Interrogatory responses
Answers to questions 21, 22
Files16
EOE-021_final.pdf
PDF · 89 KB · 1 pageText searchable
Download EOE-021_final.pdfRead the text of EOE-021_final.pdf
EOE-021 Attachment 1.pdf
PDF · 97 KB · 1 pageText searchable
Download EOE-021 Attachment 1.pdfRead the text of EOE-021 Attachment 1.pdf
EOE-021 Attachment 1.xlsx
Excel · 23 KBText searchable
Download EOE-021 Attachment 1.xlsxRead the text of EOE-021 Attachment 1.xlsx
EOE-022_final.pdf
PDF · 118 KB · 2 pagesText searchable
Download EOE-022_final.pdfRead the text of EOE-022_final.pdf
EOE-022 Attachment 01.pdf
PDF · 4.7 MB · 63 pagesText searchable
Download EOE-022 Attachment 01.pdfRead the text of EOE-022 Attachment 01.pdf
EOE-022 Attachment 02.pdf
PDF · 1.2 MB · 16 pagesText searchable
Download EOE-022 Attachment 02.pdfRead the text of EOE-022 Attachment 02.pdf
EOE-022 Attachment 03.pdf
PDF · 1.0 MB · 9 pagesText searchable
Download EOE-022 Attachment 03.pdfRead the text of EOE-022 Attachment 03.pdf
EOE-022 Attachment 04.pdf
PDF · 1.4 MB · 11 pagesText searchable
Download EOE-022 Attachment 04.pdfRead the text of EOE-022 Attachment 04.pdf
EOE-022 Attachment 05.pdf
PDF · 1.2 MB · 14 pagesText searchable
Download EOE-022 Attachment 05.pdfRead the text of EOE-022 Attachment 05.pdf
EOE-022 Attachment 06.pdf
PDF · 6.4 MB · 45 pagesText searchable
Download EOE-022 Attachment 06.pdfRead the text of EOE-022 Attachment 06.pdf
EOE-022 Attachment 12.pdf
PDF · 6.4 MB · 45 pagesText searchable
Download EOE-022 Attachment 12.pdfRead the text of EOE-022 Attachment 12.pdf
EOE-022 Attachment 11.pdf
PDF · 1.2 MB · 14 pagesText searchable
Download EOE-022 Attachment 11.pdfRead the text of EOE-022 Attachment 11.pdf
EOE-022 Attachment 10.pdf
PDF · 1.4 MB · 11 pagesText searchable
Download EOE-022 Attachment 10.pdfRead the text of EOE-022 Attachment 10.pdf
EOE-022 Attachment 09.pdf
PDF · 1.0 MB · 9 pagesText searchable
Download EOE-022 Attachment 09.pdfRead the text of EOE-022 Attachment 09.pdf
EOE-022 Attachment 08.PDF
PDF · 1.2 MB · 16 pagesText searchable
Download EOE-022 Attachment 08.PDFRead the text of EOE-022 Attachment 08.PDF
EOE-022 Attachment 07.pdf
PDF · 4.7 MB · 63 pagesText searchable
Download EOE-022 Attachment 07.pdfRead the text of EOE-022 Attachment 07.pdf
Text of EOE-022_final.pdf
Extracted from the file · 2 pages · 4,484 characters
Text of EOE-022 Attachment 01.pdf
Extracted from the file · 63 pages · 39,373 characters
Text of EOE-022 Attachment 02.pdf
Extracted from the file · 16 pages · 23,984 characters
Text of EOE-022 Attachment 03.pdf
Extracted from the file · 9 pages · 21,996 characters
Text of EOE-022 Attachment 04.pdf
Extracted from the file · 11 pages · 22,363 characters
Text of EOE-022 Attachment 05.pdf
Extracted from the file · 14 pages · 20,678 characters
Text of EOE-022 Attachment 06.pdf
Extracted from the file · 45 pages · 22,564 characters
Text of EOE-022 Attachment 12.pdf
Extracted from the file · 45 pages · 22,609 characters
Text of EOE-022 Attachment 11.pdf
Extracted from the file · 14 pages · 20,693 characters
Text of EOE-022 Attachment 10.pdf
Extracted from the file · 11 pages · 22,374 characters
Text of EOE-022 Attachment 09.pdf
Extracted from the file · 9 pages · 21,993 characters
Text of EOE-022 Attachment 08.PDF
Extracted from the file · 16 pages · 23,984 characters
Page 24 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 24 of 63 Eversource External Mutual Aid Safety Onboarding Guide Use of Pole Banners: – Pole banners are intended as an informational work control barrier for highlighting energy isolation points while crews are working beyond a protective device on primary lines. – Other normal crew protections must also take place, such as removing the cutout door, lifting taps and grounding. – The banner alone is not a protection method and should never be treated as such. – Pole banners should be applied on the pole where the open device is located. – Qualified crews shall install the pole banners and information tags and they shall remain in place until the work is complete (for the day), all grounds have been removed and all workers and equipment are in the clear. – If a pole banner is applied at a work site, contact the person on the tag before starting any work. Use of Ground Flags: – A ground flag provides an observer, whether it be the crew on-site working the line or a crew in the area, an indication that grounds are installed. Ground flags provide a better visual and stand out to an observer more than just the grounds themselves. This is a good practice to remind the crew to remove grounds prior to releasing clearance and re-energizing the line. NEVER ENERGIZE A LINE WHILE A POLE BANNER IS STILL APPLIED AT AN ENERGY ISOLATION DEVICE External Resource Field Coordinator Training - Safety 24Page 25 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 25 of 63 Eversource External Mutual Aid Safety Onboarding Guide Maximo #: 565177 Maximo #: 565180 NEVER ENERGIZE A LINE WHILE A POLE BANNER IS STILL APPLIED AT AN ENERGY ISOLATION DEVICE External Resource Field Coordinator Training - Safety 25Page 26 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 26 of 63 Eversource External Mutual Aid Safety Onboarding Guide Managing Arc Flash Hazards: – If performing live line work, minimize arc flash hazards with: – – • • Appropriate FR clothing Personal Protective Equipment (PPE) Place an upstream automatic protective device in Hot Line Tag (HLT) or in Non-Reclose Mode if HLT is not available. Increase your distance from the energized parts through use of Live Line Tools. Distribution Switching & Tagging Requirements: – Energizing or de-energizing of nomenclature (numbered) – switches and three phase devices is done only under the supervision of an Eversource employee qualified on the authorize persons list. Outside utility crews and contractors can work with the approval of local Eversource management on portions of radial taps. The person in charge shall assume responsibility for opening all cutouts, disconnects, jumpers, taps, and other means through which KNOWN sources of electric energy may be supplied. External Resource Field Coordinator Training - Safety 26Page 27 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 27 of 63 Eversource External Mutual Aid Safety Onboarding Guide The placement of Clearance Tags does not imply that Grounds are installed. Visible breaks and Grounds are required under a Clearance when practicable. Placed on Limits in the open position for known sources. Ensure that a tagged device is not to be operated. Establish a Zone of Protection, which is isolated from all Known Sources of Voltage with visible breaks and Grounded where practical. – Equipment is tested for potential and grounded. Allows the application of the test potential with the Zone of Protection provided that all other Clearance Holders for that Zone of Protection have been released and express authorization from the System Operator is granted. . – An example of a Clearance Tag use is when minimum approach distances cannot be maintained. External Resource Field Coordinator Training - Safety 27Page 28 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 28 of 63 Eversource External Mutual Aid Safety Onboarding Guide External Resource Field Coordinator Training - Safety 28Page 29 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 29 of 63 Eversource External Mutual Aid Safety Onboarding Guide Permission Tags Are placed on limits in the open position. Allow the application of test potential within the Permission Zone, provided that all other Permission Holders for that Permission Zone have been released and express authorization from the System Operator is granted. Examples of Permission Tag uses include: Ensure that a tagged device will not be operated. Shall be used on a normally closed source device in the open position, which could be used on a normally open source device in the open position to establish a Permission Zone for work on lines or equipment using Live Line Work Methods. – Overhead repairs when switches are opened for emergencies. Conductors shall be treated as energized, using Live Line Work Methods. – For work that does not require Clearance Zone of Protection but requires equipment to be de-energized. External Resource Field Coordinator Training - Safety 29Page 30 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 30 of 63 Eversource External Mutual Aid Safety Onboarding Guide External Resource Field Coordinator Training - Safety 30Page 31 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 31 of 63 Eversource External Mutual Aid Safety Onboarding Guide NRA Tags Placed on device(s) and/or associated supervisory controls to prevent automatic or manual line re-energization. May include enabling Hot Line Tag for Arc Flash Protection. An NRA tag and a Caution tag can be applied on the same device. An example of NRA tag use is when a breaker or equipment reclosing is off. External Resource Field Coordinator Training - Safety 31Page 32 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 32 of 63 Eversource External Mutual Aid Safety Onboarding Guide Caution Tags Indicate that a device should not be operated until the instructions documented on the Caution tag are complied with. May be placed on electrical apparatus in any position. Must not be used to establish a Zone of Protection. Can be applied on the same device with any other tag type. Must be used by the System Operator to track devices out of their normal configuration when ordered in switching. Examples of Caution Tag uses include: – To track System Operator Grounds in the field. – To indicate ground continuity through a closed disconnecting device. – To prevent operation of switching devices opened on precaution in support of work on another asset (network feeder put on the ground bus as a precaution, and so on). – To identify a device unsuitable for normal operation or to highlight special operating restrictions documented on the tag that must be complied with before device operation. External Resource Field Coordinator Training - Safety 32Page 33 of 63
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 33 of 63 Eversource External Mutual Aid Safety Onboarding Guide Traffic Control: – Temporary Traffic Control Plans (including signs, cones, Flaggers, etc.) shall meet the Manual on Uniform Traffic Control Devices (MUTCD). – Police Detail / Flagging. External Resource Field Coordinator Training - Safety 33
As listed on the current system
Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026