Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 962, 963

Files18

Search terms highlighted
Eversource rate increase is on 409 pages across 16 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
44 pages match

Text of OCC-962 Attachment 7.pdf

Extracted from the file · 144 pages · 700,506 characters

Text of OCC-962 Attachment 6.pdf

Extracted from the file · 136 pages · 685,692 characters

Text of OCC-962 Attachment 5.pdf

Extracted from the file · 128 pages · 641,445 characters

Text of OCC-962 Attachment 4.pdf

Extracted from the file · 120 pages · 653,488 characters

Text of OCC-962 Attachment 3.pdf

Extracted from the file · 136 pages · 666,916 characters

Text of OCC-962 Attachment 2.pdf

Extracted from the file · 128 pages · 591,550 characters

36 pages match
  1. Page 81 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 81 of 136 Effective January 1, 2018, local transmission service rates were updated to reflect the lower U.S. federal corporate income tax rate that resulted from the act. On June 28, 2018, FERC granted a one-time tariff waiver related to the federal corporate income tax rate so that effective June 1, 2018, the regional transmission service rates reflect the reduced federal corporate income tax rate at 21 percent. The refund of excess ADIT to customers will be made based on future guidance from FERC. FERC ROE Complaints: As of December 31, 2018, Eversource has a reserve established for the second ROE complaint in the pending FERC ROE complaint proceedings, which was recorded as a regulatory liability and is reflected within Regulatory Tracker Mechanisms in the table above. The cumulative pre-tax reserve (excluding interest) as of December 31, 2018 totaled $39.1 million for Eversource (including $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH). See Note 12E, "Commitments and Contingencies – FERC ROE Complaints," for further information on developments in the pending ROE complaint proceedings. 3. PROPERTY, PLANT AND EQUIPMENT AND ACCUMULATED DEPRECIATION Utility property, plant and equipment is recorded at original cost. Original cost includes materials, labor, construction overheads and AFUDC for regulated property. The cost of repairs and maintenance is charged to Operations and Maintenance expense as incurred. The following tables summarize property, plant and equipment by asset category: Eversource As of December 31, 2018 (Millions of Dollars) Distribution - Electric Distribution - Natural Gas Transmission - Electric Distribution - Water Solar 2017 15,071.1 $ 3,546.2 10,153.9 1,639.8 164.1 14,410.5 3,244.2 9,270.9 1,558.4 36.2 Utility Other (1) 30,575.1 778.6 28,520.2 693.7 Property, Plant and Equipment, Gross Less: Accumulated Depreciation Utility Other 31,353.7 29,213.9 (7,126.2) (336.7) (6,846.9) (286.9) Total Accumulated Depreciation Property, Plant and Equipment, Net Construction Work in Progress (7,462.9) 23,890.8 1,719.6 (7,133.8) 22,080.1 1,537.4 25,610.4 $ 23,617.5 Total Property, Plant and Equipment, Net $ $ As of December 31, CL&P (Millions of Dollars) Distribution - Electric Transmission - Electric Solar PSNH CL&P 2017 NSTAR Electric PSNH 6,176.4 $ 4,700.5 — 6,756.4 $ 4,065.9 164.1 2,178.6 $ 1,338.7 — 5,888.3 $ 4,239.9 — 6,479.0 $ 3,821.2 36.2 2,083.4 1,161.3 — Property, Plant and Equipment, Gross Less: Accumulated Depreciation 10,876.9 (2,302.6) 10,986.4 (2,702.0) 3,517.3 (772.9) 10,128.2 (2,239.0) 10,336.4 (2,550.2) 3,244.7 (751.8) Property, Plant and Equipment, Net Construction Work in Progress 8,574.3 335.4 8,284.4 510.3 2,744.4 135.7 7,889.2 381.8 7,786.2 460.3 2,492.9 149.4 8,909.7 $ 8,794.7 $ 2,880.1 $ 8,271.0 $ 8,246.5 $ 2,642.3 Total Property, Plant and Equipment, Net (1) $ 2018 NSTAR Electric $ These assets are primarily comprised of building improvements, computer software, hardware and equipment at Eversource Service. Depreciation of utility assets is calculated on a straight-line basis using composite rates based on the estimated remaining useful lives of the various classes of property (estimated useful life for PSNH distribution and the water utilities). The composite rates, which are subject to approval by the appropriate state regulatory agency, include a cost of removal component, which is collected from customers over the lives of the plant assets and is recognized as a regulatory liability. Depreciation rates are applied to property from the time it is placed in service. Upon retirement from service, the cost of the utility asset is charged to the accumulated provision for depreciation. The actual incurred removal costs are applied against the related regulatory liability. 68
  2. Page 82 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 82 of 136 The depreciation rates for the various classes of utility property, plant and equipment aggregate to composite rates as follows: 2018 (Percent) Eversource CL&P NSTAR Electric PSNH 2017 2.9% 2.8% 2.8% 2.8% 2016 3.0% 2.8% 2.9% 3.1% 3.0% 2.7% 2.9% 3.1% The following table summarizes average remaining useful lives of depreciable assets: As of December 31, 2018 Eversource (Years) Distribution - Electric Distribution - Natural Gas Transmission - Electric Distribution - Water Solar Other 4. CL&P 34.1 43.8 41.3 33.3 24.9 12.9 NSTAR Electric 35.4 — 38.0 — — — PSNH 33.7 — 45.3 — 24.9 — 32.3 — 42.9 — — — DERIVATIVE INSTRUMENTS The electric and natural gas companies purchase and procure energy and energy-related products, which are subject to price volatility, for their customers. The costs associated with supplying energy to customers are recoverable from customers in future rates. These regulated companies manage the risks associated with the price volatility of energy and energy-related products through the use of derivative and non-derivative contracts. Many of the derivative contracts meet the definition of, and are designated as, normal and qualify for accrual accounting under the applicable accounting guidance. The costs and benefits of derivative contracts that meet the definition of normal are recognized in Operating Expenses on the statements of income, as applicable, as electricity or natural gas is delivered. Derivative contracts that are not designated as normal are recorded at fair value as current or long-term Derivative Assets or Derivative Liabilities on the balance sheets. For the electric and natural gas companies, regulatory assets or regulatory liabilities are recorded to offset the fair values of derivatives, as contract settlement amounts are recovered from, or refunded to, customers in their respective energy supply rates. The gross fair values of derivative assets and liabilities with the same counterparty are offset and reported as net Derivative Assets or Derivative Liabilities, with current and long-term portions, on the balance sheets. The following table presents the gross fair values of contracts, categorized by risk type, and the net amounts recorded as current or long-term derivative assets or liabilities: As of December 31, 2018 (Millions of Dollars) Current Derivative Assets: CL&P Other Long-Term Derivative Assets: CL&P Current Derivative Liabilities: CL&P Other Long-Term Derivative Liabilities: CL&P Other (1) Fair Value Hierarchy Commodity Supply and Price Risk Management Netting 2017 Net Amount Recorded as a Derivative (1) Commodity Supply and Price Risk Management Netting Net Amount Recorded as a Derivative (1) Level 3 Level 2 $ 9.6 1.5 $ (3.4) (0.9) $ 6.2 0.6 $ 9.5 — $ (7.1) — $ 2.4 — Level 3 74.2 (2.3) 71.9 71.9 (5.3) 66.6 Level 3 Level 2 (55.1) — — — (55.1) — (54.4) (4.5) — — (54.4) (4.5) Level 3 Level 2 (379.5) — — — (379.5) — (376.9) (0.4) — — (376.9) (0.4) Amounts represent derivative assets and liabilities that Eversource elected to record net on the balance sheets. These amounts are subject to master netting agreements or similar agreements for which the right of offset exists. The business activities that result in the recognition of derivative assets also create exposure to various counterparties. As of December 31, 2018, Eversource's and CL&P's derivative assets were exposed to counterparty credit risk and contracted with investment grade entities. For further information on the fair value of derivative contracts, see Note 1I, "Summary of Significant Accounting Policies – Fair Value Measurements," and Note 1J, "Summary of Significant Accounting Policies – Derivative Accounting," to the financial statements. 69
  3. Page 83 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 83 of 136 Derivative Contracts at Fair Value with Offsetting Regulatory Amounts Commodity Supply and Price Risk Management: As required by regulation, CL&P, along with UI, has capacity-related contracts with generation facilities. CL&P has a sharing agreement with UI, with 80 percent of the costs or benefits of each contract borne by or allocated to CL&P and 20 percent borne by or allocated to UI. The combined capacity of these contracts is 787 MW. The capacity contracts extend through 2026 and obligate both CL&P and UI to make or receive payments on a monthly basis to or from the generation facilities based on the difference between a set capacity price and the capacity market price received in the ISO-NE capacity markets. In addition, CL&P has a contract to purchase 0.1 million MWh of energy per year through 2020. As of December 31, 2018 and 2017, Eversource had New York Mercantile Exchange ("NYMEX") financial contracts for natural gas futures in order to reduce variability associated with the price of 12.5 million and 9.5 million MMBtu of natural gas, respectively. For the years ended December 31, 2018, 2017 and 2016, there were losses of $25.0 million, $29.0 million and $125.5 million, respectively, deferred as regulatory costs, which reflect the change in fair value associated with Eversource's derivative contracts. Fair Value Measurements of Derivative Instruments Derivative contracts classified as Level 2 in the fair value hierarchy relate to the financial contracts for natural gas futures. Prices are obtained from broker quotes and are based on actual market activity. The contracts are valued using NYMEX natural gas prices. Valuations of these contracts also incorporate discount rates using the yield curve approach. The fair value of derivative contracts classified as Level 3 utilizes significant unobservable inputs. The fair value is modeled using income techniques, such as discounted cash flow valuations adjusted for assumptions related to exit price. Significant observable inputs for valuations of these contracts include energy and energy-related product prices in future years for which quoted prices in an active market exist. Fair value measurements categorized in Level 3 of the fair value hierarchy are prepared by individuals with expertise in valuation techniques, pricing of energy and energy-related products, and accounting requirements. The future power and capacity prices for periods that are not quoted in an active market or established at auction are based on available market data and are escalated based on estimates of inflation in order to address the full term of the contract. Valuations of derivative contracts using a discounted cash flow methodology include assumptions regarding the timing and likelihood of scheduled payments and also reflect non-performance risk, including credit, using the default probability approach based on the counterparty's credit rating for assets and the Company's credit rating for liabilities. Valuations incorporate estimates of premiums or discounts that would be required by a market participant to arrive at an exit price, using historical market transactions adjusted for the terms of the contract. The following is a summary of CL&P's Level 3 derivative contracts and the range of the significant unobservable inputs utilized in the valuations over the duration of the contracts: As of December 31, 2018 CL&P Capacity Prices Forward Reserve Range $ 4.30 0.75 — 7.44 — 1.78 2017 Period Covered per kW-Month per kW-Month 2022 - 2026 2019 - 2024 Range $ 5.00 1.00 — 8.70 — 2.00 Period Covered per kW-Month per kW-Month 2021 - 2026 2018 - 2024 Exit price premiums of 4.2 percent through 15.7 percent are also applied to these contracts and reflect the uncertainty and illiquidity premiums that would be required based on the most recent market activity available for similar type contracts. Significant increases or decreases in future capacity or forward reserve prices in isolation would decrease or increase, respectively, the fair value of the derivative liability. Any increases in risk premiums would increase the fair value of the derivative liability. Changes in these fair values are recorded as a regulatory asset or liability and do not impact net income. Valuations using significant unobservable inputs: The following table presents changes in the Level 3 category of derivative assets and derivative liabilities measured at fair value on a recurring basis. The derivative assets and liabilities are presented on a net basis. For the Years Ended December 31, CL&P (Millions of Dollars) 2018 Derivatives, Net: Fair Value as of Beginning of Period Net Realized/Unrealized Losses Included in Regulatory Assets and Liabilities Settlements Fair Value as of End of Period 70 2017 $ (362.3) $ (32.0) 37.8 (420.5) (9.5) 67.7 $ (356.5) $ (362.3)
  4. Page 84 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 84 of 136 5. MARKETABLE SECURITIES Eversource holds marketable securities that are primarily used to fund certain non-qualified executive benefits. The trusts that hold marketable securities are not subject to regulatory oversight by state or federal agencies. CYAPC and YAEC maintain legally restricted trusts, each of which holds marketable securities, to fund the spent nuclear fuel removal obligations of their nuclear fuel storage facilities. In December 2018, CYAPC paid $145 million from its trust to the DOE to partially settle the pre-1983 spent nuclear fuel obligation. Equity Securities: In accordance with new accounting guidance, unrealized gains and losses on equity securities are recorded in Other Income, Net on the statements of income. The fair value of equity securities subject to this guidance as of December 31, 2018 and 2017 was $44.0 million and $52.5 million, respectively. For the year ended December 31, 2018, there were unrealized losses of $4.3 million recorded in Other Income, Net related to these equity securities. For the year ended December 31, 2017, the unrealized gains and losses on these equity securities were recorded in Accumulated Other Comprehensive Income on the balance sheet. Dividend income is recorded in Other Income, Net when dividends are declared. Eversource's equity securities also include CYAPC's and YAEC's marketable securities held in spent nuclear fuel trusts, which had fair values of $200.0 million and $261.3 million as of December 31, 2018 and 2017, respectively. Unrealized gains and losses for these spent nuclear fuel trusts are subject to regulatory accounting treatment and are recorded in Marketable Securities with the corresponding offset to Other Long-Term Liabilities on the balance sheets, with no impact on the statements of income. Available-for-Sale Debt Securities: The following is a summary of the available-for-sale debt securities, which are recorded at fair value and are included in current and long-term Marketable Securities on the balance sheets. As of December 31, 2018 Eversource (Millions of Dollars) Debt Securities Amortized Cost $ 190.0 $ Pre-Tax Unrealized Gains 0.4 $ 2017 Pre-Tax Unrealized Losses Amortized Cost Fair Value (4.0) $ 186.4 $ Pre-Tax Unrealized Gains 284.9 $ 3.2 $ Pre-Tax Unrealized Losses (1.1) $ Fair Value 287.0 Eversource's debt securities include CYAPC's and YAEC's marketable securities held in spent nuclear fuel trusts in the amounts of $143.9 million and $242.3 million as of December 31, 2018 and 2017, respectively. Unrealized gains and losses on available-for-sale debt securities held in Eversource's non-qualified benefit trust are recorded in Accumulated Other Comprehensive Income. There have been no significant unrealized losses, other-than-temporary impairments, or credit losses for the years ended December 31, 2018 or 2017. Factors considered in determining whether a credit loss exists include the duration and severity of the impairment, adverse conditions specifically affecting the issuer, and the payment history, ratings and rating changes of the security. For asset-backed debt securities, underlying collateral and expected future cash flows are also evaluated. As of December 31, 2018, the contractual maturities of available-for-sale debt securities were as follows: Eversource (Millions of Dollars) Amortized Cost Fair Value Less than one year (1) One to five years Six to ten years Greater than ten years $ 30.5 $ 29.2 43.6 86.7 30.3 28.9 42.9 84.3 Total Debt Securities $ 190.0 $ 186.4 (1) Amounts in the Less than one year category include securities in the CYAPC and YAEC spent nuclear fuel trusts, which are restricted and are classified in long-term Marketable Securities on the balance sheets. Realized Gains and Losses: Realized gains and losses are recorded in Other Income, Net for Eversource's benefit trust and are offset in Other Long-Term Liabilities for CYAPC and YAEC. Eversource utilizes the specific identification basis method for the Eversource non-qualified benefit trust, and the average cost basis method for the CYAPC and YAEC spent nuclear fuel trusts to compute the realized gains and losses on the sale of marketable securities. For the year ended December 31, 2017, Eversource recognized net realized gains of $9.8 million on the sales of availablefor-sale securities held in the benefit trust. The proceeds of the sales were re-invested in the Eversource benefit trust. There were no similar sales for the year ended December 31, 2018. 71
  5. Page 85 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 85 of 136 Fair Value Measurements: The following table presents the marketable securities recorded at fair value on a recurring basis by the level in which they are classified within the fair value hierarchy: As of December 31, Eversource (Millions of Dollars) 2018 Level 1: Mutual Funds and Equities Money Market Funds 2017 $ 244.0 $ 25.9 313.8 23.3 Total Level 1 Level 2: U.S. Government Issued Debt Securities (Agency and Treasury) Corporate Debt Securities Asset-Backed Debt Securities Municipal Bonds Other Fixed Income Securities $ 269.9 $ 337.1 $ 79.6 $ 39.5 14.0 19.2 8.2 70.2 50.9 21.2 110.7 10.7 Total Level 2 Total Marketable Securities $ $ 160.5 $ 430.4 $ 263.7 600.8 U.S. government issued debt securities are valued using market approaches that incorporate transactions for the same or similar bonds and adjustments for yields and maturity dates. Corporate debt securities are valued using a market approach, utilizing recent trades of the same or similar instruments and also incorporating yield curves, credit spreads and specific bond terms and conditions. Asset-backed debt securities include collateralized mortgage obligations, commercial mortgage backed securities, and securities collateralized by auto loans, credit card loans or receivables. Asset-backed debt securities are valued using recent trades of similar instruments, prepayment assumptions, yield curves, issuance and maturity dates, and tranche information. Municipal bonds are valued using a market approach that incorporates reported trades and benchmark yields. Other fixed income securities are valued using pricing models, quoted prices of securities with similar characteristics, and discounted cash flows. 6. ASSET RETIREMENT OBLIGATIONS Eversource, including CL&P, NSTAR Electric and PSNH, recognizes a liability for the fair value of an ARO on the obligation date if the liability's fair value can be reasonably estimated, even if it is conditional on a future event. Settlement dates and future costs are reasonably estimated when sufficient information becomes available. Management has identified various categories of AROs, primarily CYAPC's and YAEC's obligation to dispose of spent nuclear fuel and high level waste, and also certain assets containing asbestos and hazardous contamination. Management has performed fair value calculations reflecting expected probabilities for settlement scenarios. The fair value of an ARO is recorded as a liability in Other Long-Term Liabilities with a corresponding amount included in Property, Plant and Equipment, Net on the balance sheets. The ARO assets are depreciated, and the ARO liabilities are accreted over the estimated life of the obligation and the corresponding credits are recorded as accumulated depreciation and ARO liabilities, respectively. As the electric and natural gas companies are rate-regulated on a cost-of-service basis, these companies apply regulatory accounting guidance and both the depreciation and accretion costs associated with these companies' AROs are recorded as increases to Regulatory Assets on the balance sheets. A reconciliation of the beginning and ending carrying amounts of ARO liabilities is as follows: As of December 31, 2018 Eversource (Millions of Dollars) CL&P 2017 NSTAR Electric PSNH Eversource CL&P NSTAR Electric PSNH Balance as of Beginning of Year Liabilities Incurred During the Year Liabilities Settled During the Year Accretion Revisions in Estimated Cash Flows $ 419.1 $ 11.3 (36.6) 25.5 46.9 31.5 $ — — 2.0 — 44.6 $ 11.3 — 2.2 14.3 25.0 $ — (21.5) 0.5 — 426.4 $ 0.2 (19.3) 26.3 (14.5) 36.0 $ 0.1 (1.0) 2.3 (5.9) 42.6 $ 0.1 (0.2) 2.1 — 23.5 — — 1.5 — Balance as of End of Year $ 466.2 $ 33.5 $ 72.4 $ 4.0 419.1 $ 31.5 $ 44.6 $ 25.0 $ Eversource's amounts include CYAPC and YAEC's AROs of $339.9 million and $301.5 million as of December 31, 2018 and 2017, respectively. The fair value of the ARO for CYAPC and YAEC includes uncertainties of the fuel off-load dates related to the DOE's timing of performance regarding its obligation to dispose of the spent nuclear fuel and high level waste and other assumptions, including discount rates. The incremental asset recorded as an offset to the ARO liability was fully depreciated since the plants have no remaining useful life. Any changes in the ARO liability are recorded with a corresponding offset to the related regulatory asset. The assets held in the CYAPC and YAEC spent nuclear fuel trusts are restricted for settling the ARO and all other nuclear fuel storage obligations. For further information on the assets held in the spent nuclear fuel trusts, see Note 5, "Marketable Securities," to the financial statements. The increase in the ARO balance at NSTAR Electric for the year ended December 31, 2018 was due to the recording of new liabilities associated with new solar sites placed into service and the replacement of certain distribution cables, and revised remediation costs for existing AROs related to asbestos and hazardous contamination. The decrease in the ARO balance at PSNH for the year ended December 31, 2018 was a result of the 72
  6. Page 86 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 86 of 136 generation divestiture and the securitization of remaining generation costs. See Note 13, "Generation Asset Sale," to the financial statements for further information on the PSNH generation divestiture. 7. SHORT-TERM DEBT Short-Term Debt Borrowing Limits: The amount of short-term borrowings that may be incurred by CL&P, NSTAR Electric and NPT is subject to periodic approval by the FERC. Because the NHPUC has jurisdiction over PSNH's short-term debt, PSNH is not currently required to obtain FERC approval for its short-term borrowings. On November 30, 2017, the FERC granted authorization that allows CL&P to issue total short-term borrowings in an aggregate principal amount not to exceed $600 million outstanding at any one time, through December 31, 2019. On November 30, 2017, the FERC granted authorization that allows NSTAR Electric to issue total short-term borrowings in an aggregate principal amount not to exceed $655 million outstanding at any one time, through December 30, 2019. On December 3, 2018, FERC authorized NPT to issue up to an aggregate of $800 million in short-term debt and long-term debt through December 31, 2020. PSNH is authorized by regulation of the NHPUC to incur short-term borrowings up to 10 percent of net fixed plant plus an additional $60 million until further ordered by the NHPUC. As of December 31, 2018, PSNH's short-term debt authorization under the 10 percent of net fixed plant test plus $60 million totaled approximately $331 million. CL&P's certificate of incorporation contains preferred stock provisions restricting the amount of unsecured debt that CL&P may incur, including limiting unsecured indebtedness with a maturity of less than 10 years to 10 percent of total capitalization. As of December 31, 2018, CL&P had $758.1 million of unsecured debt capacity available under this authorization. Yankee Gas and NSTAR Gas are not required to obtain approval from any state or federal authority to incur short-term debt. Commercial Paper Programs and Credit Agreements: Eversource parent has a $1.45 billion commercial paper program allowing Eversource parent to issue commercial paper as a form of short-term debt. Eversource parent, CL&P, PSNH, NSTAR Gas and Yankee Gas are also parties to a five-year $1.45 billion revolving credit facility. Effective December 10, 2018, the revolving credit facility's termination date was extended for one additional year to December 8, 2023. The revolving credit facility serves to backstop Eversource parent's $1.45 billion commercial paper program. NSTAR Electric has a $650 million commercial paper program allowing NSTAR Electric to issue commercial paper as a form of short-term debt. NSTAR Electric is also a party to a five-year $650 million revolving credit facility. Effective December 10, 2018, the revolving credit facility's termination date was extended for one additional year to December 8, 2023. The revolving credit facility serves to backstop NSTAR Electric's $650 million commercial paper program. The amount of borrowings outstanding and available under the commercial paper programs were as follows: Borrowings Outstanding as of December 31, (Millions of Dollars) Eversource Parent Commercial Paper Program NSTAR Electric Commercial Paper Program 2018 $ 631.5 $ 278.5 2017 979.3 $ 234.0 Available Borrowing Capacity as of December 31, 2018 818.5 $ 371.5 2017 470.7 416.0 Weighted-Average Interest Rate as of December 31, 2018 2.77% 2.50% 2017 1.86% 1.55% There were no borrowings outstanding on either the Eversource parent or NSTAR Electric revolving credit facilities as of December 31, 2018 or 2017. Eversource's water distribution segment has a $100.0 million revolving credit facility, which expires on August 19, 2019, and there were no amounts outstanding as of December 31, 2018 and $76.0 million outstanding as of December 31, 2017. Amounts outstanding under the commercial paper programs and revolving credit facility are included in Notes Payable and classified in current liabilities on the Eversource and NSTAR Electric balance sheets as all borrowings are outstanding for no more than 364 days at one time. As a result of the Eversource parent long-term debt issuances on January 8, 2018, the net proceeds of which were used to repay short-term borrowings outstanding under its commercial paper program, $201.2 million of commercial paper borrowings under the Eversource parent commercial paper program were reclassified as Long-Term Debt as of December 31, 2017. Under the credit facilities described above, Eversource and its subsidiaries must comply with certain financial and non-financial covenants, including a consolidated debt to total capitalization ratio. As of December 31, 2018 and 2017, Eversource and its subsidiaries were in compliance with these covenants. If Eversource or its subsidiaries were not in compliance with these covenants, an event of default would occur requiring all outstanding borrowings by such borrower to be repaid, and additional borrowings by such borrower would not be permitted under its respective credit facility. We believe the future operating cash flows of Eversource, CL&P, NSTAR Electric and PSNH, along with our existing borrowing availability and access to financial markets for the issuance of new long-term debt, will be sufficient to meet any working capital and future operating requirements, and capital investment forecast opportunities. 73
  7. Page 87 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 87 of 136 Intercompany Borrowings: Eversource parent uses its available capital resources to provide loans to its subsidiaries to assist in meeting their shortterm borrowing needs. In addition, growth in Eversource's key business initiatives requires cash infusion to those subsidiaries. Eversource parent records intercompany interest income from its loans to subsidiaries, which is eliminated in consolidation. Intercompany loans from Eversource parent to its subsidiaries are eliminated in consolidation on Eversource's balance sheets. As of December 31, 2018, there were intercompany loans from Eversource parent to PSNH of $57.0 million. As of December 31, 2017, there were intercompany loans from Eversource parent of $69.5 million to CL&P and $262.9 million to PSNH. Intercompany loans from Eversource parent are included in Notes Payable to Eversource Parent and are classified in current liabilities on the respective subsidiary's balance sheets. 8. LONG-TERM DEBT Details of long-term debt outstanding are as follows: CL&P (Millions of Dollars) As of December 31, 2018 2017 First Mortgage Bonds: 7.875% 1994 Series D due 2024 5.750% 2004 Series B due 2034 5.625% 2005 Series B due 2035 6.350% 2006 Series A due 2036 5.750% 2007 Series B due 2037 6.375% 2007 Series D due 2037 5.650% 2008 Series A due 2018 5.500% 2009 Series A due 2019 2.500% 2013 Series A due 2023 4.300% 2014 Series A due 2044 4.150% 2015 Series A due 2045 3.200% 2017 Series A due 2027 4.000% 2018 Series A due 2048 $ Total First Mortgage Bonds Pollution Control Revenue Bonds: 4.375% Fixed Rate Tax Exempt due 2028 Less Amounts due Within One Year Unamortized Premiums and Discounts, Net Unamortized Debt Issuance Costs CL&P Long-Term Debt $ NSTAR Electric (Millions of Dollars) 139.8 $ 130.0 100.0 250.0 150.0 100.0 — 250.0 400.0 475.0 350.0 300.0 500.0 139.8 130.0 100.0 250.0 150.0 100.0 300.0 250.0 400.0 475.0 350.0 300.0 — 3,144.8 2,944.8 120.5 (250.0 ) 10.2 (21.5 ) 120.5 (300.0) 11.5 (17.7) 3,004.0 $ 2,759.1 As of December 31, 2018 2017 Debentures: 5.750% due 2036 5.500% due 2040 2.375% due 2022 4.400% due 2044 3.250% due 2025 2.700% due 2026 3.200% due 2027 $ 200.0 $ 300.0 400.0 300.0 250.0 250.0 700.0 200.0 300.0 400.0 300.0 250.0 250.0 700.0 Total Debentures Notes: 5.900% Senior Notes Series B due 2034 6.700% Senior Notes Series D due 2037 5.100% Senior Notes Series E due 2020 3.500% Senior Notes Series F due 2021 3.880% Senior Notes Series G due 2023 2.750% Senior Notes Series H due 2026 2,400.0 2,400.0 50.0 40.0 95.0 250.0 80.0 50.0 50.0 40.0 95.0 250.0 80.0 50.0 Total Notes Less Amounts due Within One Year Unamortized Premiums and Discounts, Net Unamortized Debt Issuance Costs 565.0 — (2.5 ) (17.7 ) 565.0 — (1.8) (19.4) 2,944.8 $ 2,943.8 NSTAR Electric Long-Term Debt $ 74
  8. Page 88 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 88 of 136 PSNH (Millions of Dollars) As of December 31, 2018 2017 First Mortgage Bonds: 5.600% Series M due 2035 6.000% Series O due 2018 4.500% Series P due 2019 4.050% Series Q due 2021 3.200% Series R due 2021 3.500% Series S due 2023 $ Total First Mortgage Bonds Pollution Control Revenue Bonds: Adjustable Rate Tax Exempt Series A due 2021 Less Amounts due Within One Year Unamortized Premiums and Discounts, Net Unamortized Debt Issuance Costs PSNH Long-Term Debt $ OTHER (Millions of Dollars) 50.0 110.0 150.0 122.0 160.0 325.0 807.0 917.0 — (150.0 ) — (1.8 ) 89.3 (110.0) 0.2 (4.1) 655.2 $ 892.4 As of December 31, 2018 2017 Yankee Gas - First Mortgage Bonds: 3.020% - 8.480% due 2019 - 2048 NSTAR Gas - First Mortgage Bonds: 4.09% - 9.950% due 2020 - 2048 Eversource Parent and Other - Notes and Debentures: 4.500% Debentures due 2019 2.500% - 4.250% Senior Notes due 2021 - 2029 Unsecured Notes 3.570% - 6.430% due 2021 - 2037 Secured Debt 4.100% - 9.640% due 2021 - 2035 Pre-1983 Spent Nuclear Fuel Obligation (CYAPC) Fair Value Adjustment (1) Less Fair Value Adjustment - Current Portion (1) Less Amounts due in One Year Commercial Paper Classified as Long-Term Debt Unamortized Premiums and Discounts, Net Unamortized Debt Issuance Costs $ Total Other Long-Term Debt Total Eversource Long-Term Debt (1) 50.0 $ — 150.0 122.0 160.0 325.0 470.0 $ 385.0 520.0 285.0 350.0 4,360.0 289.5 70.7 39.5 144.7 (36.2 ) (401.1 ) — (4.2 ) (23.2 ) 350.0 3,260.0 290.9 70.4 181.4 172.6 (35.4) (104.2) 201.2 1.5 (12.8) $ 5,644.7 $ 5,180.6 $ 12,248.7 $ 11,775.9 The fair value adjustment amount is the purchase price adjustments, net of amortization, required to record the NSTAR long-term debt at fair value on the date of the 2012 merger and to record the Aquarion long-term debt at fair value on the date of the 2017 acquisition. 75
  9. Page 89 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 89 of 136 Long-Term Debt Issuances and Repayments: The following table summarizes long-term debt issuances and repayments: (Millions of Dollars) Issue Date Issuances/(Re payments) Maturity Date Use of Proceeds for Issuances/ Repayment Information 500.0 April 2048 Repaid long-term debt that matured in 2018 and repaid short-term borrowings Repaid at maturity on May 1, 2018 CL&P: (1) 4.00% 2018 Series A First Mortgage Bonds March 2018 $ 5.65% 2008 Series A First Mortgage Bonds PSNH: 6.00% 2008 Series O First Mortgage Bonds May 2008 (300.0) May 2018 May 2008 (110.0) May 2018 2001 Series A Pollution Control Revenue Bonds December 2001 (89.3) May 2021 Other: Eversource Parent 2.50% Series I Senior Notes (1) Eversource Parent 3.30% Series M Senior Notes Eversource Parent 3.80% Series N Senior Notes Eversource Parent 4.25% Series O Senior Notes Eversource Parent 1.60% Series G Senior Notes Eversource Parent 1.45% Series E Senior Notes Yankee Gas 4.13% Series O First Mortgage Bonds Yankee Gas 6.90% Series J First Mortgage Bonds NSTAR Gas 4.09% Series P First Mortgage Bonds January 2018 January 2018 December 2018 December 2018 January 2015 May 2013 September 2018 October 2008 September 2018 200.0 450.0 400.0 500.0 (150.0) (300.0) 50.0 (100.0) 100.0 March 2021 January 2028 December 2023 April 2029 January 2018 May 2018 October 2048 October 2018 October 2048 Repaid at maturity on May 1, 2018 Redeemed on November 28, 2018 at a redemption price of $89.3 million Repaid short-term borrowings Repaid long-term debt that matured in 2018 Repaid short-term borrowings Repaid short-term borrowings Repaid at maturity on January 15, 2018 Repaid at maturity on May 1, 2018 Repaid long-term debt that matured in 2018 Repaid at maturity on October 1, 2018 Repaid short-term borrowings These notes are part of the same series issued by Eversource parent in March 2016. The aggregate outstanding principal amount of these notes is now $450 million. As a result of the Eversource parent debt issuances in January 2018, $446.8 million of current portion of long-term debt related to two Eversource parent issuances maturing in 2018 and $201.2 million of commercial paper borrowings were reclassified to Long-Term Debt as of December 31, 2017. Long-Term Debt Issuance Authorizations: On August 1, 2018, the DPU approved NSTAR Gas’ request for authorization to issue up to $200 million in long-term debt through December 31, 2019. On December 3, 2018, FERC authorized NPT to issue up to an aggregate of $800 million in short-term debt and long-term debt through December 31, 2020. Long-Term Debt Provisions: The utility plant of CL&P, PSNH, Yankee Gas, NSTAR Gas and a portion of Aquarion is subject to the lien of each company's respective first mortgage bond indenture. The Eversource parent, NSTAR Electric and certain Aquarion debt is unsecured. Additionally, the long-term debt agreements provide that Eversource and certain of its subsidiaries must comply with certain covenants as are customarily included in such agreements, including equity requirements for NSTAR Electric and NSTAR Gas. Under the equity requirements, NSTAR Electric's and Aquarion's senior notes must maintain a certain consolidated indebtedness to capitalization ratio as of the end of any fiscal quarter and NSTAR Gas' outstanding long-term debt must not exceed equity. CL&P's obligation to repay the PCRBs is secured by first mortgage bonds. The first mortgage bonds contain similar terms and provisions as the applicable series of PCRBs. If CL&P fails to meet its obligations under the first mortgage bonds, then the holder of the first mortgage bonds (the issuer of the PCRBs) would have rights under the first mortgage bonds. CL&P's tax-exempt PCRBs will be subject to redemption at par on or after September 1, 2021. Certain secured and unsecured long-term debt securities are callable at redemption price or are subject to make-whole provisions. Eversource, NSTAR Electric, Yankee Gas and Aquarion have certain long-term debt agreements that contain cross-default provisions. No other debt issuances contain cross-default provisions as of December 31, 2018. Pre-1983 Spent Nuclear Fuel Obligation: Under the Nuclear Waste Policy Act of 1982, the DOE is responsible for the selection and development of repositories for, and the disposal of, spent nuclear fuel and high-level radioactive waste. CYAPC is obligated to pay the DOE for the costs to dispose of spent nuclear fuel and high-level radioactive waste generated prior to April 7, 1983 (pre-1983 Spent Nuclear Fuel) and recorded an accrual for the full liability thereof to the DOE. This liability accrues interest costs at the 3-month Treasury bill yield rate. For nuclear fuel used to generate electricity prior to April 7, 1983, payment may be made any time prior to the first delivery of spent fuel to the DOE. Fees for disposal of nuclear fuel burned on or after April 7, 1983 were billed to member companies and paid to the DOE. As of December 31, 2018 and 2017, as a result of consolidating CYAPC, Eversource has consolidated $39.5 million and $181.4 million, respectively, in pre-1983 spent nuclear fuel obligations to the DOE. In December 2018, CYAPC paid $145 million to the DOE to partially settle this obligation. The obligation includes accumulated interest costs of $29.0 million and $132.6 million as of December 31, 2018 and 2017, respectively. CYAPC maintains a trust to fund amounts due to the DOE for the disposal of pre-1983 spent nuclear fuel. For further information, see Note 5, "Marketable Securities," to the financial statements. 76
  10. Page 90 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 8, 2026 OCC-962, Attachment 1 Page 90 of 136 Long-Term Debt Maturities: Long-term debt maturities on debt outstanding for the years 2019 through 2023 and thereafter are shown below. These amounts exclude the CYAPC pre-1983 spent nuclear fuel obligation, net unamortized premiums, discounts and debt issuance costs, and other fair value adjustments as of December 31, 2018: Eversource (Millions of Dollars) CL&P NSTAR Electric PSNH 2019 2020 2021 2022 2023 Thereafter $ 801.1 $ 296.1 1,033.5 1,188.9 1,665.2 7,977.7 250.0 $ — — — 400.0 2,615.3 — $ 95.0 250.0 400.0 80.0 2,140.0 150.0 — 282.0 — 325.0 50.0 Total $ 12,962.5 $ 3,265.3 $ 2,965.0 $ 807.0 9. RATE REDUCTION BONDS AND VARIABLE INTEREST ENTITIES Rate Reduction Bonds: PSNH Funding LLC 3 (PSNH Funding) is a bankruptcy remote, special purpose, wholly-owned subsidiary of PSNH. PSNH Funding was formed solely to issue rate reduction bonds (RRBs) to finance PSNH’s unrecovered remaining costs associated with the divestiture of its generation assets. On May 8, 2018, PSNH Funding issued $635.7 million of securitized RRBs in multiple tranches with a weighted average interest rate of 3.66 percent, and final maturity dates ranging from 2026 to 2035. The RRBs are expected to be repaid by February 1, 2033. RRB payments consist of principal and interest and will be paid semi-annually, beginning on February 1, 2019. The RRBs were issued pursuant to a finance order issued by the NHPUC on January 30, 2018 to recover remaining costs resulting from the divestiture of PSNH’s generation assets. The proceeds were used by PSNH Funding to purchase PSNH’s stranded cost asset-recovery property, including its vested property right to bill, collect and adjust a non-bypassable stranded cost recovery charge from PSNH’s retail customers. The collections will be used to pay principal, interest and other costs in connection with the RRBs. The RRBs are secured by the stranded cost asset-recovery property. Cash collections from the stranded cost recovery charges and funds on deposit in trust accounts are the sole source of funds to satisfy the debt obligation. PSNH is not the owner of the RRBs, and PSNH Funding’s assets and revenues are not available to pay PSNH’s creditors. The RRBs are non-recourse senior secured obligations of PSNH Funding and are not insured or guaranteed by PSNH or Eversource Energy. PSNH Funding is considered a variable interest entity (VIE) primarily because the equity capitalization is insufficient to support its operations. PSNH has the power to direct the significant activities of the VIE and is most closely associated with the VIE as compared to other interest holders. Therefore, PSNH is considered the primary beneficiary and consolidates PSNH Funding in its consolidated financial statements. The following tables summarize the impact of PSNH Funding on PSNH's balance sheet and income statement: (Millions of Dollars) Balance Sheet: As of December 31, 2018 Restricted Cash - Current Portion (included in Prepayments and Other Current Assets) Restricted Cash - Long-Term Portion (included in Other Long-Term Assets) Securitized Stranded Cost (included in Regulatory Assets) Other Regulatory Liabilities (included in Regulatory Liabilities) Accrued Interest (included in Other Current Liabilities) Rate Reduction Bonds - Current Portion Rate Reduction Bonds - Long-Term Portion $ (Millions of Dollars) 47.5 3.2 608.4 5.8 14.4 52.3 583.3 For the Year Ended December 31, 2018 Income Statement: Amortization of RRB Principal (included in Amortization of Regulatory Assets, Net) Interest Expense on RRB Principal (included in Interest Expense) $ 27.3 14.4 Variable Interest Entities - Other: The Company's variable interests outside of the consolidated group include contracts that are required by regulation and provide for regulatory recovery of contract costs and benefits through customer rates. Eversource, CL&P and NSTAR Electric hold variable interests in VIEs through agreements with certain entities that own single renewable energy or peaking generation power plants, with other independent power producers and with transmission businesses. Eversource, CL&P and NSTAR Electric do not control the activities that are economically significant to these VIEs or provide financial or other support to these VIEs. Therefore, Eversource, CL&P and NSTAR Electric do not consolidate these VIEs. 77

Text of OCC-963 Attachment 8.pdf

Extracted from the file · 96 pages · 352,588 characters

Text of OCC-963 Attachment 7.pdf

Extracted from the file · 105 pages · 381,994 characters

Text of OCC-963 Attachment 6.pdf

Extracted from the file · 101 pages · 366,377 characters

Text of OCC-963 Attachment 5.pdf

Extracted from the file · 105 pages · 393,802 characters

Text of OCC-963 Attachment 4.pdf

Extracted from the file · 88 pages · 321,021 characters

Text of OCC-963 Attachment 3.pdf

Extracted from the file · 86 pages · 305,704 characters

Text of OCC-963 Attachment 2.pdf

Extracted from the file · 77 pages · 270,743 characters

Text of OCC-963 Attachment 1.pdf

Extracted from the file · 76 pages · 279,055 characters

As listed on the current system

Question(s) Answered 962, 963 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)