Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

Text of EOE-022 Attachment 01.pdf

Extracted from the file · 63 pages · 39,373 characters

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

  1. Page 11 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 11 of 45 ISNetworld Contractor Requirements 7.1.1 Contractors shall be subscribers of ISNetworld. 7.1.2 Contractors shall maintain an ISNetworld grade of “Approved”. This is demonstrated by sustaining a minimum of 70 within the ISNetWorld scoring matrix. 7.1.3 Contractor at-fault SIF-Actual (A), SIF-Potential (P), or Switching & Tagging incidents that occur on Eversource projects shall have an additional negative evaluation report on ISNetWorld scores. 7.1.3.1 SIF-A / SIF-P will be determined by Eversource classification standards based on industry Safety Classification & Learning (SCL) model. 7.1.3.2 Switching & Tagging errors will be classified per Eversource standards (see definition). 7.1.3.3 Prime-Contractors will be charged the negative variance for Sub-Contractor incidents. 7.1.3.4 Negative evaluation report scores will be on a rolling 12-month period
  2. Page 12 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 12 of 45 Key RESOURCES
  3. Page 13 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 13 of 45 ES device guide
  4. Page 14 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 14 of 45 Es arc flash & grounding
  5. Page 15 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 15 of 45 Storm safety briefings
  6. Page 16 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 16 of 45 Eversource storm websites External Facing Website Internal Storm Safety Sharepoint
  7. Page 17 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 17 of 45 Thank you
  8. Page 18 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 18 of 45 Contractor Expectations Safety First and Always
  9. Page 19 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 19 of 45 Monthly Forecast 3.0 – Requesting overhead Line Crews All crew types are listed. Crew type identified in request. Not limiting number of responses – City – State/Province – Crew count Example provided Safety First and Always
  10. Page 20 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 12 Page 20 of 45 Event Prestaging – Requesting overhead Line Crews Crews working on system (state specific) Crews available within Region (CT, MA, NH) Crews within 2-6 Hrs. MOB (location specific) – Request would be for an estimated start/response timeframe. Example. 0600 start MA, Saturday, April 11, 2025. – Asking for details of Crew Locations (Event Specific) – City – State/Province – Number of locations per form submission – Number of Crews Safety First and Always

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 07.pdf

Extracted from the file · 63 pages · 45,425 characters

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)