Interrogatory responses
Answers to questions 26, 27, 34, 35
Files9
EOE-026_final.pdf
PDF · 112 KB · 1 pageText searchable
Download EOE-026_final.pdfRead the text of EOE-026_final.pdf
EOE-026 Attachment 2.pdf
PDF · 74 KB · 1 pageText searchable
Download EOE-026 Attachment 2.pdfRead the text of EOE-026 Attachment 2.pdf
EOE-026 Attachment 2.xlsx
Excel · 23 KBText searchable
Download EOE-026 Attachment 2.xlsxRead the text of EOE-026 Attachment 2.xlsx
EOE-027_final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-027_final.pdfRead the text of EOE-027_final.pdf
EOE-034_final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-034_final.pdfRead the text of EOE-034_final.pdf
EOE-034 Attachment 1.pdf
PDF · 3.4 MB · 457 pagesText searchable
Download EOE-034 Attachment 1.pdfRead the text of EOE-034 Attachment 1.pdf
EOE-034 Attachment 1.xlsx
Excel · 4.2 MBText searchable
Download EOE-034 Attachment 1.xlsxRead the text of EOE-034 Attachment 1.xlsx
EOE-035_final.pdf
PDF · 84 KB · 1 pageText searchable
Download EOE-035_final.pdfRead the text of EOE-035_final.pdf
EOE-035 Attachment 1 REDACTED.pdf
PDF · 3.5 MB · 263 pagesText searchable
Download EOE-035 Attachment 1 REDACTED.pdfRead the text of EOE-035 Attachment 1 REDACTED.pdf
Text of EOE-027_final.pdf
Extracted from the file · 1 page · 1,715 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-034 Page 1 of 1 Date Filed: August 14, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM-DETAILED EXPENSES) Refer to Exhibit ACCT-2 Excel spreadsheets. Provide consolidated Excel spreadsheet(s) detailing the costs included within the Exhibit ACCT-2 tabs for each storm event with an additional column that captures the applicable storm reference (i.e., Labor by Empl. Title, Materials, Outside Contractors-Vendors, etc.). EOE requests that all storm events for each category be included on the same tabs in a structured manner to allow for all recovery amounts to be more easily analyzed. Response: Please refer to EOE 034, Attachment 1, for the requested consolidated details of cost within the Exhibit ACCT-2. While preparing this response, the Company determined that Exhibit ACCT-2 (CLP-3) (MS24C) is carrying the wrong subtotal for the P-Card expenses. The P-Card transaction detail correctly total $169, 358 as shown on page 48 of 58 but the subtotal on Page 1 of 58 in Exhibit ACCT-2 (CLP-3) (MS24C) and on Page 1 of 4 in Exhibit ACCT-1 (Summary) incorrectly show $166,252, The Company will correct this error in a future update.
Text of EOE-034 Attachment 1.pdf
Extracted from the file · 457 pages · 7,386,865 characters
Text of EOE-034 Attachment 1.xlsx
Extracted from the file
Text of EOE-035_final.pdf
Extracted from the file · 1 page · 1,104 characters
Text of EOE-035 Attachment 1 REDACTED.pdf
Extracted from the file · 263 pages · 1,403,664 characters
As listed on the current system
Question(s) Answered 26, 27, 34, 35 (CL&P dba Eversource Energy) Date Filed: 08/14/2026