Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

Text of EOE-022 Attachment 01.pdf

Extracted from the file · 63 pages · 39,373 characters

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

  1. Page 11 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 11 of 45 ISNetworld Contractor Requirements 7.1.1 Contractors shall be subscribers of ISNetworld. 7.1.2 Contractors shall maintain an ISNetworld grade of “Approved”. This is demonstrated by sustaining a minimum of 70 within the ISNetWorld scoring matrix. 7.1.3 Contractor at-fault SIF-Actual (A), SIF-Potential (P), or Switching & Tagging incidents that occur on Eversource projects shall have an additional negative evaluation report on ISNetWorld scores. 7.1.3.1 SIF-A / SIF-P will be determined by Eversource classification standards based on industry Safety Classification & Learning (SCL) model. 7.1.3.2 Switching & Tagging errors will be classified per Eversource standards (see definition). 7.1.3.3 Prime-Contractors will be charged the negative variance for Sub-Contractor incidents. 7.1.3.4 Negative evaluation report scores will be on a rolling 12-month period
  2. Page 12 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 12 of 45 Key RESOURCES
  3. Page 13 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 13 of 45 ES device guide
  4. Page 14 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 14 of 45 Es arc flash & grounding
  5. Page 15 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 15 of 45 Storm safety briefings
  6. Page 16 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 16 of 45 Eversource storm websites External Facing Website Internal Storm Safety Sharepoint
  7. Page 17 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 17 of 45 Thank you
  8. Page 18 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 18 of 45 Contractor Expectations Safety First and Always
  9. Page 19 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 19 of 45 Monthly Forecast 3.0 – Requesting overhead Line Crews All crew types are listed. Crew type identified in request. Not limiting number of responses – City – State/Province – Crew count Example provided Safety First and Always
  10. Page 20 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 6 Page 20 of 45 Event Prestaging – Requesting overhead Line Crews Crews working on system (state specific) Crews available within Region (CT, MA, NH) Crews within 2-6 Hrs. MOB (location specific) – Request would be for an estimated start/response timeframe. Example. 0600 start MA, Saturday, April 11, 2025. – Asking for details of Crew Locations (Event Specific) – City – State/Province – Number of locations per form submission – Number of Crews Safety First and Always

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 07.pdf

Extracted from the file · 63 pages · 45,425 characters

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)