Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 990, 991, 993, 994, 995, 996

Files10

Search terms highlighted
Eversource rate increase is on 3 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
1 page match
1 page match
  1. Page 1Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-991 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please provide an unlocked Excel file indicating: the date the Company installed each of the 467,145 bridge meters; if the account associated with the meter is commercial or residential; and the bridge meters’ manufacturer and model number. Please additionally provide all manufacturer’s guides and/or specifications for the meters/model numbers listed. Response: Please refer to OCC-991, Attachment 1, for the requested information. Additionally, please refer to OCC-99,1 Attachment 2, and OCC-991, Attachment 3, for additional manufacturer details on the installed meter types. OCC-991, Attachment 1, provides a breakdown of all bridge meters that are currently physically installed in Connecticut. The different rows separate meters into the year they were purchased, the customer rate class, manufacturer meter type, and if the meter is used as a solar production meter. The total quantities differ from the 467,145 figure referenced due to minor fluctuations in reporting of installed and removed meters which occurs on a daily basis. Additionally, it is necessary to highlight that the methodology of categorizing physically installed meters broken out by purchase year, matches previously filed meter breakdowns. Since there are natural delays between purchasing and installing meters in the field, it may appear as if past stated vintages are increasing (i.e. there is an increase in 2025 meters than previously stated). This variance is due to reporting on meters that were purchased in 2025 were physically installed in the field in 2026. This is true for all years resulting in older vintage volumes decreasing, and newer vintage meter volumes increasing each time this analysis is performed.
Words on different pages

Text of OCC-991 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of OCC-991 Attachment 3.pdf

Extracted from the file · 4 pages · 8,579 characters

Text of OCC-993_Final.pdf

Extracted from the file · 1 page · 1,407 characters

Words on different pagesRead the text of OCC-993_Final.pdf

Text of OCC-994_Final.pdf

Extracted from the file · 1 page · 1,370 characters

Words on different pagesRead the text of OCC-994_Final.pdf

Text of OCC-995_Final.pdf

Extracted from the file · 4 pages · 8,591 characters

Text of OCC-996_Final.pdf

Extracted from the file · 1 page · 1,097 characters

Words on different pagesRead the text of OCC-996_Final.pdf

As listed on the current system

Question(s) Answered 990, 991, 993, 994, 995, 996 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)