Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 130, 131

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-02 Date Issued August 07, 2026 EOE-131 Page 1 of 1 Date Filed: August 21, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION INVOICES) Explain why vegetation invoice costs do not agree to the requested recovery amounts. As part of the response, please provide an example of the relevant calculations and system screenshots supporting the reported differences. Response: The vegetation invoices and supporting documentation are indicative of the pretax total cost and do not include the 3.335% tax included in the recovery amounts. See, Conn. Gen. Stat. § 12407(2)(i)(V)-1. Please refer to EOE-131, Attachment 1 CONFIDENTIAL, for examples of the relevant system screenshots supporting the pre- and post-tax differences. These examples are from invoices charged to MS24A, as referenced in Exhibit ACCT-2 (CLP-1)(MS24A), “Outside ContractorsVendors” tab, Lines 38-40.

Text of EOE-131 Attachment 1 Redacted.pdf

Extracted from the file · 12 pages, 4 without text · 1,352 characters

As listed on the current system

Question(s) Answered 130, 131 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/21/2026

This filing on the current system (opens in a new tab)