Interrogatory responses
Answers to questions 205
Files4
EOE-205_Final.pdf
PDF · 135 KB · 4 pagesText searchable
Download EOE-205_Final.pdfRead the text of EOE-205_Final.pdf
EOE-205 Attachment 1.pdf
PDF · 150 KB · 2 pagesText searchable
Download EOE-205 Attachment 1.pdfRead the text of EOE-205 Attachment 1.pdf
EOE-205 Attachment 1.xlsx
Excel · 28 KBText searchable
Download EOE-205 Attachment 1.xlsxRead the text of EOE-205 Attachment 1.xlsx
EOE-205 Attachment 2 REDACTED.pdf
PDF · 9.7 MB · 10 pagesText read by machine from a scan; may contain errors, especially in numbers
Download EOE-205 Attachment 2 REDACTED.pdfScanned pages and text of EOE-205 Attachment 2 REDACTED.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 1 of 4 Date Filed: September 30, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 182-226. The Company reported an incremental charge of $188,806 for the East Coast Power LLC vendor. Respond to the following: a. The Company provided a consolidated invoice, along with various documents (i.e., timesheets) but does not appear to have provided an exhibit that details each employee, their titles, hours by day, rates, etc., to allow for a reconciliation to consolidated invoice. Provide documentation supporting the total billed amount, inclusive of rates and hours worked. If they have been filed, please indicate where it has been filed and resubmit it with this response. b. Referring to p. 183, provide a legible version of the document. (Note: it is unclear if p. 184 is the legible version of p. 183.) c. Referring to p. 184, explain why the Company allowed the vendor to bill for 12 hours of standby “waiting for Lodging Information” without assignments. d. Referring to pp. 185-193, explain if the Eversource Contractor Storm Daily Time & Work Reports were fully completed as required by the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information to be completed prior to approval. e. Referring to pp. 185-193, explain how the Eversource reviewer was able to determine that the billed activity related to work (i.e., box 12) in lieu of standby time (i.e., box 11) which would have resulted in fewer billable equipment hours as applied for other standby hours (e.g., p. 184 demonstrates certain equipment that was not billed during standby). As part of the response, provide documentation to support the correct billing classification and, if not available, identify the incremental costs for both labor and equipment that was charged for work in lieu of standby. Response: Reference to Exhibit ACCT-2 CLP-1 (MS24A, Outside Contractors-vendor, line 247, vendor East Coast Power LLC, invoice totaling in the amount of $188,806).Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 2 of 4 a. Please refer to EOE-205, Attachment 1, for a breakdown of requested details identifying each crew member’s name, classification, and equipment based on the information provided on the submitted Invoice and Timesheets. The applicable rates are provided in OCC-044, Attachment 2 CONFIDENTIAL, at pages 1142-1145. b. Upon review, the Company has identified that page 184 is a duplicate timesheet to page 183. c. The contractor crew was directed to drive to Bloomfield, CT on January 9, 2024. Normally, a contractor brought onto property on the day prior to commencing work is directed to head straight to their hotel and to standby at that location. The Contractor travelled to the lodging location and charged four hours of travel and 12 hours of standby. When particularly severe weather is expected, especially during the winter months, out-ofstate contractors will commence travel with sufficient time to ensure timely arrival in the Company’s service territory and to allow adequate time for the crew to rest before commencing storm restoration activities. However, if actual travel conditions are less severe than anticipated, the contractor may arrive in the Company’s service territory earlier than expected. In this case, the weather forecasts called for a powerful winter storm with strong damaging winds expected to impact Connecticut beginning Tuesday, January 9th and continuing into Wednesday January 10th. Despite the forecasts for severe weather, this contractor was able to mobilize into the Company’s service territory quicker than expected. When the contractor arrived in the Company service territory, there were limited lodging resources available due, in part, to the impending storm. Consequently, it took time to secure lodging for this contractor. Later in 2024, Eversource took steps to discourage early contractor arrivals by revising its hiring instructions to expressly include “show up no earlier than,” language. However, when severe weather is anticipated, the Company may decide to direct contractors to arrive early and remain on standby, nevertheless. This enables the Company to ensure that adequate resources are in place and available to respond promptly to storm-related restoration needs. d. The contractor was new to the Company’s system and, accordingly, was not yet fully conversant with the Company’s processes and protocols, including timekeeping requirements. As a result, the contractor’s timesheet did not fully conform to the Company’s requirements. Please refer to EOE-205, Attachment 2, for signed timesheets, which were located in the course of preparing for this response. e. The Contractor began their shift and reported to an Eversource location. Because the contractor began their shift, they were on working time at the applicable working rate.Page 3
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 3 of 4 Please refer to the Company’s response to EOE-267 i for additional detail regarding billing for Equipment during Standby. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: The Company’s accounting system does not separately track amounts billed by vendors for equipment during standby. Accordingly, the Company cannot generate the requested spreadsheet directly from its accounting system to provide the details requested. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. For additional context regarding these charges, the Company’s policy for billing equipment is described below: In the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the full duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel.Page 4
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-205 Page 4 of 4 Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors— and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
Scanned pages and machine-read text of EOE-205 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-16 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 1 of 10 Eversource Contractor Storm Mobilization & Demobilization Time Report
4. CONTRACTOR ADDRESS (NO., STREET, CITY, STATE, ZIP CODE) 11 Anderson Drive, Albany, NY 12205 EVERSOURCE LABOR / EQUIPMENT / EXPENSES1. CONTRACTOR NAME 2. SELECT ACTIVITY (MARK ALL THAT APPLY) 3. DESTINATION STATE East Coast Power LLC X MOBILIZATION DEMOBILIZATION CT
TRAVEL TIME DISTRIBUTION DETAIL5. NAME 6. CLASSIFICATION 7. TRAVEL TIME 8. STANDBY TIME 9. DESCRIPTION 10. ID 11. BILLABLE HOURS 12. DESCRIPTION 13. COST Bob Brown Safety 5.00 12.00 Pick Up S0010 5.00 Steve Mayo Line General Foreman 5.00 12.00 Bucket Truck B1680 5.00 Cole Trim Lineman 5.00 12.00 Colin Mahoney Working Foreman 5.00 12.00 Bucket Truck B3319 5.00 Connor Gibbs Lineman 5.00 12.00 Nick Papas Working Foreman 5.00 12.00 Bucket Truck B7406 5.00 Joe Rotundo Lineman 5.00 12.00 Brian Metzger Working Foreman 5.00 12.00 Bucket Truck B2235 5.00 Alvin Smith Line Equipment Operator 5.00 12.00 Bryan Bruce Line General Foreman 5.00 12.00 Pick Up S3585 5.00 Chris Mayo Line Foreman 5.00 12.00 Bucket Truck S4990 5.00 Dustin Danner Line Equipment Operator 5.00 12.00 Tyler Moses Working Foreman 5.00 12.00 Digger/Derrick D8987 5.00 Cody Babiarz Line Equipment Operator 5.00 12.00 Trailer - Pole PT-01 5.00 Justin House Working Foreman 5.00 12.00 Bucket Truck B7464 5.00 Josh Yotter Lineman 5.00 12.00 Chris Echavez Working Foreman 5.00 12.00 Bucket Truck B0190 5.00 Garrett Brummett Lineman 5.00 12.00 Mark Barbero Vehicle Mechanic 5.00 12.00 Mechanic Truck M0001 5.00 Josh Lovins Line Foreman 5.00 12.00 Bucket Truck B4765 5.00 Andrew Scholes Lineman 5.00 12.00 Ryan Albright Working Foreman 5.00 12.00 Bucket Truck B7385 5.00 Tyler Rothvoss Line Equipment Operator 5.00 12.00 Beau Bogart Working Foreman 5.00 12.00 Bucket Truck B0630 5.00 Brian Abbate Lineman 5.00 12.00 Brian Blumenthal Working Foreman 5.00 12.00 Bucket Truck B0239 5.00 Kayin Tipton Lineman 5.00 12.00 Jeff Zigler Working Foreman 5.00 12.00 Bucket Truck B0600 5.00 Dennis Ruvola Lineman 5.00 12.00 Patrick Bramlett Working Foreman 5.00 12.00 Bucket Truck E0437 5.00 Stephen Stinson Lineman 5.00 12.00 Josh Zeliff Working Foreman 5.00 12.00 Digger/Derrick D1634 5.00 Jo Chinco IV Line Equipment Operator 5.00 12.00 Rear Lot Machine BYM-01 5.00 Michaela Corban Administration 5.00 12.00 Car/Van/SUV S0008 5.00 14. TOTALS ▸ 170.00 408.00 105.00 $ -
Signature by Eversource constitutes acknowledgment of receipt of invoice/time sheet, but Eversource reserves the right to further review and audit this document and the associated charges, and seek reimbursement of any amounts that are found to be over-billed or inaccurate. Rev 1.0, Published 08/202315. START LOCATION 16. END LOCATION 17. STANDBY LOCATION 18. DESCRIPTION OF TIME TRACKED TRAVEL HOURS: 19. START DATE 20. START TIME 21. END DATE 22. END TIME Mechanicville, NY Bloomfield, CT Travel from Mechanicville, NY to Bloomfield, CT 1/9/2024 6:00:00 AM 1/9/2024 10:00:00 AM Bloomfield, CT Bloomfield, CT Home Depot Parking Lot - Bloomfield, CT Standby time waiting for Lodging Information 1/9/2024 10:00:00 AM 1/9/2024 10:00:00 PM Home Depot, Bloomfield, CT Milford, CT Travel to Hotel 1/9/2024 10:00:00 PM 1/9/2024 11:00:00 PM Home Depot, Bloomfield, CT Manchester, CT Travel to Hotel 1/9/2024 10:00:00 PM 1/9/2024 11:00:00 PM 23. CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 24. CONTRACTOR REPRESENTATIVE SIGNATURE 25. TELEPHONE NUMBER 26. DATE Marcy L. Canale [illegible] [phone removed] 3/6/2024 27. APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT) 28. EVERSOURCE REPRESENTATIVE SIGNATURE 29. DATE [redacted] [redacted] 3/6/2024 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 2 of 10 REDACTED
LABOREversource Contractor Storm Daily Time & Work Report EVERSOURCE Page 1 of 5 1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 1/10/2024 4 CONTRACTOR'S NAME 5 CONTRACTOR'S ADDRESS (NO. STREET CITY, STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr, Bldg F, Albany, NY 12205 6 START TIME 7 END TIME 5:00 [illegible]
WORK DISTRIBUTION8 NAME 9 CLASSIFICATION 10 TRAVEL TIME 11 STANDBY 12 WORK TIME 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Bob Brown Safety 4 Pick Up 80910 4 Steve Mayo Foreman 4 Bucket Truck B1680 4 Cole Trim Lineman 4 Corin Mahoney Lead Lineman 4 Bucket Truck B3319 4 Connor Gibbs Lineman 4 Nick Papas Lead Lineman 4 Bucket Truck B7406 4 Joe Rotundo Lineman 4 19 TOTALS 0 0 28 16 20 OMS EVENT NUMBER 21 LOCATION 22 CIRCUIT 23 DESCRIPTION OF WORK TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME 25 EVENT END TIME 26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 27 CONTRACTOR REPRESENTATIVE SIGNATURE 28 TELEPHONE NUMBER 29 DATE Marcy L. Canale [handwritten signature] 518 332-0758 1/17/2024 [redacted] 30 EVERSOURCE REPRESENTATIVE (PLEASE PRINT) 31 EVERSOURCE REPRESENTATIVE SIGNATURE [redacted] 32 DATE 7/9/24 LPK-5008 Rev #2.0 Published 06/2023 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 3 of 10 REDACTED Eversource Contractor Storm Daily Time & Work Report EVERSOURCE Page [illegible] of [illegible]
LABOR1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER C1 1/10/2024 4 CONTRACTORS NAME 5 CONTRACTORS ADDRESS (NO. STREET, CITY, STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr, Bldg F, Albany, NY 12205 6 START TIME 7 END TIME 5:00 AM (checked) PM (unchecked) 9:00 AM (checked) PM (checked)
WORK DISTRIBUTION8 NAME 9 CLASSIFICATION BILLABLE HOURS PER DAY: 10 TRAVEL TIME 11 STANDBY 12 WORK TIME 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Brian Metzger Lead Lineman 4 Bucket Truck B2235 4 Alvin Smith Heavy Equipment Operator 4 Bryan Bruce General Foreman 4 Pick Up S3585 4 Chris Mayo Line Foreman 4 Bucket Truck S4990 4 Dustin Danner Heavy Equipment Operator 4 Tyler Moses Lead Lineman 4 Digger/Derrick D8987 4 Cody Babiarz Driver Groundman 4 Trailer - Pole PT-01 4 19 TOTALS 0 0 28 20
Rev 4.0 Published 05-202320 OMS EVENT NUMBER 21 LOCATION 22 CIRCUIT 23 DESCRIPTION OF WORK TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME 25 EVENT END TIME 25 CONTRACTOR REPRESENTATIVE (PLEASE PRINT): Mary L. Canale 27 CONTRACTOR REPRESENTATIVE SIGNATURE: [illegible] 28 TELEPHONE NUMBER: 518 352-0758 29 DATE: 1/17/2024 30 APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT): [redacted] 31 EVERSOURCE REPRESENTATIVE SIGNATURE: [redacted] 32 DATE: 7/9/24 
The scanned page Machine-read text
**Header (top right):** The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 4 of 10 **Top left:** REDACTED **Form title:** Eversource Contractor Storm Daily Time & Work Report **Logo:** EVERSOURCE **Page marker:** [illegible]
**LABOR**1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 1/10/2024 4 CONTRACTORS NAME 5 CONTRACTOR'S ADDRESS (NO. STREET, CITY, STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr, Bldg F, Albany, NY 12205 6 START TIME 7 END TIME 5:00 AM [checked] PM [unchecked] [illegible] AM [checked] PM [checked]
**WORK DISTRIBUTION** 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME [blank rows]8 NAME 9 CLASSIFICATION BILLABLE HOURS PER DAY: 10 TRAVEL TIME 11 STANDBY 12 WORK TIME EQUIPMENT: 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS EXPENSES & MATERIAL (Contractor Supplied Only): 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Justin House Lead Lineman 4 Bucket Truck B7464 4 Josh Yotter Lineman 4 Chris Echavez Lead Lineman 4 Bucket Truck B00160 4 Garrett Brummett Lineman 4 Mark Barbero Eq Oper/Field Mechanic 4 Mechanic Truck M0001 4 Josh Lovins Foreman 4 Bucket Truck B4785 4 Andrew Scholes Lineman 4 16 TOTALS ▶ 0 0 28 16
**Footer:** [illegible]26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 27 CONTRACTOR REPRESENTATIVE SIGNATURE 28 TELEPHONE NUMBER 29 DATE Marcy L. Canale [illegible] [phone removed] 1/17/2024 30 APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT) [redacted] 31 EVERSOURCE [redacted] 32 DATE 7/9/24 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 5 of 10 REDACTED Eversource Contractor Storm Daily Time & Work Report | EVERSOURCE Page 4 of 5
WORK DISTRIBUTION1. STATE 2. DATE WORK WAS PERFORMED 3. STORM WORK ORDER CT 1/12/2024 4. CONTRACTOR'S NAME 5. CONTRACTOR'S ADDRESS (NO., STREET, CITY, STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr, Bldg F, Albany, NY 12205 6. START TIME 7. END TIME 5:00 AM [checked] PM [unchecked] 4:00 AM [unchecked] PM [checked] LABOR EQUIPMENT EXPENSES & MATERIAL (Contractor-Supplied Only) 8. NAME 9. CLASSIFICATION BILLABLE HOURS PER DAY: 10. TRAVEL TIME* 11. STANDBY 12. WORK TIME 13. DESCRIPTION 14. VEHICLE ID 15. BILLABLE HOURS 16. DESCRIPTION 17. QTY 18. UNIT OF MEASURE Ryan Albright Lead Lineman 4 Bucket Truck B7385 4 Tyler Rothross Groundman - 1st Step 4 Beau Bogart Lead Lineman 4 Bucket Truck B0630 4 Brian Abbate Lineman 4 Brian Blumenthal Lead Lineman 4 Bucket Truck B0239 4 Kayln Tipton Lineman 4 Jeff Zigler Lead Lineman 4 Bucket Truck B0600 4 19. TOTALS ▶ 0 0 28 16
[illegible] Rev #2 6 Published 06/202320. OMS EVENT NUMBER 21. LOCATION 22. CIRCUIT 23. DESCRIPTION OF WORK TRACKED HOURS PER OMS EVENT: 24. EVENT START TIME 25. EVENT END TIME 26. CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 27. CONTRACTOR REPRESENTATIVE SIGNATURE 28. TELEPHONE NUMBER 29. DATE Marcy L. Canale [signature] 518-332-875? 1/12/2024 30. APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT) [redacted] 31. EVERSOURCE REPRESENTATIVE SIGNATURE [redacted] 32. DATE 7/9/24 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 6 of 10 REDACTED
LABOREversource Contractor Storm Daily Time & Work Report EVERSOURCE 1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 1/1?/2024 132/5279 4 CONTRACTOR'S NAME 5 CONTRACTOR'S ADDRESS (NO. STREET CITY STATE ZIP CODE) East Coast Power LLC 11 Anderson Dr Bldg F Albany, NY 12205 6 START TIME 7 END TIME ?:00 AM ☑ PM ☐ ?:00 AM ☐ PM ☑
WORK DISTRIBUTION 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | UNACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME (blank rows)8 NAME 9 CLASSIFICATION BILLABLE HOURS PER DAY: 10 TRAVEL TIME 11 STANDBY 12 WORK TIME EQUIPMENT: 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS EXPENSES & MATERIAL (Contractor-Supplied Only): 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Bob Brown Safety 4 Pick Up 50010 4 Steve Mayo Foreman 4 Bucket Truck B1680 4 Cole Trim Lineman 4 Colin Mahoney Lead Lineman 4 Bucket Truck B3319 4 Conner Gibbs Lineman 4 Nick Papas Load Lineman 4 Bucket Truck BT406 4 Joe Retunde Lineman 2 19 TOTALS ▶ 0 0 26 15 26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 28 CONTRACTOR REPRESENTATIVE SIGNATURE 29 TELEPHONE NUMBER 27 DATE Marcy L. Canale [illegible signature] 518 332 0758 1/17/2024 30 APPROVER [redacted] (PLEASE PRINT) 31 EVERSOURCE ... REPRESENTATIVE [redacted] 32 DATE [redacted] [redacted] 7/9/24 EXX-XXX (footer) Rev. ... (footer) [illegible] 
The scanned page Machine-read text
**Header (top right):** The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 7 of 10 **Top center:** REDACTED **Form title:** Eversource Contractor Storm Daily Time & Work Report | EVERSOURCE **Form fields:**
**Labor and equipment table:**1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 1/10/2024 1321 5279 4 CONTRACTOR'S NAME 5 CONTRACTOR'S ADDRESS (NO., STREET, CITY, STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr. Bldg F Albany, NY 12205 6 START TIME 7 END TIME 6:00 AM [illegible] PM **Section labels:** LABOR EQUIPMENT EXPENSES & MATERIAL (Contractor-Supplied Only)
**Work distribution section:** WORK DISTRIBUTION 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME **Footer:**8 NAME 9 CLASSIFICATION 10 TRAVEL TIME 11 STANDBY 12 WORK TIME 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Brian Metzger Lead Lineman 4 Bucket Truck 82236 4 Mike Smith Heavy Equipment Operator 4 Bryan Bruce General Foreman 4 Pick Up 53565 4 Chris Mayo Line Foreman 4 Bucket Truck 54993 4 Dustin Danner Heavy Equipment Operator 4 Tyler Moses Lead Lineman 4 Digger/Derrick D8487 4 Cody Bobaez [illegible] 4 Trailer - Pole PT 01 4 TOTALS ▶ 0 0 28 20 26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) Marey L. Canala 27 CONTRACTOR REPRESENTATIVE SIGNATURE [illegible] 13 TELEPHONE NUMBER [phone removed] 29 DATE 1/17/2024 28 APPROVED BY (EVERSOURCE REPRESENTATIVE) (PLEASE PRINT) [redacted] 29 EVERSOURCE REPRESENTATIVE SIGNATURE [redacted] 30 DATE 7/9/24 
The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 8 of 10
LABOREversource Contractor Storm Daily Time & Work Report EVERSOURCE 1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 3/10/2024 3215279 4 CONTRACTOR'S NAME 5 CONTRACTOR'S ADDRESS (NO. STREET CITY STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr Bldg F Albany, NY 12205 6 START TIME 7 END TIME 6:00 AM 11 00 PM
WORK DISTRIBUTION 20 OMS EVENT NUMBER | 21 LOCATION | 22 CIRCUIT | 23 DESCRIPTION OF WORK | FRACKED HOURS PER OMS EVENT: 24 EVENT START TIME | 25 EVENT END TIME (blank rows)8 NAME 9 CLASSIFICATION BILLABLE HOURS PER DAY: 10 TRAVEL TIME 11 STANDBY 12 WORK TIME EQUIPMENT: 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS EXPENSES & MATERIAL (Contractor-Supplied Only): 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Justin Houre Lead Lineman 4 Bucket Truck B7?04 4 Josh Yolter Lineman 4 Chris Echavez Lead Lineman 4 Bucket Truck B00?96 4 Garrett Brummett Lineman 4 Mark Barbero Eq Ope - Field Mechanic 4 Mechanic Truck M0001 4 Josh Lowers Foreman 4 Bucket Truck B4?65 4 Andrew Scholes Lineman 4 TOTALS 0 0 28 16 26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 27 CONTRACTOR REPRESENTATIVE SIGNATURE 28 TELEPHONE NUMBER 29 DATE Marcy L Canale Mary L Canale (signature) 518 332 0758 1/17/2024 30 APPROVED BY (PLEASE PRINT) 31 EVERSOURCE REPRESENTATIVE SIGNATURE 32 DATE [redacted] [redacted] 7/9/24 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 9 of 10 REDACTED
WORK DISTRIBUTIONEversource Contractor Storm Daily Time & Work Report EVERSOURCE 1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 1/1?/2024 1321529? 4 CONTRACTOR'S NAME 5 CONTRACTOR'S ADDRESS (NO., STREET, CITY, STATE, ZIP CODE) East Coast Power LLC 11 Anderson Dr Bldg F Albany NY 12205 6 START TIME 7 END TIME 8:00 11 [illegible] LABOR EQUIPMENT EXPENSES & MATERIAL (Contractor-Supplied Only) 8 NAME 9 CLASSIFICATION 10 TRAVEL TIME 11 STANDBY 12 WORK TIME 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Ryan Albright Lead Lineman 4 Bucket Truck [illegible] 4 Tyler Rothvoss Groundman - 1st Step 4 [illegible] Lead Lineman 4 Bucket Truck 80830 4 Brian Abbate Lineman 4 Brian Blumenthal Lead Lineman 4 Bucket Truck 80234 4 Kevin Tipton Lineman 4 Jeff Zigler Lead Lineman 4 Bucket Truck 89600 4 18 TOTALS 0 0 28 1?
[illegible]20 OMS EVENT NUMBER 21 LOCATION 22 CIRCUIT 23 DESCRIPTION OF WORK TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME 25 EVENT END TIME 21 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 21 CONTRACTOR REPRESENTATIVE SIGNATURE 22 TELEPHONE NUMBER 23 DATE Marcy L. Conale [signature] 518 337 0758 1/17/2024 20 APPROVED BY EVERSOURCE REPRESENTATIVE (PLEASE PRINT) EVERSOURCE REPRESENTATIVE SIGNATURE 7/9/24 [redacted] [redacted] 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 11, 2026 EOE-205 Attachment 2 REDACTED Page 10 of 10 REDACTED Eversource Contractor Storm Daily Time & Work Report EVERSOURCE
WORK DISTRIBUTION1 STATE 2 DATE WORK WAS PERFORMED 3 STORM WORK ORDER CT 1?/10/2024 1321 527? 4 CONTRACTOR'S NAME 5 CONTRACTOR'S ADDRESS (NO. STREET, CITY STATE ZIP CODE) East Coast Power LLC 11 Anderson Dr Bldg F Albany NY 12205 6 START TIME 7 END TIME 5:00 AM [illegible] AM LABOR EQUIPMENT EXPENSES & MATERIAL (Contractor-Supplied Only) 8 NAME 9 CLASSIFICATION 10 TRAVEL TIME 11 STANDBY 12 WORK TIME 13 DESCRIPTION 14 VEHICLE ID 15 BILLABLE HOURS 16 DESCRIPTION 17 QTY 18 UNIT OF MEASURE Dennis Ruvolo Lineman 4 Patrick Bramlett Working Foreman 4 Bucket Truck B0437 4 Stephen Stinson Lineman 4 Josh Zeliff Working Foreman 4 Digger/Derrick D1634 4 Joe Chinco IV Driver Groundman 4 Other Equipment - Rear Lot Machine BYM 01 4 Michaela Corban Administration 4 Car/Van/SUV S0006 4 10 TOTALS ▶ 0 0 24 16
[illegible]20 OMS EVENT NUMBER 21 LOCATION 22 CIRCUIT 23 DESCRIPTION OF WORK TRACKED HOURS PER OMS EVENT: 24 EVENT START TIME 25 EVENT END TIME 26 CONTRACTOR REPRESENTATIVE (PLEASE PRINT) 27 CONTRACTOR REPRESENTATIVE SIGNATURE 28 TELEPHONE NUMBER 29 DATE Marcy L Canale Marcy L Canale (handwritten signature) 518 332-0758 1/17/2024 30 APPROVED EVERSOURCE REPRESENTATIVE (PLEASE PRINT) 31 EVERSOURCE REPRESENTATIVE SIGNATURE 32 DATE [redacted] [redacted] 7/9/24
As listed on the current system
Question(s) Answered 205 (The Connecticut Light and Power Company) Date Filed: 09/30/2026