Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

  1. Page 21 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 21 of 63 System Voltages: Grounded Wye, Unigrounded Wye, and Delta Primary Circuits – Each business entity within Eversource has its own distribution system voltage safety requirements and design considerations. Ask your owners representative and/or bird dog for circuit voltages and arc flash potential. ES PRIMARY DISTRIBUTION VOLTAGES PER COMPANY Company New E W Connecticut Hampshire Massachusetts Massachusetts 2,300 V Delta 2,160/3,740 V X X 2,400/4,160 V X X X X 4,800/8,320 V X X X X 4,800/8,320 V X Delta 7,200/12,470 V X 7,620/13,200 V X X 7,967/13,800 V X X X X 11,450 V X 13,200/22,860 V X X X 14,000/24,940 V X X 19,920/34,500 V X X X 26,558/46,000 V X 27,600 V Delta X Voltage External Resource Field Coordinator Training - Safety 21
  2. Page 22 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 22 of 63 PPE: – – – – – – – Comply with required federally mandated OSHA requirements and to the normal safety practices and policies of your home organizations. All personnel on site must wear appropriate PPE High Visibility Traffic Vest (Class III) Hard Hat Safety Glasses EH Safety Footwear FR Clothing External Resource Field Coordinator Training - Safety 22
  3. Page 23 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 23 of 63 Eversource External Mutual Aid Safety Onboarding Guide PPE Continued: External Resource Field Coordinator Training - Safety 23
  4. Page 24 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 24 of 63 Eversource External Mutual Aid Safety Onboarding Guide Use of Pole Banners: – Pole banners are intended as an informational work control barrier for highlighting energy isolation points while crews are working beyond a protective device on primary lines. – Other normal crew protections must also take place, such as removing the cutout door, lifting taps and grounding. – The banner alone is not a protection method and should never be treated as such. – Pole banners should be applied on the pole where the open device is located. – Qualified crews shall install the pole banners and information tags and they shall remain in place until the work is complete (for the day), all grounds have been removed and all workers and equipment are in the clear. – If a pole banner is applied at a work site, contact the person on the tag before starting any work. Use of Ground Flags: – A ground flag provides an observer, whether it be the crew on-site working the line or a crew in the area, an indication that grounds are installed. Ground flags provide a better visual and stand out to an observer more than just the grounds themselves. This is a good practice to remind the crew to remove grounds prior to releasing clearance and re-energizing the line. NEVER ENERGIZE A LINE WHILE A POLE BANNER IS STILL APPLIED AT AN ENERGY ISOLATION DEVICE External Resource Field Coordinator Training - Safety 24
  5. Page 25 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 25 of 63 Eversource External Mutual Aid Safety Onboarding Guide NEVER ENERGIZE A LINE WHILE A POLE BANNER IS STILL APPLIED AT AN ENERGY ISOLATION DEVICE External Resource Field Coordinator Training - Safety 25
  6. Page 26 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 26 of 63 Eversource External Mutual Aid Safety Onboarding Guide Managing Arc Flash Hazards: – If performing live line work, minimize arc flash hazards with: – – • • Appropriate FR clothing Personal Protective Equipment (PPE) Place an upstream automatic protective device in Hot Line Tag (HLT) or in Non-Reclose Mode if HLT is not available. Increase your distance from the energized parts through use of Live Line Tools. Distribution Switching & Tagging Requirements: – Energizing or de-energizing of nomenclature (numbered) – switches and three phase devices is done only under the supervision of an Eversource employee qualified on the authorize persons list. Outside utility crews and contractors can work with the approval of local Eversource management on portions of radial taps. The person in charge shall assume responsibility for opening all cutouts, disconnects, jumpers, taps, and other means through which KNOWN sources of electric energy may be supplied. External Resource Field Coordinator Training - Safety 26
  7. Page 27 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 27 of 63 – Equipment is tested for potential and grounded. – An example of a Clearance Tag use is when minimum approach distances cannot be maintained. External Resource Field Coordinator Training - Safety 27
  8. Page 28 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 28 of 63 External Resource Field Coordinator Training - Safety 28
  9. Page 29 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 29 of 63 – Overhead repairs when switches are opened for emergencies. Conductors shall be treated as energized, using Live Line Work Methods. – For work that does not require Clearance Zone of Protection but requires equipment to be de-energized. External Resource Field Coordinator Training - Safety 29
  10. Page 30 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 30 of 63 External Resource Field Coordinator Training - Safety 30

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 07.pdf

Extracted from the file · 63 pages · 45,425 characters

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)