A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

  1. Page 34 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 34 of 63 – CT on-call: [phone removed] – MA on-call: [phone removed] – NH on-call: [phone removed] External Resource Field Coordinator Training - Safety 34
  2. Page 35 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 35 of 63 Call an “All Stop” if you are unsure about a piece of equipment, work method, or have a safety concern. DO NOT PROCEED until clarity is provided or the appropriate/safe work method is determined. External Resource Field Coordinator Training - Safety 35
  3. Page 36 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 36 of 63 Additional mutual aid documents are located at: https://www.eversource.com/content/ct-c/about/about-us/doingbusiness-with-us/builders-contractors/electric-contractor-safetyrequirements/electric-mutual-aid-safety-onboarding External Resource Field Coordinator Training - Safety 36
  4. Page 37 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 37 of 63 Questions ??? External Resource Field Coordinator Training - Safety 37
  5. Page 38 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 38 of 63 Module 2 External Resource Field Coordinator and Crew Guide Training 38 Safety First and Always
  6. Page 39 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 39 of 63 Module 2 Agenda External Resource Field Coordinator and Crew Guide Training – ERFC & Crew Guide roles based on Incident Command System (ICS) ORG – Communicating with to Contractor Caller – ARCOS Crew Manager & Food & Lodging – Collecting signed timesheets & daily work logs 39 Safety First and Always
  7. Page 40 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 40 of 63 Definition ERFCs / Crew Guides coordinate the activities of the crews assigned to them. They communicate the restoration strategy to the crews and provide them with logistical details concerning food and lodging. They provide two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the Restoration Management Team (RMT) and field crews. The difference between ERFCs and Crew Guides is ERFCs are ESOP-100 APL (Authorized Persons List) Qualified person and can hold clearances for contractors. Crew Guides are not on the APL. Note, ERFC must be ESOP99 Qualification #5 to perform switching 40 Safety First and Always
  8. Page 41 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 41 of 63 Resource Acquisition Branch ICC Resource Section Chief ICC Resource Acquisition Branch Director ICC Group Manager: Crew Management EOC/AWC External Resource Field Unit Leader FIELD External Resource Field Coordinator FIELD Crew Guide 41 Safety First and Always
  9. Page 42 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 42 of 63 Responsibilities Operational Oversight ERFC Unit works within Resource Acquisition Unit to verify rosters and track all line contractor resources throughout the event. The ERFC or CG is the final check of contractor roster information in ARCOS to verify correct information. If roster/ARCOS information is not accurate, crews may not be assigned lodging, food, work assignments, and contractor billing can be impacted. Financial Documentation The External Resource Field Coordinator (ERFC)/Crew Guide has the responsibility to ensure accurate time reporting on daily timesheets and signing for travel times on mob/demob timesheets. 42 Safety First and Always
  10. Page 43 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 43 of 63 Safety Ensure the safety briefing (External Mutual Aid OnBoarding) is provided by a Safety Specialist – Daily Job Briefing – provided by ERFC/Crew Guide – Daily Safety Briefing – provided by ERFC/Crew Guide Contractors are following all Eversource Safety Rules including appropriate PPE and Daily Safety and Job Briefings - If unsure, contact Safety Specialist Report all incidents immediately (Injuries, MVA, etc) Safety Concerns – STOP work and work with contractor and Safety to resolve Notify the Operations Coordinator with any Safety Issues 43 Safety First and Always

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 07.pdf

Extracted from the file · 63 pages · 45,425 characters

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)