Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 207, 209

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
1 page match
  1. Page 4 of 24Match

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-209 Attachment 1 REDACTED Page 4 of 24 shall only apply to Holidays designated in this Agreement. Contractor shall not be reimbursed for Holidays beyond the hours actually worked by Contractor's personnel. No reimbursement will be made for Holidays not worked. Owner shall not be billed for Contractor's holidays. Contractor shall not be entitled to premium time quoted, estimated and/or otherwise anticipated, but not actually worked. The labor prices contained in PRICING SCHEDULE - T&M have been calculated consistent with the methodologies set forth in cost-plus pricing methodologies in Section 3 of this Pricing Schedule, and any labor rates not identified in PRICING SCHEDULE T&M shall be established consistent with such methodology. 3.4. Equipment. If any Services using time and material prices, in whole or in part, involves equipment not specifically addressed in the unit pricing established pursuant to Section 3 of this Pricing Schedule, the equipment rates set forth in PRICING SCHEDULE - T&M attached to this Agreement shall be used for pricing equipment. Hourly equipment rental rates shall be the applicable weekly rate divided by . Equipment rates shall be used only if Contractor mobilizes equipment to a Site, and such equipment is maintained in operating condition. Costs for labor associated with the operation of such equipment are not included in such equipment rates, and shall be determined in accordance with Section 3.3 of this Pricing Schedule. Equipment prices will apply without increase or other modification for use with Overtime and/or Double Time labor. The aggregate equipment charges for any single piece of Contractor-owned equipment used in all Work shall be limited to the fair market value of the piece of equipment when the first Work is priced involving usage of such piece of equipment. The equipment prices contained in PRICING SCHEDULE - T&M have been calculated consistent with the methodologies set forth in cost-plus pricing methodologies in Section 3 of this Pricing Schedule, and any equipment rates not identified in PRICING SCHEDULE - T&M (including rental equipment) shall be established consistent with such methodology; provided that fuel, insurance, depreciation, overhead, profit and all costs associated with the operation and maintenance of that equipment in good working order on the job have been (and will be) included in the equipment rates. 3.5. Major Equipment. Allowable costs may include appropriate amounts for Major Equipment (tools and equipment with an individual purchase cost of more than specifically needed and used for Work performed on a cost-plus basis. For Contractor-owned equipment, allowable "bare" equipment rates shall be the weekly rate listed in the most current publication of The Primedia Blue Book divided by to arrive at a maximum allowable hourly rate to be applied to the actual hours of equipment usage. Notwithstanding anything to the contrary in this Pricing Schedule, for Contractor-owned equipment, the aggregate equipment charges for any single piece of equipment used for Work (however priced) shall be limited to the fair market value of the piece of equipment. If Contractor requires rental equipment, Contractor shall obtain the prior approval of the applicable Owner Representative before renting such equipment, and the allowable costs for such rented equipment shall not exceed the EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
  2. Page 5 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-209 Attachment 1 REDACTED Page 5 of 24 applicable State of Connecticut rates listed in the most current publication of The Primedia Blue Book. 3.6. Standby Charges. Standby Charges for major equipment shall be included in actual costs only if Contractor mobilizes such equipment to the Site consistent with the Work Schedule, such equipment is maintained in operating condition, and the Owner's Representative directs Contractor not to use such major equipment as a result of any of the Standby Conditions detailed in Section 3 in PRICING SCHEDULE. Standby rates shall be billed as set forth in Appendix PS-5 – DIRECT, INCREMENTAL COST(S). 3.7. Materials. Time and material prices for any materials supplied by Contractor in accordance with Section 9.1(a) of this Agreement shall be based on the cost of such materials (determined in accordance with Section 3), plus the Mark-Up Percentage Fee for materials (as set forth in PRICING SCHEDULE - T&M attached to this Agreement). 3.8. Not-to-Exceed. If specified in a Work Release, Project Specific Agreement and/or any Change Order, unless Owner initiates a Change Order, Contractor's charges for all or a portion of Services using time and material pricing shall not exceed a maximum amount established by the Parties, and Owner shall not be liable for any charge in excess of such maximum. 3.9. Additional Fixed Rates. All time and material rates listed in this Pricing Schedule shall remain firm through the applicable period set forth in the PRICING SCHEDULE - T&M referenced in this Section 3. Thereafter, in the event Contractor desires to modify such rates for a subsequent rate period, or to add compensable Services not identified in the Pricing Schedule, Contractor shall submit a proposal to Owner containing fixed rates for a period of not less than twelve (12) months from the applicable effective date for: (a) compensable Services not identified in this Pricing Schedule; and/or (b) the period after the expiration of the last Term ("Last Rate Period") for the applicable Service identified in this Pricing Schedule. (c) The Parties shall negotiate each such proposal in good faith, and acceptance thereof shall be evidenced by an additional rate schedule for the applicable rate period signed by both Parties that shall be appended to, and automatically constitute a part of, this Pricing Schedule. 3.10. Notwithstanding anything to the contrary in the Contract Documents, Contractor shall bill the Owner Overtime and/or Double Time rates only after written authorization by the Owner's Representative, which may be granted or withheld in the EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
  3. Page 6 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-209 Attachment 1 REDACTED Page 6 of 24 Owner's Representative's sole and exclusive discretion. Contractor shall not charge an extra or otherwise impose any premium for shift or night work. No payment will be made for holidays not worked. Daily time sheets with names of all Contractor's employees working on the Project and the paid hours worked by Contractor's employees will be required to be submitted to Owner for both labor and equipment used by Contractor for the relevant time periods. 3.11. Intentionally omitted 3.12. Contingency must be identified for a specific Scope of Work and at a defined price or pricing methodology. At Owner’s discretion “contingency can be quoted on a percentage basis. 3.13. Markup Percentage Fee. 3.13.1. The mark-ups (each a "Markup Percentage Fee") set forth in PRICING SCHEDULE - T&M attached to this Pricing Schedule shall apply to compensation based on a cost recovery basis. Unless the Parties establish a lower mark-up in a Work Release or Project Specific Agreement for cost-based pricing, the Markup Percentage Fee set forth in PRICING SCHEDULE - T&M shall apply to each Project. The Markup Percentage Fee shall be a single markup as set forth in PRICING SCHEDULE - T&M applied to the net direct cost (excluding taxes and reimbursable costs); provided that that neither Contractor, nor any Subcontractor (at any tier) shall be entitled to, or otherwise receive any Markup Percentage Fee with respect to equipment. To the extent that any charges by any Subcontractor(s) (including any Work performed by lower tier contractors) include any cost-based pricing, the aggregate markup charged to, and paid by, Owner shall be the Markup Percentage Fee set forth in PRICING SCHEDULE - T&M as applied to the original cost; accordingly, such Subcontractor(s) shall not markup such costs, and Contractor and such Subcontractor(s) shall address the sharing of that single, combined fee in the applicable subcontract(s). Notwithstanding anything to the contrary in this Pricing Schedule, Contractor shall not include or otherwise impose on Owner any handling charge and/or percentage mark-up for the premium portion of any service, procurement or other Work. The foregoing pricing limitations shall apply equally to any and all subcontracting undertaken, at any tier, by, and/or on behalf of, any Subcontractor. 3.13.2. Without limiting the generality of the foregoing, for Owner-authorized change order Work that is performed and billed on a T&M basis, the agreed upon Markup Percentage Fee for all labor is intended to cover Contractor's profit and all indirect costs associated with such Work. Items intended to be covered by the Markup Percentage Fee include: home office expenses, branch office and field office overhead expense of any kind; project management; EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
  4. Page 7 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  5. Page 8 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  6. Page 9 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 10 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 11 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  9. Page 12 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-209 Attachment 1 REDACTED Page 12 of 24 5.2. Constructability Review. Owner may use a constructability review process as a means of improving and/or updating the Project design prior to receiving a quote from Contractor. Contractor shall have the right to receive reimbursement for such constructability review labor for a single employee (up to the classification of general foreman) and one vehicle (pick-up truck), even if Owner does not award such work to Contractor (and/or any other contractor). Contractor invoices for constructability reviews should reference the Project name and number, Owner inquiry number, purchase order and Work Release established only for constructability reviews, appropriate "work order" from the Project, and the Owner Representative's name. 5.3. Other Reimbursable Costs. If Services for a Project are exclusively priced using the time and material methodology set forth in Section 3, Owner shall reimburse Contractor for the following costs without profit or mark-up whatsoever (unless specifically indicated below), as incurred in performing the Work on such Project, but only if and to the extent not already included in any other respect in another aspect of time and material pricing and/or not otherwise addressed elsewhere in the Contract Documents: (a) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the actual cost of any manufacturer's representatives, service engineers, start-up engineers, instrument check and calibration technicians and other manufacturer’s special services; (b) net cost of correcting faulty materials furnished by Owner; (c) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the net cost of testing services by Third Parties, unless necessary as a result of negligence on the part of Contractor and/or its Subcontractor; (d) net cost of Owner-requested field office facilities equipment for exclusive use by the Owner Representative for such Project; the actual rate charged by a Subcontractor on such Project for services rendered, plus the Markup Percentage Fee in Appendix PS-6 PRICING SCHEDULE - T&M; provided that flagging/police services are not subject to a subcontractor markup unless the Owner Representative for such Project specifically requests that Contractor directly retain such services, rather than just coordinate them with the flagging company or police department; (e) (f) net direct cost paid by Contractor to Third Parties as rent or similar occupancy cost for parking, show-up, laydown and/or storage area(s) acquired for such Project (plus the Markup Percentage Fee in Appendix PS-6 PRICING SCHEDULE - T&M); provided that notwithstanding anything in this Pricing Schedule or elsewhere in the Contract Documents, Contractor shall not be EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
  10. Page 13 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-209 Attachment 1 REDACTED Page 13 of 24 entitled to recover and/or be reimbursed for (i) the internal costs of Contractor and/or any Subcontractor in locating, negotiating, acquiring, preparing and/or otherwise arranging such parking, show-up, laydown and/or storage area(s); and/or (ii) the costs associated with acquisition of a fee interest in any parking, show-up, laydown and/or storage area(s) and/or any other real property interest in the same that extends beyond the period required to perform the Work; (g) net cost paid by Contractor to a Governmental Authority as a filing fees and/or other charge as a condition to the issuance of a Contractor Permit required for such Project by such Governmental Authority; excluding, however, any such fee and/or charge required for construction equipment; and (h) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the net cost for Contractor to verify, sign for, unload and accept vendor delivered materials to the storage/staging areas. Contractor's invoicing of reimbursable costs shall be supported by reasonably detailed documentation and such other verification as requested by Owner which, in the case of Subcontractor services (including materials and supplies), shall include signed time sheets, subcontractor invoices, and delivery receipts or other relevant documentation. Contractor shall use all reasonable efforts to mitigate the costs incurred in connection with all reimbursable costs and expenses, including, in the case of any reimbursable labor, using workers with the lowest rate appropriate for the Work. 5.4. Additional Requirements. With respect to Work using time and material and/or cost-plus pricing methodologies: (a) When material transport is requested by the Owner Representative for the applicable Project, Contractor shall invoice such transport charge using the hourly rate of the 5th step apprentice, or lowest job classification on the applicable Site, whichever is lower and Contractor shall only be permitted to invoice for a maximum of up to two (2) workers with respect to such material transport charge. (b) When Contractor performs flagging Services (pursuant and subject to the terms and conditions of Section 9.9(b) of this Agreement), Contractor shall invoice such flagging Services using the hourly rate of the 5th step apprentice, or lowest job classification on the applicable Site, whichever is lower. (c) If requested by Contractor in connection with the award of a Project, Contractor and the Owner Representative for such Project shall negotiate in good faith to establish in writing a reasonable guaranteed maximum for mobilization and demobilization prior to award of such Project; provided that if EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20

As listed on the current system

Question(s) Answered 207, 209 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/28/2026

This filing on the current system (opens in a new tab)