Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

Text of EOE-022 Attachment 01.pdf

Extracted from the file · 63 pages · 39,373 characters

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

  1. Page 21 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 21 of 63 Eversource External Mutual Aid Safety Onboarding Guide System Voltages: Grounded Wye, Unigrounded Wye, and Delta Primary Circuits – Each business entity within Eversource has its own distribution system voltage safety requirements and design considerations. Ask your owners representative and/or bird dog for circuit voltages and arc flash potential. ES PRIMARY DISTRIBUTION VOLTAGES PER COMPANY Company New E W Voltage Connecticut Hampshire Massachusetts Massachusetts 2,300 V Delta 2,160/3,740 V X X 2,400/4,160 V X X X X 4,800/8,320 V X X X X 4,800/8,320 V X Delta 7,200/12,470 V X 7,620/13,200 V X X 7,967/13,800 V X X X X 11,450 V X 13,200/22,860 V X X X 14,000/24,940 V X X 19,920/34,500 V X X X 26,558/46,000 V X 27,600 V Delta X External Resource Field Coordinator Training - Safety 21
  2. Page 22 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 22 of 63 Eversource External Mutual Aid Safety Onboarding Guide PPE: – – – – – – – Comply with required federally mandated OSHA requirements and to the normal safety practices and policies of your home organizations. All personnel on site must wear appropriate PPE High Visibility Traffic Vest (Class III) Hard Hat Safety Glasses EH Safety Footwear FR Clothing External Resource Field Coordinator Training - Safety 22
  3. Page 23 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 23 of 63 Eversource External Mutual Aid Safety Onboarding Guide PPE Continued: Rubber Gloves and Sleeves Requirements: • Minimum of Class II high voltage rubber gloves and rubber sleeves (or higher rated gloves and sleeves dependent upon the nominal system voltage exposures) are required to be worn at all times whenever an employee is exposed to conductors which may be energized or become energized (between 50 Volts to 35,000 Volts) while working aloft (i.e., aerial device, climbing, the Ground to Ground/Cradle to Cradle Rule). Any deviations must be approved by the Eversource Director of Safety or designee. • Handling of any normally energized primary conductors from the ground shall be performed with a live-line tool, unless the primary conductors are effectively grounded and a minimum of Class II gloves are worn. Secondary conductors shall be handled from the ground with a minimum of Class 2 rubber gloves. • Workers performing any switching (aloft or at ground level) using a live line tool and/or when performing stick work (hot sticking work aloft) at 34.5kV or below requires a minimum of Class II rubber gloves (and rubber sleeves while working aloft during Storm Restoration ****). External Resource Field Coordinator Training - Safety 23
  4. Page 24 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 24 of 63 Eversource External Mutual Aid Safety Onboarding Guide Use of Pole Banners: – Pole banners are intended as an informational work control barrier for highlighting energy isolation points while crews are working beyond a protective device on primary lines. – Other normal crew protections must also take place, such as removing the cutout door, lifting taps and grounding. – The banner alone is not a protection method and should never be treated as such. – Pole banners should be applied on the pole where the open device is located. – Qualified crews shall install the pole banners and information tags and they shall remain in place until the work is complete (for the day), all grounds have been removed and all workers and equipment are in the clear. – If a pole banner is applied at a work site, contact the person on the tag before starting any work. Use of Ground Flags: – A ground flag provides an observer, whether it be the crew on-site working the line or a crew in the area, an indication that grounds are installed. Ground flags provide a better visual and stand out to an observer more than just the grounds themselves. This is a good practice to remind the crew to remove grounds prior to releasing clearance and re-energizing the line. NEVER ENERGIZE A LINE WHILE A POLE BANNER IS STILL APPLIED AT AN ENERGY ISOLATION DEVICE External Resource Field Coordinator Training - Safety 24
  5. Page 25 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 25 of 63 Eversource External Mutual Aid Safety Onboarding Guide Maximo #: 565177 Maximo #: 565180 NEVER ENERGIZE A LINE WHILE A POLE BANNER IS STILL APPLIED AT AN ENERGY ISOLATION DEVICE External Resource Field Coordinator Training - Safety 25
  6. Page 26 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 26 of 63 Eversource External Mutual Aid Safety Onboarding Guide Managing Arc Flash Hazards: – If performing live line work, minimize arc flash hazards with: – – • • Appropriate FR clothing Personal Protective Equipment (PPE) Place an upstream automatic protective device in Hot Line Tag (HLT) or in Non-Reclose Mode if HLT is not available. Increase your distance from the energized parts through use of Live Line Tools. Distribution Switching & Tagging Requirements: – Energizing or de-energizing of nomenclature (numbered) – switches and three phase devices is done only under the supervision of an Eversource employee qualified on the authorize persons list. Outside utility crews and contractors can work with the approval of local Eversource management on portions of radial taps. The person in charge shall assume responsibility for opening all cutouts, disconnects, jumpers, taps, and other means through which KNOWN sources of electric energy may be supplied. External Resource Field Coordinator Training - Safety 26
  7. Page 27 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 27 of 63 Eversource External Mutual Aid Safety Onboarding Guide The placement of Clearance Tags does not imply that Grounds are installed. Visible breaks and Grounds are required under a Clearance when practicable. Placed on Limits in the open position for known sources. Ensure that a tagged device is not to be operated. Establish a Zone of Protection, which is isolated from all Known Sources of Voltage with visible breaks and Grounded where practical. – Equipment is tested for potential and grounded. Allows the application of the test potential with the Zone of Protection provided that all other Clearance Holders for that Zone of Protection have been released and express authorization from the System Operator is granted. . – An example of a Clearance Tag use is when minimum approach distances cannot be maintained. External Resource Field Coordinator Training - Safety 27
  8. Page 28 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 28 of 63 Eversource External Mutual Aid Safety Onboarding Guide External Resource Field Coordinator Training - Safety 28
  9. Page 29 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 29 of 63 Eversource External Mutual Aid Safety Onboarding Guide Permission Tags Are placed on limits in the open position. Allow the application of test potential within the Permission Zone, provided that all other Permission Holders for that Permission Zone have been released and express authorization from the System Operator is granted. Examples of Permission Tag uses include: Ensure that a tagged device will not be operated. Shall be used on a normally closed source device in the open position, which could be used on a normally open source device in the open position to establish a Permission Zone for work on lines or equipment using Live Line Work Methods. – Overhead repairs when switches are opened for emergencies. Conductors shall be treated as energized, using Live Line Work Methods. – For work that does not require Clearance Zone of Protection but requires equipment to be de-energized. External Resource Field Coordinator Training - Safety 29
  10. Page 30 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 30 of 63 Eversource External Mutual Aid Safety Onboarding Guide External Resource Field Coordinator Training - Safety 30

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)