Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

  1. Page 14 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 14 of 63 Contractor onboarding VIRTUAL PROCESS • Each non-Eversource crew member (contractor and outside utility) is required to be on-boarded prior to the start of restoration work. • The General Foreman or Foreman/Lead assigned to crews for the contractor and/or outside utility will be responsible for taking applicable safety onboarding and disseminating the information to their assigned crews. • Existing contractor crew leads already on Eversource property prior to a storm event (for example, Contractors of Choice (COC)), require a formal on-boarding that is valid for one (1) year. • Formal on-boarding for a non-COC, as well as Foremen/Leads from a COC company but traveling from an area outside our service territory (CT/MA/NH), are valid for six (6) months. • Aggregator companies (i.e. Parent companies that hire subsubcontractors to work under the Parent Name), shall ensure that the Foreman/Leads from the hired companies complete the onboarding and acknowledgement form. • Eversource requires that the name on a company truck matches with the name given on the acknowledgement form. External Resource Field Coordinator Training - Safety
  2. Page 15 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 15 of 63 Contractor Connecticut (CT) Eastern Massachusetts (EMA) Western Massachusetts (WMA) New Hampshire (NH) Aldridge Electric, Inc. Asplundh Construction Corp. ATL Construction, Inc. Aztec Energy, Inc. Blakeslee Arpaia Chapman, Inc. BluRoc, LLC Bond Brothers, Inc. Central Connecticut Cable Co Inc Charter Oak Utility Constructors Inc Cianbro Corporation CJ Drilling, Inc. Conexus Energy Group LLC Creative Surveying LLC D and D Power, Inc. E. S. Boulos Company East Coast Power LLC EJ Electric Installation Co Fairway Electric Inc. Ferreira UTEC, LLC G Greene Construction Co Inc. Grattan Line Construction Corp H. I. Stone & Son Inc Harlan Electric Co Haugland Energy Group LLC Hutter Construction Corporation I C Reed & Sons Inc I.B. Abel, Inc. Infrasource Construction LLC JCR Construction Co Inc JHD Corporation Lawrence Lynch Corp. M J Electric LLC Manafort Brothers Inc. Mass Bay Electrical Corp. Matrix North American Construction, Inc. X X X X X X X X X X X X X McCourt Construction Co. Inc. McPhee Electric LTD LLC Michels Power, Inc. MTV Solutions Inc. Nooter Utility Services Northline Utilities, LLC One Source Power, LLC Orion Utility Contractors, LLC P&G Power Corp. Power Line Contractors, Inc. Riggs Distler & Company Inc. Right of Way Solutions, LLC Sargent Electric Company Squan Construction Services, LLC State Electric Corporation Suffolk Construction Company, Inc. Supreme Industries, Inc. The Middlesex Corporation Three Phase Line Construction Inc United Civil, LLC Utility Service & Assistance Inc. Valiant Energy Service LLC W. A. Chester LLC Witch Enterprises Inc X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X External Resource Field Coordinator Training - Safety 15
  3. Page 16 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 16 of 63 External Resource Field Coordinator Training - Safety 16
  4. Page 17 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 17 of 63 Eversource External Mutual Aid Safety Onboarding Guide Worker Responsibilities: Comply with required federally mandated OSHA requirements and to the normal safety practices and policies of your home organizations. Eversource Information Transfer Policy: OSHA requires Eversource and contractors to exchange information on known hazards and on the existing conditions, characteristics, design, and operation of Eversource’s installation. Eversource transfers this information through the External Contractor Mutual Aid Safety Briefing. External Resource Field Coordinator Training - Safety 17
  5. Page 18 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 18 of 63 Daily Safety Messages: All crew supervisors are expected to communicate the messages to their crews before the start of each workday. ES Storm Safety Briefing will be shared through e-mail. External Resource Field Coordinator Training - Safety 18
  6. Page 19 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 19 of 63 E-911 Information: – – – KNOW YOUR EXACT LOCATION BEFORE STARTING WORK. Notify crew leader and workers about allergies, medications, and medical conditions. Ensure your supervisor has local storm room phone number and name and address of all local medical facilities. External Resource Field Coordinator Training - Safety 19
  7. Page 20 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 20 of 63 Conduct Documented Job Briefings: – – – Before each job and when the scope of the job changes; include all personnel at site. Discuss hazards associated with job, work procedures, special precautions, energy source control, PPE, other crews in the area, emergency procedures. The documented Job Safety Briefing must be readily available at the jobsite. External Resource Field Coordinator Training - Safety 20
  8. Page 21 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 21 of 63 System Voltages: Grounded Wye, Unigrounded Wye, and Delta Primary Circuits – Each business entity within Eversource has its own distribution system voltage safety requirements and design considerations. Ask your owners representative and/or bird dog for circuit voltages and arc flash potential. ES PRIMARY DISTRIBUTION VOLTAGES PER COMPANY Company New E W Connecticut Hampshire Massachusetts Massachusetts 2,300 V Delta 2,160/3,740 V X X 2,400/4,160 V X X X X 4,800/8,320 V X X X X 4,800/8,320 V X Delta 7,200/12,470 V X 7,620/13,200 V X X 7,967/13,800 V X X X X 11,450 V X 13,200/22,860 V X X X 14,000/24,940 V X X 19,920/34,500 V X X X 26,558/46,000 V X 27,600 V Delta X Voltage External Resource Field Coordinator Training - Safety 21
  9. Page 22 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 22 of 63 PPE: – – – – – – – Comply with required federally mandated OSHA requirements and to the normal safety practices and policies of your home organizations. All personnel on site must wear appropriate PPE High Visibility Traffic Vest (Class III) Hard Hat Safety Glasses EH Safety Footwear FR Clothing External Resource Field Coordinator Training - Safety 22
  10. Page 23 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 23 of 63 Eversource External Mutual Aid Safety Onboarding Guide PPE Continued: External Resource Field Coordinator Training - Safety 23

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 07.pdf

Extracted from the file · 63 pages · 45,425 characters

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)