Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 22

Files16

Text of EOE-022_final.pdf

Extracted from the file · 2 pages · 4,484 characters

Text of EOE-022 Attachment 01.pdf

Extracted from the file · 63 pages · 39,373 characters

Text of EOE-022 Attachment 02.pdf

Extracted from the file · 16 pages · 23,984 characters

Text of EOE-022 Attachment 03.pdf

Extracted from the file · 9 pages · 21,996 characters

Text of EOE-022 Attachment 04.pdf

Extracted from the file · 11 pages · 22,363 characters

Text of EOE-022 Attachment 05.pdf

Extracted from the file · 14 pages · 20,678 characters

Text of EOE-022 Attachment 06.pdf

Extracted from the file · 45 pages · 22,564 characters

Text of EOE-022 Attachment 12.pdf

Extracted from the file · 45 pages · 22,609 characters

Text of EOE-022 Attachment 11.pdf

Extracted from the file · 14 pages · 20,693 characters

Text of EOE-022 Attachment 10.pdf

Extracted from the file · 11 pages · 22,374 characters

Text of EOE-022 Attachment 09.pdf

Extracted from the file · 9 pages · 21,993 characters

Text of EOE-022 Attachment 08.PDF

Extracted from the file · 16 pages · 23,984 characters

  1. Page 31 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 31 of 63 Eversource External Mutual Aid Safety Onboarding Guide NRA Tags Placed on device(s) and/or associated supervisory controls to prevent automatic or manual line re-energization. May include enabling Hot Line Tag for Arc Flash Protection. An NRA tag and a Caution tag can be applied on the same device. An example of NRA tag use is when a breaker or equipment reclosing is off. External Resource Field Coordinator Training - Safety 31
  2. Page 32 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 32 of 63 Eversource External Mutual Aid Safety Onboarding Guide Caution Tags Indicate that a device should not be operated until the instructions documented on the Caution tag are complied with. May be placed on electrical apparatus in any position. Must not be used to establish a Zone of Protection. Can be applied on the same device with any other tag type. Must be used by the System Operator to track devices out of their normal configuration when ordered in switching. Examples of Caution Tag uses include: – To track System Operator Grounds in the field. – To indicate ground continuity through a closed disconnecting device. – To prevent operation of switching devices opened on precaution in support of work on another asset (network feeder put on the ground bus as a precaution, and so on). – To identify a device unsuitable for normal operation or to highlight special operating restrictions documented on the tag that must be complied with before device operation. External Resource Field Coordinator Training - Safety 32
  3. Page 33 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 33 of 63 Eversource External Mutual Aid Safety Onboarding Guide Traffic Control: – Temporary Traffic Control Plans (including signs, cones, Flaggers, etc.) shall meet the Manual on Uniform Traffic Control Devices (MUTCD). – Police Detail / Flagging. External Resource Field Coordinator Training - Safety 33
  4. Page 34 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 34 of 63 Eversource External Mutual Aid Safety Onboarding Guide Incident Reporting and Analysis Contractors shall report any work-related incidents and near misses involving injury, illness, death, motor vehicle incident or damage, or property damage (public, Contractor, or Eversource) to the Eversource Representative immediately. Notwithstanding this requirement, the priorities are to ensure that any injured receive medical treatment and that the area has been made safe. Local safety or the on-call safety representative (if local is unavailable) shall be notified in addition to the Eversource Rep. – CT on-call: [phone removed] – MA on-call: [phone removed] – NH on-call: [phone removed] External Resource Field Coordinator Training - Safety 34
  5. Page 35 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 35 of 63 Eversource External Mutual Aid Safety Onboarding Guide Call an “All Stop” if you are unsure about a piece of equipment, work method, or have a safety concern. DO NOT PROCEED until clarity is provided or the appropriate/safe work method is determined. External Resource Field Coordinator Training - Safety 35
  6. Page 36 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 36 of 63 Eversource External Mutual Aid Safety Onboarding Guide Additional mutual aid documents are located at: https://www.eversource.com/content/ct-c/about/about-us/doingbusiness-with-us/builders-contractors/electric-contractor-safetyrequirements/electric-mutual-aid-safety-onboarding External Resource Field Coordinator Training - Safety 36
  7. Page 37 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 37 of 63 Eversource External Mutual Aid Safety Onboarding Guide Questions ??? External Resource Field Coordinator Training - Safety 37
  8. Page 38 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 38 of 63 Module 2 External Resource Field Coordinator and Crew Guide Training 38 Safety First and Always
  9. Page 39 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 39 of 63 Module 2 Agenda External Resource Field Coordinator and Crew Guide Training – ERFC & Crew Guide roles based on Incident Command System (ICS) ORG – Communicating with to Contractor Caller – ARCOS Crew Manager & Food & Lodging – Collecting signed timesheets & daily work logs 39 Safety First and Always
  10. Page 40 of 63

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-022 Attachment 7 Page 40 of 63 Definition ERFCs / Crew Guides coordinate the activities of the crews assigned to them. They communicate the restoration strategy to the crews and provide them with logistical details concerning food and lodging. They provide two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the Restoration Management Team (RMT) and field crews. The difference between ERFCs and Crew Guides is ERFCs are ESOP-100 APL (Authorized Persons List) Qualified person and can hold clearances for contractors. Crew Guides are not on the APL. Note, ERFC must be ESOP99 Qualification #5 to perform switching 40 Safety First and Always

As listed on the current system

Question(s) Answered 21, 22 (CL&P dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)