  1. Page 11 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 11 of 108 Emergency Response Plan Electric System Operations - CT 1.4 Planning Considerations This ERP provides the overall framework for preparedness and response and a high-level overview of each function. The Plan is implemented by specific policies, procedures, guidelines, checklists, and job aids. The ERP documentation and other supporting documentation detail specific actions and responsibilities for functions and organizations necessary for effectively responding to an emergency event. Employees use these documents to guide their specific actions consistent with their training. The Electric System is susceptible to the effects of certain emergency events and disasters and, depending on the nature of the event, the design and engineering of the system can mitigate some effects. The scope and severity of the impact of an emergency event varies widely, ranging from events that are locally isolated and impact a small number of customers for a short period of time to events that are geographically widespread and causes outages for many customers. The planning considerations used in the design of the Plan and the supporting implementing documents include, but are not limited to: • An emergency incident or disaster can occur at any time of the day or night, weekend, or holiday, with little or no warning. • Not all outage-related events or incidents require the full activation of this Plan. • The Incident Commander may declare activation of the Plan either before an emergency event occurs or after, based on the timing and predicted severity of the event. • Event Levels 1, 2, 3, and 4 require full activation of the Incident Management Team (IMT) • The Operational Period for extended emergencies that require 24-hour operations is divided into two operational shifts of 12 hours each starting at 0600 and 1800 with a turnover period that begins 30 minutes before each shift starts. • All employees are familiar with this Plan and their specific emergency job position responsibilities when the Plan is activated. In addition, Eversource conducts training and exercises to ensure all employees are aware of the general framework for responding to emergency events. • The Company’s response is based on the availability of resources. If resource requirements warrant, affiliate company, mutual assistance, and contractor assistance is requested. • This ERP is based on the implementation activities of the National Incident Management System (NIMS) and uses the Incident Command System (ICS). This alignment assists in the de-centralization and recentralization of command and control throughout an emergency event in order to provide optimum and efficient response and utilization of resources. • This ERP is intended to align with the concepts of the Connecticut State Response Framework and Connecticut Emergency Support Function 12 (ESF-12) All Hazards Energy and Utility Annex, as appropriate. • During and after catastrophic events, normal emergency services within the affected area can be overwhelmed and essential community services may not be available. EP-CT-ELEC-PLN-2000 11 of 108 Rev 6
  2. Page 12 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 12 of 108 Emergency Response Plan Electric System Operations - CT 2. STRATEGY FOR EMERGENCY OPERATIONS Authority for the performance and direction of actions under this ERP is delegated by the President of the Company to the Incident Commander and other positions identified in this document. Pursuant to this delegation, the IC has the authority to manage the overall emergency response for the Company and is expected to provide periodic updates to senior management, including the President of the Company. The IC informs the President in a timely manner, who informs and consults with Eversource’s Emergency Coordination Team (ECT), of any actions or developments that could require extensive resources from other Eversource locations or business units or could reasonably cause significant operating or financial risk to the Company. Given the broad authority granted to the IC in this Plan, the IC should consult periodically with the President of the Company to seek input on the overall direction or operating objectives, or to obtain any necessary authorization for specific exceptions to the President’s authority. The IC and the executive leadership team must effectively communicate during an emergency event, particularly whenever significant changes occur. Should any of the following critical incidents occur, the IC informs the executive leadership team immediately and provides it with all available information about the incident: 2.1 • A fatality or life-threatening injury to a Company employee, Eversource Service Organization or affiliate employee, contractor, or mutual assistance crew member • A fatality or life-threatening injury to anyone possibly involving any part of the Electric System, staff, or entity working on behalf of the Company • A fatality or a life-threatening injury to a member of the public that could have been caused by the Company infrastructure • Any event that could potentially cause significant harm to the Company, its staff, or system • Any other unforeseen event that the IC reasonably deems of significant concern that has the potential to affect the Company or its ability to carry out obligations under the Plan Guiding Principles The Company has the responsibility to establish and ensure the safety and security of all participants of the emergency restoration effort. This is achieved by communicating guidelines during emergency events and the reinforcement of safe work practices by the restoration crews. Each participant is responsible for their own safety and Company management is responsible for ensuring all participants work in a safe manner and that prompt corrective action is taken whenever unsafe conditions are observed or reported. Eversource operates under the following Vision and Mission statements: • Vision To be viewed as the premium emergency response company by our customers, communities, regulators, and government officials • Mission Anticipate, prepare, and efficiently recover from major events by: 1. Investing prudently in our infrastructure and preparedness; 2. 3. 4. 5. EP-CT-ELEC-PLN-2000 Partnering with local and state government in planning, preparing, and responding to events; Communicating proactively and with transparency; Acting with urgency and empathy to safely restore; and Leveraging all available and emerging technology. 12 of 108 Rev 6
  3. Page 13 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 13 of 108 Emergency Response Plan Electric System Operations - CT Emergency Preparedness at Eversource provides oversight on the readiness of IMT members and subordinate emergency positions by administering training in collaboration with formal operating policies and procedures. Each year, IMT members receive both on-the-job training, through actual emergency event response, and opportunities to refine their knowledge on their specific roles and responsibilities through scheduled drills and exercises. Job assignments and proficiency of the associated skills are critical to the framework of the ERP. Participants, whether performing their routine assignments during the restoration effort or performing infrequent duties as their emergency assignments dictate, are expected to perform at the same standard of excellence: 2.2 • We consider public safety and the safety of our workers and other responders to be our highest core value. • We ensure our IMTs follow a formal ICS and each position and function within the structure has a clearly defined role and understood authority. • We ensure that our employees are trained and exercised in their assigned emergency job positions. • We set reasonable expectations with our stakeholders and deliver results that are consistent with or exceed those expectations. • We partner with our municipalities to identify and understand their priorities and integrate them into our restoration Plans. • We provide our communities with accurate, timely, and consistent information. • We complete an initial damage assessment and provide a global restoration projection within 48 hours after a storm has left our service territory. • We ensure that sufficient numbers of qualified resources are secured in a timely manner to support an efficient restoration process. • We take the necessary actions to protect the environment. • We use available technology and our leadership capabilities to automate restoration processes and efficiently manage available resources. • We use every opportunity to collect feedback and measure our performance to ensure continuous improvement. • We are committed to mitigating the vulnerability of our distribution infrastructure to weather events. Use of the Incident Command System The Incident Command System is a component of NIMS, an emergency management doctrine used across the United States to coordinate emergency preparedness and incident management and response among the public (Federal, Tribal, state, and local government agencies) and private sectors. It provides for a standardized, on-scene, all-hazards incident management approach that: ▪ allows for the integration of facilities, equipment, personnel, procedures, and communications operating within a common organizational structure ▪ enables a coordinated response among various jurisdictions and functional agencies, both public and private ▪ establishes common processes for planning and managing resources EP-CT-ELEC-PLN-2000 13 of 108 Rev 6
  4. Page 14 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 14 of 108 Emergency Response Plan Electric System Operations - CT As a system, the ICS is extremely useful. The ICS not only provides an organizational structure for incident management, but it also guides the process for planning, building, and adapting that structure to best fit the current situation. ICS is flexible and can be used for incidents of any type, scope, or complexity. ICS allows Eversource to adopt an integrated organizational structure to match the complexities and demands of single or multiple incidents. The range of these events can vary from a minor facility event to a major loss of systems, equipment, personnel, or information. The ICS is also employed by offsite response organizations that Eversource interfaces with during an event thereby enhancing the coordination of all emergency responders. The ICS is typically structured to facilitate activities in five major functional areas: Command, Operations, Planning, Logistics, and Finance/Administration. Additional Command and General Staffing may be added based on the needs of the command structure. It is possible that all of the functional areas might not be used based on the needs of the incident. 2.2.1 Incident Command Incident Command is responsible for overall management of the emergency and occurs at the IMT level. An IC is designated and has the authority to commit and obtain resources necessary to meet prioritized needs. The IC also has the authority to issue assignments that involve the commitment of human and material resources and to expend funds to meet emergency needs. Command Staff and General Staff assignments are delegated and assigned by the IC as required. ICS Command and General Staff positions are described in further detail below. 2.2.2 Non-Incident Command System Roles Emergency response is also performed by personnel within Eversource (for example, Facilities, Material Logistics, Fleet Services, and so on) that are not actually assigned ICS roles during an emergency because their emergency roles and responsibilities generally parallel their normal (blue sky) organizational roles and responsibilities. Specific day-to-day tasks and activities that do not contribute directly to the emergency response efforts can be suspended temporarily or redirected for the duration of an event. 2.3 Core Capabilities Capabilities are identified as the ability to achieve a specific outcome with an applicable combination of planning, organization, resources, and trained and exercised personnel. Core Capabilities are a list of capabilities needed collectively by the Company to prepare for, respond to, and recover from events and incidents causing power outages and other disruptions to the Electric System. The Company’s Core Capabilities are: 1. Community Preparedness – The continuous effort to assist all communities and the State to be fully aware, trained, and practiced on how to prepare for and, as appropriate, coordinate response to, events that have the potential to impact the Electric System. 2. Risk Management – The continuous process of managing the likelihood of an adverse event and its impact on the Electric System through a series of mitigation and preparedness actions. 3. Training, Qualifications, and Exercises – The process of transferring required knowledge and skills needed for the Company to perform activities and task supporting the ERP capabilities, and of verifying individual and organizational competencies of these capabilities. 4. Incident Command – The ability to effectively direct and control event activities using ICS, consistent with Eversource policy and procedures. 5. Planning – The process of collecting, displaying, and evaluating event information and coordinating the development of applicable Incident Action Plans (IAP). EP-CT-ELEC-PLN-2000 14 of 108 Rev 6
  5. Page 15 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 15 of 108 Emergency Response Plan Electric System Operations - CT 6. Damage Assessment – The process of conducting Electric System damage and safety assessments to accurately determine the significance of the event, locations of damage and damaged equipment, access restrictions, and other information needed to estimate the time necessary for repair and effectively choose a restoration strategy. 7. Incident Command Center Management – The ability to provide Electric System coordination for event management by activating and operating the ICC for a pre-planned or no-notice event. ICC management includes: • ICC and Regional Emergency Operations Center (EOC) activation, notification, staffing, and deactivation; • Management, direction, control, and coordination of response and recovery activities; • Coordination of efforts among governments at each level and among local, regional, and state EOCs; • Coordination of public information; and • Maintenance of the information and communications necessary for coordinating response and recovery activities. 8. Response & Restoration – Prepare for, initiate, and sustain repair, replacement, or other activities needed to restore the Company’s Electric System to normal operating condition. This consists of eliminating identified threats to public safety, removing electric hazards, restoring critical facilities, and performing bulk restoration to customers. 9. Resource Management (Logistics) – Identify, order, acquire, mobilize/on-board, accurately track and record, reassign, recover, and demobilize all resources (including Company, Eversource Service Organization, mutual aid, contracted, and vendor resources) throughout all event management phases. (NOTE: Resources include material, equipment, and personnel.) 10. Public Information (Communications & Media) – Develop, coordinate, and disseminate information to the public, state, and municipal officials, and Electric System and other applicable Eversource employees across all jurisdictions and disciplines effectively under all hazard conditions. 11. Worker Health and Safety – Ensure an adequate quantity of trained and equipped personnel and resources are available at the time of an event to protect the safety and health of Electric System and other applicable Eversource employees, mutual aid, and contracted workers. 12. Financial Tracking and Reporting – Accurately account for personnel time: collecting cost data; performing cost effectiveness analyses; providing cost estimates and cost saving recommendations; administering financial matters pertaining to vendor contracts, leases, and fiscal agreements; and management and direction of all administrative matters pertaining to compensation for injury and claims-related activities. 2.4 Event Classification The Eversource Event Level Matrix (ELM) defines five levels of incidents or emergency events and establishes the criteria to guide the IC in determining the appropriate categorization. The ELM is utilized in all ERP events and is an important tool in determining an appropriate course of action for responding to emergency events. The event level may be changed or modified based on continual assessment of event level criteria and other factors, including evaluation of pre-incident expectations and actual impact assessments. The ELM encompassed as Table 1 - Event Level Matrix Crew Requirements and Table 2 - Event Level Matrix Full Time Employee/Equivalent Requirements are used by the IC to declare and communicate the emergency event level to company personnel and other stakeholders. EP-CT-ELEC-PLN-2000 15 of 108 Rev 6
  6. Page 16 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 16 of 108 Emergency Response Plan Electric System Operations - CT The criteria used to determine the event level is based on: • The weather forecast or actual weather • The estimated or actual number of trouble spots • The estimated or actual number of customers outages • The estimated or actual number of regions and/or Area Work Centers (AWC) affected • Geographic dispersion and nature of the damage • The anticipated duration of the restoration The ELM provides a framework to assist in determining the ERP activation level; the command location; the need for mutual aid resources; the timing for issuance of a Global Estimated Time to Restoration (ETR); the conduct of damage assessment; and the type(s) of restoration strategy to be used for the event response. Based on factors such as the nature of the service area affected, dispersion of event damage, and deployment of resources, it may be appropriate to conduct response and restoration activities employing multiple strategies. Additionally, multiple strategies may be run concurrently in one or more geographic area. Typical weather-related events include warm weather events, cold weather events, and tropical events. Warm weather events include extreme heat waves, thunderstorms squall line wind events, and weather generally associated with the movement of a weather system from west to east. Cold weather events include wind events, Nor’easters, blizzards, and weather generally associated with the movement of a weather system up the northeast coast. Tropical events pose a specific risk and are classified based on the strength, movement, and classification of the system by the National Oceanic and Atmospheric Administration (NOAA). When expected or actual circumstances of an emergency event escalate (that is, anywhere from Level 5 to Level 1), the response organization and resources scale up accordingly. The ICS structure established in this ERP is sufficiently flexible to be implemented in all emergencies, regardless of whether they are classified as a Level 5 or Level 1 event. 2.4.1 Event Level Matrix The IC determines the event level based on the parameters set forth in Table 1 - Event Level Matrix Crew Requirements and Table 2 - Event Level Matrix Full Time Employee/Equivalent Requirements shown below. No single parameter dictates the event level declared at any given time. Rather, the IC relies on data and information gathered in relation to the event level classification criteria, as it evolves through the actual impact and beyond, in parallel with any other consultation and inputs pertinent to the actual event and the Company’s safe and expeditious response. Below, Table 1 and Table 2 indicate the Crew Requirements and Full Time Employee/Equivalent Requirements associated with each combination of trouble spots and customer outages. EP-CT-ELEC-PLN-2000 16 of 108 Rev 6
  7. Page 17 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 17 of 108 Emergency Response Plan Electric System Operations - CT Table 1 - Event Level Matrix Crew Requirements Event Level Typical No. of Customers Out at Peak (Crews at Onset/Crews at Peak) (Note 1) Typical No. of Trouble Spots Line (Crews) (Onset | Peak) Service Crews Tree Crews DA Crews (Note 2) Note 1: Note 2: Note 3: Note 4: Liaison (FTEs=Crews) Public Safety Specialist Comm. Liaison Comm. Liaison – Account Executive Typical Restoration Duration Typical Global ETR Timeframe 5 0% - 9% (<130k) <3000 290 | 550 0 | 40 145 | 275 30 | 175 N/A 12 | 149 20 + 3 1-3 Days < 24 hours 4 10% - 29% (130k 400k) 1500 – 10,000 340 500 | 1,200 30 | 125 250 | 600 100 | 300 149 149 | 160 20 + 3 2-6 Days < 36 hours 3 30% - 49% (400k – 690k) 8,000 – 25,000 390 900| 2,500 60 | 250 450 | 1,250 225 | 700 149 160 20 + 6 5-10 Days < 48 hours 2 50% - 69% (660k – 920k) 15,000 – 48,000 490 1,000| 2,500 120 | 320 500 | 1,250 400 | 700 149 160 20 + 6 8-21 Days < 72 hours 1 70% 100% (>920k) > 35,000 590 1,200 | 2,500 120 | 320 600 | 1,250 400 | 700 149 160 20 + 6 > 18 Days < 72 hours “Crews at Onset” are the number of crews available during the first 48 hours after the onset of the storm to address public safety priorities and other concerns. The term Peak refers to the number of crews needed to restore the high-range number of trouble spots for each event level within the designated restoration period. Peak numbers are based on customer count of 1.3M as of May 1, 2024 Prior to the onset of a storm event, Eversource will obtain external contractor crews and mutual aid crews to assist in the first 48 hours after the onset of the storm, commensurate with the magnitude of the storm event and the declared event level. The low-end figure of the range for each event level includes 290 crews representing the total complement of 310 crews, accounting for typical unavailability of individual employees due to illness, FMLA, and disability. Resource Strategy includes the use of internal resources, resources from affiliate companies, contractors, and utility mutual assistance. See Section 2.11.4, External Resource Acquisition and Section 3.4.2, Planning Section Roles and Responsibilities. The IMT structure may be activated at Level 5 and is activated at Level 4. The IMT organization for a Level 3, 2, or 1 event expands horizontally with additional satellite locations and accompanying support and supervision to maintain appropriate spans of control. EP-CT-ELEC-PLN-2000 17 of 108 Rev 6
  8. Page 18 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 18 of 108 Emergency Response Plan Electric System Operations - CT Note 5: Note 6: Note 7: Note 8: ICC Activation may be influenced by additional factors. These factors include the breadth of the forecasted or actual damage (that is, the number of regions or AWCs impacted), number of external resources deployed, and availability of locations suitable for logistics operation. The Damage Assessment and Restoration Strategies may be influenced by additional factors, such as the breadth of the forecasted or actual damage (that is, the number of regions or AWCs impacted), type of damage, and number of external resources deployed. See Section 2.11.3, Restoration Strategies and Section 3.4.4, Damage Assessment & Situational Awareness. The Logistics Strategy may be influenced by additional factors. These factors can include the breadth of the forecasted or actual damage (that is, number of regions or AWCs impacted), number of external resources deployed, and availability of locations suitable for logistics operation. The Public Safety Specialist role is not required to be activated for an Event Level 5. Based on the severity of the damage of an Event Level 4 event or higher, this role may be activated. See Section 3.4.6, Estimated Times to Restoration and Restoration Projections of this ERP, which explains that there are factors outside the Company’s control or in combination with factors outside the Company’s control that may prevent issuance of the global ETR within the “Typical Global ETR Timeframe” or prevent restoration within the above-described “Typical Restoration Duration.” Each event is unique and expected impacts will always deviate from actual impacts. The Event Level Matrix is designed to guide high-level estimates for typical events. EP-CT-ELEC-PLN-2000 18 of 108 Rev 6
  9. Page 19 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 19 of 108 Emergency Response Plan Electric System Operations - CT Table 2 - Event Level Matrix Full Time Employee/Equivalent Requirements (FTEs at Onset/FTEs at Peak) (Note 1) Typical No. of Customers Out at Peak Typical No. of Trouble Spots 5 0% - 9% (<130k) <3000 540 | 1200 4 10% - 29% (130k 400k) 1500 – 10,000 3 30% - 49% (400k – 690k) 2 1 Event Level Line FTEs Service Onset | FTEs Peak Liaison (FTEs=Crews) Typical Restoration Duration Typical Global ETR Availability Timeframe Tree FTEs DA FTEs Public Safety Specialist Comm. Liaison Comm. Liaison – Account Executive 0 | 80 290 | 550 30 | 175 N/A 12 | 149 20 + 3 1-3 Days < 24 hours 665 1,050 | 2,800 60 | 250 300 | 1,200 100 | 425 149 149 | 160 20 + 3 2-6 Days < 36 hours 8,000 – 25,000 790 2,050| 6,000 120 | 500 900 | 2,500 275 | 1,225 149 160 20 + 6 5-10 Days < 48 hours 50% - 69% (660k – 920k) 15,000 – 48,000 1040 2,300| 6,000 240 | 640 1,000 | 2,500 625 | 1,225 149 160 20 + 6 8-21 Days < 72 hours 70% 100% (> 920k) > 35,000 1290 2,800 | 6,000 240 | 640 1,200 | 2,500 625 | 1,225 149 160 20 + 6 > 18 Days < 72 hours (Note 2) Note 1: FTEs at onset represents the minimum number of targeted FTEs assured prior to the event. Peak number of resources represents FTEs needed to restore high range number of trouble spots for each event type Note 2: Where Crews at Onset is expressed as a range, the lower number indicates the maximum Eversource can guarantee on the basis of internal employees and regular onsite contractors, and the higher number what Eversource will endeavor to achieve by securing additional contract and mutual assistance resources ahead of the storm. The base figure of 540 FTEs is the total complement of 310 crews accounting for typical unavailability because of sickness, FMLA, and disability Note 3: Assumes one tree crew for every two line crews Note 4: Per 48-hour Damage Assessment study Note 5: The Public Specialist role is not required to be activated for an Event Level 5. Based on the severity of the damage of an Event Level 4 or higher, this role may be activated EP-CT-ELEC-PLN-2000 19 of 108 Rev 6
  10. Page 20 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 6 Page 20 of 108 Emergency Response Plan Electric System Operations - CT 2.4.2 Event Level Overviews The Event Level is used for planning purposes to estimate the potential or actual size, scope, and complexity of the incident in order to disseminate and communicate the severity of the emergency to key stakeholders. When the severity and complexity of the emergency event are analyzed or more clearly understood, the Incident Commander is responsible for establishing or adjusting the Event Level as is appropriate. It is critical to maintain flexibility and scalability when establishing the appropriate response, organization, and scale of the response. Therefore, the Event Level does not necessarily stipulate a mandated response organization scale. Rather, the Event Level determination provides an expected scope of response activities and staffing requirements. The transition from one Event Level to another, either higher or lower, is accomplished solely at the discretion of the Incident Commander, based on analysis of the severity and complexity combined with recommendations of General and Command Staff, leadership, and other key organizational members. Once established or modified, the Event Level is communicated to all internal and external leaders and organizations currently engaged in or anticipated to be engaged in restoration or support activities, as soon as is practical. Typically, changes in the event level are communicated formally through the scheduled Briefing Sheets, published through Communications. Verbal communication should be made to stakeholders as soon as is practical, along with formal written briefings. Determining the level of an event helps determine the scope of the ICS deployment. Although not an exact science, reliance on the ELM and exercise of professional judgment will enable the IC to make a reasonable supposition. a. Level 5 Emergency Event A Level 5 event is classified as a local emergency that is expected to be resolved within one to three days and that may be readily addressed by company personnel or available contractors. In general, the impact on customers, the environment, and safety is minimal. Level 5 events generally are characterized by: o o o o o Ability to address the emergency in a timely manner Limited impact on customer outages (duration or number) Ability to restore service in a timely manner Lack of threat to broader public safety Limited impact on company operations or financial risk b. Level 4 Emergency Event A Level 4 event is classified as a local emergency event that has an appreciable impact on customers, the environment, and safety, and is expected to last between two and six days. Additional organizational and resource support is normally required. The initiating conditions for activation include: o o o o EP-CT-ELEC-PLN-2000 Broad customer or critical facility impact A threat to public safety Moderate impact on the environment Moderate impact on company operations or financial risk 20 of 108 Rev 6

As listed on the current system