Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

  1. Page 44 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 44 of 63 External Resource Field Unit Leader External Resource Field Unit Leader oversees External Resource Field Coordinators/Crew Guides who are assigned to contract crews. They determine Coordinator schedules and assign them to contractors and act as a key point of contact to address any logistical, operational or safety issues that may arise Pre-ERP Focus Assess availability, activate, and deploy unit personnel as directed, including ERFC and Crew Guides Assign External Resource Field Coordinators and Crew Guides with contract crews in anticipation of arrival During ERP Focus Provides a schedule for all personnel for location, shifts and contractor coverage and directs the contractors through the on-boarding process Ensure logistics needs such as F&L, materials, etc. are being met Provides oversight while crews are working on system Remind the ERFC to coordinate daily safety briefings and to maintain time sheets Job Description EP-ALL-EPJD-RM-08R0 is located on the Eversource Intranet, Weather & Outages, EP Doc Library. 44 Safety First and Always
  2. Page 45 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 45 of 63 External Resource Field Coordinator / Crew Guide ERFC/Crew Guide coordinates the activities of crews assigned to them. They communicate the restoration strategy to the crews and provide them with logistical details concerning food and lodging. Meet and greet your contractor and exchange cell #’s Communicates with Contractor Caller regularly to verify contractor roster and communicate any discrepancies as well as obtain Food & Lodging information. Coordinates Contractor Safety Briefings, makes sure all have PPE Coordinate Food and Lodging requests through Contractor Callers Work with RMT on work assignments for each day Track contractor working and rest hours each day (16/8) or (18/6) Hold work clearances as needed (ERFC Only) Act as a field liaison between the contractor and RMT if issues arise 45 Safety First and Always
  3. Page 46 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 46 of 63 Ensure that all completed work is called back into the RMT Ensure contractor is providing on-site status and ETR’s – Liaison between contractor and RMT to complete work safely and in a timely manner – Must provide status – on-route, on-site, and ETR’s in timely manner for all assigned work tickets back to RMT – Ensure all completed work is reported back to RMT Ensure contractor timesheet is accurate, sign and retain a copy Field Coordinators should end shift work early enough to allot for travel to lodging and meals Responsible for demobilization and returning materials to local storerooms 46 Safety First and Always
  4. Page 47 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 47 of 63 Forward all signed time sheets to Resource Acquisition UL state email box – [email removed] – [email removed] – [email removed] Job Description EP-ALL-EPJD-RM-09R1 and EP-ALL-EPJDRM-14R1 respectively are located on the Eversource Intranet, Weather & Outages, EP Doc Library. 47 Safety First and Always
  5. Page 48 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 48 of 63 ERFC/Crew Guide Difference Authorized Persons List (APL) – Authorized Person A Qualified Person who has been deemed competent to perform one or more of the following activities and whose name and authorized category(s) are on the Eversource Authorized Person List: – Request a Clearance, Permission, or NRA – Hold a Clearance, Permission, or NRA – Perform Operator Switching & Tagging – Perform Field Switching & Tagging – Perform Delegated Controllership responsibilities Exception: A person who is undergoing On-the-Job Training and who, during such training, has demonstrated an ability to perform duties safely at his or her level of training and is under the direct supervision of an Authorized Person, may be considered an Authorized Person in the performance of those specific duties. Hub Link for more information: https://eversourceenergy.sharepoint.com/sites/ElectricOperations/SitePages/Switching-and-Tagging-Project.aspx Safety First and Always 48
  6. Page 49 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 49 of 63 APL Qualified Switching Resources APL’s are assigned to assist Crew Guides (sometimes multiple) during an event to act as a qualified switching resource in the field. Activated and receive assigned Crew Guides and/or contractor lead contact information and reporting location from Contract Callers. Communicate/coordinate with Crew Guides and/or contractor leads at start of event and every shift to ensure all are in required locations working or ready to respond. Coordinate with Crew Guides on daily work assignments that require switching support. Take applicable switching orders at physical job locations from Dispatch for all non-APL qualified Crew Guides as required. Communicate status of work assignments to Crew Guides. – On route, working, complete Expect to receive multiple check-in phone calls per day from Contractor Callers before and during each shift of an event. – Activation/assignments, location changes, new instructions or direction, receive information back from field, etc. Safety First and Always
  7. Page 50 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 50 of 63 Resource Acquisition Specialist / Contractor Caller Trained to make contact with the ERFC/Crew Guide periodically throughout the day to remind & ensure the following: – Safety briefing takes place and or reporting of any safety incidents – Crew and bucket count changes – Work has been received from the EOC/RMT – Verify the estimated finish time for the days work – Confirm changes in work locations – Check to confirm Food and Lodging arrangements 50 Safety First and Always
  8. Page 51 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 51 of 63 Methods of Lodging Notification Email 51 Safety First and Always
  9. Page 52 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 52 of 63 Correct ARCOS Crew Roster Example 52 Safety First and Always
  10. Page 53 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 1 Page 53 of 63 Daily Timesheet 53 Safety First and Always

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 07.pdf

Extracted from the file · 63 pages · 45,425 characters

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)