for the use of land, office space, service centers, vehicles, information technology, and equipment. These lease agreements are classified as either finance or operating leases and the liability and right-of-use asset are recognized on the balance sheet at lease commencement. Leases with an initial term of 12 months or less are not recorded on the balance sheet and are recognized as lease expense on a straight-line basis over the lease term. Eversource determines whether or not a contract contains a lease based on whether or not it provides Eversource with the use of a specifically identified asset for a period of time, as well as both the right to direct the use of that asset and receive the significant economic benefits of the asset. Eversource has elected the practical expedient to not separate non-lease components from lease components and instead to account for both as a single lease component, with the exception of the information technology asset class where the lease and non-lease components are separated. The provisions of Eversource, CL&P, NSTAR Electric and PSNH lease agreements contain renewal options. The renewal options range from one year to twenty years. The renewal period is included in the measurement of the lease liability if it is reasonably certain that Eversource will exercise these renewal options. For leases entered into or modified after the January 1, 2019 implementation date, the discount rate utilized for classification and measurement purposes as of the inception date of the lease is based on each company's collateralized incremental interest rate to borrow over a comparable term for an individual lease because the rate implicit in the lease is not determinable. CL&P and PSNH entered into certain contracts for the purchase of energy that qualify as leases. These contracts do not have minimum lease payments and therefore are not recognized as a lease liability on the balance sheet and are not reflected in the future minimum lease payments table below. Expense related to these contracts is included as variable lease cost in the table below. The expense and long-term obligation for these contracts are also included in Note 13B, "Commitments and Contingencies - Long-Term Contractual Arrangements," to the financial statements. The components of lease cost, prior to amounts capitalized, are as follows: For the Year Ended December 31, 2019 Eversource (Millions of Dollars) Financing Lease Cost: Amortization of Right-of-use-Assets Interest on Lease Liabilities $ Total Finance Lease Cost Operating Lease Cost Variable Lease Cost Total Lease Cost 1.7 $ 1.2 2.9 11.7 $ 60.5 75.1 $ CL&P NSTAR Electric 0.7 $ 0.6 0.2 $ 0.1 0.8 3.4 0.1 0.1 0.6 1.3 0.5 13.3 — 15.1 $ PSNH 4.2 $ — 47.2 47.4 Operating lease rental payments charged to expense in 2018 and 2017 (which exclude CL&P's and PSNH's energy purchase contracts) were as follows: Eversource (Millions of Dollars) 2018 2017 $ 10.8 $ 10.5 CL&P NSTAR Electric 10.9 $ 11.7 11.8 $ 11.3 PSNH 2.5 3.3 Operating lease cost, net of the capitalized portion, is included in Operations and Maintenance (or Purchased Power, Fuel and Transmission expense for transmission segment leases) on the statements of income. Amortization of finance lease assets is included in Depreciation on the statements of income. Interest expense on finance leases is included in Interest Expense on the statements of income. 88
  9. Page 101 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 101 of 128 Supplemental balance sheet information related to leases is as follows: As of December 31, 2019 Balance Sheet Classification (Millions of Dollars) Operating Leases: Operating Lease Right-of-use-Assets, Net Operating Lease Liabilities Operating Lease Liabilities - Current Portion Operating Lease Liabilities - Long-Term Total Operating Lease Liabilities Finance Leases: Finance Lease Right-of-use-Assets, Net Finance Lease Liabilities Finance Lease Liabilities - Current Portion Finance Lease Liabilities - Long-Term Total Finance Lease Liabilities Eversource Other Long-Term Assets $ Other Current Liabilities $ CL&P NSTAR Electric 49.9 $ 0.7 $ 8.6 $ 0.5 $ $ 49.9 $ Property, Plant and Equipment, Net $ Other Current Liabilities $ Other Long-Term Liabilities Other Long-Term Liabilities 24.2 $ 0.4 0.7 $ 0.1 0.7 $ 24.2 $ 0.4 8.2 $ 1.9 $ 3.3 $ 0.9 2.4 $ 1.6 $ — $ 0.1 10.5 $ 3.0 $ 4.4 $ 0.9 41.3 0.2 8.1 $ PSNH 23.5 1.4 0.3 4.4 0.8 The finance lease payments that NSTAR Electric will make over the next twelve months are entirely interest-related, due to escalating payments. As such, none of the finance lease payments over the next twelve months will reduce the finance lease liability. Other information related to leases is as follows (in millions of dollars, unless otherwise noted): Eversource CL&P NSTAR Electric PSNH As of December 31, 2019 Weighted-Average Remaining Lease Term (Years): Operating Leases 12 Finance Leases 2 12 Weighted-Average Discount Rate (Percentage): Operating Leases 3.9% Finance Leases 20 2 2.5% 4.0% 9 4.1% 10.5% Eversource 9 22 3.7% 2.9% CL&P 3.5% NSTAR Electric PSNH For the Year Ended December 31, 2019 Cash Paid for Amounts Included in the Measurement of Lease Liabilities: Operating Cash Flows from Operating Leases $ Operating Cash Flows from Finance Leases 11.4 $ Financing Cash Flows from Finance Leases 0.4 $ Right-of-use-Assets Obtained in Exchange for New Operating Lease Liabilities Right-of-use-Assets Obtained in Exchange for New Finance Lease Liabilities 0.1 — 0.1 0.1 0.2 0.6 0.6 2.9 1.0 2.6 Supplemental Non-Cash Information on Lease Liabilities: 1.6 $ 1.2 1.4 2.0 — — — — Future minimum lease payments, excluding variable costs, under long-term leases, as of December 31, 2019 are as follows: Operating Leases (Millions of Dollars) Year Ending December 31, 2020 2021 Eversource $ 10.2 $ CL&P 0.6 $ 0.1 — 1.6 0.1 1.5 — 0.6 0.1 1.7 — 0.8 0.7 0.1 15.7 11.3 1.0 0.1 Thereafter 28.9 Present value of future minimum lease payments $ 49.9 $ 63.2 13.3 PSNH 2.0 $ — Future lease payments Less amount representing interest NSTAR Electric 3.4 $ 4.9 2.8 CL&P 0.1 $ 2023 2024 Eversource 1.8 $ 0.2 7.4 PSNH 0.5 $ 9.0 2022 Finance Leases NSTAR Electric 1.6 1.6 — 0.1 28.7 0.8 0.1 37.0 12.8 0.7 $ 24.2 $ 89 0.1 — 0.2 0.5 0.1 0.4 $ 2.9 0.8 13.1 22.5 12.0 10.5 $ 1.5 — — — 3.5 0.5 3.0 $ 0.6 0.6 12.6 4.4 $ 0.1 0.1 0.5 0.9
  10. Page 102 of 128

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 2 Page 102 of 128 At December 31, 2018, future minimum rental payments, excluding executory costs, such as property taxes, state use taxes, insurance, and maintenance were as follows: Operating Leases (Millions of Dollars) 2019 2020 Eversource $ 2021 Thereafter Future minimum lease payments 7.2 1.1 4.4 Capital Leases (Millions of Dollars) 2019 2020 1.2 4.7 0.5 74.6 $ 5.9 $ 32.7 $ 2021 CL&P Thereafter Future minimum lease payments Less amount representing interest Present value of future minimum lease payments 55.5 $ 2.2 29.5 PSNH 1.5 — 0.6 1.5 0.1 0.1 0.6 0.1 16.1 12.4 1.0 0.1 — 13.4 4.5 $ 3.7 $ 5.5 1.0 12.0 $ 0.1 0.1 0.5 — 13.9 0.3 NSTAR Electric 0.5 $ 0.5 25.8 13.8 $ 0.4 0.2 2.0 $ 2.0 0.7 0.4 3.1 3.4 $ 3.4 2.9 2022 0.5 0.4 5.3 0.2 Eversource $ 2023 PSNH 7.2 $ 6.0 8.7 2023 NSTAR Electric 1.5 $ 1.4 2022 16. CL&P 11.5 $ 9.8 0.5 0.9 FAIR VALUE OF FINANCIAL INSTRUMENTS The following methods and assumptions were used to estimate the fair value of each of the following financial instruments: Preferred Stock, Long-Term Debt and Rate Reduction Bonds: The fair value of CL&P's and NSTAR Electric's preferred stock is based upon pricing models that incorporate interest rates and other market factors, valuations or trades of similar securities and cash flow projections. The fair value of long-term debt and RRB debt securities is based upon pricing models that incorporate quoted market prices for those issues or similar issues adjusted for market conditions, credit ratings of the respective companies and treasury benchmark yields. The fair values provided in the table below are classified as Level 2 within the fair value hierarchy. Carrying amounts and estimated fair values are as follows: Eversource Carrying Amount (Millions of Dollars) As of December 31, 2019: Preferred Stock Not Subject to Mandatory Redemption Long-Term Debt $ Rate Reduction Bonds As of December 31, 2018: Preferred Stock Not Subject to Mandatory Redemption Long-Term Debt Rate Reduction Bonds 155.6 $ 14,098.2 583.3 $ 155.6 $ 13,086.1 635.7 CL&P Fair Value 162.0 $ 15,170.2 625.9 156.8 $ 13,154.9 645.8 Carrying Amount 116.2 $ 3,518.1 — 116.2 $ 3,254.0 — NSTAR Electric Fair Value 117.8 $ 4,058.0 — 113.8 $ 3,429.2 — Carrying Amount 43.0 $ 3,342.1 — 43.0 $ 2,944.8 — PSNH Fair Value 44.2 $ 3,659.9 — 43.0 $ 3,024.1 — Carrying Amount — $ 951.6 583.3 — $ 805.2 635.7 Fair Value — 1,005.7 625.9 — 819.5 645.8 Derivative Instruments and Marketable Securities: Derivative instruments and investments in marketable securities are carried at fair value. For further information, see Note 4, "Derivative Instruments," and Note 5, "Marketable Securities," to the financial statements. See Note 1I, "Summary of Significant Accounting Policies – Fair Value Measurements," for the fair value measurement policy and the fair value hierarchy. 90

Text of OCC-962 Attachment 1.pdf

Extracted from the file · 136 pages · 612,504 characters

Text of OCC-963 Attachment 8.pdf

Extracted from the file · 96 pages · 352,588 characters

Text of OCC-963 Attachment 7.pdf

Extracted from the file · 105 pages · 381,994 characters

Text of OCC-963 Attachment 6.pdf

Extracted from the file · 101 pages · 366,377 characters

Text of OCC-963 Attachment 5.pdf

Extracted from the file · 105 pages · 393,802 characters

Text of OCC-963 Attachment 4.pdf

Extracted from the file · 88 pages · 321,021 characters

Text of OCC-963 Attachment 3.pdf

Extracted from the file · 86 pages · 305,704 characters

Text of OCC-963 Attachment 2.pdf

Extracted from the file · 77 pages · 270,743 characters

Text of OCC-963 Attachment 1.pdf

Extracted from the file · 76 pages · 279,055 characters

As listed on the current system

Question(s) Answered 962, 963 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)