Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 205

Files4

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
1 page match
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 1 of 4 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 182-226. The Company reported an incremental charge of $188,806 for the East Coast Power LLC vendor. Respond to the following: a. The Company provided a consolidated invoice, along with various documents (i.e., timesheets) but does not appear to have provided an exhibit that details each employee, their titles, hours by day, rates, etc., to allow for a reconciliation to consolidated invoice. Provide documentation supporting the total billed amount, inclusive of rates and hours worked. If they have been filed, please indicate where it has been filed and resubmit it with this response. b. Referring to p. 183, provide a legible version of the document. (Note: it is unclear if p. 184 is the legible version of p. 183.) c. Referring to p. 184, explain why the Company allowed the vendor to bill for 12 hours of standby “waiting for Lodging Information” without assignments. d. Referring to pp. 185-193, explain if the Eversource Contractor Storm Daily Time & Work Reports were fully completed as required by the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information to be completed prior to approval. e. Referring to pp. 185-193, explain how the Eversource reviewer was able to determine that the billed activity related to work (i.e., box 12) in lieu of standby time (i.e., box 11) which would have resulted in fewer billable equipment hours as applied for other standby hours (e.g., p. 184 demonstrates certain equipment that was not billed during standby). As part of the response, provide documentation to support the correct billing classification and, if not available, identify the incremental costs for both labor and equipment that was charged for work in lieu of standby. Response: Reference to Exhibit ACCT-2 CLP-1 (MS24A, Outside Contractors-vendor, line 247, vendor East Coast Power LLC, invoice totaling in the amount of $188,806).
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 2 of 4 a. Please refer to EOE-205, Attachment 1, for a breakdown of requested details identifying each crew member’s name, classification, and equipment based on the information provided on the submitted Invoice and Timesheets. The applicable rates are provided in OCC-044, Attachment 2 CONFIDENTIAL, at pages 1142-1145. b. Upon review, the Company has identified that page 184 is a duplicate timesheet to page 183. c. The contractor crew was directed to drive to Bloomfield, CT on January 9, 2024. Normally, a contractor brought onto property on the day prior to commencing work is directed to head straight to their hotel and to standby at that location. The Contractor travelled to the lodging location and charged four hours of travel and 12 hours of standby. When particularly severe weather is expected, especially during the winter months, out-ofstate contractors will commence travel with sufficient time to ensure timely arrival in the Company’s service territory and to allow adequate time for the crew to rest before commencing storm restoration activities. However, if actual travel conditions are less severe than anticipated, the contractor may arrive in the Company’s service territory earlier than expected. In this case, the weather forecasts called for a powerful winter storm with strong damaging winds expected to impact Connecticut beginning Tuesday, January 9th and continuing into Wednesday January 10th. Despite the forecasts for severe weather, this contractor was able to mobilize into the Company’s service territory quicker than expected. When the contractor arrived in the Company service territory, there were limited lodging resources available due, in part, to the impending storm. Consequently, it took time to secure lodging for this contractor. Later in 2024, Eversource took steps to discourage early contractor arrivals by revising its hiring instructions to expressly include “show up no earlier than,” language. However, when severe weather is anticipated, the Company may decide to direct contractors to arrive early and remain on standby, nevertheless. This enables the Company to ensure that adequate resources are in place and available to respond promptly to storm-related restoration needs. d. The contractor was new to the Company’s system and, accordingly, was not yet fully conversant with the Company’s processes and protocols, including timekeeping requirements. As a result, the contractor’s timesheet did not fully conform to the Company’s requirements. Please refer to EOE-205, Attachment 2, for signed timesheets, which were located in the course of preparing for this response. e. The Contractor began their shift and reported to an Eversource location. Because the contractor began their shift, they were on working time at the applicable working rate.
  3. Page 3

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 3 of 4 Please refer to the Company’s response to EOE-267 i for additional detail regarding billing for Equipment during Standby. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: The Company’s accounting system does not separately track amounts billed by vendors for equipment during standby. Accordingly, the Company cannot generate the requested spreadsheet directly from its accounting system to provide the details requested. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. For additional context regarding these charges, the Company’s policy for billing equipment is described below: In the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the full duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel.
  4. Page 4Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 4 of 4 Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors— and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
Words on different pages
Words on different pages

Scanned pages and machine-read text of EOE-205 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-16 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 1 of 10 Eversource Contractor Storm Mobilization & Demobilization Time Report
    1. CONTRACTOR NAME2. SELECT ACTIVITY (MARK ALL THAT APPLY)3. DESTINATION STATE
    East Coast Power LLCX MOBILIZATIONDEMOBILIZATIONCT
    4. CONTRACTOR ADDRESS (NO., STREET, CITY, STATE, ZIP CODE) 11 Anderson Drive, Albany, NY 12205 EVERSOURCE LABOR / EQUIPMENT / EXPENSES
    5. NAME6. CLASSIFICATION7. TRAVEL TIME8. STANDBY TIME9. DESCRIPTION10. ID11. BILLABLE HOURS12. DESCRIPTION13. COST
    Bob BrownSafety5.0012.00Pick UpS00105.00
    Steve MayoLine General Foreman5.0012.00Bucket TruckB16805.00
    Cole TrimLineman5.0012.00
    Colin MahoneyWorking Foreman5.0012.00Bucket TruckB33195.00
    Connor GibbsLineman5.0012.00
    Nick PapasWorking Foreman5.0012.00Bucket TruckB74065.00
    Joe RotundoLineman5.0012.00
    Brian MetzgerWorking Foreman5.0012.00Bucket TruckB22355.00
    Alvin SmithLine Equipment Operator5.0012.00
    Bryan BruceLine General Foreman5.0012.00Pick UpS35855.00
    Chris MayoLine Foreman5.0012.00Bucket TruckS49905.00
    Dustin DannerLine Equipment Operator5.0012.00
    Tyler MosesWorking Foreman5.0012.00Digger/DerrickD89875.00
    Cody BabiarzLine Equipment Operator5.0012.00Trailer - PolePT-015.00
    Justin HouseWorking Foreman5.0012.00Bucket TruckB74645.00
    Josh YotterLineman5.0012.00
    Chris EchavezWorking Foreman5.0012.00Bucket TruckB01905.00
    Garrett BrummettLineman5.0012.00
    Mark BarberoVehicle Mechanic5.0012.00Mechanic TruckM00015.00
    Josh LovinsLine Foreman5.0012.00Bucket TruckB47655.00
    Andrew ScholesLineman5.0012.00
    Ryan AlbrightWorking Foreman5.0012.00Bucket TruckB73855.00
    Tyler RothvossLine Equipment Operator5.0012.00
    Beau BogartWorking Foreman5.0012.00Bucket TruckB06305.00
    Brian AbbateLineman5.0012.00
    Brian BlumenthalWorking Foreman5.0012.00Bucket TruckB02395.00
    Kayin TiptonLineman5.0012.00
    Jeff ZiglerWorking Foreman5.0012.00Bucket TruckB06005.00
    Dennis RuvolaLineman5.0012.00
    Patrick BramlettWorking Foreman5.0012.00Bucket TruckE04375.00
    Stephen StinsonLineman5.0012.00
    Josh ZeliffWorking Foreman5.0012.00Digger/DerrickD16345.00
    Jo Chinco IVLine Equipment Operator5.0012.00Rear Lot MachineBYM-015.00
    Michaela CorbanAdministration5.0012.00Car/Van/SUVS00085.00
    14. TOTALS ▸170.00408.00105.00$ -
    TRAVEL TIME DISTRIBUTION DETAIL
    15. START LOCATION16. END LOCATION17. STANDBY LOCATION18. DESCRIPTION OF TIMETRACKED TRAVEL HOURS: 19. START DATE20. START TIME21. END DATE22. END TIME
    Mechanicville, NYBloomfield, CTTravel from Mechanicville, NY to Bloomfield, CT1/9/20246:00:00 AM1/9/202410:00:00 AM
    Bloomfield, CTBloomfield, CTHome Depot Parking Lot - Bloomfield, CTStandby time waiting for Lodging Information1/9/202410:00:00 AM1/9/202410:00:00 PM
    Home Depot, Bloomfield, CTMilford, CTTravel to Hotel1/9/202410:00:00 PM1/9/202411:00:00 PM
    Home Depot, Bloomfield, CTManchester, CTTravel to Hotel1/9/202410:00:00 PM1/9/202411:00:00 PM
    23. CONTRACTOR REPRESENTATIVE (PLEASE PRINT)24. CONTRACTOR REPRESENTATIVE SIGNATURE25. TELEPHONE NUMBER26. DATE
    Marcy L. Canale[illegible][phone removed]3/6/2024
    27. APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT)28. EVERSOURCE REPRESENTATIVE SIGNATURE29. DATE
    [redacted][redacted]3/6/2024
    Signature by Eversource constitutes acknowledgment of receipt of invoice/time sheet, but Eversource reserves the right to further review and audit this document and the associated charges, and seek reimbursement of any amounts that are found to be over-billed or inaccurate. Rev 1.0, Published 08/2023
  2. Scan of page 2 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 2 of 10 REDACTED
    Eversource Contractor Storm Daily Time & Work ReportEVERSOURCEPage 1 of 5
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT1/10/2024
    4 CONTRACTOR'S NAME5 CONTRACTOR'S ADDRESS (NO. STREET CITY, STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr, Bldg F, Albany, NY 12205
    6 START TIME7 END TIME
    5:00[illegible]
    LABOR
    8 NAME9 CLASSIFICATION10 TRAVEL TIME11 STANDBY12 WORK TIME13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURS16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Bob BrownSafety4Pick Up809104
    Steve MayoForeman4Bucket TruckB16804
    Cole TrimLineman4
    Corin MahoneyLead Lineman4Bucket TruckB33194
    Connor GibbsLineman4
    Nick PapasLead Lineman4Bucket TruckB74064
    Joe RotundoLineman4
    19 TOTALS002816
    WORK DISTRIBUTION
    20 OMS EVENT NUMBER21 LOCATION22 CIRCUIT23 DESCRIPTION OF WORKTRACKED HOURS PER OMS EVENT: 24 EVENT START TIME25 EVENT END TIME
    26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)27 CONTRACTOR REPRESENTATIVE SIGNATURE28 TELEPHONE NUMBER29 DATE
    Marcy L. Canale[handwritten signature]518 332-07581/17/2024
    [redacted]30 EVERSOURCE REPRESENTATIVE (PLEASE PRINT)31 EVERSOURCE REPRESENTATIVE SIGNATURE[redacted]32 DATE7/9/24
    LPK-5008Rev #2.0 Published 06/2023
  3. Scan of page 3 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 3 of 10 REDACTED Eversource Contractor Storm Daily Time & Work Report EVERSOURCE Page [illegible] of [illegible]
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    C11/10/2024
    4 CONTRACTORS NAME5 CONTRACTORS ADDRESS (NO. STREET, CITY, STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr, Bldg F, Albany, NY 12205
    6 START TIME7 END TIME
    5:00 AM (checked) PM (unchecked)9:00 AM (checked) PM (checked)
    LABOR
    8 NAME9 CLASSIFICATIONBILLABLE HOURS PER DAY: 10 TRAVEL TIME11 STANDBY12 WORK TIME13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURS16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Brian MetzgerLead Lineman4Bucket TruckB22354
    Alvin SmithHeavy Equipment Operator4
    Bryan BruceGeneral Foreman4Pick UpS35854
    Chris MayoLine Foreman4Bucket TruckS49904
    Dustin DannerHeavy Equipment Operator4
    Tyler MosesLead Lineman4Digger/DerrickD89874
    Cody BabiarzDriver Groundman4Trailer - PolePT-014
    19 TOTALS002820
    WORK DISTRIBUTION
    20 OMS EVENT NUMBER21 LOCATION22 CIRCUIT23 DESCRIPTION OF WORKTRACKED HOURS PER OMS EVENT: 24 EVENT START TIME25 EVENT END TIME
    25 CONTRACTOR REPRESENTATIVE (PLEASE PRINT): Mary L. Canale27 CONTRACTOR REPRESENTATIVE SIGNATURE: [illegible]28 TELEPHONE NUMBER: 518 352-075829 DATE: 1/17/2024
    30 APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT): [redacted]31 EVERSOURCE REPRESENTATIVE SIGNATURE: [redacted]32 DATE: 7/9/24
    Rev 4.0 Published 05-2023
  4. Scan of page 4 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    **Header (top right):** The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 4 of 10 **Top left:** REDACTED **Form title:** Eversource Contractor Storm Daily Time & Work Report **Logo:** EVERSOURCE **Page marker:** [illegible]
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT1/10/2024
    4 CONTRACTORS NAME5 CONTRACTOR'S ADDRESS (NO. STREET, CITY, STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr, Bldg F, Albany, NY 12205
    6 START TIME7 END TIME
    5:00 AM [checked] PM [unchecked][illegible] AM [checked] PM [checked]
    **LABOR**
    8 NAME9 CLASSIFICATIONBILLABLE HOURS PER DAY: 10 TRAVEL TIME11 STANDBY12 WORK TIMEEQUIPMENT: 13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURSEXPENSES & MATERIAL (Contractor Supplied Only): 16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Justin HouseLead Lineman4Bucket TruckB74644
    Josh YotterLineman4
    Chris EchavezLead Lineman4Bucket TruckB001604
    Garrett BrummettLineman4
    Mark BarberoEq Oper/Field Mechanic4Mechanic TruckM00014
    Josh LovinsForeman4Bucket TruckB47854
    Andrew ScholesLineman4
    16 TOTALS ▶002816
    **WORK DISTRIBUTION** 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME [blank rows]
    26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)27 CONTRACTOR REPRESENTATIVE SIGNATURE28 TELEPHONE NUMBER29 DATE
    Marcy L. Canale[illegible][phone removed]1/17/2024
    30 APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT)[redacted]
    31 EVERSOURCE[redacted]32 DATE7/9/24
    **Footer:** [illegible]
  5. Scan of page 5 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 5 of 10 REDACTED Eversource Contractor Storm Daily Time & Work Report | EVERSOURCE Page 4 of 5
    1. STATE2. DATE WORK WAS PERFORMED3. STORM WORK ORDER
    CT1/12/2024
    4. CONTRACTOR'S NAME5. CONTRACTOR'S ADDRESS (NO., STREET, CITY, STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr, Bldg F, Albany, NY 12205
    6. START TIME7. END TIME
    5:00 AM [checked] PM [unchecked]4:00 AM [unchecked] PM [checked]
    LABOREQUIPMENTEXPENSES & MATERIAL (Contractor-Supplied Only)
    8. NAME9. CLASSIFICATIONBILLABLE HOURS PER DAY: 10. TRAVEL TIME*11. STANDBY12. WORK TIME13. DESCRIPTION14. VEHICLE ID15. BILLABLE HOURS16. DESCRIPTION17. QTY18. UNIT OF MEASURE
    Ryan AlbrightLead Lineman4Bucket TruckB73854
    Tyler RothrossGroundman - 1st Step4
    Beau BogartLead Lineman4Bucket TruckB06304
    Brian AbbateLineman4
    Brian BlumenthalLead Lineman4Bucket TruckB02394
    Kayln TiptonLineman4
    Jeff ZiglerLead Lineman4Bucket TruckB06004
    19. TOTALS ▶002816
    WORK DISTRIBUTION
    20. OMS EVENT NUMBER21. LOCATION22. CIRCUIT23. DESCRIPTION OF WORKTRACKED HOURS PER OMS EVENT: 24. EVENT START TIME25. EVENT END TIME
    26. CONTRACTOR REPRESENTATIVE (PLEASE PRINT)27. CONTRACTOR REPRESENTATIVE SIGNATURE28. TELEPHONE NUMBER29. DATE
    Marcy L. Canale[signature]518-332-875?1/12/2024
    30. APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT)[redacted]31. EVERSOURCE REPRESENTATIVE SIGNATURE[redacted]32. DATE7/9/24
    [illegible] Rev #2 6 Published 06/2023
  6. Scan of page 6 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 6 of 10 REDACTED
    Eversource Contractor Storm Daily Time & Work ReportEVERSOURCE
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT1/1?/2024132/5279
    4 CONTRACTOR'S NAME5 CONTRACTOR'S ADDRESS (NO. STREET CITY STATE ZIP CODE)
    East Coast Power LLC11 Anderson Dr Bldg F Albany, NY 12205
    6 START TIME7 END TIME
    ?:00 AM ☑ PM ☐?:00 AM ☐ PM ☑
    LABOR
    8 NAME9 CLASSIFICATIONBILLABLE HOURS PER DAY: 10 TRAVEL TIME11 STANDBY12 WORK TIMEEQUIPMENT: 13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURSEXPENSES & MATERIAL (Contractor-Supplied Only): 16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Bob BrownSafety4Pick Up500104
    Steve MayoForeman4Bucket TruckB16804
    Cole TrimLineman4
    Colin MahoneyLead Lineman4Bucket TruckB33194
    Conner GibbsLineman4
    Nick PapasLoad Lineman4Bucket TruckBT4064
    Joe RetundeLineman2
    19 TOTALS ▶002615
    WORK DISTRIBUTION 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | UNACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME (blank rows)
    26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)28 CONTRACTOR REPRESENTATIVE SIGNATURE29 TELEPHONE NUMBER27 DATE
    Marcy L. Canale[illegible signature]518 332 07581/17/2024
    30 APPROVER[redacted] (PLEASE PRINT)31 EVERSOURCE ... REPRESENTATIVE[redacted]32 DATE
    [redacted][redacted]7/9/24
    EXX-XXX (footer)Rev. ... (footer) [illegible]
  7. Scan of page 7 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    **Header (top right):** The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 7 of 10 **Top center:** REDACTED **Form title:** Eversource Contractor Storm Daily Time & Work Report | EVERSOURCE **Form fields:**
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT1/10/20241321 5279
    4 CONTRACTOR'S NAME5 CONTRACTOR'S ADDRESS (NO., STREET, CITY, STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr. Bldg F Albany, NY 12205
    6 START TIME7 END TIME
    6:00 AM[illegible] PM
    **Section labels:** LABOREQUIPMENTEXPENSES & MATERIAL (Contractor-Supplied Only)
    **Labor and equipment table:**
    8 NAME9 CLASSIFICATION10 TRAVEL TIME11 STANDBY12 WORK TIME13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURS16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Brian MetzgerLead Lineman4Bucket Truck822364
    Mike SmithHeavy Equipment Operator4
    Bryan BruceGeneral Foreman4Pick Up535654
    Chris MayoLine Foreman4Bucket Truck549934
    Dustin DannerHeavy Equipment Operator4
    Tyler MosesLead Lineman4Digger/DerrickD84874
    Cody Bobaez[illegible]4Trailer - PolePT 014
    TOTALS ▶002820
    **Work distribution section:** WORK DISTRIBUTION 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME **Footer:**
    26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)Marey L. Canala27 CONTRACTOR REPRESENTATIVE SIGNATURE[illegible]13 TELEPHONE NUMBER[phone removed]29 DATE1/17/2024
    28 APPROVED BY (EVERSOURCE REPRESENTATIVE) (PLEASE PRINT)[redacted]29 EVERSOURCE REPRESENTATIVE SIGNATURE[redacted]30 DATE7/9/24
  8. Scan of page 8 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 8 of 10
    Eversource Contractor Storm Daily Time & Work ReportEVERSOURCE
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT3/10/20243215279
    4 CONTRACTOR'S NAME5 CONTRACTOR'S ADDRESS (NO. STREET CITY STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr Bldg F Albany, NY 12205
    6 START TIME7 END TIME
    6:00 AM11 00 PM
    LABOR
    8 NAME9 CLASSIFICATIONBILLABLE HOURS PER DAY: 10 TRAVEL TIME11 STANDBY12 WORK TIMEEQUIPMENT: 13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURSEXPENSES & MATERIAL (Contractor-Supplied Only): 16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Justin HoureLead Lineman4Bucket TruckB7?044
    Josh YolterLineman4
    Chris EchavezLead Lineman4Bucket TruckB00?964
    Garrett BrummettLineman4
    Mark BarberoEq Ope - Field Mechanic4Mechanic TruckM00014
    Josh LowersForeman4Bucket TruckB4?654
    Andrew ScholesLineman4
    TOTALS002816
    WORK DISTRIBUTION 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | FRACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME (blank rows)
    26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)27 CONTRACTOR REPRESENTATIVE SIGNATURE28 TELEPHONE NUMBER29 DATE
    Marcy L CanaleMary L Canale (signature)518 332 07581/17/2024
    30 APPROVED BY (PLEASE PRINT)31 EVERSOURCE REPRESENTATIVE SIGNATURE32 DATE
    [redacted][redacted]7/9/24
  9. Scan of page 9 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 9 of 10 REDACTED
    Eversource Contractor Storm Daily Time & Work ReportEVERSOURCE
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT1/1?/20241321529?
    4 CONTRACTOR'S NAME5 CONTRACTOR'S ADDRESS (NO., STREET, CITY, STATE, ZIP CODE)
    East Coast Power LLC11 Anderson Dr Bldg F Albany NY 12205
    6 START TIME7 END TIME
    8:0011 [illegible]
    LABOREQUIPMENTEXPENSES & MATERIAL (Contractor-Supplied Only)
    8 NAME9 CLASSIFICATION10 TRAVEL TIME11 STANDBY12 WORK TIME13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURS16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Ryan AlbrightLead Lineman4Bucket Truck[illegible]4
    Tyler RothvossGroundman - 1st Step4
    [illegible]Lead Lineman4Bucket Truck808304
    Brian AbbateLineman4
    Brian BlumenthalLead Lineman4Bucket Truck802344
    Kevin TiptonLineman4
    Jeff ZiglerLead Lineman4Bucket Truck896004
    18 TOTALS00281?
    WORK DISTRIBUTION
    20 OMS EVENT NUMBER21 LOCATION22 CIRCUIT23 DESCRIPTION OF WORKTRACKED HOURS PER OMS EVENT: 24 EVENT START TIME25 EVENT END TIME
    21 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)21 CONTRACTOR REPRESENTATIVE SIGNATURE22 TELEPHONE NUMBER23 DATE
    Marcy L. Conale[signature]518 337 07581/17/2024
    20 APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT)EVERSOURCE REPRESENTATIVE SIGNATURE7/9/24
    [redacted][redacted]
    [illegible]
  10. Scan of page 10 of 10 of EOE-205 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 10 of 10 REDACTED Eversource Contractor Storm Daily Time & Work Report EVERSOURCE
    1 STATE2 DATE WORK WAS PERFORMED3 STORM WORK ORDER
    CT1?/10/20241321 527?
    4 CONTRACTOR'S NAME5 CONTRACTOR'S ADDRESS (NO. STREET, CITY STATE ZIP CODE)
    East Coast Power LLC11 Anderson Dr Bldg F Albany NY 12205
    6 START TIME7 END TIME
    5:00 AM[illegible] AM
    LABOREQUIPMENTEXPENSES & MATERIAL (Contractor-Supplied Only)
    8 NAME9 CLASSIFICATION10 TRAVEL TIME11 STANDBY12 WORK TIME13 DESCRIPTION14 VEHICLE ID15 BILLABLE HOURS16 DESCRIPTION17 QTY18 UNIT OF MEASURE
    Dennis RuvoloLineman4
    Patrick BramlettWorking Foreman4Bucket TruckB04374
    Stephen StinsonLineman4
    Josh ZeliffWorking Foreman4Digger/DerrickD16344
    Joe Chinco IVDriver Groundman4Other Equipment - Rear Lot MachineBYM 014
    Michaela CorbanAdministration4Car/Van/SUVS00064
    10 TOTALS ▶002416
    WORK DISTRIBUTION
    20 OMS EVENT NUMBER21 LOCATION22 CIRCUIT23 DESCRIPTION OF WORKTRACKED HOURS PER OMS EVENT: 24 EVENT START TIME25 EVENT END TIME
    26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT)27 CONTRACTOR REPRESENTATIVE SIGNATURE28 TELEPHONE NUMBER29 DATE
    Marcy L CanaleMarcy L Canale (handwritten signature)518 332-07581/17/2024
    30 APPROVED EVERSOURCE REPRESENTATIVE (PLEASE PRINT)31 EVERSOURCE REPRESENTATIVE SIGNATURE32 DATE
    [redacted][redacted]7/9/24
    [illegible]

As listed on the current system

Question(s) Answered 205 (The Connecticut Light and Power Company) Date Filed: 09/30/2026

This filing on the current system (opens in a new tab)